Files
knowledge-wiki/channels/1532415849762127902.md
T

959 lines
283 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# vssa-storm
_Last sync: 2026-08-21 04:13 UTC_
## CVP IS instructor lesson 3 — organization/client data (2026-08-19)
- Designated instructor `476287310627864587` taught the organization-search entry point: `https://viesiejipirkimai.lt/epps/prepareAdvancedSearch.do?type=org`, with form fields `viewMode=&selectable=&within=template.group.ca&name=<client name or fragment>&shortName=&city=&street=`.
- Organization results expose basic organization/contact information. After identity-checking the intended legal entity, open `prepareViewCAOrganisation.do?id=<organization id>` for its profile, then use the profile-derived `authorityId` and `orgGroupId` with `notices/viewPublishedNotices.do?authorityId=<...>&orgGroupId=<...>` to enumerate that organization's published procurements. Instructor example: LITGRID profile `id=1159`, published-notices tuple `authorityId=1159&orgGroupId=1160`.
- Exact legal-name identity remains mandatory; partial `name` searches are discovery only. Organization/contact and published-notice metadata do not by themselves prove a system, contractor, award, signed contract, delivery, hosting, production use or completion.
## Executive presentation — channel work (2026-08-19)
- Built a nine-slide English executive briefing using the official VSSA PowerPoint template. Final revision: `/opt/data/2026-08-19-vssa-clients-systems-intelligence-executive-briefing-1.0.1.pptx`.
- The story covers the executive thesis, registry asset model, current coverage, research engine, evidence controls, executive value, human-guided learning loop and a concrete executive decision. Claims are bounded to the current validated state: `290` clients, `522` canonical systems, `747` observations, `110` commercial contractor cards and statuses `79 researched / 196 partial / 15 no-public-evidence / 0 pending`.
- Completed three visual-QA cycles plus independent fresh-eyes review. Corrections included slide 6 body-text containment, less technical executive language, removal of repeated metrics from slide 3, clearer coverage wording, stronger footers, and an explicit closing ask to name an executive sponsor and select three priority research questions for the next 90 days. Final package checks passed: `9` slides, `9` fade transitions, `140` ZIP members, no duplicates, no out-of-bounds shapes, no empty text boxes/placeholders and retained VSSA theme/master parts. Final full-deck and focused slide rechecks found no delivery-blocking overlap or clipping.
- Final SHA-256: `27367d5323f2f1ab7511f944043bce86e07aa9843cf951f17b0d957a7affd0e8`. Contact-sheet preview: `/opt/data/2026-08-19-vssa-clients-systems-intelligence-executive-briefing-1.0.1-preview.png`.
## Entity-classification correction — VSSA (2026-08-19)
- RootAtSkic clarified that **Valstybės skaitmeninių sprendimų agentūra (VSSA)** is Lithuania's central/root government digital-solutions agency—not a system or contractor. It may operate shared services and itself have systems and commercial contractors.
- VSSA already exists correctly as **Client `036`**. The derived contractor parser was corrected to preserve VSSA's public-service relationships as observation text while excluding the agency from `CTR-*` extraction and contractor links. Its erroneous `CTR-02AF47629A` route is no longer generated.
- The regenerated local site retains the Client `036` dossier and removes the VSSA contractor route. Registry totals are now `290` clients, `521` systems, `746` observations and `110` contractor cards; commercial contractor links are complete at `212` Client→contractor and `212` System→contractor relationships.
- All `16` tests, full validation, type checking, production build, registry/generated-route checks and `git diff --check` passed. Documentation commit `6fe5e4425668b3958b231b8828027f12f95b9ef9` is on `main`; exact-head Actions task `1293` succeeded, including Pages publication, with remote ref equality and authenticated source readback verified. Public routes reach the expected OAuth `302`; authorized deployed page-body readback was unavailable.
- The reusable classification rule was added to the Gitea-backed `vssa-clients` skill: classify entities before `CTR-*` extraction; government client bodies do not become contractors merely by operating or centrally providing shared services. Skill commit `d744fb0efac8fa801a0db51ed21052b5262f58e1` passed validation, remote readback, ref equality and exact-head Actions task `1294`.
## CVP IS instructor lesson 2 — result details (validated 2026-08-19)
- The search result's **Pirkimo ID** is the procurement `resourceId`. For each retained result, open three public routes: `prepareViewCfTWS.do?resourceId=...` for detailed order metadata, `viewContractNotices.do?resourceId=...` for notices and summary-PDF links, and `listContractDocuments.do?resourceId=...` for procurement attachments.
- Live validation used instructor example `resourceId=9279980`. All three routes returned HTTP `200` HTML for LITGRID AB (PV), **Vertybinių popierių apskaita (skelbiama apklausa be derybų)**. The order page exposed buyer, procedure, CPV, dates and duration; the notices page exposed one published notice; the documents page exposed a conditions ZIP (`documentId=9280091`) and tender-structure XML (`documentId=9280218`).
- The notice link returned a valid four-page, 2,029,056-byte `application/pdf` with extractable buyer/procedure text. Some document links use `href="#"` plus JavaScript anonymous-download handlers carrying `documentId`; parsers must recover that action rather than treating the attachment as missing or inventing a direct URL.
- The authoritative `vssa-clients` skill now requires opening all three result-detail routes and retains strict document/stage semantics. Commit `ebc9f1641ff3455d16901a4332b2f25b93c3f3f4` is on `main`; local/remote equality, remote readback and skill validation passed.
## CVP IS instructor lesson 1 — basic search (validated 2026-08-19)
- Designated instructor `476287310627864587` taught the basic advanced-search route at `viewCFTSAction.do`: use `mode=search`, `isFTS=true`, `type=cftFTS`, `isPopup=false`, and the actual query key `contractAuthority=<URL-encoded client name>`, leaving other form filters empty unless intentionally applied.
- Live validation used VSSA client `Lietuvos Respublikos Vyriausybės kanceliarija`. Both the exact name and partial `Vyriausybės kanceliarija` returned HTTP `200` HTML with `39` total results; the first page contained `10` rows whose authority cells showed the exact full legal name, including IT-relevant procurement titles.
- Operational rule: search the exact legal name first; partial names are discovery fallbacks only. Parse complete rows and all pages, identity-check each contracting-authority cell, and treat the result table as discovery metadata. Open and classify the procurement body/attachment before mapping any system, supplier, contract, delivery, hosting or completion claim.
- The authoritative Gitea-backed `vssa-clients` skill now documents the validated route in `SKILL.md` and `references/cvp-is-organization-route.md`. Commit `9de0e702f44797a63f995ffd4fe3e0f408a092a7` is on `main`; local/remote equality, authenticated remote readback and skill validation passed.
## Latest documentation delivery — 2026-08-18 17:15 UTC
- Doubled the desktop right-side page table-of-contents panel from `10rem` (`160px`) to `20rem` (`320px`) at viewports `1280px` and wider. The existing `997`–`1279px` rule still hides the secondary table of contents to preserve article width.
- Updated the layout regression test to require both `flex-basis` and `max-width` at `20rem`. All `15` tests, full validation, production build and `git diff --check` passed; the build verified `290` client, `520` system and `111` contractor routes, `745` observations and `296` raw artifacts.
- Commit `3fc30f514db8d6ea0b2a69263dd66d4847b60cf2` is on `main`; local/remote ref equality and authenticated exact-SHA CSS readback passed. Exact-head Gitea Actions task `1263` reached `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized page-body readback and browser acceptance were unavailable because this runtime has no service-proxy client and could not launch Chrome.
## Latest scheduled rotation — 2026-08-23 11:42 UTC
- Completed the explicitly assigned ordered review of clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the ordered cursor.
- Reopened all `71` distinct current evidence URLs with browser-equivalent requests; every source returned HTTP `200`. Ran `52` exact CPVA client/system searches and `52` contractor/procurement query ladders; broad token matches and noisy search output remained discovery only.
- Repeated both CVP IS discovery routes. Basic search retained `47` exact-authority rows and `11` broad candidates. Organization-first discovery reviewed `20` identity-checked current/variant profiles, preserved both Vilniaus teatras „Lėlė“ profiles, excluded the near-name collision for client `117`, and parsed `197` notice rows including `54` broad candidates without forcing near-name identities.
- Re-downloaded and text-extracted all `12` currently cited CVP IS PDFs, confirming four tender notices and eight award notices. The `11` cited resources exposed `30` public detail routes and three login redirects; no claim was based on an inaccessible body.
- This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, `62` observation rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and index dates advanced to `2026-08-23`.
- Validation passed: `16` tests, registry validation, `corepack`-managed pnpm validation, TypeScript, production build, raw-artifact publication checks and `git diff --check`. The build verified `290` client, `524` system and `111` contractor routes, `749` observations and `296` raw artifacts. Browser-equivalent local HTTP checks passed for the homepage, client `110`, Systems, Contractors and the raw Markdown route; Chrome could not be launched in this runtime.
- Documentation commit `ffe0378e13a7f6f49d4ed6d5646250d1c4c6dcbb` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1337`, run `108` (`build`), reached `success`, including Pages publication. Public Pages returned the expected OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no `/gondor-v1-gitea-pages` mount, `microk8s`, or `kubectl` service-proxy client.
- The synchronized channel state contains no instructor guidance newer than CVP IS lesson 3. This run established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-21 08:12 UTC
- Completed the explicitly assigned ordered review of clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the ordered cursor.
- Reopened the assigned dossiers and all `71` distinct current evidence URLs (`81` dossier URL occurrences) with browser-equivalent requests; all opened successfully in the `requests` verification pass. Ran `52` exact CPVA client/system searches and `52` client/system contractor/procurement query ladders; broad token matches and noisy search output remained discovery only.
- Repeated both CVP IS discovery routes. Basic search retained `47` exact-authority rows and four broad IT/digital candidates. Organization-first discovery reviewed `20` identity-checked current/variant profiles across `19` clients, preserved both Vilniaus teatras „Lėlė“ profiles, excluded the near-name collision for client `117`, and parsed `212` current notice rows.
- Re-downloaded and text-extracted all `12` previously cited CVP IS PDFs, confirming four tender notices and eight award notices. The current order/notice-list/document-route pass kept `30` detail routes accessible and identified three anonymous routes that redirected to login; no claim was based on an inaccessible body.
- One defensible evidence update was published for client `110`: a new official CVP IS open-tender notice published `2026-08-20` replaces the older `2026-06-15` notice as the current evidence that VDI plans to procure Potencialiai pavojingų įrenginių valstybės registras maintenance and modification. The opened four-page notice names VDI, the register, programming/consulting/training scope, a planned `37`-month term and estimated EUR `45,000` value. It remains classified strictly as intended procurement; no selected supplier, signed contract, delivery, hosting or production release was inferred. The other nineteen clients produced conservative no-new-claim outcomes, and existing rows, statuses, confidence, aliases, gaps and explicit unknowns were preserved.
- Registry state remains `290` clients, `524` canonical systems, `749` observations and `111` contractor cards; statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- Under checksum-verified Node `22.23.2`, all `16` tests, `corepack pnpm validate`, `corepack pnpm build`, registry/type/generated-route/raw-artifact checks, six-column validation and `git diff --check` passed. Browser-equivalent local HTTP readback verified the changed client page, canonical system page, system and contractor directories, and raw client artifact.
- Documentation commit `2e38a142b5e15a3075444dcb336ea5d0c8fd8157` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1336` (`build`) reached `success`, including Pages publication. Public Pages returned the expected OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no Pages service-proxy client.
- The synchronized channel state contained no instructor guidance newer than CVP IS lesson 3. This run established no new reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-21 06:11 UTC
- Followed the durable wiki cursor and completed the next ordered review of clients `121`–`140`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the ordered sequence.
- Reopened all `70` distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP `200` content. Ran `41` exact CPVA client/system searches and `41` contractor/procurement query ladders; broad CPVA token matches and search-engine output remained discovery only.
- Repeated both CVP IS discovery routes. Basic search retained `220` exact-authority rows and `34` broad IT/digital candidates. Organization-first discovery reviewed `20` identity-checked current/variant profiles, including the documented successor/typography variants for clients `130`, `134` and `136`, and parsed all `505` notice rows with `72` broad candidates without forcing near-name identities.
- Re-downloaded and text-extracted all `16` currently cited CVP IS PDFs, confirming `15` tender notices and one award notice. All `48` order, notice-list and procurement-document detail routes returned inspected HTTP `200` bodies without login redirection. Existing patient-turning, social-care-system, PAIS, IP-telephony, satellite-broadband, video/security, Šeimos kortelė, SGLEP, SOPAS, legal-information and staff-call observations remain bounded to the document stages already represented.
- This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and index dates advanced to `2026-08-21`.
- Registry state remains `290` clients, `524` canonical systems, `749` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `213` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- Under checksum-verified Node `22.23.2`, all `16` tests, `corepack pnpm validate`, `corepack pnpm build`, registry/type/generated-route/raw-artifact checks, assigned six-column/date checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `121`, `130` and `140`, both registries and client `130`'s raw artifact.
- Documentation commit `c9c20e87d9f7f95e607b85bac2a7bc140fcb04af` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1335` (`build`) reached `success`, including Pages publication. Public Pages returned the expected OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no `/gondor-v1-gitea-pages` mount or Kubernetes service-proxy client.
- The synchronized channel state contains no instructor guidance newer than CVP IS lesson 3. This run established no new reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified.
- Next ordered dossier rotation: `141`–`160`.
### Previous scheduled rotation — 2026-08-21 04:13 UTC
- Completed the explicitly assigned ordered review of clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
- Reopened all `70` distinct current dossier URLs with browser-equivalent requests and inspected HTTP `200` content. Ran `52` exact CPVA client/system searches and `52` client/system contractor/procurement query ladders; noisy search results and broad CPVA token matches remained discovery only.
- Repeated both CVP IS discovery routes. Basic search retained `47` exact-authority rows and `11` broad IT/digital candidates. Organization-first discovery reviewed `20` identity-checked current/variant profiles across `19` clients, preserved both Vilniaus teatras „Lėlė“ profiles, excluded the near-name collision for client `117`, and parsed `197` notice rows including `54` broad candidates.
- Re-downloaded and text-extracted all `11` previously cited CVP IS PDFs across `10` resources, confirming four tender notices and seven award notices. All `30` detail-route requests returned HTTP `200`; `27` opened the public body and the three routes for resource `108142` redirected to login, so no claim was derived from those metadata views.
- Added one stronger body-supported claim to client `110`. The opened award notice identifies **UAB Tilde informacinės technologijos** as winner and supplier of VDI's AI-based organization-information search and content-creation assistant under contract `2045`, signed `2025-01-07` for `EUR 60,500`. The existing `Organizacijos pagalbininkas` system identity was preserved; a separate 2026 open maintenance tender still does not establish a selected maintenance supplier.
- Registry state remains `290` clients, `524` canonical systems and `749` observations; contractor cards increased from `110` to `111`. Client→contractor and System→contractor links increased from `212` to `213` and remain complete. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- Under checksum-verified Node `22.23.2`, all `16` tests, `corepack pnpm validate`, `corepack pnpm build`, registry/type/generated-route/raw-artifact checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified client `110`, its canonical system page, the new `CTR-3ECBB8DFD1` contractor card, both registries and the raw client artifact. The Chrome harness could not launch.
- Documentation commit `29140246ab4eeeed735606ddad177ed5f1e64e04` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1334` (`build`) reached `success`, including Pages publication. Public Pages returned the expected OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no `/gondor-v1-gitea-pages` mount or Kubernetes service-proxy client.
- The latest `100` live Discord messages contained no instructor guidance newer than CVP IS lesson 3. This run established no new reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-21 02:08 UTC
- Completed the explicitly assigned ordered review of clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
- Reopened all `81` distinct current dossier URLs with browser-equivalent requests and inspected HTTP `200` content. Ran `52` exact CPVA client/system searches and `52` client/system contractor/procurement query ladders; noisy external-search output was time-boxed and not treated as evidence.
- Repeated both CVP IS discovery routes. Basic search retained `47` exact-authority rows and four broad candidates. Organization-first discovery identity-checked `18` clients across `19` profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, and reviewed `221` notice rows including `30` broad IT/digital candidates without forcing near-name identities.
- Re-downloaded and text-extracted all `11` cited CVP IS PDFs across `10` resources. Their bodies remain correctly classified as four tender notices and seven award notices. All `30` detail-route requests returned HTTP `200`; `27` opened the public order/notice/document body and three for resource `108142` redirected to the CVP IS login, so no claim was derived from those three metadata views.
- This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps, explicit unknowns and already-current `2026-08-21` dates were preserved; no empty documentation commit was created.
- All `16` tests, registry validation, type checking, production build, generated-route/raw-artifact checks and `git diff --check` passed under checksum-verified Node `22.23.2`; the requested `corepack pnpm` path was unavailable and the host Node `26.5.1` made `npm` segfault, so repository-equivalent validation/build ran with the pinned Node 22 runtime. Browser-equivalent local HTTP marker checks passed for clients `101`, `110` and `120`, both registries and client `110`'s raw artifact; Chrome could not be launched.
- Registry state remains `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Documentation `main` remains exactly equal to remote commit `748d6b2f34eb288c2560a9a1a7f7fd657b5abea2`; authenticated exact-SHA source readback passed and exact-head Actions task `1333` remains `success`, including Pages publication.
- Public Pages returned the expected OAuth `302`. Authorized deployed page-body readback remained unavailable because this runtime has no `/gondor-v1-gitea-pages` mount or Kubernetes service-proxy client, so no content claim was made from the login response. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified.
- The synchronized wiki still contains CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-21 00:10 UTC
- Completed the explicitly assigned ordered review of clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
- Reopened all `81` distinct current dossier URLs with browser-equivalent requests and inspected HTTP `200` content. Ran `52` exact CPVA client/system searches and `52` client/system contractor/procurement query ladders; noisy external-search results were time-boxed and not treated as evidence.
- Repeated both CVP IS discovery routes. Basic search retained `47` exact-authority rows and four broad candidates. Organization-first discovery identity-checked `18` clients across `19` profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, and reviewed `221` notice rows including `30` broad IT/digital candidates without forcing near-name identities.
- Re-downloaded and text-extracted all `11` cited CVP IS PDFs across `10` resources. Their bodies remain correctly classified as four tender notices and seven award notices. All `30` detail-route requests returned HTTP `200`; `27` opened the public order/notice/document body and three for resource `108142` redirected to the CVP IS login, so no claim was derived from those three metadata views.
- This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and index dates advanced to `2026-08-21`.
- All `16` tests, registry validation, type checking, production build, generated-route/raw-artifact checks and `git diff --check` passed. Local browser-equivalent HTTP marker checks passed for clients `101`, `110` and `120`, both registries and client `110`'s raw artifact. Registry state remains `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. `corepack pnpm` was attempted but unavailable, so repository-equivalent `npm run validate` and `npm run build` completed successfully.
- Documentation commit `748d6b2f34eb288c2560a9a1a7f7fd657b5abea2` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1333` / run `104` (`build`) reached `success`, including the workflow's Pages publication step. Public Pages resolved to the Keycloak/OAuth login boundary; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client, so no content claim was made from the login response.
- Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. The synchronized wiki still contains CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-20 22:05 UTC
- Completed the explicitly assigned ordered review of clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
- Reopened all `81` distinct current dossier URLs with browser-equivalent requests and inspected HTTP `200` content. The Microsoft Bookings URL now redirected to its current `bookings.cloud.microsoft` page at HTTP `200`. Ran `52` exact CPVA client/system searches and `52` client/system contractor/procurement query ladders; noisy external-search results were time-boxed rather than treated as evidence.
- Repeated both CVP IS discovery routes. Basic search retained `47` exact-authority rows and four broad candidates. Organization-first discovery identity-checked `18` clients across `19` profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, and reviewed `221` exposed notice rows including `30` broad IT/digital candidates without forcing near-name identities.
- Re-downloaded and text-extracted all `11` cited CVP IS PDFs across `10` procurement resources. Their bodies remain correctly classified as four tenders and seven award notices. All `30` order, notice-list and procurement-document detail routes returned inspected HTTP `200`; no search row or infrastructure/equipment lead was promoted beyond the body-supported stage.
- This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing `2026-08-20` dates, statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved.
- All `16` tests, registry validation, type checking, production build, generated-route/raw-artifact checks and `git diff --check` passed. Browser-equivalent local HTTP marker checks passed for clients `101`, `110` and `120`, both registries and client `110`'s raw artifact. Registry state remains `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. `corepack pnpm` was attempted but unavailable, so repository-equivalent `npm run validate` and `npm run build` completed successfully.
- No documentation source changed, so no empty commit was created. Documentation `main` remains exactly equal to remote commit `f877fcc41f9510c16c6c99e15a07b892d07f78ae`; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1324` (`build`) remains `success`, including Pages publication. Public Pages returned the expected OAuth `302`, proving the authentication boundary rather than page content; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client.
- Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. The synchronized wiki still contains CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-20 20:09 UTC
- Completed the ordered review of clients `101`–`120` from the job's stated durable cursor after `081`–`100`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
- Reopened all `70` distinct current dossier URLs with browser-equivalent requests: `69` returned inspected HTTP `200`, while the already documented Microsoft Bookings endpoint retained its automation-specific `417`. All `11` cited CVP IS PDFs were re-downloaded, verified as PDFs and text-extracted; their bodies continue to support the existing tender versus award/contract classifications.
- Ran `54` de-duplicated exact CPVA client/system searches and `62` per-observation contractor/procurement query ladders, and repeated both CVP IS discovery routes. The basic route retained `55` exact-authority rows. Organization-first discovery identity-checked `19` clients across `20` profile records, preserving both unresolved Vilniaus teatras Lėlė profiles, and reviewed `214` exposed notice rows without forcing a near-name identity.
- A newly published `2026-08-20` open-tender notice for Potencialiai pavojingų įrenginių registro maintenance and modification was opened and classified from its four-page body. It states a planned EUR 45,000 open procurement covering programming, consulting and training, with offers due `2026-09-02`; it names no selected supplier or signed contract and adds no stronger dossier claim than the already represented planned procurement. Other surfaced rows were already represented, outside system/service scope, or tender-stage/infrastructure leads. This was a genuine conservative no-new-claim review; current `2026-08-20` dates, statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved.
- All `16` tests, registry validation, type checking, production build, generated-route/raw-artifact checks and `git diff --check` passed. Local browser-equivalent HTTP marker checks passed for clients `101`, `110` and `120`, both registries and client `110`'s raw artifact. Registry state remains `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. `corepack pnpm` was attempted but unavailable, so repository-equivalent `npm run validate` and `npm run build` completed successfully.
- No documentation source changed, so no empty commit was created. Documentation `main` remains exactly equal to remote commit `f877fcc41f9510c16c6c99e15a07b892d07f78ae`; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1324` (`build`) remains `success`, including Pages publication. The public Pages request redirected to Keycloak and returned the login page, proving the authentication boundary rather than changed page content; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client, and Chrome could not be launched.
- Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. The synchronized wiki still contains CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-20 18:07 UTC
- Completed the explicitly assigned ordered review of clients `101`–`120`, using the job's stated durable cursor after `081`–`100`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
- Reopened all `81` current dossier evidence occurrences with inspected browser-equivalent HTTP `200`, ran `52` exact CPVA client/system searches and `52` client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. Exact-authority basic search retained `47` byte-exact authority rows and four broad candidates. Organization-first discovery retained `19` identity-checked profiles and reviewed `221` exposed notice rows, including `30` broad IT/digital candidates; no near-name identity was forced.
- Existing direct bodies continue to support the current systems, contractors and bounded procurement-stage semantics. Newly surfaced discovery rows were either already represented, outside the information-system/service scope (for example, projector and drainage procurements), or tender-stage/infrastructure leads that did not establish a defensible new dossier claim. This was a genuine no-new-claim review, not a skipped search; the already current `2026-08-20` dossier and index check dates, statuses, rows, confidence and gaps were preserved.
- Validation and production build passed: `16` tests, registry validation, type checking, Docusaurus build, generated route/raw-artifact checks and `git diff --check`. Registry state is `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor link coverage remains complete at `212` each. `corepack pnpm` was attempted but unavailable, so the repository-equivalent `npm run validate` and `npm run build` scripts were executed successfully.
- No documentation source changed, so no empty commit was created. Documentation `main` remains exactly equal to remote commit `f877fcc41f9510c16c6c99e15a07b892d07f78ae`; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1324` (`build`) remains `success`, including Pages publication. Public Pages reached the expected Keycloak/OAuth `302`; authorized deployed page-body readback and browser acceptance were unavailable because this runtime has no service-proxy client and Chrome could not be launched. A representative built client route passed local HTTP marker checks.
- Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. The synchronized wiki contained CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-20 16:12 UTC
- Completed the next durable ordered review of clients `141`–`160`, following the wiki's latest completed `121`–`140` range; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
- Reopened all `77` current dossier evidence occurrences (`59` distinct URLs) with inspected browser-equivalent HTTP `200`, ran `65` exact CPVA client/system searches and `65` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. It retained `19` exact profiles, forced no near-name profile for client `155`, and reviewed all `324` exposed notice rows, including `134` broad IT/digital candidates.
- Reopened all currently cited direct evidence bodies successfully. The three Pirkimo-ID detail routes were also retried for all `16` cited resources, but the portal returned uniform HTTP `500`; no claim was derived from those unavailable metadata views. Existing VTAIS, Vektra, Avilys, ArcGIS, seabed/marine-cartography, VSS IS, ULSVIS/VSSIS, competency-platform, VAPRIS/VPREG, RSC GIP, MetaSystems and RADIS evidence remains bounded to the procurement stages established by the opened direct bodies.
- This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to `2026-08-20`.
- Registry state remains `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was attempted but unavailable, so repository-equivalent `npm run validate` and `npm run build` scripts were used. Browser-equivalent local HTTP readback verified clients `141`, `150` and `160`, both registries and client `141`'s raw artifact.
- Documentation commit `f877fcc41f9510c16c6c99e15a07b892d07f78ae` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1324` / run `103` (`build`) reached `success`, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `161`–`180`.
### Previous scheduled rotation — 2026-08-20 14:06 UTC
- Completed the next durable ordered review of clients `121`–`140`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
- Reopened all `70` current dossier evidence URLs with inspected browser-equivalent HTTP `200`, ran `40` exact CPVA client/system searches and `40` client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. Exact-authority basic search returned `462` complete rows (`450` byte-exact authority matches and `46` broad IT/digital candidates). Organization-first discovery retained `20` identity-checked profiles and reviewed all `505` exposed notice rows, including `70` broad candidates; punctuation/case variants for clients `126`, `134` and `136` remained bounded and no near-name identity was forced.
- Reopened all three public Pirkimo-ID detail routes for the `16` procurement resources currently cited across the range (`48/48` HTTP `200`). Existing PAIS award evidence and patient-turning, software, social-care-system, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call tender evidence remain correctly bounded to the document stages already represented.
- This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved. Dossier and index dates were already `2026-08-20`, so the completed review produced no source diff and no empty commit was created.
- Registry state remains `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, all assigned URL checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was attempted but unavailable, so the repository-equivalent `npm run validate` and `npm run build` scripts were used. Browser-equivalent local HTTP readback verified clients `121`, `130` and `140`, both registries and client `130`'s raw artifact.
- Documentation `main` remains exactly equal to remote commit `ccc162cf95e5c790439720c43c29a08c7cf78158`; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1309` (`build`) remains `success`, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `141`–`160`.
### Previous scheduled rotation — 2026-08-20 12:07 UTC
- Completed the explicitly assigned ordered review of clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
- Reopened all `81` current dossier evidence occurrences with inspected browser-equivalent HTTP `200`, ran `52` exact CPVA client/system searches and `52` client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. Exact-authority basic search retained `47` byte-exact authority rows and four broad candidates. Organization-first discovery retained `19` identity-checked profiles and reviewed all `221` exposed notice rows, including `30` broad IT/digital candidates, without forcing near-name identities.
- Reopened all `11` currently cited direct CVP IS notice PDFs at HTTP `200` and preserved their body-classified tender/award semantics. The three public Pirkimo-ID detail routes returned a uniform portal-side HTTP `500` during this run, so no claim was derived from those unavailable metadata views and the opened direct notice bodies remained the evidence. Existing systems, contractors, procurement stages, confidence, aliases and explicit unknowns remain supported.
- This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Dossier and index dates were already `2026-08-20`, so the completed review produced no source diff and no empty commit was created.
- Registry state remains `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, all assigned URL checks and `git diff --check` passed. `corepack pnpm` was attempted but unavailable, so the repository-equivalent `npm run validate` and `npm run build` scripts were used. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120` plus both registries; the Chrome harness could not launch a supported browser.
- Documentation `main` remains exactly equal to remote commit `ccc162cf95e5c790439720c43c29a08c7cf78158`; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1309` (`build`) remains `success`, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-20 10:04 UTC
- Completed the explicitly assigned ordered review of clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
- Reopened all `81` distinct current dossier URLs with inspected browser-equivalent HTTP `200`, ran `52` exact CPVA client/system searches and `52` client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search retained `47` byte-exact authority rows and four broad candidates. Organization-first discovery retained `19` identity-checked profiles and reviewed `30` broad IT/digital candidates without forcing near-name identities.
- Client `110` now records three additional bounded tender-stage observations. VDI's opened official notices establish planned maintenance/modification procurement for the Potentially Dangerous Equipment Register and the named `Organizacijos pagalbininkas` software, plus planned UiPath-based process-automation modification, creation and consulting. All three bodies are open-tender notices only: selected suppliers, signed contracts, delivery, production use, hosting and release remain unproved and explicitly unresolved.
- Registry state is `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, all assigned URL checks and `git diff --check` passed. `corepack pnpm` was attempted but unavailable, so the repository-equivalent `npm run validate` and `npm run build` scripts were used. Local browser-equivalent HTTP readback verified client `110`, both registries and its raw artifact; the Chrome harness could not launch a supported browser.
- Documentation commit `ccc162cf95e5c790439720c43c29a08c7cf78158` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1309` (`build`) is `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-20 06:05 UTC
- The explicitly assigned `101`–`120` rotation was already fully researched, committed and published earlier today at documentation commit `72dd243839e74ec4cc67d270d877c379f87f8fab`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the ordered cursor. This idempotent replay did not repeat the same CPVA/contractor/CVP IS batch or create an empty documentation commit.
- Reopened all `67` distinct current dossier URLs across `81` occurrences with browser-equivalent requests: `66` returned inspected HTTP `200`; the already documented Microsoft Bookings endpoint retained its automation-specific `417`. Existing system, contractor, procurement-stage, confidence, alias and explicit-unknown claims were preserved; no defensible new dossier claim was established.
- Repository validation and production build passed again: `16` tests, registry validation, type checking, Docusaurus build, generated-route/raw-artifact checks and `git diff --check`. Registry state remains `290` clients, `522` canonical systems, `747` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. `corepack pnpm` was attempted but unavailable, so the repository-equivalent `npm run validate` and `npm run build` scripts were used.
- Documentation `main` remains exactly equal to remote commit `72dd243839e74ec4cc67d270d877c379f87f8fab`; authenticated source readback passed and exact-head Gitea Actions task `1305` / run `101` (`build`) remains `success`, including Pages publication. Public Pages resolved to the expected Keycloak/OAuth boundary; authorized deployed page-body readback remains unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- New CVP IS instructor lesson 3 was validated live: `GET /epps/prepareAdvancedSearch.do?type=org` returned the `searchOrganizationForm`, whose exact action is `POST /epps/viewOrganisations.do` with lowercase `viewMode`, `selectable`, `within`, `name`, `shortName`, `city` and `street` fields. A session-preserving `name=LITGRID` submission returned the exact `LITGRID AB (PV)` row and profile ID `1159`; this validates route mechanics only, not any system or procurement claim.
- The authoritative `vssa-clients` skill now documents that validated entry route and form contract at commit `8329b6aaff02e4b27a65ea667f89bcf18b384b2c`. Complete skill validation, local/remote ref equality, authenticated exact-SHA readback, runtime `skill_view` reload and exact-head Gitea Actions task `1306` / run `7` (`validate`) all passed.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-20 04:07 UTC
- Completed the next ordered review of clients `121`–`140`, following the durable wiki cursor after the latest completed `101`–`120` rotation; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the sequence.
- Reopened all `70` distinct current dossier URLs with inspected browser-equivalent HTTP `200`, ran `40` exact CPVA client/system searches and `40` client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search returned `460` complete rows (`448` byte-exact authority matches and `46` broad IT/digital candidates). Organization-first discovery retained `20` identity-checked profiles and reviewed all `502` exposed notice rows, including `70` broad candidates; punctuation/case variants for clients `126`, `134` and `136` were bounded and no near-name identity was forced.
- Reopened all three public Pirkimo-ID detail routes for the `16` procurement resources currently cited across the range (`48/48` HTTP `200`). Existing PAIS award evidence and patient-turning, software, social-care-system, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call tender evidence remain correctly bounded to the document stages already represented.
- This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved. The dossier and index dates were already `2026-08-20`, so the completed review produced no source diff and no empty commit was created.
- Registry state remains `290` clients, `522` canonical systems, `747` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, full validation, type checking, production build, registry/generated-route checks, all assigned URL checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was attempted but unavailable, so equivalent `npm run validate` and `npm run build` scripts were used. Browser-equivalent local readback verified clients `121`, `130` and `140`, both registries and the raw client artifact.
- Existing `main` head `72dd243839e74ec4cc67d270d877c379f87f8fab` remains exactly equal to the remote; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1305` / run `101` (`build`) remains `success`, including Pages publication. Public Pages resolved through the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable from this runtime. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- The synchronized wiki contained the validated CVP IS instructor lessons. This run established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `141`–`160`.
### Previous scheduled rotation — 2026-08-20 02:08 UTC
- Completed the explicitly assigned ordered review of clients `101`–`120`; the completed extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
- Reopened all `78` distinct dossier URLs with inspected browser-equivalent HTTP `200`, ran `50` exact CPVA client/system searches and `50` client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search retained `47` byte-exact authority rows and four broad keyword candidates. Organization-first discovery retained `19` identity-checked profiles, including both Vilniaus teatras „Lėlė“ profiles, and reviewed `30` broad IT/digital candidates without forcing near-name identities.
- Reopened the order, notices and procurement-document routes and re-extracted direct official PDFs for material resources `5869290`, `616558` and `8701921`. Their bodies remain procurement/tender notices for video projectors, contact-centre software rental and short/800-number communications services—not awards or signed contracts. Current DSS IS, KVS, VASIS and UT IS award evidence remains represented with bounded contractual roles.
- This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to `2026-08-20`.
- Registry state remains `290` clients, `522` canonical systems, `747` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, full validation, type checking, production build, registry/generated-route checks, all assigned URL checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was unavailable, so equivalent `npm run validate` and `npm run build` scripts were used. Browser-equivalent local readback verified clients `101`, `110` and `120`, both registries and the raw client artifact.
- Commit `72dd243839e74ec4cc67d270d877c379f87f8fab` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1305` / run `101` (`build`) reached `success`, including Pages publication. Public Pages resolved through the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- The synchronized wiki contained the validated CVP IS instructor lessons. This run established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-20 00:07 UTC
- Completed the next durable ordered rotation, clients `121`–`140`; the already completed extra `001`–`020` rerun did not reset the cursor.
- Reopened all `70` distinct dossier URLs with inspected browser-equivalent HTTP `200`, ran `40` exact CPVA client/system searches and `40` client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search returned `460` complete rows (`448` exact-authority matches and `46` broad IT/digital candidates). Organization-first discovery resolved `20` identity-checked profiles and parsed all `502` exposed notice rows, including `70` broad candidates; no near-name identity was forced.
- Reopened all three Pirkimo-ID detail routes for the `16` procurement resources currently cited across the range (`48/48` HTTP `200`). Existing PAIS award evidence and patient-turning, software, social-care-system, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call tender evidence remain correctly bounded to the document stages already represented.
- This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to `2026-08-20`.
- Registry state remains `290` clients, `522` canonical systems, `747` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, full validation, type checking, production build, registry/generated-route checks, all assigned URL checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was unavailable, so equivalent `npm run validate` and `npm run build` scripts were used. Browser-equivalent local readback verified clients `121`, `130` and `140`, both registries and the raw client artifact.
- Commit `c056b73088eea80d7989f598947c98c2b066a33d` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1304` / run `100` (`build`) reached `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- The synchronized wiki contained the validated CVP IS instructor lessons. This run established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `141`–`160`.
### Previous scheduled rotation — 2026-08-19 22:09 UTC
- Completed the explicitly assigned ordered repeat review of clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the ordered cursor.
- Reopened all `78` distinct current dossier URLs with inspected browser-equivalent HTTP `200`, ran `50` exact CPVA client/system searches and `50` client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. The exact-authority basic search returned `47` byte-exact authority rows and four broad keyword candidates. Organization-first discovery reviewed `19` identity-checked profiles across `18` clients, preserved both Vilniaus teatras „Lėlė“ profiles (`16216` and `5822`), forced no near-name identity for clients `108` or `117`, and parsed all `220` exposed notice rows, including `30` broad IT/digital candidates.
- Reopened the order, notices and procurement-document routes and re-extracted the direct official PDFs for material resources `5869290`, `616558` and `8701921`. Their bodies remain procurement/tender notices for video projectors, contact-centre software rental and short/800-number communications services—not awards or signed contracts. The contact-centre notice remains represented with bounded intended-procurement semantics; the other candidates do not support an additional system or contractor row.
- This was a conservative no-new-claim review. No defensible new system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and `2026-08-19` dossier/index dates were preserved.
- Registry state remains `290` clients, `522` canonical systems, `747` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, full validation, type checking, production build, registry/generated-route checks, all assigned URL checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was unavailable, so the equivalent repository `npm run validate` and `npm run build` scripts were used. Browser-equivalent local HTTP readback verified representative clients `101`, `109` and `120`, both registries, both machine-readable registries and the raw client artifact.
- The completed repeat review produced no source diff, so no empty commit was created. Existing `main` head `a092dd4d957e2e02170dab48122cac6311f07372` remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task `1301` (`build`) remains `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client and the browser harness could not launch Chrome. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run reconfirmed those mechanics without establishing an additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-19 20:09 UTC
- Completed the ordered repeat review of clients `141`–`160`, following the latest durable wiki cursor; the extra `001`–`020` rerun did not reset the ordered sequence.
- Reopened all `59` distinct dossier evidence URLs at inspected browser-equivalent HTTP `200`, ran `70` exact CPVA client/system searches and `70` client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. The exact-authority basic search returned `336` complete identity-matched rows with `103` broad IT/digital candidates. Organization-first discovery resolved `15` exact identity-checked profiles and parsed all `184` exposed notice rows, including `68` broad IT/digital candidates; no near-name profile was forced where the exact query returned none.
- Opened all three public Pirkimo-ID detail routes for seven material resources and re-extracted the direct PDF bodies for the VTAIS, seabed/marine-cartography, public-health-monitoring, competency-platform and VAPRIS/VPREG notices. The July 2026 Visuomenės sveikatos stebėsenos informacinė sistema body remains an open tender (plus deadline amendment), not an award; the dossier already records that bounded procurement relationship. Newer ULSVIS/VSSIS basic-search rows exposed market-consultation metadata, while their detailed order view redirected to login and no public award/signed-contract body was available.
- This was a conservative no-new-claim review. No defensible new system, contractor, signed supplier engagement, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and `2026-08-19` dossier/index dates were preserved.
- Registry state remains `290` clients, `522` canonical systems, `747` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, full validation, type checking, production build, registry/generated-route checks, all assigned evidence URL checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was unavailable, so the equivalent repository `npm run validate` and `npm run build` scripts were used. Browser-equivalent local readback verified representative clients `141`, `149` and `159`, both registries, both machine-readable registries and the raw client artifact.
- The completed repeat review produced no source diff, so no empty commit was created. Existing `main` head `a092dd4d957e2e02170dab48122cac6311f07372` remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task `1301` / run `99` (`build`) remains `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run reconfirmed those mechanics without establishing an additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `161`–`180`.
### Previous scheduled rotation — 2026-08-19 18:49 UTC
- Completed the ordered review of clients `121`–`140`, following the durable latest cursor after the completed `101`–`120` rotation; the extra `001`–`020` rerun did not reset the sequence.
- Reopened all `70` distinct dossier evidence URLs at inspected browser-equivalent HTTP `200`, ran `40` exact CPVA client/system searches and `40` client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. The exact-authority basic search returned `460` complete rows (`448` exact-authority matches and `46` broad IT/digital candidates). Organization-first discovery resolved `20` identity-checked profiles and parsed all `502` exposed notice rows, including `70` broad IT/digital candidates.
- This was a conservative no-new-claim review. Existing patient-turning, computer/software, social-care-system, PAIS, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call records remained bounded to the procurement stage established by their opened bodies. No defensible new contractor, signed supplier engagement, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and `2026-08-19` dossier/index dates were preserved.
- Registry state remains `290` clients, `522` canonical systems, `747` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, full validation, type checking, production build, registry/generated-route checks, all assigned evidence URL checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was unavailable, so the equivalent repository `npm run validate` and `npm run build` scripts were used. Browser-equivalent local readback verified representative clients `121`, `130` and `140`, both registries, both machine-readable registries and the raw client artifact.
- The completed review produced no source diff, so no empty commit was created. Existing `main` head `a092dd4d957e2e02170dab48122cac6311f07372` remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task `1301` / run `99` (`build`) remains `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client, and the browser harness could not launch Chrome. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run reconfirmed those mechanics without establishing an additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `141`–`160`.
### Previous scheduled rotation — 2026-08-19 12:11 UTC
- Completed the explicitly assigned ordered review of clients `101`–`120`; the extra `001`–`020` rerun did not reset the ordered cursor.
- Reopened all `66` distinct dossier evidence URLs (`65` returned inspected browser-equivalent HTTP `200`; the documented Microsoft Bookings endpoint retained its automation-specific `417`), ran `51` exact CPVA client/system searches and `79` client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. The exact-authority basic search returned `63` complete rows, including `59` exact-authority matches and three broad IT/digital candidates. Organization-first discovery resolved `20` identity-checked profiles across `19` clients after bounded legal-form/typography variants, preserved both exact-equivalent Vilniaus teatras Lėlė profiles (`16216` and `5822`), excluded the near-name collision for client `117`, and parsed all `196` exposed notice rows.
- Opened the order, notices and procurement-document routes plus the direct official PDFs for material resources `5869290`, `616558` and `8701921`. Their bodies classify each as a tender/procurement notice rather than an award. The 2024-12-27 Jaunimo reikalų agentūra notice directly establishes intended procurement of contact-centre software rental for telephone client contact and operator monitoring/control; the new dossier row explicitly does not claim award, contract signature, supplier, delivery or production use. No defensible new contractor, production-hosting, original-kickoff, production-release or completion claim was found.
- Registry state is now `290` clients, `522` canonical systems, `747` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, full validation, type checking, production build, registry/generated-route checks, URL checks and `git diff --check` passed. `corepack`/`pnpm` was unavailable, so the equivalent repository `npm run validate` and `npm run build` scripts were used. Browser-equivalent local readback verified representative clients `101`, `109` and `120`, the new `SYS-90B309892D` dossier, both registry overviews, both machine-readable registries and the raw client artifact.
- Commit `a092dd4d957e2e02170dab48122cac6311f07372` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1301` / run `99` (`build`) reached `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no `microk8s`, `kubectl` or `k3s` service-proxy client. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run applied them and established no additional reusable mechanic or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-19 10:08 UTC
- Completed the ordered review of clients `141`–`160`, following the latest durable wiki cursor; the completed extra `001`–`020` rerun did not reset the ordered sequence.
- Reopened all `59` distinct dossier evidence URLs across `77` occurrences at inspected browser-equivalent HTTP `200`, ran `65` exact CPVA client/system searches and `65` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS discovery. The exact-authority basic search returned `335` identity-matched rows and `103` broad IT/digital candidates; organization-first discovery resolved `19` profiles, preserved the absence of an exact profile for client `155`, and parsed all `322` exposed notice rows including `133` broad IT/digital candidates.
- Opened all three public Pirkimo-ID detail routes—order metadata, notices and procurement documents—for seven material resources covering the existing VSS IS improvement, seabed/marine-cartography, ULSVIS/VSSIS security/support, and antivirus-support leads. Existing award, tender and market-consultation observations remained bounded to the stage established by their opened bodies; search-table statuses such as `Nustatytas laimėtojas` were not treated as award or supplier evidence.
- This was a conservative no-new-claim review. No defensible new system, contractor, signed supplier engagement, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence levels, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to `2026-08-19`.
- Registry state remains `290` clients, `521` canonical systems, `746` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `359` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `15` tests, full validation, production build, registry/generated-route checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was unavailable, so the equivalent repository `npm run validate` and `npm run build` scripts were used. Local browser-equivalent HTTP readback verified representative clients `141`, `149` and `159`, the Systems and Contractors registries, and both machine-readable registries.
- Commit `6c4df2981148b366f6c5183187d1b58eb1f4db85` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1292` / run `97` (`build`) reached `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no Kubernetes service-proxy client and none of the documented in-cluster service names resolves. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run applied both and established no additional reusable mechanic or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `161`–`180`.
### Previous scheduled rotation — 2026-08-19 08:07 UTC
- Completed the ordered review of clients `121`–`140`, following the latest durable wiki cursor; the completed extra `001`–`020` rerun did not reset the ordered sequence. Reopened all `70` distinct dossier evidence URLs at inspected browser-equivalent HTTP `200`, ran `40` exact CPVA client/system searches, `40` client/system contractor-procurement query-ladder searches, the newly instructed exact-authority basic CVP IS search, and identity-checked CVP IS organization-first discovery.
- The basic CVP IS route returned `460` complete rows across all derived result pages (`448` rows matched the exact searched authority; typography-form differences for clients `134` and `136` were not forced). Organization-first discovery resolved `20` identity-checked profiles and parsed all `502` exposed notice rows, including `70` broad IT/digital candidates. Following instructor lesson 2, all three public Pirkimo-ID detail routes—order data, notices and procurement documents—were opened for `18` material resources. Existing patient-turning, computer/software, social-care-system, PAIS, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call records remained bounded to the procurement stage established by their opened bodies. Basic-search statuses such as `Nustatytas laimėtojas` were retained as discovery metadata only: public attachments exposed conditions, specifications, ZIP/XML artifacts and draft contracts, while the internal awarding view required login and no opened public award or signed-contract body established a supplier.
- This was a conservative no-new-claim review. No defensible new system, contractor, signed supplier engagement, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and `2026-08-19` dossier/index dates were preserved.
- Registry state remains `290` clients, `521` canonical systems, `746` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `359` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `15` tests, full validation, production build, registry/generated-route checks, exact six-column/date checks and `git diff --check` passed. Corepack/pnpm was unavailable, so the equivalent repository `npm run validate` and `npm run build` scripts were used. Local browser-equivalent route checks verified representative clients, the PAIS system dossier and both machine-readable registries; the Chrome harness itself was unavailable.
- The review produced no source diff, so no empty commit was created. Existing `main` head `8c8f6a876e96192e87686a6773237e1460b88fdf` remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task `1275` / run `96` (`build`) remains `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no service-proxy client and neither known in-cluster hostname resolves. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- The synchronized channel wiki contained validated CVP IS instructor lessons 1 and 2; this run applied the exact-authority basic search and all three Pirkimo-ID detail routes across the assigned range. Live validation established one additional reusable clarification: the basic-search page's first `writePageSelection(...)` argument is the result-page count, not the row count. The authoritative `vssa-clients` reference now documents that trap at commit `e85df2916ce7ba74c0dc8fd6f01d2ddf2337fb0d`; follow-up commit `85d016431774d523816e36c62ee01fe9e2da58b4` replaced the failing JavaScript checkout action with an exact-SHA shell checkout for the self-hosted runner. Local validation, remote ref/readback and exact-head Gitea Actions task `1285` / run `3041` all passed.
- Next ordered dossier rotation: `141`–`160`.
### Previous scheduled rotation — 2026-08-19 06:04 UTC
- Completed the explicitly assigned repeat review of clients `101`–`120`; the completed extra `001`–`020` rerun did not reset the ordered cursor. Reopened all `66` distinct dossier evidence URLs (`65` returned inspected browser-equivalent HTTP `200`; the documented Microsoft Bookings endpoint retained its automation-specific `417`), ran `51` exact CPVA client/system searches and `79` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS resolved `20` profiles across `19` identity-checked clients after the documented exact-name and bounded legal-form/typography-variant checks, preserving both exact-equivalent Vilniaus teatras Lėlė profiles (`16216` and `5822`); no exact profile was forced for client `117`. All `196` exposed notice rows were parsed across complete pagination. Existing projector, contact-centre, register-maintenance, KVS, VASIS, DSS IS, software, server and network records remained bounded to the procurement stage established by their opened sources.
- This was a conservative no-new-claim repeat review. No defensible new system, contractor, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and `2026-08-19` dossier/index dates were preserved.
- Registry state remains `290` clients, `521` canonical systems, `746` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `359` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `15` tests, full validation, production build, registry/generated-route checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was unavailable, so the equivalent repository `npm run validate` and `npm run build` scripts were used. Browser-equivalent local readback verified clients `101`, `110` and `117`, source/raw content and both machine-readable registries.
- The repeat review produced no source diff, so no empty commit was created. Existing `main` head `8c8f6a876e96192e87686a6773237e1460b88fdf` remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task `1275` / run `96` (`build`) remains `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no service-proxy client and neither known in-cluster hostname resolves. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- No newer CVP IS instructor guidance was present in the latest `100` live channel messages. Live work reconfirmed the documented exact-identity, legal-form/typography-variant, duplicate-profile, complete-pagination and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-19 04:04 UTC
- Completed the explicitly assigned repeat review of clients `101`–`120`; the completed extra `001`–`020` rerun did not reset the ordered cursor. Reopened all `66` distinct dossier evidence URLs (`65` returned inspected browser-equivalent HTTP `200`; the documented Microsoft Bookings endpoint retained its automation-specific `417`), ran `51` exact CPVA client/system searches and `79` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS resolved `20` profiles across `19` identity-checked clients, preserving both exact-equivalent Vilniaus teatras Lėlė profiles (`16216` and `5822`); no exact profile was forced for client `117`. All `196` exposed notice rows were parsed across complete pagination. Existing projector, contact-centre, register-maintenance, KVS, VASIS, DSS IS, software, server and network records remained bounded to the procurement stage established by their opened sources.
- This was a conservative no-new-claim repeat review. No defensible new system, contractor, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and `2026-08-19` dossier/index dates were preserved.
- Registry state remains `290` clients, `521` canonical systems, `746` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `359` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `15` tests, full validation, production build, registry/generated-route checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was unavailable, so the equivalent repository `npm run validate` and `npm run build` scripts were used. Browser-equivalent local readback verified three client routes, the DSS IS system route, the UAB „Novian PRO“ contractor route and both machine-readable registries; the Chrome harness itself was unavailable.
- The repeat review produced no source diff, so no empty commit was created. Existing `main` head `8c8f6a876e96192e87686a6773237e1460b88fdf` remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task `1275` / run `96` (`build`) remains `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no service-proxy client and neither known in-cluster hostname resolves. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- No newer CVP IS instructor guidance was present in the latest `100` live channel messages. Live work reconfirmed the documented exact-identity, legal-form/typography-variant, duplicate-profile, complete-pagination and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-19 02:08 UTC
- Completed the explicitly assigned review of clients `101`–`120`; the completed extra `001`–`020` rerun did not reset the ordered cursor. Reopened all `66` distinct dossier evidence URLs (`65` returned inspected browser-equivalent HTTP `200`; the documented Microsoft Bookings endpoint retained its automation-specific `417`), ran `51` exact CPVA client/system searches and `79` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS resolved `20` profiles across `19` identity-checked clients, preserving both exact-equivalent Vilniaus teatras Lėlė profiles (`16216` and `5822`); no exact profile was forced for client `117`. All `196` exposed notice rows were parsed across complete pagination. Existing projector, contact-centre, register-maintenance, KVS, VASIS, DSS IS, software, server and network records remained bounded to the procurement stage established by their opened sources.
- This was a conservative no-new-claim review. No defensible new system, contractor, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to `2026-08-19`.
- Registry state remains `290` clients, `521` canonical systems, `746` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `359` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `15` tests, full validation, production build, registry/generated-route checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was unavailable, so the equivalent repository `npm run validate` and `npm run build` scripts were used. Browser-equivalent local readback verified three changed client routes, a derived system route, a contractor route and both machine-readable registries.
- Commit `8c8f6a876e96192e87686a6773237e1460b88fdf` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1275` / run `96` (`build`) reached `success`, including Pages publication. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- No newer CVP IS instructor guidance was present in the latest `100` channel messages. Live work reconfirmed the documented exact-identity, legal-form/typography-variant, duplicate-profile, complete-pagination and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-19 00:03 UTC
- Completed the ordered review of clients `121`–`140`; the completed extra `001`–`020` rerun did not reset the ordered cursor. Reopened all `70` distinct dossier evidence URLs, reran exact CPVA client/system searches and contractor query ladders, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS resolved `19` current or exact-equivalent identities, including successor **Priėmimo ir integracijos agentūra** for client `130`; no exact registry result was forced for client `134`. All exposed notice pages were reviewed. Existing PAIS, mobile-application, camera-system, Šeimos kortelė, legal-information database and employee-call-system evidence remained correctly bounded to its source procurement stage.
- This was a conservative no-new-claim review. No defensible new system, contractor, hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to `2026-08-19`.
- Registry state remains `290` clients, `521` canonical systems, `746` observations and `111` contractor cards; statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `15` tests, full validation, production build, registry/generated-route checks, six-column/date checks, all `70` evidence URL checks and `git diff --check` passed. `corepack pnpm` was unavailable, so the equivalent repository `npm run validate` and `npm run build` scripts were used. Browser-equivalent local readback verified three changed client routes, two derived system routes and both machine-readable registries.
- Commit `0464bb7b920883cba4f205bd53c6e71b5d21842a` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1274` / run `95` (`build`) reached `success`, including publication. Public Pages reached the expected Keycloak/OAuth `302` boundary; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` client, so no content claim was made from the login response. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- No reusable CVP IS mechanic or pitfall beyond the current skill guidance was established, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `141`–`160`.
### Previous scheduled rotation — 2026-08-18 22:06 UTC
- Completed the explicitly assigned review of clients `101`–`120`; the additional completed `001`–`020` rerun did not reset this range. Reopened all `66` distinct current dossier evidence URLs (`77` occurrences), ran `65` exact CPVA client/system searches and `65` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS produced `20` identity-checked profiles across `19` clients, preserving both exact-equivalent Vilniaus teatras Lėlė profiles (`16216` and `5822`) and bounded current/legal-form variants for clients `108`, `110`, `111` and `112`. Client `117` still had no defensible exact profile, so the similarly named institution was not forced. All `196` exposed notice rows were parsed across complete pagination; current projector, contact-centre, register-maintenance, software, server and network leads did not establish a defensible additional client-specific claim beyond the evidence already represented.
- This was a conservative no-new-claim review. All supported rows, statuses, confidence levels, dates and explicit gaps were preserved; no tender or equipment notice was promoted to an award, signed supplier engagement, delivery, production use, hosting, completion, original kickoff or production release.
- Generated state remains `290` clients, `521` canonical systems, `746` observations and `111` contractor cards. Client→contractor and system→contractor links remain complete at `359` each; dossier statuses remain `79 researched`, `196 partial` and `15 no-public-evidence`.
- All `15` repository tests, full validation, production build, registry/generated-route checks, six-column/date checks, all `66` evidence URL checks and `git diff --check` passed. `corepack pnpm` was unavailable in this cron runtime, so the equivalent repository `npm run validate` and `npm run build` scripts were executed. Local browser-equivalent HTTP checks verified clients `101` and `110`, the DSS IS system dossier, the UAB „Novian PRO“ contractor card, claim-level links, References indexes, machine-readable registry data and explicit unknown lifecycle fields; the browser harness could not launch Chrome.
- The completed review produced no source diff, so no empty commit was created. Existing `main` head `3f1efc09fa840c625f0fecf3a8773e07d0911ae6` remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task `1265` remains `success`, including Pages publication. Public Pages reached the Keycloak/OAuth `302` boundary; authorized deployed page-body readback was unavailable because this runtime has no `kubectl` or `microk8s` client, so no content claim was made from the login response. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, legal-form/typography-variant, duplicate-profile, complete-pagination and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-18 20:11 UTC
- Completed the ordered review of clients `161`–`180`, following the latest durable wiki cursor; the already completed extra `001`–`020` rerun did not reset the range. Reopened all `56` distinct current dossier evidence URLs, ran `49` distinct exact CPVA client/system searches and `54` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS produced `17` identity-checked profiles, including both exact-equivalent Lietuvos įtraukties švietime centras profiles (`2903` and `2876`); no near-name profile was forced. The profile-derived lists exposed `75` complete notice rows. Material licence, website-creation and digital-methodical-tool tender bodies were opened as direct PDFs and classified from their text.
- Added one bounded observation to client `179`: an opened October 2025 tender states that Lietuvos istorijos institutas sought renewals for its existing Veeam, TeamViewer Corporate, ESET Protect Complete Cloud, ArcGIS, GraphPad, AutoCAD LT, Adobe Acrobat Pro, FortiGate UTP and source-labelled `M365 Business Standart` licence portfolio. The notice proves current licence possession and planned renewal procurement only; it does not identify selected suppliers, signed contracts, delivery, hosting, original kickoff or a production release. Other dossiers preserved their supported rows, statuses, confidence and explicit gaps.
- Generated state advanced from `520` to `521` canonical systems and from `745` to `746` observations; contractor cards remain `111`. New deterministic `SYS-F8EB1084B0` retains production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at `359` each; dossier statuses remain `79 researched`, `196 partial` and `15 no-public-evidence`.
- All `15` repository tests, full validation, production build, registry/generated-route checks, exact six-column/date checks, evidence URL checks and `git diff --check` passed. `corepack pnpm` was unavailable in this cron runtime, so the equivalent repository `npm run validate` and `npm run build` scripts were executed. Local browser-equivalent HTTP checks verified client `179`, the new derived system dossier, claim-level citation, machine-readable registry record and explicit unknown infrastructure/lifecycle fields.
- Final commit `3f1efc09fa840c625f0fecf3a8773e07d0911ae6` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1265` (run `3022`) reached `success`, including Pages publication. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- No newer human directive or CVP IS instructor guidance was present in the latest `100` live channel messages. Live work reconfirmed the documented organization-first, exact-identity, duplicate-profile, complete-row, direct-PDF and strict tender-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `181`–`200`.
### Previous scheduled rotation — 2026-08-18 18:21 UTC
- Completed the ordered review of clients `141`–`160`, following the latest durable wiki cursor; the already completed extra `001`–`020` rerun did not reset the range. Reopened all `59` distinct current dossier evidence URLs (`77` occurrences), ran `65` exact CPVA client/system searches and `65` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS produced `19` identity-checked profiles; no near-name profile was forced for client `155`. All `322` exposed published-notice rows were parsed across complete pagination, including `133` broad IT/digital-title leads. The current counts and candidates matched the completed same-day review; tender, voluntary ex-ante and award bodies already represented in the dossiers retained their exact procurement-stage semantics.
- This was a conservative no-new-claim review. Every current evidence URL returned inspected browser-equivalent HTTP `200` content, and the current official, CPVA, contractor-search and procurement sources established no defensible additional client-specific system, contractor, production-hosting, original-kickoff or production-release claim. All twenty dossier rows, statuses, confidence levels, explicit unknowns, gaps and `2026-08-18` dates were preserved.
- Generated state remains `290` clients, `520` canonical systems, `745` observations and `111` contractor cards. Client→contractor and system→contractor links remain complete at `359` each; dossier statuses remain `79 researched`, `196 partial` and `15 no-public-evidence`.
- All `15` repository tests, full validation, production build, registry/generated-route checks, exact six-column/date checks, all evidence URL checks and `git diff --check` passed. `corepack pnpm` was unavailable in this cron runtime, so the equivalent repository `npm run validate` and `npm run build` scripts were executed. Local browser-equivalent route checks verified clients `141`, `147` and `154`, two derived system dossiers, claim-level markers, machine-readable registry records and explicit unknown infrastructure/lifecycle fields.
- The completed review produced no source diff, so no empty commit was created. Existing `main` head `3fc30f514db8d6ea0b2a69263dd66d4847b60cf2` remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task `1263` remains `success`, including Pages publication. Public Pages reached the Keycloak/OAuth boundary. Authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, neither documented backend hostname resolves, and no content claim was made from the login page. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, exact-identity, complete-row, pagination, direct-PDF and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `161`–`180`.
### Previous scheduled rotation — 2026-08-18 16:14 UTC
- Completed the ordered review of clients `121`–`140`, following the latest durable wiki cursor; the already completed extra `001`–`020` rerun did not reset the range. Reopened all `70` distinct current dossier evidence URLs, ran `40` exact CPVA client/system searches and `40` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS produced one identity-checked current, predecessor/successor or documented typography-variant profile for every client. All `502` exposed notice rows were parsed, including `70` broad IT/digital-title leads. Six material bodies were downloaded as direct PDFs and classified from their text; a patient-turning mattress system and an unnamed generic software package were not forced into the information-system registry.
- Added four bounded planned-procurement observations. Client `130` now records the predecessor's December 2024 smartphone-application creation/implementation/maintenance tender and the successor agency's June 2026 video-camera, recording and switching-equipment tender. Client `135` now records a February 2025 Šeimos kortelė website-maintenance tender and a January 2026 planned 12-month legal-information search-system/database subscription. None establishes an award, selected supplier, signed contract, delivery, active subscription, production use, hosting, completion or release; contractors remain `Not publicly identified`.
- All other dossier rows, statuses, confidence levels and unresolved gaps were preserved while all twenty dossier/index dates advanced to `2026-08-18`. Generated state advanced from `516` to `520` canonical systems and from `741` to `745` observations; contractor cards remain `111`. New `SYS-B102E857D5`, `SYS-3BD89B3105`, `SYS-A82F69643F` and `SYS-A41510A0DD` retain production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at `359` each.
- All `15` repository tests, full validation, production build, registry/generated-route checks, six-column/date checks, all `70` evidence URL checks and `git diff --check` passed. Corepack/pnpm was unavailable in this cron runtime, so the equivalent repository `npm run validate` and `npm run build` scripts were executed. Local browser-equivalent HTTP checks verified clients `130` and `135`, all four new system dossiers, claim-level links, References indexes, machine-readable registry records and explicit unknown lifecycle fields; the cron browser harness could not launch Chrome.
- Commit `4444c51b321cd1d240260ac7c82a23538c017433` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1262` (run `3019`) reached `success`, including Pages publication. Public Pages reached the expected Keycloak boundary. Authorized deployed page-body readback was not available because this runtime has no `kubectl`/service-proxy client and `docs.lego-cloud.eu` did not resolve; no content claim was made from the login page.
- No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, legal-form/typography-variant, successor, complete-row, pagination, direct-PDF and strict tender-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `141`–`160`.
### Previous scheduled rotation — 2026-08-18 14:13 UTC
- Completed the explicitly assigned ordered review of clients `101`–`120`; the already completed additional `001`–`020` rerun did not reset this cursor. Reopened all `66` distinct current dossier evidence URLs, ran `51` exact CPVA client/system searches and `79` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS yielded `20` identity-checked profiles across `19` clients, including both exact-equivalent Vilniaus teatras Lėlė profiles (`16216` and `5822`) and bounded current/legal-form variants for clients `108`, `110`, `111`, and `112`. Client `117` still had no defensible exact profile, so the similarly named institution was not forced. All `100` exposed notice rows were reviewed; the projector/equipment and other current leads did not establish an additional award, supplier engagement, delivery, hosting, completion or production release.
- This was a conservative no-new-claim review: all supported rows, statuses, confidence levels and unresolved gaps were preserved, while all twenty dossier/index dates advanced to `2026-08-18`. Generated state remains `290` clients, `516` canonical systems, `741` observations and `111` contractor cards; client→contractor and system→contractor links remain complete at `359` each.
- All `15` repository tests, Corepack-wrapped pnpm validation/build, registry/generated-route checks, six-column/date checks, all `66` evidence URL checks and `git diff --check` passed. Local browser-equivalent HTTP checks verified clients `101` and `110`, the DSS IS system dossier, UAB „Novian PRO“ contractor card, claim-level links, References indexes and explicit unknown lifecycle fields. The cron browser harness could not launch Chrome.
- Research/dossier commit `767b18acc7259aaeda31591c0ca283d9d5ecd1ef` was followed by runner-hardening commit `eb99420af8280f2bcb186a8c5cdc3b0c94c9a360`, which isolated CI in a stable Node container after the inherited `ubuntu-latest` image repeatedly crashed `curl`, Python and Node. Local/remote ref equality and authenticated source readback passed. Exact-head Gitea Actions task `1261` (run `3018`) reached `success`, including Pages publication. Public Pages reached the expected Keycloak boundary; authorized `pages/pages` service-proxy readback verified deployed client `101` and the DSS IS system page with the new review date, canonical links, References index and explicit unknown lifecycle fields.
- No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, legal-form/typography-variant, duplicate-profile, complete-row and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-18 09:40 UTC
- Completed the ordered review of clients `181`–`200`, following the durable wiki cursor rather than repeating the already completed `101`–`120` range. Reopened all `60` distinct current dossier evidence URLs (`77` occurrences), ran `52` exact CPVA client/system searches and `52` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS produced `15` identity-checked current or official-successor profiles with profile-derived `(authorityId, orgGroupId)` tuples. No near-name profile was forced for the remaining clients. All `826` exposed published-notice rows were parsed across complete pagination, including `130` broad digital/IT-title leads; material MUKIS, STEAM, KELTAS and IPBR bodies were opened as direct PDFs and classified from their text.
- Added bounded planned-procurement evidence to client `183`: current legal successor LINEŠA tendered MUKIS qualification-program content digitization/deployment services in May 2026 and STEAM information-system modernization/functionality expansion in December 2025. Both are tender-stage observations only; selected suppliers, signed contracts, delivery, hosting, completion and production release remain unproved.
- Added two direct contract-award findings for client `190`. UAB „Asseco Lietuva“ won KELTAS software maintenance/development contract `56917`, signed `2026-06-04` for `EUR 260,000`, and IPBR software maintenance/development contract `58867`, signed `2026-06-23` for `EUR 70,000`. Official NŠA pages independently establish each system's purpose and NŠA relationship; neither award is presented as original development, production hosting, acceptance, completion or production release.
- All other dossiers retained their supported rows, statuses, confidence levels and unresolved gaps while their completed-review dates advanced to `2026-08-18`. Generated state advanced from `507` to `510` canonical systems and from `732` to `735` observations; contractor cards remained `108`. New `SYS-8094196CBD`, `SYS-CA136E0290` and `SYS-F2452BA519` retain production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at `350` each.
- All `15` repository tests, full validation, production build, registry/generated-route checks, six-column/date checks, all evidence URL checks and `git diff --check` passed. Corepack was unavailable in the cron runtime, so the already installed dependencies were exercised through the equivalent `npm run validate` and `npm run build` scripts. The build verified `290` client, `510` system and `108` contractor routes, `735` observations and `296` raw artifacts. Local browser-equivalent route checks verified clients `183` and `190`, all three new system pages and the established UAB „Asseco Lietuva“ contractor card with claim-level links, References indexes and explicit unknown lifecycle fields; Chrome itself could not be launched by the cron browser harness.
- The research commit was `0e0e4ea0320414a061c2eb1ce572f06346621fe1`. After the self-hosted runner began crashing every JavaScript action under Node 20, four narrow follow-up commits replaced JavaScript setup actions with an authenticated exact-SHA shell checkout, checksum-verified Node `22.23.2`, and the documented trusted pnpm shim. Final commit `d1c311889c8287fc3f91b295db5ffbd1009a183d` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1251` (`build`, run `3012`) reached `success`, including Pages publication.
- Live investigation reconfirmed the documented organization-first, exact-successor, complete-row, pagination, direct-PDF, award and tender-stage mechanics. No new reusable research procedure or portal pitfall was established, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `201`–`220`.
### Previous scheduled rotation — 2026-08-18 02:29 UTC
- Completed the ordered review of clients `161`–`180`, following the latest durable cursor rather than repeating the already completed `101`–`120` range. Reopened `56` distinct current dossier evidence URLs (`75` occurrences), ran `52` exact CPVA client/system searches and `52` readable Bing client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS produced `18` identity-checked profiles. Client `180` retained two separate exact-equivalent profiles (`2903` and `2876`) rather than silently selecting one; no near-name profile was forced for clients without an exact result. All `162` exposed published-notice rows were parsed, including `43` broad IT/digital-title leads, and material bodies were opened as direct PDFs and classified from their text.
- Added two bounded planned-procurement observations. Client `161` tendered metadata-tool installation, data modelling and Central Metadata Repository integration for the „Duomenų valdymo modelio sukūrimas“ project. Client `162` directly states that it uses ArcGIS Enterprise and tendered perpetual Enterprise/Professional-user licences, update assurance and 60 months of technical support. Neither tender proves an award, selected supplier, signed contract, delivery, completion, hosting or production release; contractors remain `Not publicly identified`.
- Deepened client `179`'s existing „Atvira istorija“ row with the opened 2025 tender for creation and installation of the institute-administered portal and its content-management module. Current portal operation is independently evidenced, but the tender does not establish a selected supplier, signed contract or delivery. Other dossiers retained their rows, statuses and confidence while all check dates advanced to `2026-08-18`.
- Generated state advanced from `505` to `507` canonical systems and from `730` to `732` observations; contractor cards remained `108`. New deterministic `SYS-18E23152F2` and `SYS-6F6716F88C` retain production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at `348` each.
- All `15` repository tests, pinned-pnpm `validate`, pinned-pnpm `build`, registry/generated-route checks, six-column/date checks and `git diff --check` passed. Corepack was unavailable, so pnpm `9.15.9` was executed directly through Node. Browser-equivalent checks returned inspected HTTP `200` content for `55` of `56` distinct URLs; the remaining official KPMPC SMIS page returned the expected `302` to the currently unreachable `www.smis.lt`, matching the dossier's explicit availability gap. The build verified `290` client, `507` system and `108` contractor routes, `732` observations and `296` raw artifacts. Local rendered-route checks verified clients `161`, `162`, `179` and both new system pages with claim-level links, References indexes and explicit unknown lifecycle fields; Chrome itself could not be launched by the cron browser harness.
- Commit `9a3b62817dabb9befb1adb1d77141c8b91f236d2` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1204` (`build`) reached `success`, including Pages publication. The public changed route returned the expected Keycloak/OAuth `302`; authorized `pages/pages` Kubernetes service-proxy readback verified deployed clients `161` and `162` plus both new system pages with exact changed-content markers, References indexes and explicit unknown lifecycle fields.
- No newer CVP IS instructor guidance was present in the latest live channel readback. Live work reconfirmed the documented organization-first, duplicate-profile, complete-row, direct-PDF and strict tender-stage mechanics without exposing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `181`–`200`.
### Previous scheduled rotation — 2026-08-18 00:14 UTC
- Completed the ordered review of clients `141`–`160`, following the latest durable cursor rather than repeating the already completed `101`–`120` range. Reopened all `59` distinct current dossier evidence URLs (`105` occurrences), ran `60` exact CPVA client/system searches and `60` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS produced `19` identity-checked profiles; no near-name profile was forced for client `155`. All `322` exposed published-notice rows were parsed, including `133` broad IT/digital-title leads. Material award and voluntary ex-ante bodies were opened as direct PDFs, verified and classified from their text.
- Added six bounded supplier findings. Client `142` records Starkodas as VTAIS design, creation, deployment and integration supplier under contract `19814`, signed `2025-05-13` for a `EUR 230,000` offer. Client `147` records UAB „Asseco Lietuva“ for Vektra operational maintenance/software modification and Avilys maintenance/development, plus UAB „Hnit-Baltic“ for ArcGIS GeoEvent/Staging Server licences and support. Client `154` records UAB „Hnit-Baltic“ for RSC GIP component creation and UAB „Laborama“ for MetaSystems cytogenetic-system modernization/expansion. Its RADIS record names ENVINET GmbH only as the intended direct-award supplier from a voluntary ex-ante notice; contract signature, delivery and production use remain unproved.
- Preserved all other dossier rows, statuses and confidence levels while advancing review dates to `2026-08-18`. The RSC register/RSIS maintenance documents remain tender-stage evidence only; no cloud, hosting, original kickoff, completion, acceptance or production release was inferred.
- Generated state advanced from `500` to `505` canonical systems, from `725` to `730` observations and from `106` to `108` contractor cards. Five new deterministic `SYS-*` records retain production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at `348` each.
- All `15` repository tests, `pnpm validate`, `pnpm build`, registry/generated-route checks, all `59` evidence URL checks and `git diff --check` passed. Corepack was unavailable, so the pinned pnpm `9.15.9` shim was used. The build verified `290` client, `505` system and `108` contractor routes, `730` observations and `296` raw artifacts. Local rendered-route checks verified clients `142`, `147`, `154`, VTAIS, RADIS and the UAB „Laborama“ contractor page with claim-level links and References indexes; Chrome itself could not be launched by the cron browser harness.
- Commit `8a136a6176d4726cc6a286e0fa9f3a504c5cc12c` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1165` (`build`) reached `success`, including Pages publication. Public routes reached the expected Keycloak boundary; authorized `pages/pages` Kubernetes service-proxy readback verified deployed client `142`, client `154` and RADIS system page bodies with exact changed-content markers and References indexes.
- No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, complete-row, direct-PDF, award and voluntary-ex-ante stage mechanics without exposing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `161`–`180`.
### Previous scheduled rotation — 2026-08-17 22:17 UTC
- Completed the ordered review of clients `121`–`140`. Reopened all `63` distinct pre-existing dossier evidence URLs (`86` occurrences), ran `33` exact CPVA client/system searches and `122` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS exact, documented legal-form/typography-variant or authoritative successor-name routes produced one identity-checked profile for every client. All `140` exposed published-notice rows were parsed. Material digital leads were opened as direct PDFs and classified from their bodies; the retained findings remain bounded to their exact tender stages.
- Added three planned-procurement observations. Client `130`'s authoritative successor, Priėmimo ir integracijos agentūra, published August 2026 tenders for 36-month IP-telephony services and a satellite-broadband equipment kit. Client `136` published a January 2026 tender for an integrated digital staff-call, resident-safety and monitoring system with hardware, software, installation, configuration, testing and training. None proves an award, selected supplier, signed contract, delivery, implementation, production use, hosting, completion or release; contractors remain `Not publicly identified`.
- Preserved all other dossier rows, statuses and confidence levels while advancing the reviewed dates to `2026-08-17`. The Jurdaičiai multimedia/patient-equipment notices, Marijampolė care-system creation notices, Šeimos kortelė maintenance notice, Strūnos call-system notice and other records remain bounded to their exact procurement stages.
- Generated state advanced from `497` to `500` canonical systems and from `722` to `725` observations; contractor cards remained `106`. New `SYS-FAC512FBC9`, `SYS-7E154BC591` and `SYS-9D86A66A9D` retain deterministic identities and explicit unknowns for production hosting, original kickoff and latest production release. Client→contractor and system→contractor links remain complete at `341` each.
- All `15` repository tests, `pnpm validate`, `pnpm build`, registry/generated-route checks and `git diff --check` passed. `corepack` was unavailable on this host, so the pinned pnpm `9.15.9` CLI was executed directly through Node. Evidence verification covered all `66` distinct changed-range URLs at inspected HTTP `200`; every dossier table retained exactly six cells. The build verified `290` client, `500` system and `106` contractor routes, `725` observations and `296` raw artifacts. Browser-equivalent local HTTP checks verified clients `130` and `136`, both new derived system routes, claim-level markers and References indexes; Chrome itself could not be launched in the cron browser harness.
- Commit `c40128a030e120d1fc3a1d1da6f39a37f17a11b4` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1150` (`build`) reached `success`, including Pages publication. Public routes reached the expected Keycloak boundary; authorized `pages/pages` Kubernetes service-proxy readback verified the deployed client `130`, client `136` and digital staff-call system page bodies with exact changed-content markers.
- No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented successor-name, legal-form/typography-variant, complete-row, direct-PDF and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `141`–`160`.
### Previous scheduled rotation — 2026-08-17 20:21 UTC
- Completed the ordered review of clients `101`–`120`. Reopened all `64` distinct pre-existing dossier evidence URLs (`78` occurrences), ran `51` exact CPVA client/system searches and `81` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS exact or bounded legal-name/form variants produced `19` identity-checked profiles for `18` clients; the two exact-equivalent Vilniaus teatras Lėlė profiles (`16216` and `5822`) were kept separate. No exact profile was forced for clients `108` or `117`. All `192` exposed published-notice rows were parsed, including `44` IT/digital-title leads, and material award bodies were opened and classified directly.
- Added two direct contract-award findings for client `110`. VDI's Kokybės vadybos informacinė sistema (KVS) records UAB „Novian PRO“ as maintenance/modification supplier under contract `30383`, signed `2025-10-01`, winning offer `EUR 99,300`. Virtualios atestacijos sistema (VASIS) records UAB "Vextur" as maintenance, modification and remote-exam integrity-service supplier under contract `21386`, signed `2025-06-02` for `EUR 75,183.58`.
- Preserved all other dossier rows, statuses and confidence levels while advancing the reviewed dates to `2026-08-17`. The Valstybinis jaunimo teatras projector notice, Jaunimo reikalų agentūra contact-centre/telecommunications tenders and other notices remain bounded to their exact procurement stages; none was promoted to award, supplier engagement, delivery, hosting, kickoff or release evidence. The Microsoft Bookings endpoint still returned automation-specific `417`; the opened official Centre page remains the institution-relationship evidence, so no broader exception or hosting claim was introduced.
- Generated state advanced from `495` to `497` canonical systems, `720` to `722` observations and `105` to `106` contractor cards. New `SYS-07B92C746C`, `SYS-DF9C72A71D` and `CTR-95DBE306A7` retain deterministic identities; both new systems keep production hosting, original kickoff and latest production release explicitly unknown. Client→contractor and system→contractor links are complete at `341` each.
- All `15` repository tests, Corepack-wrapped `pnpm validate`, Corepack-wrapped `pnpm build`, registry/generated-route checks and `git diff --check` passed. Evidence verification covered all `66` distinct changed-range URLs: `65` returned inspected HTTP `200` content and the Microsoft Bookings endpoint retained its documented automation-specific `417` handling; every dossier table retained exactly six cells. The build verified `290` client, `497` system and `106` contractor routes, `722` observations and `296` raw artifacts. Browser-equivalent local route checks verified client `110`, both new system dossiers, the UAB "Vextur" contractor card, claim-level links and References indexes.
- Commit `96295e4bed73112028e1434708849bfdf2ea70f9` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1134` (`build`) reached `success`, including Pages publication. Public routes reached the expected Keycloak boundary; authorized `pages/pages` Kubernetes service-proxy readback verified the deployed client `110`, VASIS system and UAB "Vextur" contractor page bodies with exact changed-content markers.
- No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented legal-name-variant, duplicate-profile, complete-row, pagination, direct-PDF and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-17 18:20 UTC
- Completed the explicitly requested additional review of clients `001`–`020` after the registry-table fix. Reopened all `54` distinct current dossier evidence URLs (`86` per-dossier occurrences), ran `46` exact CPVA client/system searches and `78` per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
- CVP IS exact or documented legal-form/case-equivalent profiles were opened for `19` clients; client `010` still had no exact profile and no near-name result was forced. Client `007` returned two exact-equivalent profile IDs (`2367` and `2871`), so both profile-derived lists were kept separate and reviewed. All `736` complete published-notice rows exposed across the `20` profiles were parsed and material award bodies were opened directly.
- Added three direct contract-award findings. Client `001` now records the Chancellery's DIVIS and UAB „Asseco Lietuva“ maintenance/development contract `23315` (signed `2025-07-22`, offer value `EUR 70,200`). Client `005` now records UAB DIGMATIX Lithuania as the VBAMS licence-update supplier under contract `14P-25/62` (signed `2025-10-24`, `EUR 539,639`), while the separate 2026 notice remains bounded as intended procurement only. Client `007` now records NEVDA as the SPIS maintenance, development and consulting supplier under contract `41453` (signed `2025-12-15`, offer value `EUR 2,889,298.50`).
- Preserved conservative unknowns for cloud/hosting, original delivery kickoff, latest production release, later-tender suppliers and other portfolio suppliers. No tender, consultation, bid or publication date was promoted to award, signature, delivery, hosting, kickoff or release evidence.
- Generated state advanced from `494` to `495` canonical systems, `719` to `720` observations and `104` to `105` contractor cards. New `SYS-C500290F8A` preserves hosting, original kickoff and latest release as explicitly unknown; generated Client→System→Contractor links and references remained complete.
- All `15` repository tests, `corepack pnpm validate` (`543` assertions), `corepack pnpm build`, registry/generated-route checks, all changed-dossier evidence URL checks and `git diff --check` passed. Local production-build browser acceptance verified client `001`, the new DIVIS system dossier, UAB „Asseco Lietuva“ contractor linkage, exact source links and the generated References index; rendered client `005`, client `007` and UAB DIGMATIX Lithuania markers were also verified.
- Commit `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1119` (`build`) reached `success`, including the repository's Pages publication workflow. Authorized deployed page-body readback could not be claimed from this cron runtime because the service hostname did not resolve and the documented backend address had no network route. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
- No newer CVP IS instructor guidance was present in the synchronized channel state. The run reused already documented exact-identity, duplicate-profile, pagination, direct-PDF and procurement-stage mechanics without exposing a new reusable method, so the authoritative `vssa-clients` skill required no update.
- Next ordered dossier rotation: `101`–`120`. The additional `001`–`020` rerun is complete and does not reset the ordered cursor.
- Scheduler diagnosis: this run exhausted Hermes's `60` tool-calling iterations after publication and wiki update. The cron failure summarizer scanned the successful report text, matched words such as `authenticated`, and mislabeled the iteration-limit failure as a provider authentication error. OpenAI Codex authentication remained healthy. Job `88833e00b4a2` was restored from the temporary 20-minute cadence to `0 */2 * * *`, the stale one-time-rerun directive was removed, and earlier delivery cutoffs were added.
### Previous scheduled rotation — 2026-08-17 17:51 UTC
- Completed the ordered rotation of clients `081`–`100`. Reopened all `81` distinct current dossier evidence URLs, ran `73` exact CPVA client/system searches and `142` per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. Exact or documented legal-form/typography-variant profiles and their notice lists were opened for `19` clients; no near-name profile was forced for client `091`, and all `186` published-notice rows exposed by the lists were parsed, including `9` IT/digitalization-title leads.
- No defensible new client-specific system, contractor, production-hosting, original-kickoff or production-release claim was established beyond the evidence published earlier today. The digital-exhibition, CCTV, digitization-equipment and website-update notices remain bounded to their exact tender stages; no planned procurement was promoted to award, supplier engagement, delivery, hosting, completion or release. Existing rows, statuses, confidence levels, gaps and `2026-08-17` dossier dates were conservatively preserved.
- Generated state remains `290` clients, `494` canonical systems, `719` observations and `104` contractor cards, with complete `336` client→contractor and `336` system→contractor links. Statuses remain `79 researched`, `195 partial` and `16 no-public-evidence`; explicit hosting, original-kickoff and latest-release unknowns remain unchanged.
- All `15` repository tests, `corepack pnpm validate`, `corepack pnpm build`, registry/generated-route checks, all evidence URL checks and `git diff --check` passed. The build verified `290` client, `494` system and `104` contractor routes, `719` observations and `296` raw artifacts. The two Nacionalinis Kauno dramos teatras URLs that failed the local CA chain were opened successfully in a browser-equivalent browser session.
- This completed conservative no-new-claim review produced no source diff, so no empty commit was created. Existing `main` head `6c06ec27733066a6af8474af8eb0dbfe12d85ad1` remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task `1102` remains `success`, including Pages publication. The public routes return the expected Keycloak/OAuth `302`; authorized `pages/pages` service-proxy readback verified the homepage, client `081`, its LKT IS system dossier and its raw dossier artifact. Unrelated PPTX-improvement directories remain untracked and excluded.
- No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented exact-identity, legal-form-variant, complete-row and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next dossier rotation: `101`–`120`.
### Previous scheduled rotation — 2026-08-17 17:25 UTC
- Completed the ordered rotation of clients `061`–`080`. Reopened all `66` distinct current dossier evidence URLs (`97` citation occurrences), ran `81` exact CPVA client/system searches and `122` per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. Exact profiles and profile-derived notice lists were opened for `10` clients; no near-name profile was forced, and all `58` published-notice rows exposed by those lists were parsed, including `18` IT/digitalization-title leads.
- No defensible new client-specific system, contractor, production-hosting, original-kickoff or production-release claim was established beyond the evidence already published earlier today. The current ELVIS, exhibition-design and digitization-equipment notices remained bounded to their exact tender/award stages; no planned procurement was promoted to award, supplier engagement, delivery, hosting, completion or release. Existing rows, statuses, confidence levels, gaps and `2026-08-18` dossier dates were conservatively preserved.
- Generated state remains `290` clients, `494` canonical systems, `719` observations and `104` contractor cards, with complete `336` client→contractor and `336` system→contractor links. Statuses remain `79 researched`, `195 partial` and `16 no-public-evidence`; explicit hosting, original-kickoff and latest-release unknowns remain unchanged.
- All `15` repository tests, `corepack pnpm validate`, `corepack pnpm build`, registry/generated-route checks, all `66` browser-equivalent evidence URL checks and `git diff --check` passed. The build verified `290` client, `494` system and `104` contractor routes, `719` observations and `296` raw artifacts. Local browser acceptance confirmed client `076`, its MB „Baukas“ contractor relationship and references, zero horizontal overflow, and no console or JavaScript errors.
- This completed conservative no-new-claim review produced no source diff, so no empty commit was created. Existing `main` head `6c06ec27733066a6af8474af8eb0dbfe12d85ad1` remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task `1102` remains `success`, including Pages publication. Public overview, client and system routes returned the expected Keycloak/OAuth `302`; `kubectl`/an authorized `pages/pages` service-proxy route was unavailable in this cron environment, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remain untracked and excluded.
- No newer CVP IS instructor guidance was available in the synchronized channel state. Live work reconfirmed the documented exact-identity, complete-row and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next dossier rotation: `081`–`100`.
### Previous scheduled rotation — 2026-08-17 16:55 UTC
- Completed the ordered rotation of clients `041`–`060`. Reopened all `59` distinct current dossier evidence URLs (`97` citation occurrences), ran `91` exact CPVA client/system searches and `108` per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. Exact profiles and profile-derived notice lists were opened for `16` clients; no near-name profile was forced, and all `51` published-notice rows exposed by those lists were parsed, including `24` IT-title leads.
- No defensible new client-specific system, contractor, production-hosting, original-kickoff or production-release claim was established beyond the evidence already published earlier today. Current award and tender leads remained represented under their exact procurement stages; no planned procurement was promoted to award, supplier engagement, delivery, hosting, completion or release. Existing rows, statuses, confidence levels, gaps and `2026-08-17` dates were conservatively preserved.
- Generated state remains `290` clients, `494` canonical systems, `719` observations and `104` contractor cards, with complete `336` client→contractor and `336` system→contractor links. Statuses remain `79 researched`, `195 partial` and `16 no-public-evidence`; explicit hosting, original-kickoff and latest-release unknowns remain unchanged.
- All `15` repository tests, `corepack pnpm validate`, `corepack pnpm build`, registry/generated-route checks, all `59` browser-equivalent evidence URL checks and `git diff --check` passed. The build verified `290` client, `494` system and `104` contractor routes, `719` observations and `296` raw artifacts. Local browser acceptance confirmed the client directory and client `044` system/reference content.
- This completed conservative no-new-claim review produced no source diff, so no empty commit was created. Existing `main` head `6c06ec27733066a6af8474af8eb0dbfe12d85ad1` remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task `1102` remains `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth redirect; authorized `pages/pages` service-proxy page-body readback verified the client directory, client `044`, and the generated IMIS system dossier with explicit unknown infrastructure/lifecycle fields. Unrelated PPTX-improvement directories remain untracked and excluded.
- No newer human directive or CVP IS instructor guidance was present in the latest `100` Discord messages. Live work reconfirmed the documented exact-identity, complete-row and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next dossier rotation: `061`–`080`.
### Previous scheduled rotation — 2026-08-17 16:36 UTC
- Completed the required post-rerun rotation of clients `021`–`040`. Reopened all `69` distinct current dossier evidence URLs (`109` citations), ran `89` exact CPVA client/system searches and `104` per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. Exact profiles and profile-derived notice lists were opened for `18` clients; no near-name profile was forced for clients without an exact result, and all `421` complete published-notice rows exposed by the full lists were classified.
- No defensible new client-specific system, contractor, production-hosting, original-kickoff or production-release claim was established beyond the evidence already published earlier today. In particular, newly reopened APVA-profile award bodies named Aplinkos apsaugos departamentas or Aplinkos apsaugos agentūra—not APVA—as the contracting organization, so they were not converted into client `025` system-use/supplier claims. Exact CPVA results were broad-token or unrelated, and contractor searches produced no stronger opened source. Existing rows, statuses, confidence levels, gaps and `2026-08-17` dates were conservatively preserved.
- Generated state remains `290` clients, `494` canonical systems, `719` observations and `104` contractor cards, with complete `336` client→contractor and `336` system→contractor links. Statuses remain `79 researched`, `195 partial` and `16 no-public-evidence`; explicit hosting, original-kickoff and latest-release unknowns remain unchanged.
- All `15` repository tests, `corepack pnpm validate`, `corepack pnpm build`, registry/generated-route checks, all `69` browser-equivalent evidence URL checks and `git diff --check` passed. The build verified `290` client, `494` system and `104` contractor routes, `719` observations and `296` raw artifacts. Local browser acceptance confirmed client `028`, its system/contractor evidence links, no page overflow and no console or JavaScript errors.
- This completed conservative no-new-claim review produced no source diff, so no empty commit was created. Existing `main` head `6c06ec27733066a6af8474af8eb0dbfe12d85ad1` remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task `1102` remains `success`, including Pages publication. Public overview, client and system routes returned the expected Keycloak OAuth `302`; the authorized backend hostname did not resolve from this cron environment, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remain untracked and excluded.
- No newer human directive or CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented exact-identity, complete-row, direct-PDF and stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next dossier rotation: `041`–`060`.
### Previous scheduled rotation — 2026-08-17 16:08 UTC
- Completed RootAtSkic's explicitly requested second one-time rerun of clients `001`–`020` after the registry-table fix. Reopened all `54` distinct current Markdown evidence URLs with browser-equivalent requests, reran `127` exact CPVA client/system searches and `182` per-system contractor/procurement query-ladder searches, and repeated CVP IS organization-first discovery. Identity-checked exact profiles and their profile-derived notice lists were opened for `19` clients; client `010` still had no exact portal row and no near-name identity was forced.
- The current CVP IS lists contained `40` complete rows, including `37` IT/digitalization-stage leads. Two additional material tender leads were opened as direct PDFs and classified from their bodies: a Vyriausybės kanceliarija tender for planned privileged-access-management support and a Kultūros ministerija tender for planned Moodle-or-equivalent learning-management-system implementation/adaptation/training/maintenance. Neither notice proves an award, selected supplier, signed contract, delivery, production use, hosting, completion or release; the Moodle lead remains explicitly recorded in client `006`'s gap. Contractor searches and CPVA results produced no defensible stronger claim, so all dossier rows, statuses, confidence levels, gaps and `2026-08-17` dates were conservatively preserved.
- Generated state remains `290` clients, `494` canonical systems, `719` observations and `104` contractor cards, with complete `336` client→contractor and `336` system→contractor links. Statuses remain `79 researched`, `195 partial` and `16 no-public-evidence`; explicit production-hosting, original-kickoff and latest-release unknowns remain unchanged.
- All `15` repository tests, `corepack pnpm validate`, `corepack pnpm build`, registry/generated-route checks, evidence URL checks and `git diff --check` passed. The build verified `290` client, `494` system and `104` contractor routes, `719` observations and `296` raw artifacts. Local browser acceptance confirmed the representative client `001` page and PPVIS system dossier, including exact client→system→contractor/evidence relationships.
- This completed no-new-claim rerun produced no source diff, so no empty commit was created. Existing `main` head `6c06ec27733066a6af8474af8eb0dbfe12d85ad1` remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task `1102` remains successful, including the main-push Pages publication step. Public overview, client and system routes returned the expected Keycloak OAuth `302`; no authorized backend route was available, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remain untracked and excluded.
- No newer human directive or CVP IS instructor guidance was present in the accessible synchronized channel state. Live portal work reconfirmed the documented exact-organization, complete-row and direct-PDF stage-classification mechanics without exposing a new reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next dossier rotation: `021`–`040`.
### Previous scheduled rotation — 2026-08-17 15:52 UTC
- Reviewed clients `061`–`080` through all `64` distinct current dossier evidence URLs, official client/system sources, `80` exact CPVA client/system searches, `120` per-system contractor/procurement query-ladder searches, and identity-checked CVP IS organization-first discovery. All current evidence URLs remained readable. Ten byte-exact CVP IS profiles and their profile-derived notice lists were opened; near-name rows were not forced, and the `18` IT/digitalization-stage leads were classified conservatively from their notice types and opened bodies where material.
- Added one defensible client `076` observation: the planned **Permanent-exhibition expansion with innovative and inclusive solutions**. CPVA directly establishes the museum's funded project, while the opened CVP IS contract-award body establishes MB „Baukas“ as the EUR 37,631 technical-project design and author-supervision contractor under a contract signed `2025-07-31`. The claim is not extended to exhibition implementation, technology integration, completion, production use, hosting or current support. The other 19 clients produced conservative no-new-claim outcomes; all twenty dossier and index dates advanced to `2026-08-18` without status promotion.
- Generated state advanced from `493` to `494` canonical systems and from `718` to `719` observations; contractor cards advanced from `103` to `104`, with complete `336` client→contractor and `336` system→contractor links. New `SYS-7C4EFE9F86` and `CTR-551788F646` preserve hosting, original kickoff and latest production release as explicitly unknown.
- All `15` repository tests, `corepack pnpm validate`, `corepack pnpm build`, registry/generated-route checks, exact date/six-column checks, evidence URL checks and `git diff --check` passed. The build verified `290` client, `494` system and `104` contractor routes, `719` observations and `296` raw artifacts. Local browser acceptance confirmed client `076`, the new system and contractor links.
- Commit `6c06ec27733066a6af8474af8eb0dbfe12d85ad1` is on `main`; local/remote equality and authenticated exact-SHA client/system-analysis/index readback passed. Exact-SHA Gitea Actions task `1102` (run `2867`, job `3843`) succeeded, including the **Publish to LEGO Cloud Pages** step. The public changed route reached the expected Keycloak authentication boundary. The authorized backend hostname `vssa-documentation.vssa-v1.svc.cluster.local` did not resolve from this cron environment, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded.
- Live research reconfirmed the documented organization-first, direct-PDF and procurement-stage semantics without exposing a new reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next dossier rotation: `081`–`100`.
### Previous scheduled rotation — 2026-08-17 15:10 UTC
- Re-reviewed clients `041`–`060` after the completed one-time `001`–`020` rerun and the subsequent `021`–`040` rotation. The run reopened all `59` distinct dossier evidence URLs, executed `91` exact CPVA client/system searches and `112` per-system contractor/procurement searches, and reran identity-checked CVP IS organization-first discovery. Exact profile-linked notice lists were resolved for `16` clients and all `51` current complete rows were parsed; near-name rows for the remaining clients were not forced.
- Every reopened dossier URL returned browser-equivalent HTTP `200` content. The current official, CPVA, contractor and procurement sources produced no defensible new system, contractor, lifecycle or hosting claim beyond the evidence already published earlier today, so all rows, statuses, confidence levels, gaps and `2026-08-17` check dates were conservatively preserved.
- Generated state remains `290` clients, `493` canonical systems, `718` observations and `103` contractor cards, with complete `335` client→contractor and `335` system→contractor links. Statuses remain `79 researched`, `195 partial` and `16 no-public-evidence`; unknown production hosting, original kickoff and latest-release values remain explicit.
- All `15` repository tests, `corepack pnpm validate`, `corepack pnpm build`, registry/generated-route checks, evidence URL checks and `git diff --check` passed. Local browser acceptance confirmed the representative client `056` route, KVR evidence, zero horizontal overflow and no console or JavaScript errors. The build verified `290` client, `493` system and `103` contractor routes plus `296` raw artifacts.
- This conservative no-new-claim rerun produced no source diff, so no empty commit was created. Existing `main` head `8ce8b9479515257c417d455d1e23e5ec66d03828` remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task `1091` remains successful, including Pages publication. The public changed route returned the expected Keycloak OAuth `302`, so unauthenticated deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded.
- No new CVP IS instructor guidance, reusable source route or portal pitfall was found, so the authoritative `vssa-clients` skill required no update.
- Next dossier rotation: `061`–`080`.
### Previous scheduled rotation — 2026-08-17 14:53 UTC
- Reviewed clients `021`–`040` through all current dossier evidence and official client/system sources, `82` exact CPVA client/system searches, contractor/procurement query ladders, and identity-checked CVP IS organization-first discovery. Exact or identity-supported portal profiles were checked for `18` clients; every page of the `12` current profile-linked notice lists was parsed (`421` complete rows), while no near-name identity was forced for clients without an exact result.
- Two opened CVP IS contract-award PDFs added bounded client `028` observations. Nacionalinė žemės tarnyba awarded UAB COETUS a EUR 142,500 contract signed `2024-12-17` to create and develop a satellite-image-management digital tool, and awarded UAB „Novian Technologies“ a EUR 135,000 contract signed `2025-09-30` for IT-infrastructure maintenance, repair and related services. Neither award is presented as production deployment, acceptance, hosting, original system kickoff or a production release.
- Client `030` now directly cites the opened December 2025 STVK open-tender PDF for planned development, maintenance and support services. The contractor remains `Not publicly identified`, and the notice is not presented as an award or signed supplier engagement. APVA-profile awards whose bodies identified another agency as contract signer were conservatively excluded from client `025` system-use attribution.
- Generated state advanced from `491` to `493` canonical systems and from `716` to `718` observations; contractor cards advanced from `101` to `103`, with complete client→contractor and system→contractor links advancing from `333` to `335`. Statuses remain `79 researched`, `195 partial` and `16 no-public-evidence`; both new canonical analysis entries preserve hosting, original kickoff and latest production release as explicitly unknown.
- All `109` dossier citations across the batch (`69` unique URLs) returned opened browser-equivalent HTTP `200` content, including all three new direct procurement PDFs. All `15` tests, `corepack pnpm validate`, `corepack pnpm build`, registry/generated-route checks, `git diff --check` and local rendered Client/System/Contractor checks passed. The build verified `290` client, `493` system and `103` contractor routes, `718` observations and `296` raw artifacts.
- Commit `8ce8b9479515257c417d455d1e23e5ec66d03828` is on `main`; local/remote equality, authenticated exact-SHA source readback and exact-SHA Gitea Actions task `1091` succeeded, including the main-push **Publish to LEGO Cloud Pages** step. The authorized raw-IP backend check was blocked by this runtime's interactive security-approval guard, direct browser access to that endpoint was refused, and `docs.lego-cloud.eu` did not resolve, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded.
- Live research exposed no new reusable source-route mechanic or portal pitfall beyond the authoritative skill, so `vssa-clients` required no update.
- Next dossier rotation: `041`–`060`.
### Previous scheduled rotation — 2026-08-17 14:32 UTC
- Completed RootAtSkic's explicitly requested one-time rerun of clients `001`–`020` after the registry-table delivery. Reopened all `48` current Markdown citations, ran `46` exact CPVA client/system searches and `62` system contractor/procurement ladders, identity-checked exact CVP IS organization rows for `19` clients, and reviewed every page of their profile-derived published-notice lists. Client `010` still had no exact portal row; no near-name identity was forced. No new CVP IS instructor guidance was present beyond the durable validated mechanics.
- Two opened CVP IS contract-award PDFs materially deepened existing rows. Lietuvos Respublikos Vyriausybės kanceliarija awarded UAB „DevOcean LT“ PPVIS maintenance and improvement contract `46673`, signed `2025-09-09` for EUR 110,000. Lietuvos Respublikos aplinkos ministerija awarded MB „Duida“ NTIS expert consulting for system management, improvement and development under contract `43221`, signed `2025-05-22` for EUR 24,960. These awards are not presented as original development, production hosting, acceptance, completion or release; MB „Duida“ is explicitly not labelled the NTIS developer.
- Generated state remains `290` clients, `491` canonical systems and `716` observations; contractor cards advanced from `100` to `101`, with complete client→contractor and system→contractor links advancing from `331` to `333`. Statuses remain `79 researched`, `195 partial` and `16 no-public-evidence`; lifecycle and hosting unknowns were preserved.
- All `13` tests, `corepack pnpm validate`, `corepack pnpm build`, evidence-body extraction, route/registry validation, `git diff --check` and local browser checks passed. The build verified `290` client, `491` system and `101` contractor routes, `716` observations and `296` raw artifacts. Commit `e063285cf50cd6e9f65d844a6f97348452eae219` is on `main`; local/remote equality, authenticated exact-SHA source readback and exact-SHA Gitea Actions task `1088` (run `70`) succeeded, including Pages publication. Authorized `pages/pages` service-proxy readback verified both changed client bodies and award markers; the public route returned the expected Keycloak OAuth `302`. Unrelated PPTX-improvement directories remained untracked and excluded.
- Live research reconfirmed the documented exact-organization, complete-pagination and direct-PDF stage-classification mechanics without exposing a new reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next dossier rotation: `021`–`040`.
## Latest documentation delivery — 2026-08-17 14:34 UTC
- Improved the shared Docusaurus layout for wide registries. The left navigation is now `20rem` (`320px`), the desktop right table-of-contents column is reduced to `10rem` (`160px`), and the central document column consumes the remaining width instead of retaining Docusaurus's former column cap.
- The Systems registry is emitted inside an accessible, keyboard-focusable responsive region and uses a compact fixed-layout table with deliberate column proportions. At the verified `1280px` desktop viewport, the sidebar measured `320px`, article `753px`, TOC `160px`, and table/wrapper `753px`; neither the registry nor the body had horizontal overflow. At `997`–`1279px`, the secondary TOC is hidden and the compact table floor drops to `38rem`, preserving the primary registry rather than forcing three competing columns. Mobile behavior remains Docusaurus-native.
- Added regression coverage for the generated MDX wrapper and responsive layout contracts. All `15` tests, `corepack pnpm validate`, `corepack pnpm build`, registry/route validation and `git diff --check` passed against `491` system routes, `716` observations, `100` contractor routes and `296` raw artifacts. Browser acceptance found no console/JavaScript errors. Independent review found no blocking issue; its intermediate-width concern was addressed before merge.
- PR [#2](https://gitea.lego-cloud.eu/vssa-v1/documentation/pulls/2) passed exact feature-head Actions run `69` at `0eb5271610f30cfea33d5360f860b56d724dacff` and was merged as `7515aca24a78f509834b1435c784b7d171e0b6f8`. Exact merge-head Actions run `71`, job `3830`, succeeded, including **Publish to LEGO Cloud Pages**. Remote `main` equality and authenticated exact-SHA source readback passed. The public route reached the expected Keycloak OAuth `302`, so unauthenticated deployed-body readback was not claimed.
### Previous scheduled rotation — 2026-08-17 14:03 UTC
- Reviewed clients `081`–`100` through `80` reopened dossier citations, `90` exact CPVA client/system searches, `140` contractor/procurement searches, and identity-checked CVP IS organization discovery. Exact or identity-supported profiles were resolved for `18` clients; no near-name profile was forced for clients `088` or `091`.
- Added a bounded planned-procurement observation for client `082`: the opened August 2026 CVP IS notice is an open tender for software-programming services and audiovisual components for the **„TREMTIES VAGONAS: KITA STOTELĖ SIBIRAS“ digital exhibition**. It does not prove an award, selected supplier, signed contract, delivery, production operation, hosting, completion or release. Direct tender citations were also added to the existing bounded client `001` PPVIS manufacturer-support and client `005` VBAMS licence-update statements. Other reviewed rows, statuses, confidence levels and gaps were preserved.
- Generated state advanced from `490` to `491` canonical systems and from `715` to `716` observations; contractor cards remain `100`, with `331` complete client→contractor and `331` system→contractor links. New `SYS-7D116B8FB6` preserves production hosting, original delivery kickoff and production release as explicitly unknown.
- All `13` tests, `corepack pnpm validate`, `corepack pnpm build`, route/registry validation, `git diff --check` and local browser acceptance passed. Commit `d1a9e194fe5f289f98763297a169eee4cf8e6cfc` is on `main`; local/remote equality, authenticated exact-SHA readback and exact-SHA Gitea Actions task `1081` (run `67`) succeeded, including Pages publication. Unrelated PPTX-improvement directories remained untracked and excluded.
- The scheduler's “provider authentication error” label was false: OpenAI Codex authenticated and the run completed research, commit, push, source readback and exact-head CI. The agent then exhausted its tool-iteration budget immediately after CI, so its otherwise complete report was wrapped in `RuntimeError`; deployed body readback and this wiki update were the only unfinished steps. The wiki cursor has now been repaired manually.
- Next dossier rotation: `101`–`120`.
## Latest documentation delivery — 2026-08-17 10:16 UTC
- Fixed the public registry generators after the earlier work remained only in an undeployed feature worktree. The Clients registry now includes a distinct canonical **Systems** count; rendered Client sidebar labels omit numeric prefixes while source filenames and dossier headings retain them. The Systems registry removes **Type** and adds **Contractors**, **Cloud** (`AWS`, `AZURE`, `GCP`, `Other`, `NaN`) and **OnPrem?** (`Yes`, `No`, `NaN`).
- Added behavioral regression coverage for all requested table/sidebar semantics. All `13` tests, `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed. The production build verified `290` client, `482` system and `100` contractor routes, `707` observations, `329` client→contractor links, `329` system→contractor links and `296` raw artifacts. Independent frozen-patch review passed with no security or logic findings.
- Rendered browser acceptance confirmed number-free Client sidebar labels, preserved numbered dossier heading `001 — Lietuvos Respublikos Vyriausybės kanceliarija`, Client table headers `ID / Client / Systems / Status / Last investigated`, client `001` system count `2`, and Systems headers `ID / System or service / Contractors / Cloud / OnPrem? / Clients / Observations`; `Type` was absent, unknown values rendered `NaN`, and the wide table retained horizontal scrolling.
- PR [#1](https://gitea.lego-cloud.eu/vssa-v1/documentation/pulls/1) was opened at exact reviewed head `48d81d6b0a0e35887a0737fbbab94d5bf89b306a`; exact-head task `1020` succeeded. The PR was merged as `1624e77c90f1a38205c63cf025ec55d0444eef9a`; exact merge-head task `1021` succeeded, including Pages publication. Authenticated exact-SHA source readback confirmed all four changed files. Public browser access reached the expected Keycloak boundary, so unauthenticated deployed page-body readback was not claimed.
- RootAtSkic explicitly requested another one-time review of clients `001`–`020`. The wiki cursor and cron prompt were reset accordingly, and an immediate scheduled run was triggered. After it completes, the cursor advances to `021`–`040`.
## Latest scheduled rotation — 2026-08-17 13:32 UTC
- Reviewed clients `061`–`080` through all current dossier citations and official client/system sources, `58` exact CPVA client/system searches, `80` system/contractor/procurement query-ladder searches, and identity-checked CVP IS organization-first discovery. Exact profiles were resolved for `15` clients; client `066` exposed two distinct exact-name profiles and both notice lists were preserved and reviewed rather than forcing one canonical record. No exact profile was forced for clients `061`, `064`, `071`, `072` or `073`. All twenty dossier/index dates advanced to `2026-08-17` without unsupported status promotion.
- Two opened direct CVP IS tender PDFs added bounded planned-procurement observations for client `075`: **text-to-speech synthesis software** and **illustration-content recognition software**. Each notice says that Lietuvos audiosensorinė biblioteka planned to acquire the software through an open tender; neither identifies a selected supplier or proves award, contract signature, delivery, production use, hosting, completion or release. The other reopened sources produced no defensible new claim and retained their existing rows, confidence levels and gaps.
- Generated state advanced from `488` to `490` canonical systems and from `713` to `715` observations; contractor cards remain `100`, and complete client→contractor plus system→contractor link counts remain `331`. New `SYS-E795BC75EF` and `SYS-71E3A7ECDE` preserve production hosting, original delivery kickoff and latest production release as explicitly unknown.
- All `62` pre-existing dossier URLs plus both new CVP IS PDFs returned opened browser-equivalent HTTP `200` content; both new bodies were verified as non-trivial PDFs and text-extracted for stage classification. All `13` tests, `corepack pnpm validate`, `corepack pnpm build`, registry/generated-route checks and `git diff --check` passed; the build verified `290` client, `490` system and `100` contractor routes, `715` observations and `296` raw artifacts. Local browser acceptance confirmed the updated client `075` and new system route with no console errors.
- Commit `6fe5d6a6f5537658c81e15f9cf28c389647a431e` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-SHA Gitea Actions task `1073` (run `66`) succeeded, including the main-push Pages publication step. The public documentation hostname did not resolve from this runtime and no authorized backend route or mounted Pages dataset was available, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded.
- Live work reconfirmed the documented organization-first, duplicate-profile ambiguity and direct-PDF stage-classification mechanics but established no new reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next dossier rotation: `081`–`100`.
### Previous scheduled rotation — 2026-08-17 12:44 UTC
- Completed clients `041`–`060` after the required `001`–`020` rerun and the subsequent `021`–`040` batch. Current dossier evidence, official client/system routes, exact CPVA client/system searches, contractor ladders and identity-checked CVP IS organization-first records were reviewed. The reopened sources that did not produce a defensible new claim retained their existing rows, statuses, confidence levels and gaps; all twenty dossier/index dates advanced to `2026-08-17`.
- Opened direct CVP IS bodies added three bounded planned/unsuccessful-procurement observations: VMI's planned **ITIS_EU** modernization/consulting procurement, VMI's unsuccessful **i.KON** risk-analysis-module development procedure (explicitly no winner), and NBFC's planned **Užduočių valdymo informacinė sistema** creation/implementation procurement. A separate open tender added planned KVR/KPEPIS maintenance/support scope to client `056`. None was presented as a selected supplier, signed contract, delivery, production use, hosting, acceptance, completion or release.
- Generated state advanced from `485` to `488` canonical systems and from `710` to `713` observations; contractor cards remain `100`, and complete client→contractor plus system→contractor link counts remain `331`. New `SYS-B6A420C06F`, `SYS-3791C39F61` and `SYS-52BFEDE8DB` preserve production hosting, original delivery kickoff and latest production release as explicitly unknown.
- All `59` distinct dossier URLs returned opened browser-equivalent HTTP `200` content. All `13` tests, `corepack pnpm validate`, `corepack pnpm build`, registry/generated-route checks and `git diff --check` passed; the build verified `290` client, `488` system and `100` contractor routes, `713` observations and `296` raw artifacts. Local browser acceptance confirmed the updated client `056` heading and planned-maintenance wording with no console errors.
- Commit `494a3144f176e90f5e8e7215562d56fbfd3d4208` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-SHA Gitea Actions task `1067` (run `65`) succeeded, including Pages publication. The public changed route reached the expected Keycloak OAuth boundary; no authorized backend route or mounted Pages dataset was available in this runtime, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded.
- No new reusable CVP IS mechanic or source-route pitfall was established, so the authoritative `vssa-clients` skill required no update.
- Next dossier rotation: `061`–`080`.
### Previous scheduled rotation — 2026-08-17 11:43 UTC
- Reviewed clients `021`–`040` through all current dossier citations and official client/system sources, `85` exact CPVA client/system searches, contractor query ladders, and identity-checked CVP IS organization-first discovery. Exact profiles were resolved for `17` clients; no near-name profile was forced for clients `026`, `029` or `034`. All `87` existing dossier URLs returned HTTP `200`; the two JavaScript-rendered sources were separately opened in a browser and confirmed readable.
- Three opened direct CVP IS procurement-notice PDFs added bounded evidence for client `039`: planned update/maintenance/support procurement for **TARES**, planned MDAS maintenance/support and **iMDAS** update procurement, and planned update/maintenance/support procurement for **Komandoras**. Each body identifies the exact contracting authority and open-tender stage; no supplier, award, signed contract, delivery, production release or hosting was inferred. The other reopened sources produced no defensible new claim, so their statuses and unresolved gaps were preserved while all twenty dossier/index dates advanced to `2026-08-17`.
- Legacy four-column dossiers `033`, `034`, `036` and `040` were normalized to the canonical six-column table while preserving their original system labels and evidence semantics. Generated state advanced from `483` to `485` canonical systems and from `708` to `710` observations; contractor cards remain `100`, and complete client→contractor plus system→contractor links advanced from `329` to `331`. New `SYS-D36FA3BF0E` and `SYS-FBEDF460ED` retain hosting, original kickoff and latest production release as explicitly unknown.
- All `13` tests, `corepack pnpm validate`, `corepack pnpm build`, registry/generated-route checks, `git diff --check`, evidence URL checks and local browser acceptance passed. Commit `00075a5bc6c78147fab84af8478a8bb33c973738` was pushed to `main`; local/remote ref equality, authenticated exact-SHA source readback and exact-SHA Gitea Actions task `1058` (run `64`) succeeded, including Pages publication. The deployed route reaches the expected Keycloak OAuth `302`; no authorized backend route or mounted Pages dataset was available in this runtime, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded.
- Live CVP IS work reconfirmed the documented organization-first, exact-identity and direct-body stage-classification mechanics but exposed no new reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next dossier rotation: `041`–`060`.
### Previous scheduled rotation — 2026-08-17 10:27 UTC
- Completed RootAtSkic's explicit one-time rerun of clients `001`–`020` after the registry-table fix. All current dossier evidence and official client/system routes were reopened; `46` exact CPVA client/system queries and the `19` identity-checked CVP IS organization notice lists were rerun. Client `010` still has no defensible exact CVP IS organization profile, so no near-name record was forced. Existing system contractor ladders were rechecked; no procurement-stage record was promoted beyond what its opened body proves.
- A newly surfaced official Aplinkos ministerija sitemap route added **Nuotekų tvarkymo informacinė sistema (NTIS)** to client `002`. The opened Ministry page says the Ministry created NTIS and directly describes its individual-wastewater registry, collection/transfer/treatment recording, risk-control and reporting functions. No commercial developer, current support supplier, production host, original kickoff or production release was identified; the page's update date was not treated as lifecycle evidence.
- All `50` distinct dossier URLs returned readable browser-equivalent content. Generated state advanced from `482` to `483` canonical systems and from `707` to `708` client-system observations while remaining `100` contractor cards; new `SYS-4546BF5F3B` preserves hosting, original kickoff and latest production release as explicitly unknown. Complete contractor link counts remain `329` client→contractor and `329` system→contractor.
- All `13` tests, `corepack pnpm validate`, `corepack pnpm build`, registry/generated-route validation, `git diff --check`, and local rendered Client/System route checks passed. Commit `b52d7231fe4197cc8f88150fc9b0838b35b42bf0` was pushed to `main`; local/remote ref equality, authenticated exact-SHA source readback and exact-SHA Gitea Actions task `1024` succeeded, including Pages publication. The public route reached the expected Keycloak OAuth `302`; no authorized backend route or mounted Pages dataset was available in this runtime, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded.
- The live portal work reconfirmed the documented organization-first, identity-check and direct-body stage-classification mechanics but exposed no new reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
- Next dossier rotation: `021`–`040`.
### Previous scheduled rotation — 2026-08-17 10:00 UTC
- Reviewed reset rotation `001`–`020`. New bounded tender-stage evidence was added for client `012` (Ministry of Agriculture DocLogix document-management-system maintenance procurement) and client `017` (State Forest Service National Forest Inventory Information System modernization procurement). Both direct CVP IS PDFs are tender notices only; no selected supplier, signed contract, delivery, production use, hosting, completion or release was inferred.
- Clients `013`–`016` were converted from legacy evidence tables to the canonical six-column format while preserving supported system identities and direct official citations. Other clients without defensible new claims were rechecked and dated `2026-08-17` without unsupported status promotion or contractor attribution.
- Generated state advanced to `482` canonical systems, `707` client-system observations and `100` contractor cards. New `SYS-A09C6AC314` and `SYS-04AA743682` retain hosting, original kickoff and latest production release as explicitly unknown. All `49` distinct dossier URLs passed browser-equivalent checks, including both inspected CVP IS PDFs.
- `corepack pnpm validate`, `corepack pnpm build`, registry/generated-route validation, `git diff --check`, and local browser verification passed. Commit `2c018c2248faebcdf06b7a1cb018de4eddb7cd2c` was pushed to `main`; local/remote ref equality, authenticated exact-SHA source readback, exact-SHA Gitea Actions task `1018`, Pages publication, and authorized service-proxy deployed-content checks passed. Unrelated PPTX-improvement directories remained untracked and excluded.
- The scheduler marked this run failed only because the agent exhausted its `60/60` turn budget after completing delivery and then returned the final report through a `RuntimeError`. Provider authentication was healthy; the alert's authentication label was a misclassification. The durable wiki cursor was repaired manually after the run.
- Next dossier rotation: `001`–`020` (**explicit one-time rerun requested after registry-table delivery; after completion continue with `021`–`040`**).
### Previous scheduled rotation — 2026-08-17 06:15 UTC
- Reviewed rotation `201`–`210` through all existing dossier citations and official client routes, exact CPVA client/system searches, contractor/system query ladders, and CVP IS organization-first discovery. Exact profile tuples were confirmed for clients `201` (`organizationId=12830`, `authorityId=12830`, `orgGroupId=29932`), `202` (`13905`, `13905`, `36656`), `203` (`2137`, `2137`, `2149`), `204` (`1522`, `1522`, `1525`), `205` (`4500`, `4500`, `4906`), `206` (`2329`, `2329`, `2359`), `207` (`5766`, `5766`, `7188`) and `209` (`1516`, `1516`, `1519`). Client `208` returned an exact-name row whose contact domain conflicted with the institution and was not relied on; no exact organization row was found for client `210`.
- Nine opened direct CVP IS award/amendment PDFs added bounded evidence. Client `204` now records DocuWare support/development by DocWay sp. z o.o., Ivanti Neurons for ITSM support/development by Synergy Consulting, OAS and UAIS support/development by UAB CGI Lithuania, and process-robotization licence rental by ATEA. Client `205` records VATIS modernization by Asserte and the directly stated VSSA-administered production environment while leaving cloud/on-premises/hybrid classification unknown. Client `206` records ŽDIS improvement by ATEA and vCatch update/support by Twoday A/S. Client `209` adds VVR programming/development by UAB Fortevento. Dates, values and roles were taken from the award bodies and were not extended to original development, production hosting, acceptance, completion or release.
- The other reopened sources and applicable notice lists produced no defensible additional claim. All ten dossier/index dates advanced to `2026-08-17` without status promotion. The obsolete non-resolving IMVIS login citation was replaced by the opened current official VMVT IMVIS page, and its claim was narrowed accordingly. Browser-equivalent verification reopened all `37` distinct Markdown URLs, including all nine direct procurement PDFs; every URL returned inspected HTTP `200` content.
- Generated state advanced from `473` systems / `698` observations / `95` contractors to `480` systems / `705` observations / `100` contractors. Seven new canonical analysis entries retain production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client/System pages preserve all `705` system links and complete `325` client→contractor plus `325` system→contractor links. The ATEA regression expectation was updated from three to five evidenced client/system relationships.
- `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed. The build verified `290` client, `480` system and `100` contractor routes plus `296` raw artifacts. Commit `174030f7445f0ff1df5a69e694f085e5d17b3943` was pushed to `main`; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task `940` (run `58`) succeeded, including Pages publication. Representative Client, System and Contractor routes returned the expected Keycloak OAuth `302`; `docs.lego-cloud.eu` remained unresolvable, so backend page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
- Discord readback reached bot message `1538732595821547540`; no newer human directive or message from designated CVP IS instructor `476287310627864587` was present. Live portal work reconfirmed the existing exact-organization, complete-row and direct-PDF mechanics but exposed no new reusable procedure or pitfall, so `vssa-clients` required no update.
- Next dossier rotation: `211`–`220`.
### Previous scheduled rotation — 2026-08-17 02:12 UTC
- Reviewed rotation `191`–`200` through all existing dossier citations and official client routes, exact CPVA client/system searches, contractor/system query ladders, and CVP IS organization-first discovery. Identity-checked exact CVP IS profile tuples were: client `192` (`organizationId=4600`, `authorityId=4600`, `orgGroupId=5025`), `194` (`1957`, `1957`, `1962`), `195` (`13077`, `13077`, `31408`), `196` (`8420`, `8420`, `14170`), `198` (`1160`, `1160`, `1161`), `199` (`10201`, `10201`, `19143`) and `200` (`8449`, `8449`, `14261`). No near-name portal record was forced for clients without a defensible exact identity.
- An opened direct CVP IS national procurement-notice PDF added a bounded observation for client `192`: Riešės gimnazija initiated a planned **Skaitmeninių mokymosi aplinkų licencijų** procurement with estimated value `32 000 Eur` excluding VAT. The notice does not identify products, winner, signed contract, delivery or production use, so the contractor remains `Not publicly identified` and relationship is `procures (planned)`.
- The remaining nine dossiers produced no defensible additional claim after reopening official pages, exact CPVA broad-token searches and applicable CVP IS notice lists. Existing rows, statuses, confidence levels and gaps were preserved; all ten dossier/index dates advanced to `2026-08-17`. Browser-equivalent verification reopened all `22` distinct Markdown URLs (including the direct procurement PDF): every source returned inspected HTTP `200` content. Live portal work reconfirmed exact/variant organization matching, complete-row parsing and direct-PDF classification but exposed no new reusable mechanic or pitfall, so the authoritative `vssa-clients` skill required no change.
- Generated state advanced from `472` systems / `697` observations / `95` contractors to `473` systems / `698` observations / `95` contractors. New canonical `SYS-B7123CD417` keeps production hosting, original delivery kickoff and latest production release explicitly unknown. Generated Client/System pages preserve all `698` system links and complete `315` client→contractor plus `315` system→contractor links; the new unknown-contractor placeholder remains explicit and unlinked.
- `corepack pnpm validate`, `corepack pnpm build`, `git diff --check`, and local browser route checks passed. The build verified `290` client, `473` system and `95` contractor routes, `698` observations, and `296` raw artifacts. Commit `83b802bbcd589c8492f6c1daf3a7982c0d5cfc65` was pushed to `main`; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task `930` succeeded, including Pages publication. Representative public Client and System routes returned the expected Keycloak OAuth `302`; no authorized backend route was available, so deployed page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
- Discord readback reached bot message `1538671402167701666`; no newer channel message, human directive, or message from designated CVP IS instructor `476287310627864587` was present. No portal guidance was invented.
- Next dossier rotation: `201`–`210`.
### Previous scheduled rotation — 2026-08-17 00:12 UTC
- Reviewed rotation `181`–`190` through all existing dossier citations and official client routes, exact CPVA client/system searches, contractor/system query ladders, and CVP IS organization-first discovery. Identity-checked CVP IS profile tuples included successor LINEŠA for client `183` (`organizationId=10864`, `authorityId=10864`, `orgGroupId=21121`), close portal renderings for `184` (`263836`, `383359`, `383359`) and `185` (`66513`, `132804`, `132804`), and exact Nacionalinė švietimo agentūra profile `1211` (`1211`, `1212`). No near-name record was forced for clients without a defensible exact/current identity.
- Two opened direct CVP IS contract-award PDFs materially deepened client `190`. UAB „Asseco Lietuva“ won AIKOS software maintenance/development contract `52300`, signed `2026-02-27` for EUR 22,400, and NEMIS software maintenance/development contract `27824`, signed `2025-08-19` for EUR 29,040. The NEMIS observation was corrected from the erroneous “Neformaliojo švietimo” expansion to **Nesimokančių vaikų ir mokyklos nelankančių mokinių informacinė sistema**, as confirmed by both the NŠA system page and award body. A separate opened ŠVIS tender proves intended procurement of 24 months of maintenance/development only; no supplier or signed contract was attributed.
- LINEŠA's official `2023-09-07` announcement explicitly says the updated **Mokinių ugdymo karjerai informacinė sistema (MUKIS)** was already operating. Canonical `SYS-F0B5221055` now records that day as the latest directly evidenced production release; original delivery kickoff and hosting remain unknown. The renamed NEMIS generated `SYS-921BF5E45C`; its stale all-unknown misnamed analysis entry was removed before bootstrap. Registry totals remain `79 researched`, `195 partial`, `16 no-public-evidence`, `472` systems, `697` observations and `95` contractors. Generated Client/System pages preserve all `697` system links and complete `315` client→contractor plus `315` system→contractor links, including both new links to established `CTR-E90B7D3CBD`.
- The remaining nine dossiers produced no defensible additional claim after reopening official pages, CPVA broad-token results and applicable CVP IS notice lists; their existing rows, statuses, confidence levels and gaps were preserved. All ten dossier/index dates advanced to `2026-08-17`. Live portal work reconfirmed exact/variant organization matching, complete-row pagination and direct-PDF classification but exposed no new reusable mechanic or pitfall, so the authoritative `vssa-clients` skill required no change.
- `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed. The build verified `290` client, `472` system and `95` contractor routes, `697` observations, complete `315` client→contractor plus `315` system→contractor links, and `296` raw artifacts. Commit `bf0c44153cee7d7f4cbe2abdda9984964b9b4988` was pushed to `main`; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task `925` (run `56`) succeeded, including Pages publication. Representative public routes returned the expected Keycloak OAuth `302`; `docs.lego-cloud.eu` remained unresolvable and no authorized backend route was available, so deployed page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
- Discord readback reached bot message `1538671402167701666`; no new human directive or message from designated CVP IS instructor `476287310627864587` was present after high-watermark `1538638252054761644`. No portal guidance was invented.
- Next dossier rotation: `191`–`200`.
### Previous scheduled rotation — 2026-08-16 22:09 UTC
- Reviewed rotation `171`–`180` through all existing dossier citations and official client routes, exact CPVA client/system searches, contractor/system query ladders, and CVP IS organization-first discovery. Profile-derived tuples were `171` `7064` `(authorityId=7064, orgGroupId=10354)`, `172` `1297` `(1297,1298)`, `173` `7299` `(7299,10959)`, `174` `3350` `(3350,3432)`, `175` `4292` `(4292,4624)`, `176` `10551` `(10551,20145)`, `177` `7697` `(7697,12093)`, `178` `10208` `(10208,19163)`, and `179` portal rendering `Lietuvos istorijos institutas (PV)` `4329` `(4329,4680)`. Client `180` remains represented by distinct profiles `2876` `(2876,2931)` and `2903` `(2903,2960)`; both notice lists were reviewed rather than silently selecting one canonical record.
- CVP IS lists exposed tender/award leads including training services for client `175`, a specialist book scanner for `177`, website creation/licence notices for `179`, and test-standardisation plus digital-methodical-content procurements for `180`. None directly and unambiguously established a new canonical information system, contractor role, production hosting, original delivery kickoff, or production release after stage and identity checks. No defensible new claim was added; all ten existing rows, statuses, confidence levels and gaps were preserved, while dossier/index check dates advanced to `2026-08-16`. Registry totals remain `79 researched`, `195 partial`, `16 no-public-evidence`, `472` systems, `697` observations and `95` contractors.
- Browser-equivalent verification reopened `28` distinct Markdown URLs. `27` resolved to inspected HTTP `200` pages; the official KPMPC SMIS citation redirected to the unavailable `www.smis.lt` endpoint, matching the dossier's explicit unresolved current-availability gap and not supporting any stronger current claim. Exact CPVA broad-token results yielded no claim source. Live CVP IS work reconfirmed exact/variant identity checks, separate duplicate-profile handling and complete-row parsing but exposed no new reusable mechanic or pitfall, so the authoritative `vssa-clients` skill required no change.
- `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed after repairing a corrupted local Docusaurus package installation with a frozen forced pnpm reinstall. The final build verified `290` client, `472` system and `95` contractor routes, `697` observations, complete `313` client→contractor plus `313` system→contractor links, and `296` raw artifacts. Commit `39db665cf22246a8c5e5ad1c12364dd0407368c6` was pushed to `main`; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task `920` (run `55`) succeeded, including Pages publication. The representative public route returned the expected Keycloak OAuth `302`; `docs.lego-cloud.eu` remained unresolvable from this runtime, so backend page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
- Local Discord state contained no channel message newer than high-watermark `1538638252054761644`; no new human directive or message from designated CVP IS instructor `476287310627864587` was available. No portal guidance was invented.
- Next dossier rotation: `181`–`190`.
### Previous scheduled rotation — 2026-08-16 20:14 UTC
- Reviewed rotation `161`–`170` through all existing dossier citations, official client routes, exact CPVA client/system queries, contractor ladders, and CVP IS organization-first discovery. Identity-checked CVP IS profiles were `161` `5234` `(authorityId=5234, orgGroupId=6064)`, `162` `9176` `(9176,16805)`, `163` `5288` `(5288,6187)`, `165` typography variant `Diemedžio ugdymo centras` `18293` `(18293,75131)`, `166` `5432` `(5432,6490)`, `167` `1500` `(1500,1503)`, and `169` `8181` `(8181,13526)`. No exact profile was forced for `164`, `168`, or `170`. All `32` Markdown URLs across the ten dossiers returned browser-equivalent HTTP `200`; dossier/index dates advanced to `2026-08-16` while statuses remain `79 researched`, `195 partial`, `16 no-public-evidence`.
- Three opened direct CVP IS contract-award PDFs added bounded evidence for Lietuvos medicinos biblioteka. The library explicitly governs/administers **MNKV IS**: UAB nSoft won modernization and implementation contract `53411`, signed `2025-07-08` for EUR 347,500, and FORIT UAB won independent technical-supervision contract `53415`, signed `2025-07-07` for EUR 73,000. UAB „IO projects“ won HL7 FHIR medical-document/data-modelling contract `53417`, signed `2025-08-11` for EUR 217,000. None of these awards was extended to production hosting, completion or a production release.
- Lietuvių kalbos institutas's opened award proves that USA LT won programming contract `6440`, signed `2025-03-14`, to create language-heritage data models, digitisation/integration tools, maps, geo-spatial infrastructure and open-data publication. The notice reports EUR 1,198,800 total awarded-contract value and a EUR 1,450,548 winning offer; both were preserved rather than reconciled by inference. It records unnamed subcontracting, so no subcontractor was attributed. The remaining eight dossiers gained no defensible system/contractor claim after the assigned source-class review; their existing rows, confidence, statuses and gaps were preserved.
- Generated state advanced from `469` systems / `694` observations / `93` contractors to `472` systems / `697` observations / `95` contractors. New `SYS-2EDA44EE65`, `SYS-57D7B32F9F`, and `SYS-5287D32490` retain production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client/System pages preserve all `697` system links and complete `313` client→contractor plus `313` system→contractor links; new FORIT UAB (`CTR-C52C3F9113`) and USA LT (`CTR-840737E61E`) cards and established UAB nSoft/UAB „IO projects“ cards are linked from the exact observations.
- `corepack pnpm validate`, `corepack pnpm build`, URL verification and `git diff --check` passed; the build verified `290` client, `472` system and `95` contractor routes, `697` observations and `296` raw artifacts. Commit `65b40cbb3c73e7bbfb80a0d0620648733f213dd1` was pushed to `main`; ref equality and authenticated source readback passed. Exact-final-SHA Gitea Actions task `915` succeeded, including Pages publication. This runtime could neither resolve `docs.lego-cloud.eu` nor route to the previously used backend address and had no `kubectl`/mounted authorized service-proxy path, so public OAuth and backend page-body readback were not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
- Discord readback reached message `1538638252054761644`; the only new message after the prior high-watermark was bot-authored and no new human directive or message from designated CVP IS instructor `476287310627864587` was present. Live portal work reconfirmed existing exact-organization, typography-variant, complete-row and direct-PDF mechanics but exposed no new reusable procedure or pitfall, so `vssa-clients` required no update.
- Next dossier rotation: `171`–`180`.
### Previous scheduled rotation — 2026-08-16 18:13 UTC
- Reviewed rotation `151`–`160` through all existing dossier citations, exact CPVA client/system queries, contractor ladders, and CVP IS organization-first discovery. Identity-checked profile tuples included `151` `4212` `(4212,4495)`, `152` `4917` `(4917,5505)`, `153` `6371` `(6371,8635)`, former rendering `155` `1695`, `156` `5704` `(5704,7042)`, `158` `8783` `(8783,15347)`, `159` `2097` `(2097,2109)`, and `160` `10220` `(10220,19195)`. All `39` Markdown URLs across the ten dossiers returned browser-equivalent HTTP `200`; dossier/index dates advanced to `2026-08-16` while statuses remain `79 researched`, `195 partial`, `16 no-public-evidence`.
- Opened direct CVP IS PDFs added bounded evidence: client `151` tendered a two-month technology rewrite of the donor/recipient register; client `152` tendered ULSVIS vulnerability, penetration, speed and performance testing; neither tender proves an award or supplier. Client `156` awarded UAB MeritStory contract `35299`, signed `2025-11-05` for EUR 655,000, to develop LSPSKP IS; its separate chatbot tender remains planned procurement with no attributed supplier or deployment. Client `159` awarded MB IT innovations contract `3075`, signed `2025-01-22` for EUR 126,370, for VAPRIS/VPREG modernization technical supervision. A separate EUR 655,560 modernization award omitted the winner name, so no implementation supplier was inferred.
- Scoped the generic chatbot observation to **VASPVT išmanusis pokalbių robotas** before final delivery, preventing client-specific tender evidence from contaminating another organization's generic chatbot record. Generated state advanced from `467` systems / `692` observations / `91` contractors to `469` systems / `694` observations / `93` contractors. New `SYS-B477086866` and the VASPVT-scoped chatbot record retain production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client/System pages preserve all `694` system links and complete `309` client→contractor plus `309` system→contractor links; UAB MeritStory (`CTR-4AC7BF2CE8`) and MB IT innovations (`CTR-F0C874147B`) link to valid Contractor Cards.
- `corepack pnpm validate`, `corepack pnpm build`, URL verification and `git diff --check` passed; the final build verified `290` client, `469` system and `93` contractor routes, `694` observations and `296` raw artifacts. Research commit `12ef084c2f2204a81356c06146b5a7b923e12230` and final identity-scope fix `0f4e31cfc8ef1f1ee8edcc935ceefe4256a65de6` were pushed to `main`; final ref equality and authenticated source readback passed. Exact-final-SHA Gitea Actions task `906` (run `53`) succeeded, including Pages publication. The public route returned the expected Keycloak OAuth `302`; this runtime had no `kubectl`/mounted authorized backend path, so backend page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
- Discord readback reached message `1538578370701430856`; all messages newer than the prior high-watermark were bot-authored rate-limit reports, with no new human directive or message from designated CVP IS instructor `476287310627864587`. Live portal work reconfirmed existing organization-first, profile-ID and direct-PDF mechanics but exposed no new reusable procedure or pitfall, so `vssa-clients` required no update.
- Next dossier rotation: `161`–`170`.
### Previous scheduled rotation — 2026-08-15 06:10 UTC
- Reviewed rotation `141`–`150` through current dossier evidence, exact client/system CPVA queries, contractor queries, CVP IS organization/notice discovery and opened direct procurement PDFs. Broad-token CPVA results did not directly prove an additional claim. All `58` Markdown URLs across the ten dossiers returned browser-equivalent HTTP `200`; all dossier and index check dates advanced to `2026-08-15` while statuses remained `79 researched`, `195 partial`, `16 no-public-evidence`.
- Lietuvos transporto saugos administracija's direct contract-award PDF establishes **Jūros dugno duomenų bazės ir jūrinio kartografavimo sistemos programinė įranga** and UAB „Hnit-Baltic“ as the software-update and maintenance supplier under contract `62212`, signed `2026-07-28` for EUR 460,425. This award is not extended to original development, hosting, completion or production release.
- Higienos institutas's opened July 2026 notice establishes intended procurement of **Visuomenės sveikatos stebėsenos informacinės sistemos** improvement services for four months. It is a tender, not an award, so no supplier or delivery claim was added. The remaining eight clients produced no defensible new claim after the assigned source-class review; their existing rows, confidence and unresolved gaps remain unchanged.
- Generated state advanced from `466` systems / `691` observations / `91` contractors to `467` systems / `692` observations / `91` contractors. New `SYS-1567A86E5F` retains production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client/System pages preserve all `692` system links and complete `306` client→contractor plus `306` system→contractor links; the LTSA row links to the established `CTR-37185E6E09` UAB „Hnit-Baltic“ Contractor Card.
- `corepack pnpm validate`, `corepack pnpm build`, URL verification and `git diff --check` passed; the build verified `290` client, `467` system and `91` contractor routes, `692` observations and `296` raw artifacts. Commit `859687042e395516473bc10c72816f3a1b9d3939` was pushed to `main`; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task `886` (run `51`) succeeded, including Pages publication. The public route returned the expected Keycloak OAuth `302`; this runtime had no `kubectl`/authorized service-proxy client, so backend page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
- The synchronized channel export remains at message `1538007301989331127`, with no recorded newer human directive or message from designated CVP IS instructor `476287310627864587`. Live portal work reconfirmed existing organization-first and direct-PDF behavior but exposed no new reusable mechanic, so `vssa-clients` required no update.
- Next dossier rotation: `151`–`160`.
### Previous scheduled rotation — 2026-08-15 04:14 UTC
- Reviewed rotation `131`–`140` through all current dossier citations, exact client/system CPVA queries, contractor searches, and every page of the identity-checked CVP IS organization notice lists. Exact profiles and profile-derived `(authorityId, orgGroupId)` pairs were confirmed as: `131` `4842` `(4842,4904)`; `132` `5786` `(5786,7270)`; `133` `2781` `(2781,2818)`; `134` punctuation variant `Socialinės globos centras "Vija"` `8826` `(8826,15535)`; `135` `2176` `(2176,2198)`; `136` punctuation variant `Specialieji socialinės globos namai "Tremtinių namai"` `20789` `(20789,100442)`; `137` `5939` `(5939,7459)`; `138` `1722` `(1722,1726)`; `139` `3011` `(3011,3053)`; and `140` `5113` `(5113,5856)`. Profile domains/addresses corroborated the punctuation variants; no near-name result was forced.
- Ten client observations now reuse shared CVP IS identity `SYS-9FC4DC8662`. Seven opened direct tender PDFs added bounded planned-procurement evidence: client `132` video-surveillance/security installation plus fire-alarm/security maintenance; `133` security, fire-alarm, video-surveillance and call-system maintenance; `135` SOPAS maintenance/support/modification, SGLEP support/maintenance/modification, and Šeimos kortelė mobile-app maintenance/app-store publication; and `139` a wireless personnel-call system. These notices do not establish an award, signed contract, supplier, delivery, production use, hosting, original kickoff or release, so contractor cells remain `Not publicly identified`.
- Exact CPVA and contractor/system ladders produced no additional directly proved claim. All `41` Markdown URLs across the ten dossiers returned browser-equivalent HTTP `200`, including the seven direct CVP IS PDFs. Dossier and index dates advanced to `2026-08-15`; statuses remain `79 researched`, `195 partial`, `16 no-public-evidence`.
- Generated state advanced from `461` systems / `676` observations / `91` contractors to `466` systems / `691` observations / `91` contractors. New canonical records `SYS-D85FD35B15`, `SYS-E06F4B3954`, `SYS-F6360A31DB`, `SYS-896D8490FF`, and `SYS-66AE9E5F80` retain production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client and System pages preserve all `691` system links; existing `305` client→contractor and system→contractor links remain complete.
- `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed; the build verified `290` client, `466` system and `91` contractor routes, `691` observations and `296` raw artifacts. Commit `12926c6764136d5f9c154252b9d7b2181ee99fd8` was pushed to `main`; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task `877` succeeded, including Pages publication. Authorized `pages/pages` service-proxy readback verified client `135`, its SGLEP and Šeimos kortelė rows, the SGLEP System Dossier link and explicit unknown lifecycle state; the public route returned the expected Keycloak OAuth `302`. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
- Discord readback reached message `1538007301989331127`; the latest channel messages were bot-authored and no newer human directive or message from designated CVP IS instructor `476287310627864587` was present. Live portal work confirmed existing organization-first, typography-variant and direct-PDF behavior but exposed no new reusable mechanic, so `vssa-clients` required no update.
- Next dossier rotation: `141`–`150`.
### Previous scheduled rotation — 2026-08-15 02:10 UTC
- Reviewed rotation `121`–`130` through current official evidence, every existing dossier URL, exact client/system CPVA queries, contractor searches, and the complete CVP IS organization-first notice lists. Exact current identities were confirmed for `121`–`129`; client `130` was identity-checked through the official 2025 rename from Pabėgėlių priėmimo centras to Priėmimo ir integracijos agentūra and exact successor profile `1688` with `(authorityId=1688, orgGroupId=1690)`. No near-name result was forced.
- Two direct CVP IS PDFs produced new bounded evidence. Marijampolės specialieji socialinės globos namai's `2025-02-24` tender proves intended procurement of a **Socialinės globos ir slaugos valdymo informacinė sistema** only; no award, signed contract, supplier, delivery or production use was found. Priėmimo ir integracijos agentūra's PAIS award proves that **Finance engineering** won modernization and implementation contract `46706`, signed `2026-02-24`; this is not extended to original development, hosting, completion, production deployment, release or later support.
- Client `125` was converted from its legacy four-column dossier to the canonical concise six-column format while preserving all four system/service labels byte-for-byte. Its generic `2024` software-package tender did not identify a defensible named product or awarded supplier and was not added. Other IT-titled rows in the ten notice lists were equipment, building systems, generic packages, tender-stage leads or unrelated scope and were not promoted into unsupported system/contractor claims.
- Exact CPVA queries produced no additional directly proved claim. Existing evidence remained readable; all `23` Markdown URLs across the changed dossiers returned browser-equivalent HTTP `200`, including both direct CVP IS PDFs. All ten dossier/index dates advanced to `2026-08-15`; statuses remain `79 researched`, `195 partial`, `16 no-public-evidence`.
- Generated state advanced from `459` systems / `674` observations / `90` contractors to `461` systems / `676` observations / `91` contractors. New `SYS-2580C4A9DB` and `SYS-E0E1929D7C` analysis records retain hosting, original kickoff and latest production release as explicitly unknown. Generated Client and System pages link Finance engineering to its valid Contractor Card; client→contractor and system→contractor link counts are both `305`.
- `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed; the build verified `290` client, `461` system and `91` contractor routes, `676` observations and `296` raw artifacts. Commit `d2b96a26ef726702efc64da8d63f313cc91f917e` was pushed to `main`; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task `869` (run `49`) succeeded, including Pages publication. The public route returned the expected Keycloak OAuth `302`; direct backend DNS was unavailable from this runtime, so no backend body readback was claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
- Discord readback reached message `1537948061043531866`; no newer human directive or message from designated CVP IS instructor `476287310627864587` was present. Live portal work confirmed existing organization-first, complete-row and direct-PDF behavior but exposed no new reusable mechanic, so `vssa-clients` required no update.
- Next dossier rotation: `131`–`140`.
### Previous scheduled rotation — 2026-08-15
- Reviewed rotation `111`–`120` through current official domains and sitemaps, exact client/system CPVA searches, exact/current-name CVP IS organization discovery, all pages of the nine identity-checked organization notice lists, and opened award bodies. Exact CVP IS organization profiles were confirmed for clients `111`–`116` and `118`–`120`; no defensible exact profile or named system was found for client `117`, whose status remains `no-public-evidence`.
- Nine CVP IS client observations now reuse the established shared identity `SYS-9FC4DC8662` instead of creating a descriptive duplicate. Užimtumo tarnyba's four-page notice list yielded four direct contract-award PDFs: Reiz Tech for UT IS maintenance/development (contract signed `2025-08-01`), Urgent tools for Vilnius regional career-centre interactive-space support/development (`2026-06-18`), Sign on Tab UAB for tablet electronic-signing licence rental/programming/maintenance (`2025-02-25`), and UAB „Bitė Lietuva“ for IP-telephony installation/service/expansion (`2025-03-13`). These bounded roles are not extended to cloud hosting, original kickoff, acceptance, completion, or production release.
- Contractor/system ladders and CPVA searches produced no further defensible supplier, production-hosting, original-kickoff, or production-release claim for the other institutions. All ten dossier/index dates advanced to `2026-08-15` after the completed source-class review without unsupported status promotion.
- Generated state advanced from `455` systems / `661` observations / `86` contractors to `459` systems / `674` observations / `90` contractors. Four new canonical analysis records retain hosting, kickoff and latest release as explicitly unknown; generated client and system pages link each new named supplier to a valid Contractor Card.
- `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed; build verified `290` client, `459` system and `90` contractor routes, `674` observations and `296` raw artifacts. Commit `78370615c1f7fd74904e760c49193f80a42320fc` was pushed to `main`; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task `860` (run `48`) succeeded, including Pages publication. Authorized `pages/pages` service-proxy readback verified the deployed Užimtumo tarnyba Client Card, Reiz Tech Contractor Card, and client-row contractor link; the public route returned the expected OAuth `302`. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
- Discord readback reached message `1537948061043531866`; the four messages after the prior high-watermark were bot-authored cron reports. No newer human directive or message from designated CVP IS instructor `476287310627864587` was present, and live portal work exposed no reusable mechanic beyond existing guidance, so `vssa-clients` required no update.
- Statuses remain `79 researched`, `195 partial`, `16 no-public-evidence`; next dossier rotation: `121`–`130`.
### Previous scheduled rotation — 2026-08-14
- Reviewed rotation `101`–`110` through every existing dossier citation, exact client/system CPVA searches, and CVP IS organization-first routes. All 30 existing dossier URLs remained readable and claim-supporting. Exact or identity-checked CVP IS profiles were reviewed for clients `101`–`107` and `109`–`110`; no defensible organization match was found for `108`. Client `107` still has two close portal profiles (`64972` and `125006`) whose case-only name variants remain unresolved, so neither was silently designated canonical.
- A direct CVP IS contract-award PDF for client `110` (`organizationId=421589`, `authorityId=435489`, `orgGroupId=3340`, `resourceId=7746421`, `documentId=8997165`, `noticeId=8994263`) proves that UAB „Novian PRO“ won contract `61875`, signed `2026-07-28` for EUR 233,000, to maintain and modify the **Darbo sąlygų darbo vietose nuolatinės stebėsenos informacinė sistema (DSS IS)**. The body also directly describes DSS IS inspection, data-exchange and reporting functions. The evidence was not extended to hosting, original development/kickoff, completion or production release.
- Clients `101`–`109` produced no defensible new claim after the assigned official-source, CPVA and CVP IS checks. Their dossier/index dates advanced conservatively to `2026-08-14` without changing rows, status, confidence or unresolved gaps. Search-provider HTML returned no usable results and was time-boxed rather than retried indefinitely.
- Generated state advanced from `454` systems / `660` observations / `86` contractors to `455` systems / `661` observations / `86` contractors. New `SYS-0D3736A986` preserves DSS IS hosting, kickoff and latest release as unknown; UAB „Novian PRO“ reuses established contractor identity `CTR-DB2CC6C476`. Generated client→contractor and system→contractor link counts are both `299`.
- `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed; build verified `290` client, `455` system and `86` contractor routes, `661` observations and `296` raw artifacts. Commit `78c4ae2536ebe03619c8d27ea47720fd068cd231` was pushed to `main`; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task `852` (run `47`) succeeded, including Pages publication. Public Pages returned the expected OAuth `302`; authorized `pages/pages` service-proxy readback verified the deployed client `110` DSS IS row and its valid `SYS-*` and `CTR-*` links. Unrelated untracked PPTX-improvement directories were preserved and excluded.
- Discord readback found three newer bot-authored job-status messages after human message `1537822091275927682`, no newer human directive, and no message from designated CVP IS instructor `476287310627864587` in the latest 100 channel messages. No reusable portal mechanic was added to `vssa-clients`.
- Statuses remain `79 researched`, `195 partial`, `16 no-public-evidence`; next dossier rotation: `111`–`120`.
### Previous scheduled rotation — 2026-08-14
- Reviewed rotation `091`–`100` through reopened official evidence, exact CPVA searches and CVP IS organization-first routes. The only defensible new claim was client `091`: an official CPVA completion article established production use of the M. K. Čiurlionis museum VR application by `2018-12` and named UAB „MultimediaMark“ as creator. Hosting, original kickoff and latest release remained unknown.
- Clients `092`–`100` produced no defensible new claim and advanced conservatively without unsupported status or row changes. Generated state moved to `454` systems / `660` observations / `86` contractors. Commit `e00c4e8e7e2ff2a3aa0d9210761d1bb5fcf89c67` was pushed; exact-SHA Actions task `851` succeeded and publication/readback checks passed. That delivery set the next rotation to `101`–`110`.
### Previous scheduled rotation — 2026-08-14
- Reviewed rotation `081`–`090` through all 53 existing/new dossier citations, exact client/system CPVA searches, direct CVP IS discovery and 101 published-notice rows in identity-checked organization profiles. Confirmed profiles and profile-derived `(authorityId, orgGroupId)` pairs: `081` `5803` `(5803,7279)`; `082` `4334` `(4334,4689)`; `083` portal legal-form variant `Biudžetinė įstaiga Lietuvos nacionalinis dramos teatras` `2670` `(2670,2718)`; `084` `5190` `(5190,5964)`; `085` `2046` `(2046,2060)`; `086` `3569` `(3569,3747)`; `087` `3035` `(3035,3104)`; `088` portal punctuation variant `Lietuvos teatro muzikos ir kino muziejus (PV)` `8731` `(8731,15151)`; `089` `2790` `(2790,2844)`; and `090` `2698` `(2698,2748)`. The synchronized channel export contained no newer guidance from designated instructor `476287310627864587`, so no portal mechanic was patched.
- Two opened direct tender PDFs produced bounded high-confidence planned-procurement observations. Lietuvos etnografijos muziejus published a June 2025 open tender for a fully digital VR game combining characters, animated 3D scenes, effects, UI, sound and interactive programming. Lietuvos švietimo muziejus published an April 2025 open tender for VR audiovisual content about Vilnius University and European higher-education history. Neither tender proves an award, signed contract, selected supplier, delivery, hosting or production use, so contractor cells remain `Not publicly identified` and all lifecycle/infrastructure fields remain explicitly unknown.
- The other published-notice rows concerned physical equipment, construction, stage systems, instruments, furniture, utilities or other non-IT scope, or were tender-stage leads without a defensible additional client-system claim. Exact CPVA searches returned irrelevant broad-token matches only. No defensible new commercial contractor, production-hosting classification, original delivery kickoff or production-release date was established. Existing statuses and bounded roles were preserved; all ten dossier/index dates advanced to `2026-08-14` after the full source-class review.
- Generated state advanced from `451` systems / `657` observations to `453` systems / `659` observations while remaining `86` contractors; statuses remain `79 researched`, `195 partial`, `16 no-public-evidence`. Two client-scoped canonical analysis records were bootstrapped with hosting, kickoff and release explicitly unknown. `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed; build verified `290` client, `453` system and `86` contractor routes, `659` system-observation links and `296` raw artifacts. All 53 dossier citations opened successfully: 51 returned browser-equivalent HTTP `200`, while the two Nacionalinis Kauno dramos teatras pages failed the local Requests CA chain but opened and supported their claims in the browser-equivalent browser retry.
- Commit `8f0eeb80dab179bcd024a57660b9a3b9824b36d8` was pushed to `main`; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task `812` (run 44) completed with `success`, including Pages publication. Public Pages returned the expected OAuth `302`; authorized `pages/pages` service-proxy readback verified client `082`, its `SYS-6B4BD590EC` system-dossier link, the generated system page and explicit unknown release state. Unrelated untracked PPTX-improvement directories were preserved and excluded. Next dossier rotation: `091`–`100`.
### Previous scheduled rotation — 2026-08-14
- Reviewed rotation `071`–`080` through all 30 existing dossier citations, exact client/system CPVA searches, direct CVP IS discovery and every published-notice row in identity-checked organization profiles. Confirmed exact profiles: `071` `53959` `(130340,130340)`; `074` portal variant `BĮ Kultūros infrastruktūros centras` `2548` `(2594,2594)`; `075` `1551` `(1551,1554)`; `076` `4108` `(4108,4425)`; `077` `5687` `(5687,7145)`; `078` portal variant `Lietuvos jūrų muziejus (PV)` `397998` `(648902,648902)`; `079` `12863` `(12863,23931)`; and `080` `5416` `(5416,6482)`. No exact organization row was established for `072` or `073` under bounded legal-name/short-name variants, so no near-name record was forced. The synchronized channel export contained no newer message from designated instructor `476287310627864587`, so no portal mechanic was patched.
- Classified all 36 published-notice rows from those profiles. The direct ELVIS award body proves that ATEA won the ELVIS modernization/development contract for EUR 779,792, signed `2025-01-02`; that bounded role was added to client `075` without extending it to current maintenance, hosting, storage, identity or rights services. Other IT-titled rows were tender-stage or unrelated and were not treated as awards or delivery evidence.
- Added the museum-operated `„Septynis kartus link begalybės“ interactive exhibition` to client `077`. CPVA's official `2020-08-31` account says the new exhibition had opened and received visitors during July 2020, directly supporting latest production operation at month precision `2020-07`; original delivery kickoff and hosting classification remain unknown. CPVA names a Saulius Valius-led artistic team but no contracting company, integrator or current support supplier, so no unsupported contractor entity was created.
- Clients `071`–`074` and `076`–`080` produced no other defensible new client-specific commercial contractor, production-hosting classification, original kickoff or production-release evidence after the full source-class review. Their existing rows/statuses were preserved and all ten dossier/index dates advanced to `2026-08-14`.
- Generated state advanced from `450` systems / `656` observations to `451` systems / `657` observations while remaining `86` contractors; statuses remain `79 researched`, `195 partial`, `16 no-public-evidence`. `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed; build verified `290` client, `451` system and `86` contractor routes, `657` system links and `296` raw artifacts.
- Commit `722590521c4d1b67d55cf6dc8d3d82082a2abd53` was pushed to `main`; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task `760` (run 42) completed with `success`, including Pages publication. Public Pages returned the expected OAuth `302`; authorized `pages/pages` service-proxy readback verified client `077`, `SYS-D212D4771B`, and `Latest production release: 2020-07`. Unrelated untracked PPTX-improvement directories were preserved and excluded. Next dossier rotation: `081`–`090`.
### Previous scheduled rotation — 2026-08-14
- Reviewed rotation `061`–`070` through all 27 existing official/provider citations, exact CPVA client/system searches, direct CVP IS discovery, and all pages of the identity-checked organization notice lists. Confirmed current/former identity profiles for `061`: `Kauno apskrities viešoji biblioteka` `2891` `(2947,2947)` and `Ąžuolyno biblioteka` `312424` `(458907,458907)`; `062` `1465` `(1467,1467)`; `063` `2633` `(2681,2681)`; `065` `1151` `(1151,1152)`; `067` `10202` `(10202,19145)`; `068` `1927` `(1927,1931)`; `069` `5198` `(5198,5975)`; and `070` `1505` `(1505,1508)`. Client `066` produced two exact same-address portal records, `15741` `(15741,51164)` and `5128` `(5128,5860)`; both notice lists were reviewed, but neither was arbitrarily designated as the sole canonical profile. No exact CVP IS organization result was established for `064` under bounded current/former-name variants, so no near-name record was forced. The synchronized channel export still contained no newer message from designated instructor `476287310627864587`, so no portal mechanic was patched.
- Reviewed all 85 published-notice rows returned by those exact authority profiles, including page 2 for `070`. Rows concerned books, instruments, construction, premises, travel, utilities, solar equipment and other non-IT scope. Exact CPVA queries were empty or produced irrelevant broad-token matches. No opened body established a new client-specific system, commercial contractor, production hosting/cloud, original delivery kickoff, or dated production release.
- This was a completed conservative no-new-claim rotation, not “no search performed.” Existing rows, bounded roles, status/confidence values and gaps were preserved; all ten dossier/index check dates advanced to `2026-08-14`. All 27 dossier URLs returned browser-equivalent HTTP `200`.
- Generated state remained `290` clients, `450` systems, `656` observations, `86` contractors; statuses remained `79 researched`, `195 partial`, `16 no-public-evidence`. `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed; build verified `290` client, `450` system and `86` contractor routes, `656` links and `296` raw artifacts.
- Commit `d63985018ea4250392e2592765b77c161af77ffb` was pushed to `main`; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task `742` (run 41) completed with `success`, including Pages publication. Public Pages returned the expected OAuth `302`; authorized `pages/pages` service-proxy readback returned client `061` with its exact heading, `2026-08-14`, and generated `System dossier` content. Unrelated untracked PPTX-improvement directories were preserved and excluded. Next dossier rotation: `071`–`080`.
### Previous scheduled rotation — 2026-08-14
- Reviewed rotation `051`–`060` through official client/system pages, exact CPVA searches and classified CVP IS award bodies. Added bounded high-confidence awards for UAB „Insoft“ on KVR/KPEPIS modernization; UAB „Asseco Lietuva“ on LIMIS modernization; Biznio mašinų kompanija UAB on the LNDM virtual-collections/interactive-3D platform; and UAB „Asseco Lietuva“ plus UAB „Insoft“ on LIBIS modernization and VEPIS maintenance/programming. No award was extended to production deployment, hosting, completion or unrelated current support.
- Two new canonical systems advanced the generated state from `448` systems / `654` observations to `450` systems / `656` observations; contractor routes reached `86`, with lifecycle/hosting fields for the new systems explicitly unknown. Validation/build passed and commit `a3a8f17829e26309b4a74c1db9a9ffa1e8ae8cf1` was pushed. Exact-SHA Actions task `701` (run 40) failed; the immediately following cumulative main run 41 succeeded and republished Pages without removing this evidence commit. Next dossier rotation recorded: `061`–`070`.
### Previous scheduled rotation — 2026-08-14
- Reviewed rotation `041`–`050` through official client/system pages, exact CPVA searches, and every page of the identity-checked CVP IS organization notice lists. Confirmed exact CVP IS organization/profile IDs and profile-derived `(authorityId, orgGroupId)` pairs: `041` `5788` `(5788,7264)`; `042` `1390` `(1390,1393)`; `043` `5789` `(5789,7265)`; `044` `4077` `(4077,4380)`; `045` `5779` `(5779,7255)`; `047` `7416` `(7416,10901)`; `048` `6796` `(6796,9711)`; `049` `1335` `(1335,1336)`; `050` `10407` `(10407,19461)`. No exact organization result was established for `046`, including bounded legal-name and `AVNT` variants, so no near-name record was forced. No new CVP IS instructor guidance was present after message `1537121770707091537`.
- Converted legacy dossiers `042`, `044`, and `046` to the canonical concise six-column format. Direct CVP IS PDFs added bounded high-confidence evidence: Muitinės mokymo centras's 2026-08-11 tender proves intended DEKLARIS maintenance/support procurement only; VMI awarded IMIS modernization to UAB CORNER CASE TECHNOLOGIES (EUR 859,504.13; contract 2026-07-09) and Oracle licences to Proit (EUR 304,190.22; contract 2026-07-10); NBFC awarded SABIS development/maintenance/support to UAB „Novian PRO“ (EUR 436,500; contract 2026-02-20), DUPA IS creation/implementation to NEVDA (EUR 1,555,000; contract 2025-06-11), and IVANTI development services to Synergy Consulting (EUR 19,965; contract date unstated). A 2025-12-08 voluntary ex-ante notice identifies UAB „Stekas“ as the sole Stekas-Alga support/development supplier and records a EUR 104,540 winning offer, but is not presented as proof of a signed contract. None of these records is presented as production hosting, original development where unstated, acceptance, deployment, or go-live.
- The remaining clients produced generic IT, training or unrelated leads only. Exact CPVA searches yielded no additional defensible claim. All ten dossier/index dates advanced to `2026-08-14` after the full rotation, with statuses unchanged.
- Generated state: `290` clients, `448` systems, `654` observations, `84` contractors; statuses `79 researched`, `195 partial`, `16 no-public-evidence`. Seven new canonical system-analysis records were bootstrapped with production hosting, original kickoff and latest production release explicitly unknown; three legacy labels were preserved byte-for-byte during format conversion so existing canonical system identities did not fragment.
- `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed; build verified `290` client, `448` system and `84` contractor routes, `654` system-observation links and `296` raw artifacts. Every Markdown URL in all ten changed dossiers returned browser-equivalent HTTP `200`, including seven direct CVP IS PDFs; generated registry checks confirmed the new deterministic system links and bounded contractor roles.
- Commit `57bff3bdc6473f7989e19e33ca039160efffed6d` was pushed to `main`; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task `691` completed with `success`, including Pages publication. The representative public Pages dossier returned the expected Keycloak OAuth `302`; no direct Pages-backend route was available from this runtime. Unrelated untracked `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories were preserved and excluded from the commit. Next dossier rotation: `051`–`060`.
### Previous scheduled rotation — 2026-08-14
- Reviewed rotation `031`–`040` through official client/system pages, exact CPVA searches, and all pages of identity-checked CVP IS organization notice lists. Confirmed exact CVP IS organization/profile IDs and profile-derived `(authorityId, orgGroupId)` pairs: `031` `4823` `(4823,5354)`; `032` `9665` `(9665,17861)`; `033` `1678` `(1678,1681)`; `035` `4133` `(4133,4459)`; `036` `6537` `(6537,9237)`; `037` `8915` `(8915,15595)`; `038` `6884` `(6884,9865)`; `039` `499664` `(499664,810894)`; `040` `5791` `(5791,7267)`. No exact organization result was established for `034`, so no near-name record was forced. No new CVP IS instructor guidance was present after message `1537121770707091537`.
- Converted dossier `039` to the canonical six-column format. Five direct award PDFs added bounded high-confidence Customs Department supplier roles: UAB „Baltnetos komunikacijos“ for VIKIS maintenance/support under a EUR 108,917.92 contract signed 2026-07-30; UAB „Hnit-Baltic“ for ArcGIS licence support/updates/migration under the 2024-08-28 contract whose 2026 notice records EUR 122,064.43 excluding VAT; UAB „Hnit-Baltic“ for MGIS maintenance/support under a EUR 90,118.38 offer-value contract signed 2025-04-01; Netcode for MOVAS maintenance/support under a EUR 162,621.82 contract signed 2025-04-01; and UAB „InnoForce“ for tax-accounting/control-IS maintenance/support under a EUR 95,550 contract signed 2025-01-28. These awards are not presented as original development, hosting, acceptance, or production release.
- The remaining clients produced tender-stage, generic IT or unrelated leads only. Exact CPVA searches yielded no additional defensible claim. All ten dossier/index dates advanced to `2026-08-14` after the full rotation, with statuses unchanged.
- Generated state: `290` clients, `441` systems, `647` observations, `80` contractors; statuses `79 researched`, `195 partial`, `16 no-public-evidence`. Four new canonical system-analysis records were bootstrapped with production hosting, original kickoff, and latest production release explicitly unknown. The reviewed `ArcGIS software licences` / `ESRI programinė įranga` alias merged two clearly identical Esri ArcGIS observations into one canonical system instead of creating a duplicate.
- `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed; build verified `290` client, `441` system and `80` contractor routes, `647` system-observation links and `296` raw artifacts. Every Markdown URL in the changed `039` dossier returned browser-equivalent HTTP `200`, including five direct CVP IS award PDFs; the generated client route contained the new deterministic system links and contractor markers.
- Commit `a8861147288068b2bd0a231ab0e4effb702f27c6` was pushed to `main`; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task `682` completed with `success`, including Pages publication. The representative public Pages dossier returned the expected Keycloak OAuth `302`; no direct Pages-backend route was available from this runtime. An unrelated untracked `.pptx_improve_run/` worktree directory was preserved and excluded from the commit. Next dossier rotation: `041`–`050`.
### Previous scheduled rotation — 2026-08-14
- Reviewed rotation `021`–`030` through official client/system pages, exact CPVA searches, and identity-checked CVP IS organization notice lists. Confirmed profile IDs for `021`–`028` and `030`: `4630`, `1689`, `12872`, `11636`, `1778`, `5297`, `3731`, `2363`, and `1336`; no exact organization result was established for `029`, so no near-name record was forced. No new CVP IS instructor guidance was present after message `1537121770707091537`.
- Converted legacy dossiers `022`, `025`, `026`, `028`, and `030` to the canonical concise six-column format. Direct award PDFs added four bounded high-confidence supplier roles: APVA awarded UAB Dizaino kryptis APVIS development/support under a EUR 500,000 offer-value contract; NŽT awarded NRD Digital process-management-IS support under a EUR 129,600 contract signed 2026-02-27, and UAB „Asseco Lietuva“ land-asset-administration-IS support/development under a EUR 211,680 contract signed 2026-02-27 plus document-management-IS support under a EUR 76,800 contract signed 2025-01-31. The awards are not presented as original development, hosting, acceptance, or production release.
- The remaining clients produced tender-stage, generic IT, or unrelated leads only. Exact CPVA searches yielded no additional defensible claim. All ten dossier/index check dates advanced to `2026-08-14` after the full source-class rotation, with statuses unchanged.
- Generated state: `290` clients, `437` systems, `642` observations, `77` contractors; statuses `79 researched`, `195 partial`, `16 no-public-evidence`. Three new canonical system-analysis records were bootstrapped with production hosting, original kickoff, and latest production release explicitly unknown; the former duplicate nSoft vendor-as-system row was removed when the Zoo ticketing observation was normalized.
- `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed; build verified `290` client, `437` system and `77` contractor routes plus `296` raw artifacts. Every Markdown URL in the changed dossiers returned browser-equivalent HTTP `200`, including four direct CVP IS award PDFs.
- Commit `e2f160b76aef06d063559fb3fc1e287523f843f5` was pushed to `main`; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task `673` completed with `success`, including Pages publication. The representative public Pages dossier returned the expected Keycloak OAuth `302`; no direct Pages-backend route was available from this runtime. Next dossier rotation: `031`–`040`.
### Previous scheduled rotation — 2026-08-13
- Reviewed rotation `011`–`020` through official client pages and sitemaps, exact CPVA searches, and all pages of the identity-checked CVP IS organization notice lists. Exact CVP IS organization/profile IDs and profile-derived `(authorityId, orgGroupId)` pairs were confirmed as: `011` `2964` `(2964,3027)`; `012` `2352` `(2352,2387)`; `013` `1489` `(1489,1492)`; `014` `4357` `(4357,4722)`; `015` `5459` `(5459,6540)`; `016` `9187` `(9187,16821)`; `017` `9608` `(9608,17654)`; `018` `4872` `(4872,5425)`; `019` `1287` `(1287,1288)`; `020` `5035` `(5035,5718)`.
- Converted dossiers `017` and `018` from the legacy four-column format to the canonical concise six-column format. Direct award PDFs added bounded high-confidence roles: Valstybinė miškų tarnyba awarded UAB „Erisata“ ALIS LKMP development/programming under a EUR 170,000 offer-value contract signed 2025-07-15; VTPSI awarded Proit TPDR application maintenance/development under a EUR 498,000 contract signed 2025-04-29, and UAB „Hnit-Baltic“ land-use-supervision e-service/GIS work under a EUR 229,900 offer-value contract signed 2025-07-15 plus ESRI subscriptions under a EUR 113,000.87 offer value. The ALIS award's separately displayed participant-group-leader label „Via GIS“ was not concatenated into the winner identity. Awards are not presented as original development, hosting, acceptance, or production release.
- The other `011`–`020` records produced tender-stage, generic IT, or unrelated leads only; no unsupported supplier mapping was made. Exact CPVA searches produced no additional defensible system/contractor claim. No new CVP IS instructor guidance was available beyond message `1537121770707091537`.
- Generated state: `290` clients, `435` systems, `640` observations, `74` contractors; statuses `79 researched`, `195 partial`, `16 no-public-evidence`. Three new canonical analysis entries were bootstrapped with hosting, kickoff and latest production release explicitly unknown.
- `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed; build verified `290` client, `435` system and `74` contractor routes plus `296` raw artifacts. Every Markdown URL in the changed dossiers returned browser-equivalent HTTP `200`, including four direct CVP IS PDFs.
- Commits `9cb2f44601775a366f44a09251af772bfbdded4c` and `e4c9f9ab6c6052445cd90c803555f9c90cd69c65` were pushed to `main`; the latter normalized the ALIS winner identity after distinguishing the award's participant-group-leader metadata. Authenticated source readback and ref equality passed. Exact-SHA Gitea Actions tasks `662` and `663` both completed with `success`, including Pages publication. Representative public Pages routes returned the expected Keycloak OAuth `302`; no direct Pages-backend route was available from this runtime. Next dossier rotation: `021`–`030`.
### Previous scheduled rotation — 2026-08-13
- Reopened and normalized dossiers `001`–`010` into the canonical concise six-column format; exact names/statuses were preserved and dossier/index check dates advanced to `2026-08-13`.
- Reopened purpose acts, official system pages, VSSA centralized-service evidence, exact CPVA searches, and CVP IS organization-first searches. Exact CVP IS organization IDs for `001`–`009`: `2076`, `2017`, `3210`, `3345`, `2862`, `5224`, `2737`, `2900`, `1599`; profile-derived `(authorityId, orgGroupId)` pairs: `(2076,2088)`, `(2017,2026)`, `(3210,3287)`, `(3345,3427)`, `(2862,2917)`, `(5224,6045)`, `(2737,2788)`, `(2900,2956)`, `(1599,1602)`. No byte-exact row was found for `010`; no near-name record was forced.
- Current PPVIS licence/support, VBAMS licence-update, Moodle implementation, and generic SADM development/analysis/test records were classified conservatively. Tender-stage records were not treated as supplier/delivery proof; generic awards were not mapped to SPIS without explicit scope.
- No defensible new commercial contractor, production-hosting classification, original delivery kickoff, or production-release date was established. Existing bounded public-provider roles were retained.
- Generated state: `290` clients, `432` systems, `637` observations, `72` contractors; statuses `79 researched`, `195 partial`, `16 no-public-evidence`.
- `corepack pnpm validate` and `corepack pnpm build` passed; build verified `290` client, `432` system and `72` contractor routes plus `296` raw artifacts. Every Markdown URL in changed dossiers returned browser-equivalent HTTP `200`.
- Commit `4fc00aa78776cc8ee7971f21b72cd13c365e84a5` was pushed to `main`; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task `649` completed with `success`, including Pages publication. The public Pages endpoint returned the expected Keycloak OAuth `302`; this host exposes no direct Pages-backend verification route.
- Next dossier rotation: `011`–`020`.
## Purpose
VSSA client investigation and evidence gathering.
## Current assets
- Gitea organization: `vssa-v1`
- Repository: <https://gitea.lego-cloud.eu/vssa-v1/documentation>
- Repository worktree: `/opt/data/vssa-documentation`
- Published Docusaurus site: <https://pages.apps.lego-cloud.eu/vssa-v1/documentation/>
- Client navigation has first-level **Overview** and an expanded **Registry** group containing 290 ordered client dossiers. System navigation follows the same hierarchy with 494 ordered system dossiers. Contractors are a separate top-level collection with the same **Overview → Registry** hierarchy and 104 generated contractor/provider dossiers. Systems Dossiers are generated from canonical client system-table rows; the latest validated registry contains 494 unique systems from 719 observations, with conservative alias rules in `data/system-aliases.json` and machine-readable outputs at `/data/systems-registry.json` and `/data/contractors-registry.json`.
- Each generated Systems Dossier now includes canonical system-level analysis for production cloud/on-premises/hybrid hosting, original delivery kickoff, and latest production release. The source is `data/system-analysis.json`; known values require direct system-level URLs and supporting quotes, while missing evidence remains explicit rather than inferred.
- Overview, Clients, Systems, Contractors, Methodology, and Data now use separate Docusaurus docs-plugin instances and dedicated sidebars. Generated system relationships use reusable React evidence cards, and every generated client/system dossier has a de-duplicated References index. `SYS-*` and `CTR-*` IDs are deterministic internal registry IDs, not public-source identifiers.
- Every generated client system table has a **System dossier** column. Each of the 719 client observations displays its canonical `SYS-*` ID and links directly to one of the 494 internal system dossiers; generation fails if any observation is unlinked. Per Lego's confirmed 2026-08-14 requirement, each exact client-system row also shows every evidenced contractor in the **Contractor / company** column and links each named contractor to its `CTR-*` Contractor Card; multiple contractors are supported, while unknown contractors remain explicit and unlinked. Commit `bc0b40f17b3bfecb41bc54574ece969bb02e08fa` implemented and pushed the relationship-linking change. Its local validation/build passed and local/remote refs matched; final CI/Pages verification for that exact commit was not claimed because an approval timed out.
- Gitea Actions workflow: `.gitea/workflows/pages.yml`; successful `main` builds publish through the mounted LEGO Cloud Pages root.
- Source registry: `source/message.txt`, containing 290 numbered clients.
- Required output: one concise Markdown dossier per client with exact name, one-sentence purpose, systems/clouds, plain-language system meaning, precise client relationship, identified contractor/company and role, direct evidence, confidence, and short gaps.
- Investigation skill: `vssa-clients`; authoritative source is Gitea repository `vssa-v1-skills-code-agent/vssa-clients` on `main`, maintained in `/opt/data/vssa-clients-skill` and installed through the runtime symlink `/opt/data/skills/research/vssa-clients`. Recurring runs must deepen contractor research and publish validated reusable skill improvements to Gitea before reporting them.
- Documentation skill: `documentation-docusaurus`; authoritative source is Gitea repository `vssa-v1-skills-code-agent/documentation-docusaurus` on `main`, maintained in `/opt/data/documentation-docusaurus-skill` and installed through `/opt/data/skills/productivity/documentation-docusaurus`. It absorbs the former `gitea-docusaurus-projects` capabilities, including Docusaurus structure, evidence portals, Gitea repository setup, Actions, LEGO Cloud Pages, and end-to-end acceptance verification.
## Confirmed skill-governance decisions — 2026-08-14
- Lego renamed the channel's investigation skill from `client-investigator` to `vssa-clients` and required it to be managed in Gitea. Organization `vssa-v1-skills-code-agent` and public repository `vssa-clients` were created; commit `fd33a2144ac78223bbe8281776b043d61121b74d` was pushed, exact-SHA Actions task `814` succeeded, and the runtime now loads the Gitea worktree through a symlink. The former active skill was archived outside the runtime tree.
- Lego directed that `gitea-docusaurus-projects` be merged into a VSSA-owned `documentation-docusaurus` skill repository. The merged repository is `vssa-v1-skills-code-agent/documentation-docusaurus`; commit `b08614dc908cd110de2dc82fece14f8d276a3250` was pushed, exact-SHA Actions task `818` succeeded, authenticated source readback passed, and the runtime symlink now points to its maintainer worktree. The absorbed skill was archived and removed from the active runtime.
- The requested comparison source `corp-v1-skills-code-agent/documentation-docusaurus` was unavailable (`404` through the authenticated API and `Cannot find repository` through SSH), so it remains untouched. Read-only comparison used the accessible `home-v1-skills-code-agent/documentation-docusaurus` baseline and `corp-v1-aerosim-skills-code-agent/documentation-docusaurus--aerosim`; provenance and independent-adoption safeguards were retained.
## Operational ledger — documentation improvement follow-up (2026-08-14)
- **Status:** **DELIVERED.** The approved documentation-improvement work was resumed from the 11-file partial worktree, reviewed, validated, committed, pushed, and deployed. The two unrelated untracked PPTX-improvement directories were preserved and excluded.
- **Outcome:** Contractors are now an equal homepage discovery path with a source-derived count; static search covers client, system, contractor, methodology, and provenance content through a filename-hashed index; system dossiers link every named observation contractor to its generated `CTR-*` card; machine-readable contractor provenance and identifier semantics are documented; and build validation now enforces homepage contractor discovery, contractor-registry schema, complete system→contractor-card links, and representative search-index coverage.
- **Verification:** `corepack pnpm validate`, `corepack pnpm build`, and `git diff --check` passed. The build verified `290` client routes, `453` system routes, `86` contractor routes, `659` observations, `298` client→contractor links, `298` system→contractor links, one filename-hashed search index, and `296` raw artifacts. Local browser acceptance verified contractor search/results and no JavaScript errors.
- **Delivery:** Commit `905e57522e8c054590d6065d10a13ebf73960370` is on `main`; local/remote ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task `826` (run `45`) succeeded, including Pages publication. Public Pages returned the expected OAuth `302`; authorized `pages/pages` service-proxy readback verified the new homepage contractor/search markers and the INVESTIS system→ATEA contractor-card link.
- **Current next action:** Continue the scheduled evidence rotation at clients `151`–`160`; no documentation-delivery blocker remains. **Latest synchronized channel high-watermark:** `1538007301989331127`.
## Automation
- Cron job `88833e00b4a2` (`VSSA documentation continuous research`) runs every 20 minutes at `*/20 * * * *` and reports to this channel.
- Per Lego's 2026-08-17 reset directive, the ordered rotation restarts with clients `001`–`020`, then continues in 20-client batches (`021`–`040`, `041`–`060`, and so on), wrapping after `281`–`290`. Each successful run records its completed and next batch here as the durable cursor.
- Each run audits all 290 records, deeply researches its assigned 20-client batch, continuously improves client/system/contractor evidence and documentation, reviews conservative system identity rules, validates the complete Docusaurus build, pushes evidence-backed changes, verifies exact-head Actions, and checks the deployed Pages backend.
- Research must prefer primary sources and must not infer providers/systems without corroborating evidence.
- Every run explicitly searches CPVA's official search portal for exact client/system names and relevant projects, treating result pages as discovery only until an opened CPVA source proves the claim. It also maintains per-record References indexes and preserves dedicated sidebars and evidence cards.
- Discord user `476287310627864587` is the designated CVP IS instructor for `https://viesiejipirkimai.lt/epps/viewCFTSAction.do`. Every run reads that user’s new channel guidance, validates reusable portal mechanics, updates the Gitea-backed `vssa-clients` skill, and searches procurement stages from RFI/market consultation through tender, award, contract, amendment, and completion. Records are mapped to exact clients and canonical systems only when supported; stage semantics prevent an RFI/RFP/bid from being presented as an award, supplier engagement, implementation, production use, hosting, or completion.
- CVP IS also has a validated organization-first discovery route: search the exact client at `https://viesiejipirkimai.lt/epps/viewOrganisations.do`, identity-check and open `prepareViewCAOrganisation.do?id=<organizationId>`, then follow **PERŽIŪRĖTI VISUS PASKELBTUS SKELBIMUS** to `viewPublishedNotices.do?authorityId=<authorityId>&orgGroupId=<orgGroupId>`. Both IDs must be extracted from the actual profile link. Notice-type links can be direct PDF downloads; preserve their identifiers/metadata, extract the body, and classify procurement stage before mapping evidence. This route is additional and not assumed complete.
- The job workdir and remote now target `/opt/data/vssa-documentation` and `vssa-v1/documentation`; it must not edit generated Docusaurus output.
- The recurring job explicitly treats a dated official announcement that says a named system started operating/launched/went live as direct production-release evidence at the announcement's stated precision, while distinguishing this from generic webpage metadata. It maintains contractor dossiers as exact client-system-role-evidence relationships and does not conflate development, hosting, support, licensing, or other roles.
- **Latest rotation (2026-08-13):** clients 281–290 were reviewed through official client sources, exact CPVA searches, contractor queries, and CVP IS organization-first profiles/notices. Exact organization profiles were confirmed for clients 282–287 and 289–290 (organization/profile IDs 2025, 1466, 14214, 9078, 10493, 1739, 1670, and 11068); client 281 returned two different records and client 288 returned none, so neither was force-mapped. Direct award PDFs added high-confidence bounded supplier roles: Generalinė prokuratūra awarded Starkodas PAIS maintenance/improvement (EUR 118,228; contract 2026-06-05); NTA awarded Proit LITEKO–MAIS integration and LITEKO development (EUR 229,900; contract 2025-04-15), Aisoft LITEKO2 licence support (EUR 205,700; contract 2026-05-15), and UAB „Asseco Lietuva“ accounting/financial-system maintenance, improvement and user consulting (EUR 298,870 offer value; contract 2026-05-14). No award is presented as proof of original development, hosting, acceptance or go-live. Other notice rows were tender-stage or unrelated, and CPVA exact searches yielded no additional defensible claim. No new CVP IS instructor guidance was present after message `1537121770707091537`. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; the registry now contains 432 systems, 637 observations, and 70 normalized contractors/providers. Commit `9897769d3a47e39c15be9b194706f43013fcd4b9` was pushed and authenticated source readback passed; Actions run `2402`, task `639`, succeeded including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; direct backend verification was unavailable from this runtime. Next rotation wraps to clients 1–10.
- **Previous rotation (2026-08-13):** clients 271–280 were reviewed through authoritative identity recovery, official sources, CPVA exact-name searches, contractor queries, and CVP IS organization-first profiles/notices. Exact CVP IS identities were confirmed for clients 272–280 (organization/profile IDs 2868, 1067, 1203, 1965, 12934, 4839, 7603, 5900, and 1763); client 271 had no exact result and was not mapped to a near name. Direct award PDFs added two high-confidence VRKIS supplier roles for client 279: UAB „iTree Lietuva“ won VRKIS maintenance, development and support under a EUR 1,736,000 contract signed 2026-01-02; UAB „IO projects“ won VRKIS modernization technical supervision under a EUR 79,000 contract signed 2025-07-21. A VRK voluntary ex-ante notice also established dependency on an intelligent chatbot whose support includes rental and operation of the production cloud infrastructure in which it runs; the notice does not name the supplier or cloud provider. Other notices were tender-stage, unrelated, or did not support a distinct client-system claim; CPVA searches yielded no additional defensible claim. No new CVP IS instructor guidance was present after message `1537121770707091537`. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; registry counts are now 430 systems, 635 observations, and 68 normalized contractor/provider entities. Next rotation: clients 281–290. Commits `256011fc76c857ec1aa74b1df982ea8699f3eda6` and `fcd7781dedd5d06d408443d46fb7f066ed4f6830` were pushed; the second conservatively scoped the generic chatbot identity to VRK before attaching its production-cloud evidence. Authenticated source readback passed; final Actions run `2388`, task `625`, succeeded including Pages publication. Public Pages returned the expected Keycloak `302`; direct backend verification was unavailable from this runtime.
- **Previous rotation (2026-08-13 14:00 UTC):** clients 261–270 were reviewed through exact identity checks, official client/system sources, CPVA exact searches, contractor searches, and CVP IS organization-first profiles/notices. Exact CVP IS identities were found for clients 261–263, 266, and 268–270 (organization IDs 1007, 8353, 1107, 7928, 5391, 1258, and 5708); exact byte-level matches were absent for clients 264, 265, and 267 and were not forced to near-name records. A direct Žemės ūkio agentūra award PDF (`resourceId=3904100`, `documentId=6586911`, `noticeId=6586102`, procedure `e698e26b-25bd-4bae-b4f0-e7c365b7fcf1`) added two high-confidence system observations: its import/export licences, quotas and export-compensation administration IS, and its market-regulation-measures administration IS. UAB „Novian PRO“ won their maintenance/support, updates, new-function/change development and consulting contract for EUR 78,840, signed 2025-10-17. The award does not prove original development, hosting, acceptance or production release. Other notice lists yielded tender-stage or unrelated leads only; exact CPVA searches produced no additional defensible claim. No new CVP IS instructor guidance was present after message `1537121770707091537`. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; registry counts are now 428 systems, 633 observations, and 68 normalized contractor/provider entities. Commit `2143cc9b81aee5371f1924500d0bb3fa98adb15e` was pushed and authenticated source readback passed; Actions run `2378`, task `615`, succeeded including Pages publication. Public Pages returned the expected Keycloak `302`; direct backend verification was unavailable from this runtime.
- **Previous rotation (2026-08-13 12:00 UTC):** clients 251–260 were reviewed through exact identity checks, official client-system pages, CPVA exact searches, contractor/vendor searches, and CVP IS organization-first profiles/notices. All ten clients identity-matched in CVP IS (organization IDs 10152, 3359, 3851, 4239, 1022, 8182, 1480, 3838, 1349, and 1707); current organization lists produced only tender-stage or unrelated leads and no new award/contractor claim. One official Police completion page materially deepened DI.POLIS: implementation began in September 2023, the production version moved from Vytautas Magnus University's experimental environment into the Informatikos ir ryšių departamentas production environment, was integrated into ePolicija, accepted for operation, and opened to external users. The canonical system analysis now records kickoff at month precision and preserves the production-environment statement while leaving cloud/on-premises/hybrid and latest release explicitly unknown. The existing IRD contractor identity was reused, yielding 68 normalized contractor/provider entities without fragmentation. Exact CPVA searches produced no additional defensible claim. No new CVP IS instructor guidance was present after message `1537121770707091537`. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; registry counts remain 426 systems and 631 observations. Commit `ed851725b68866d749d8d5924f7ed66f5cb9ec8c` was pushed and authenticated source readback passed; Actions run `2371`, task `608`, succeeded including Pages publication. Public Pages returned the expected Keycloak `302`; direct backend verification was unavailable from this runtime.
- **Previous rotation (2026-08-13 10:08 UTC):** clients 241–250 were reviewed. The CVP IS organization-first route identity-matched nine clients; no exact organization result was found for client 241. Two direct award PDFs added high-confidence contractor evidence: AB „Via Lietuva“ awarded Starkodas maintenance/modification of its public EV-charging-operator/access-point registration system for EUR 98,920 under a contract signed 2026-07-13; Lietuvos probacijos tarnyba awarded Buddi Limited rental of electronic-monitoring devices and software for EUR 2,196,000 under a contract signed 2026-01-06. A „Plačiajuostis internetas“ network-equipment award was reviewed but not mapped as a distinct software/system observation. Exact CPVA searches produced no additional defensible claim. No new CVP IS instructor guidance was present in the latest accessible channel export. Commit `7273c63676ad36d79178e40abc44327e9c49e171` was pushed and authenticated source readback passed; Actions run `2369`, task `606`, succeeded including Pages publication. Public Pages returned the expected Keycloak `302`; the Pages dataset mount was unavailable from this runtime. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; the registry now contains 426 systems, 631 observations, and 67 normalized contractor/provider entities. Next rotation: clients 251–260.
- **Previous rotation (2026-08-13 08:08 UTC):** clients 231–240 were reviewed. Direct CVP IS award PDFs added four high-confidence system/contractor observations: Inovacijų agentūra awarded UAB „DevOcean LT“ IAVV IS creation/support for EUR 576,250 under a contract signed 2025-03-21; CPVA awarded ECM studija DVS IS support/development for EUR 392,040 under a 36-month contract signed 2026-02-27; and CPVA awarded UAB „NRD Systems“ VSFSVVP IS development/support for EUR 198,347 under a contract signed 2024-12-16, with UAB „Etronika“ explicitly named as a 10% / EUR 18,997 subcontractor. Awards are not presented as acceptance, production release, hosting, or completion evidence. Exact CPVA searches for all ten clients produced no additional defensible claim. No new CVP IS instructor guidance was present in the latest accessible channel export. Commit `cf311bbbd2ae07a49ff88d2f54782ac6f2725665` was pushed and authenticated source readback passed; Actions run `2367`, task `604`, succeeded including Pages publication. Public Pages returned the expected Keycloak `302`; direct backend verification was unavailable from this runtime. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; the registry contained 425 systems, 630 observations, and 65 normalized contractor/provider entities.
- **Previous rotation (2026-08-13 04:08 UTC):** clients 221–230 were reviewed. The CVP IS organization-first route identity-matched all ten exact legal names. Direct award PDFs added two high-confidence findings: (1) Valstybinė duomenų apsaugos inspekcija awarded UAB „Lexita“ both 2025 project lots—new information-system creation for EUR 265,000 and statistics-tool creation for EUR 53,000—under contracts signed 2025-07-31; (2) Viešųjų pirkimų tarnyba awarded MB „Nordic plum“ the CVP IS subsystem maintenance/development contract for EUR 287,200, signed 2025-11-30. The records explicitly retain acceptance, production release, and hosting as unknown. Exact CPVA searches and the other identity-checked organization notice lists produced no defensible new claim. No new CVP IS instructor guidance was present in the latest accessible channel export. Commit `1980408a29173679122dd9b34e2c9ce1ad75749e` was pushed and authenticated source readback passed; Actions run `2366`, job `3342`, succeeded including Pages publication. Public Pages returned the expected Keycloak `302`; backend verification was unavailable because this runtime has no resolvable Kubernetes control-plane host. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; the registry contained 422 systems, 627 observations, and 61 normalized contractor/provider entities.
- **Previous rotation (2026-08-13 02:14 UTC):** clients 211–220 were reviewed. The CVP IS organization-first route identity-matched clients 211–214 and 216–220; no exact organization result was found for 215. The direct award PDFs established that UAB „Asseco Lietuva“ received three bounded E-kinas contracts from the Lithuanian Central State Archives: modernization/deployment signed 2025-02-10 for EUR 93,800, plus maintenance/development signed 2025-05-13 and 2026-03-31 for EUR 165,000 each. A separate award established UAB „Asseco Lietuva“ as the Lithuanian Chief Archivist’s Office EAIS modernization contractor under a EUR 660,000 contract signed 2025-02-24 for the E-kultūros platform project. Client 213 and 219 dossiers now cite the exact CVP IS award PDFs and explicitly retain production hosting, acceptance, and go-live dates as unknown. Other exact client/system CPVA searches, official sources, and procurement lists produced no defensible additional system, contractor, production-hosting, delivery-kickoff, or production-release claim. No new CVP IS instructor guidance was available through the runtime's latest accessible channel export. Commits `0220ccfc71f97950e61457eb636eee8ac3d8a6a1` and `f5574bc01fb7aba20b9c6f77cf3a8e524f177460` were pushed; Actions runs `2364` and `2365` succeeded, including Pages publication.
## Availability continuity
- On 2026-08-14, `gitea-docusaurus-projects` was merged into the VSSA-managed `documentation-docusaurus` skill and retired from the active runtime. Public Gitea repository `vssa-v1-skills-code-agent/documentation-docusaurus` is authoritative; all 22 merged references, the Actions template, provenance, validator and runtime symlink are maintained from `/opt/data/documentation-docusaurus-skill`. The exact requested comparison repository `corp-v1-skills-code-agent/documentation-docusaurus` was absent through both authenticated API and SSH and was not touched. The accessible central `home-v1-skills-code-agent/documentation-docusaurus` baseline and independent AeroSim adoption were inspected read-only; the VSSA skill preserved the baseline guidance and adopted the explicit independent-adoption/provenance model. Cron job `88833e00b4a2` now loads `documentation-docusaurus` instead of the absorbed skill.
- On 2026-08-14, the VSSA research skill was renamed from `client-investigator` to `vssa-clients`. Public Gitea organization `vssa-v1-skills-code-agent` and repository `vssa-clients` were created; repository `main` is now authoritative, `/opt/data/vssa-clients-skill` is the maintainer worktree, and `/opt/data/skills/research/vssa-clients` is the runtime symlink. Cron job `88833e00b4a2` now loads `vssa-clients` and requires every reusable skill improvement to be validated, committed, pushed, remotely read back, and runtime-loaded before reporting.
- On 2026-08-13, rotation 231–240 added direct CVP IS award evidence for IAVV IS (UAB „DevOcean LT“, EUR 576,250), CPVA DVS IS (ECM studija, EUR 392,040), and VSFSVVP IS (UAB „NRD Systems“, EUR 198,347; UAB „Etronika“ as the explicitly named 10% subcontractor). Validation and the production build passed with 290 clients, 425 systems, 630 observations, and 65 contractor/provider dossiers. Commit `cf311bb` was pushed and read back; Actions run `2367`, task `604`, succeeded including LEGO Cloud Pages publication, and public Pages retained the expected Keycloak `302`.
- On 2026-08-13, rotation 221–230 added direct CVP IS award evidence that UAB „Lexita“ received VDAI's new information-system and statistics-tool creation contracts (EUR 265,000 and EUR 53,000; signed 2025-07-31), and MB „Nordic plum“ received VPT's CVP IS subsystem maintenance/development contract (EUR 287,200; signed 2025-11-30). Validation and the production build passed with 290 clients, 422 systems, 627 observations, and 61 contractor/provider dossiers. Commit `1980408` was pushed and read back; Actions run `2366`, job `3342`, succeeded including LEGO Cloud Pages publication, and public Pages retained the expected Keycloak `302`.
- On 2026-08-13, rotation 211–220 added direct CVP IS award evidence for three E-kinas contracts awarded to UAB „Asseco Lietuva“ (EUR 93,800 modernization/deployment and two EUR 165,000 maintenance/development contracts) and a EUR 660,000 EAIS modernization contract awarded to the same company. Validation and the production build passed with 290 clients, 421 systems, 626 observations, and 59 contractor/provider dossiers. Commits `0220ccf` and `f5574bc` were pushed and read back; Actions runs `2364` and `2365` succeeded including LEGO Cloud Pages publication, and public Pages retained the expected Keycloak `302`.
- On 2026-08-13, rotation 201–210 added direct CVP IS award evidence that UAB „iTree Lietuva“ won the NMA ŽŪPAIS Informacinio portalo 36-month maintenance/development contract for EUR 104,060, signed 2026-05-28. The award PDF is `resourceId=6504564`, `documentId=8110181`, `noticeId=8110157`, procedure `32350071-7198-4af1-a61e-f26a6efd8eba`. Validation and the full build passed with 290 clients, 421 systems, 626 observations, and 58 contractor/provider dossiers. Commit `5cc1b2c` was pushed and read back; Actions run `2363`, job `3339`, succeeded including LEGO Cloud Pages publication, and public Pages retained the expected Keycloak `302`.
- On 2026-08-12, scheduled rotation 191–200 completed with conservative no-new-claim outcomes. `corepack pnpm validate`, the full production build (290 client, 421 system and 57 contractor routes; 626 observations; 296 raw artifacts), and `git diff --check` passed. Commit `7c1f68f` was pushed, authenticated read back, and published by successful Actions run `2357`; public Pages retained the intended Keycloak `302`. The host did not expose the runner Pages dataset mount, so no direct backend-file readback was available from this runtime.
- On 2026-08-12, commit `d0c828a` added the first-class Contractors collection: top navigation, dedicated Docusaurus plugin/sidebar, **Overview → Registry**, 58 generated contractor/provider dossiers, stable internal `CTR-*` IDs, a machine-readable registry, exact client/system/evidence relationships, and generated contractor sections on system dossiers. INVESTIS now displays ATEA with its bounded evidenced role. The same change recorded **2023-10-02** as INVESTIS's production release because CPVA's dated official announcement explicitly says the system started operating; the 2023-10-03 Inovacijų agentūra announcement is retained as corroboration. Delivery kickoff remains unknown because neither announcement establishes when delivery began. Focused tests, registry validation, the full production build, local browser checks, authenticated Gitea source readback, and Actions run `2351` succeeded; public Pages correctly returns the expected Keycloak `302` for the new routes. Recurring job `88833e00b4a2` and `client-investigator` now preserve this release-date rule and contractor-registry semantics.
- On 2026-08-12, three live organization-first CVP IS trials produced exact, PDF-backed system procurements. (1) Vyriausybės kanceliarija: organization `2076`, `orgGroupId=2088`, 40 notices; a 2025 PPVIS maintenance/improvement tender (`resourceId=3325946`) explicitly names PPVIS, EUR 110,000 excluding VAT, 36 months, and has a later contract-award notice, which must be opened separately before supplier attribution. (2) Inovacijų agentūra: organization `1679`, `orgGroupId=1681`; the IAVV IS creation/support award (`resourceId=16691`) names UAB `DevOcean LT`, EUR 576,250, winner selection 2025-02-27, and contract date 2025-03-21. This maps to a newly evidenced IAVV IS, not INVESTIS; separate AIS, IAVVIS technical-supervision, project/portfolio-platform, and B2Lithuania notices also appeared. (3) CPVA: organization `1253`, `orgGroupId=1254`, 224 notices; a 2026 tender (`resourceId=9090393`) explicitly covers development, maintenance, and warranty services for VSFSVVP IS, an electronic data-exchange system for Internal Security Fund / Border Management and Visa Policy financial support. It proves intended procurement only, not award or supplier. Direct notice endpoints returned valid PDF attachments and extracted text.
- On 2026-08-12, instructor guidance established the CVP IS organization-first route. Live validation confirmed that the organization search exposes exact organization rows; example profile `id=1297` links to published notices with distinct `authorityId=1297` and `orgGroupId=1298`; the notice list exposes type, title, upload/publication dates, language, and status; and a notice-type link returned HTTP 200 `application/pdf` with an attachment filename and stable resource/document/notice identifiers. Browser navigation can abort on this legitimate download. The validated mechanics and PDF/stage safeguards were added to `client-investigator` and recurring job `88833e00b4a2`.
- On 2026-08-12, an exhaustive CPVA sweep queried all 421 then-current canonical system names through the live validated `https://cpva.lt/paieska?_sf_s=<phrase>` mechanism with zero request failures. CPVA uses broad token matching, so raw search-card hits are noisy and require opened-body verification. The first defensible case was INVESTIS: CPVA's 2023-10-02 production-launch notice explicitly describes INVESTIS/DMS, its production start and functions, and ATEA as the service provider collaborating on system creation. Client 236 (Inovacijų agentūra) and client 240 (CPVA) were updated with the bounded historical supplier role in commit `18751f6`; local validation/build, authenticated readback, Actions run `2350`, and Pages publication succeeded. The `client-investigator` CPVA procedure was corrected from ineffective POST assumptions to the confirmed `_sf_s` URL and now warns that broad token matches are discovery only.
- On 2026-08-12, Lego designated Discord user `476287310627864587` to teach Hermes use of the CVP IS procurement portal (`https://viesiejipirkimai.lt/epps/viewCFTSAction.do`) for finding and mapping RFIs, RFPs, specifications, awards, contracts/amendments, and completion records to VSSA clients and systems. This is a **CONFIRMED process directive**; exact portal procedures remain **UNKNOWN** until taught and validated. Recurring job `88833e00b4a2` was configured to ingest the instructor's channel guidance and preserve procurement-stage semantics.
- On 2026-08-12, commit `15020a8` added one defensible Mano dienynas observation for client 167, increasing the registry to 622 observations while retaining 420 canonical systems. Validation, deployed-content checks, authenticated remote readback, and Gitea Actions run `2344` succeeded. CPVA exact-name searches for clients 161–170 returned no applicable findings.
- On 2026-08-12, commit `4756f0d` added a generated **System dossier** column to every client “Cloud services and systems”/structured systems table. All 621 observations link by displayed `SYS-*` ID to valid canonical system routes covering 420 systems. Local validation/build passed, authenticated source readback succeeded, and Gitea Actions run `2343` completed successfully including Pages publication. Public access continues to return the intended Keycloak `302` redirect.
- On 2026-08-12, commit `d3b833b` reorganized both Clients and Systems sidebars into exactly two first-level entries: **Overview** and an expanded **Registry** group containing the ordered individual dossiers (290 clients and 420 systems). Local validation/build and rendered sidebar checks passed, authenticated Gitea readback confirmed both sidebar files, and Actions run `2342` completed successfully including the Pages publish step. Public access continues to return the intended Keycloak `302` redirect.
- On 2026-08-12, commit `95d2a9c` split Overview, Clients, Systems, Methodology, and Data into dedicated Docusaurus sidebars; documented that `SYS-*` values are deterministic internal IDs generated from canonical identity keys rather than public identifiers; replaced system relationship tables with reusable React evidence cards; added de-duplicated References indexes to all 290 client and 420 system dossiers; and updated recurring job `88833e00b4a2` to search CPVA's official `https://cpva.lt/paieska` endpoint for client/system mentions while retaining only verified evidence. Validation/build and representative rendered-route checks passed, Gitea Actions run `2341` succeeded, and public Pages retained its expected Keycloak `302` protection.
- On 2026-08-12, commit `a6ca8ab` added infrastructure/lifecycle analysis fields to all 420 then-current unique system records, updated the machine-readable registry to schema version 2, added identity-safe validation/bootstrap handling, and updated the recurring research job to investigate these fields continuously. Initial values remain `unknown` until direct evidence is found; no hosting or dates were fabricated from existing client observations. Validation/build passed, Gitea Actions run `2340` succeeded, and the Pages backend returned HTTP 200 with the three fields, schema-v2 registry, and raw canonical analysis file. Public access remains Keycloak-protected (`302`).
- On 2026-08-12, commit `1542674` reorganized the portal around researched user tasks after reviewing GOV.UK content-design/writing guidance, W3C WAI design guidance, and USWDS card/table guidance. Global navigation is now Overview, Clients, Systems, Methodology, and Data; the homepage prioritizes client browsing, system exploration, and evidence search; scope metrics distinguish clients, systems, and observations; generated overview/directory/system-registry guidance explains ordering, statuses, counts, and safe interpretation; provenance documents the machine-readable registry. The rationale is recorded in `docs/content-organization-research.md`. Validation/build passed, desktop visual and browser checks found no clipping/JS errors, Gitea Actions run `2335` succeeded, and the Pages backend returned HTTP 200 for all representative routes and search. Public access remains Keycloak-protected (`302`).
- The first scheduled continuous-research invocation at 22:00 UTC failed because the model provider reported overload. The next invocation completed at 00:12 UTC, validated all 290 clients plus 419 system routes/620 observations, pushed commit `b34670484501f0ddd27154c19b7605bf00f3efdd`, and verified successful Gitea Actions run `2333`. Public Pages correctly redirected unauthenticated traffic to Keycloak (`302`), while direct backend checks returned HTTP 200 for representative client/system routes and the registry.
- On 2026-08-11, the visible navbar/site label was changed from `VSSA Documentation` to `VSSA - Clients & Systems` in commit `d062598`. Gitea Actions run `2332` succeeded and the Pages backend returned HTTP 200 with the new label.
- On 2026-08-11, commit `e0efc31` flattened the Client Dossiers sidebar and added Systems Dossiers: 621 canonical evidence observations consolidated into 421 conservative unique-system records, 421 generated system routes, client/system provenance links, reviewed alias rules, machine-readable JSON, search indexing, and build validation. Gitea Actions run `2331` succeeded. The Pages backend returned HTTP 200 for the homepage, client 001, systems registry, representative centralized-government-IT dossier, registry JSON, and search index. Public Pages became Keycloak-protected concurrently and now correctly returns HTTP 302 to `/oauth2/start` for unauthenticated requests; this is infrastructure authentication, not a deployment failure.
- On 2026-08-11, the dedicated VSSA-styled Docusaurus landing page and native local search were published in commit `d43effe`. The design uses the official VSSA navy/blue visual language, locally bundled Public Sans, the official mark, square geometry, a separate `/overview/` documentation route, and live registry-derived metrics. Gitea Actions run `2330` completed successfully. The public homepage, overview, directory, local 3 MB search index, and logo returned HTTP 200; a browser query for `kanceliarija` returned multiple dossier results and opened client 001 successfully. Search is generated and executed inside the static site with no external search service.
- On 2026-08-11, `vssa-v1/vssa-clients` was renamed to `vssa-v1/documentation` with history preserved. The main worktree and 20 linked-worktree pointers were repaired and verified. Docusaurus 3.10.2 now renders all 290 dossiers from generated MDX-safe copies, preserves canonical source artifacts, and publishes byte-identical raw artifacts with SHA-256 hashes. Gitea Actions run `2329` completed successfully for commit `0a2144f`, and the public LEGO Cloud Pages homepage, directory, representative dossier routes, and raw manifest returned HTTP 200.
- On 2026-08-11, Gitea 1.27.0 initially left web/API healthy while all Git transport operations crashed in the Go runtime during `moduledataverify1`. Gitea was subsequently updated to `1.27.1`; SSH and Smart HTTP recovered. The queued VSSA commit `6fc42ab` was pushed and remotely verified, leaving local `main` synchronized with `origin/main`.
- **CONFIRMED recovery decision/status (2026-08-11 19:05–19:06 UTC):** after Lego asked Hermes to recheck, live verification showed Gitea `1.27.1`, REST API, SSH Git, and HTTPS Git all healthy. The queued VSSA client-dossier commit `6fc42ab` was pushed, remote `INDEX.md` was read back, and local `main` matched `origin/main`. No VSSA delivery blocker remained from this incident.
- On 2026-08-04 at 20:05–20:42 UTC, Lego (`root_at_skic`) repeatedly asked whether Hermes was alive. These messages are evidence of the broader Hermes availability incident, not a change to the VSSA investigation scope. The incident was subsequently investigated in `#jarvis-jr-v1-hermes-setup`.
## Terminology
- In repository and Gitea workflow guidance, **mutation** means an operation that changes data or state (for example editing, committing, pushing, changing settings, or deleting). “Discovery before mutation” means inspect and confirm the target repository and its current state before making changes.
## Source anchor
- Latest processed human message: `1539720023382298655` (2026-08-19 19:37 UTC). RootAtSkic requested an executive-level presentation using the VSSA PowerPoint template; the completed, validated final presentation and artifact details are recorded above.
- Previous processed human message: `1539580734690557972` (2026-08-19 10:24 UTC). RootAtSkic corrected VSSA's entity classification; the confirmed repository, skill and generated-route correction is recorded above.
- Previous processed human message: `1539556697855623238` (2026-08-19 08:48 UTC). The designated CVP IS instructor supplied lesson 3, the organization/client-data search and profile-derived published-notices route recorded above.
- Previous processed human messages: `1539539693383852083` and `1539544570164158526` (2026-08-19 07:41–08:00 UTC). The designated instructor supplied CVP IS lessons 1 and 2, recorded and validated above.
- Previous processed human message: `1539320694246998056` (2026-08-18 17:10 UTC). RootAtSkic required the desktop “On this page” panel to be at least twice as wide; the confirmed `160px` → `320px` delivery is recorded above.
- Previous processed human messages: `1537814241019564032`, `1537819093254668479`, and `1537819134069571685` (2026-08-14 13:24–13:44 UTC). Lego directed the documentation improvement using the updated `documentation-docusaurus` skill and then confirmed that approval was given.
- Previous processed human message: `1537799637707128902` (2026-08-14 12:26 UTC). Lego directed the merge of `gitea-docusaurus-projects` into a dedicated VSSA-managed `documentation-docusaurus` repository and authorized read-only learning from, but no modification of, the requested corp repository; the verified outcome and unavailable exact comparison source are recorded above.
- Previous processed human messages: `1537796686020349992`–`1537798034602065940` (2026-08-14 12:15–12:20 UTC). Lego asked which documentation skills were used and whether both were Gitea-managed, leading to the confirmed merge/repository directive.
- Previous processed human messages: `1537794036780498954` and `1537794525836218368` (2026-08-14 12:04–12:06 UTC). Lego asked which skill governs this channel, renamed it to `vssa-clients`, and required a dedicated repository under `vssa-v1-skills-code-agent`.
- Previous processed human messages: `1537785454265634817` and `1537793619442925701` (2026-08-14 11:30–12:02 UTC). Lego required contractor links on each exact client-system row and asked for a concrete Client Card example; the implemented relationship model and Nacionalinė teismų administracija example are recorded above.
- Previous processed human message: `1537121770707091537` (2026-08-12 15:33 UTC). Lego clarified that dated official announcements explicitly saying a system started operating can evidence its production release and asked why INVESTIS lacked kickoff/release values; the confirmed release-date rule and deployed INVESTIS result are recorded above, while kickoff remains unknown.
- Previous processed human message: `1537121281529356391` (2026-08-12 15:31 UTC). Lego required system dossiers to expose evidenced contractors and proposed a first-class Contractors registry; commit `d0c828a` implemented and published that structure.
- Previous processed human message: `1537120485870018662` (2026-08-12 15:28 UTC). Lego requested exact system links to inspect documentation updates; Hermes clarified that the three CVP IS trials had been captured as research leads but had not yet been incorporated into documentation pages.
- Previous processed human messages: `1537116481408466974`–`1537117840715546624` (2026-08-12 15:12–15:17 UTC). Lego taught and requested live trials of the additional CVP IS organization-first search route; the validated mechanics and three trial results are recorded above.
- Previous processed human message: `1537072799775203358` (2026-08-12 12:18 UTC). Lego designated user `476287310627864587` as the CVP IS instructor and directed the recurring job to learn the procurement portal workflow and map supported procurement records to VSSA clients and systems.
- Previous processed human message: `1537067600998047804` (2026-08-12 11:57 UTC). Lego requested internal system-dossier links in every client cloud-services/systems table; commit `4756f0d` implemented and verified the links as recorded above.
- Previous processed human message: `1537058117223972915` (2026-08-12 11:20 UTC). Lego requested Overview/Registry hierarchy for both Clients and Systems sidebars; commit `d3b833b` implemented it.
- Previous processed human messages: `1537047891309494343`–`1537049333352894514` (2026-08-12 10:39–10:45 UTC). Lego required recurring infrastructure/lifecycle research, dedicated top-level sidebars, clarification of generated `SYS-*` IDs, reusable relationship cards, CPVA searching, and per-record reference indexes; commits `a6ca8ab` and `95d2a9c` implemented these requirements.
- Latest processed human message: `1536934392302141461` (2026-08-12). Lego requested an immediate research-led overall page improvement cycle focused on best practices for content organization; the deployed result is recorded above.
- Latest processed human message: `1536859431533281312` (2026-08-11). Lego requested the site label `VSSA - Clients & Systems`; it was published and verified as recorded above.
- Latest processed human message: `1536847412382015629` (2026-08-11). Lego requested a flat Client Dossiers sidebar, a unique Systems Dossiers registry, and continuous documentation/research automation; all three were implemented and published as recorded above.
- Latest processed human message: `1536845732613591160` (2026-08-11). Lego reported that the new landing page and search were not visible; inspection confirmed the changes had only existed locally. Hermes committed and pushed them, verified successful Actions run `2330`, and confirmed the public deployment and search behavior.
- Latest processed human message: `1536835494909055107` (2026-08-11). Lego directed Hermes to rename the repository to `documentation`, convert it to Docusaurus, add Gitea Actions, and publish through LEGO Cloud Pages; the completed state is recorded above.
- Previous processed human message: `1536812738679021618` (2026-08-11 19:05 UTC). Lego asked Hermes to check Gitea after remediation; the subsequent verified result is recorded above.
- Previous incident message: `1536807021674762261` (2026-08-11 18:42 UTC), asking what was wrong with Gitea and how to resolve it.
- Previous availability message: `1534300468530905170` (2026-08-04 20:42 UTC). Lego asked whether Hermes was alive; no VSSA project scope or status changed.
- Previous terminology message: `1533032343021813930` (2026-08-01 08:43 UTC), requesting clarification of “mutation”.
- Previous durable directive: `1532810727847624884` (2026-07-31 18:02 UTC), confirming the concise one-file-per-client format, plain-language system meaning, contractor/company research, deep public investigation, and iterative improvement of `client-investigator`.