wiki: sync 2026-08-29 03:04 UTC — 4 file(s) updated
This commit is contained in:
@@ -1,6 +1,6 @@
|
||||
# vssa-storm
|
||||
|
||||
_Last sync: 2026-08-27 20:20 UTC_
|
||||
_Last sync: 2026-08-28 22:05 UTC_
|
||||
|
||||
## CVP IS instructor lesson 3 — organization/client data (2026-08-19)
|
||||
|
||||
@@ -43,7 +43,150 @@ _Last sync: 2026-08-27 20:20 UTC_
|
||||
- Updated the layout regression test to require both `flex-basis` and `max-width` at `20rem`. All `15` tests, full validation, production build and `git diff --check` passed; the build verified `290` client, `520` system and `111` contractor routes, `745` observations and `296` raw artifacts.
|
||||
- Commit `3fc30f514db8d6ea0b2a69263dd66d4847b60cf2` is on `main`; local/remote ref equality and authenticated exact-SHA CSS readback passed. Exact-head Gitea Actions task `1263` reached `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized page-body readback and browser acceptance were unavailable because this runtime has no service-proxy client and could not launch Chrome.
|
||||
|
||||
## Latest scheduled rotation — 2026-08-28 02:13 UTC
|
||||
## Latest scheduled rotation — 2026-08-29 02:10 UTC
|
||||
|
||||
- Followed this run's explicit ordered cursor after clients `081`–`100` and completed clients `101`–`120`; the already completed extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the ordered sequence.
|
||||
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests: `73` returned HTTP `200`; the Microsoft Bookings endpoint returned the previously bounded automation-specific HTTP `417`, while the Centre's opened official homepage still links that exact endpoint. Re-downloaded, verified and text-extracted all `14` cited CVP IS PDFs (`56` pages; `92,387` extracted characters).
|
||||
- Ran `56` de-duplicated exact CPVA client/system searches and `140` de-duplicated contractor/procurement ladder searches at HTTP `200`; broad-token CPVA and Bing output remained discovery only.
|
||||
- Repeated both documented CVP IS routes with bounded identity variants. Exact-authority basic search retained `55` complete rows and flagged `17` broad candidates. Organization-first discovery retained `20` identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, rejected the near-name `Viešoji įstaiga Vaiko užuovėja` collision, and parsed all `197` published-notice rows. The current client `109` table status says a winner was selected for the short/800-number tender, but no opened award or signed-contract body was found; it was not promoted beyond tender-stage evidence. Existing VDI and Užimtumo tarnyba award/tender classifications remained supported, and no table state, tender, consultation or bid was promoted into an award, signed engagement, delivery, production use, hosting, completion or release claim.
|
||||
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates advanced to `2026-08-29` without status promotion.
|
||||
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact.
|
||||
- Documentation `main` is exactly equal to remote commit `a18c0edbc797b20513f43b5004271e55e78b47f1`; authenticated exact-SHA source readback verified clients `101`, `110`, `120` and `INDEX.md`. Exact-head Gitea Actions task `1589`, run `135` (`build`), reached `success`, including guarded Pages publication. Public Pages reached the expected Keycloak/OAuth authentication boundary; authorized Kubernetes `pages/pages` service-proxy page-body readback verified deployed clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact with current markers.
|
||||
- The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/`.
|
||||
- Next ordered dossier rotation: `121`–`140`.
|
||||
|
||||
### Previous scheduled rotation — 2026-08-29 00:08 UTC
|
||||
|
||||
- Followed the durable wiki cursor after clients `101`–`120` and completed clients `121`–`140`; the already completed extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the ordered sequence.
|
||||
- Reopened all `72` distinct current dossier evidence URLs with browser-equivalent requests at HTTP `200`. Re-downloaded, verified and text-extracted all `17` cited PDFs (`69` pages; `115,244` extracted characters); all `51` cited CVP IS order, notice-list and document-detail routes returned HTTP `200`.
|
||||
- Ran `42` exact CPVA client/system searches and `42` contractor-procurement query ladders at HTTP `200`; broad-token CPVA and external-search output remained discovery only.
|
||||
- Repeated both documented CVP IS routes with bounded identity variants. Exact-authority basic search retained `240` complete rows and reviewed `66` broad IT/digital candidates. Organization-first discovery retained `17` identity-checked profiles, parsed `238` published-notice rows and reviewed `51` broad candidates without forcing near-name identities. Counts and evidence bodies remained stable; no result-table state, consultation, tender or bid was promoted into an award, signed engagement, delivery, production use, hosting, completion or release claim.
|
||||
- This was a genuine conservative no-new-claim review. Existing statuses, `71` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates advanced to `2026-08-29` without status promotion.
|
||||
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `121`, `130` and `140`, the Systems and Contractors directories, and client `130`'s raw artifact. A real Chrome acceptance pass was unavailable because this runtime could not launch Chrome.
|
||||
- Documentation `main` is exactly equal to remote commit `a3679ecbaab3c6bb2302518284f615d19217f578`; authenticated exact-SHA source readback verified clients `121`, `130` and `INDEX.md`. Exact-head Gitea Actions task `1588` (`build`) reached `success`, including guarded Pages publication. Public Pages reached the expected Keycloak/OAuth `302`; authorized Kubernetes `pages/pages` service-proxy page-body readback verified deployed clients `121`, `130` and `140`, the Systems and Contractors directories, and client `130`'s raw artifact with current markers.
|
||||
- The latest `100` live Discord messages were read through `1543019171237990551` (`2026-08-28T22:07:18.333000+00:00`); all were bot-authored, with no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/`.
|
||||
- Next ordered dossier rotation: `141`–`160`.
|
||||
|
||||
### Previous scheduled rotation — 2026-08-28 22:05 UTC
|
||||
|
||||
- Followed this run's explicit ordered cursor after clients `081`–`100` and completed clients `101`–`120`; the already completed extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the ordered sequence.
|
||||
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests at HTTP `200`. Re-downloaded, verified and text-extracted all `14` cited CVP IS PDFs (`56` pages; `92,429` extracted characters).
|
||||
- Ran `56` exact CPVA client/system searches and `84` client/system contractor-procurement query ladders at HTTP `200`. CPVA's `1,093` broad-token navigation matches and the external search output remained discovery only.
|
||||
- Repeated both documented CVP IS routes with bounded, previously identity-checked variants. Exact-authority basic search retained `63` complete rows and reviewed `11` broad IT/digital candidates. Organization-first discovery retained `20` identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed `197` published-notice rows and reviewed `53` broad candidates without forcing near-name identities. The candidate sets were byte-stable against the preceding saved pass. No result-table state, tender body, RFI, consultation or bid was promoted into an award, signed engagement, delivery, production use, hosting, completion or release claim.
|
||||
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates were already `2026-08-28`, so no documentation source changed and no empty commit was created.
|
||||
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact.
|
||||
- Documentation `main` remains exactly equal to remote commit `be9349a2c65a8cb0e8adafbe65add2b000a514a4`; authenticated exact-SHA source readback verified client `110`. Exact-head Gitea Actions task `1563`, run `133` (`build`), remains `success`, including guarded Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized Kubernetes `pages/pages` service-proxy page-body readback verified deployed clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact with current markers.
|
||||
- The latest `100` live Discord messages were read through `1542989089081532506` (`2026-08-28T20:07:46.188000+00:00`); all were bot-authored, with no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/`.
|
||||
- Next ordered dossier rotation: `121`–`140`.
|
||||
|
||||
### Previous scheduled rotation — 2026-08-28 20:06 UTC
|
||||
|
||||
- Followed this run's explicit ordered cursor after clients `081`–`100` and completed clients `101`–`120`; the already completed extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the ordered sequence.
|
||||
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests at HTTP `200`. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,387` extracted characters); all `39` cited CVP IS order, notice-list and document-detail routes returned HTTP `200`.
|
||||
- Ran `54` exact CPVA client/system searches and `54` client/system contractor-procurement query ladders. Google returned `44` readable responses and rate-limited `10`; all ten were retried through Bing at HTTP `200`. CPVA broad-token pages and search-provider output remained discovery only.
|
||||
- Repeated both documented CVP IS routes with bounded, previously identity-checked variants. Exact-authority basic search retained `47` complete rows and reviewed `11` broad IT/digital candidates. Organization-first discovery retained `20` identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed `197` published-notice rows and reviewed `54` broad IT/digital candidates without forcing near-name identities. The current candidate set reconfirmed the already represented VDI organizational-assistant maintenance tender and Užimtumo tarnyba workplace-support procurement; the adjustable-bed rows are equipment rather than an information system. No table status or tender body was promoted into an award, signed engagement, delivery, production use or hosting claim.
|
||||
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates were already `2026-08-28`, so no documentation source changed and no empty commit was created.
|
||||
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||
- All `16` tests, pnpm validation, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact.
|
||||
- Documentation `main` remains exactly equal to remote commit `be9349a2c65a8cb0e8adafbe65add2b000a514a4`; authenticated exact-SHA source readback verified client `110`. Exact-head Gitea Actions task `1563`, run `133` (`build`), remains `success`, including the guarded Pages publication step. Public Pages reached the expected Keycloak/OAuth boundary; authorized Kubernetes `pages/pages` service-proxy page-body readback verified deployed clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact with current markers.
|
||||
- The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/`.
|
||||
- Next ordered dossier rotation: `121`–`140`.
|
||||
|
||||
### Previous scheduled rotation — 2026-08-28 18:08 UTC
|
||||
|
||||
- Followed this run's explicit ordered cursor after clients `081`–`100` and completed clients `101`–`120`; the already completed extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the ordered sequence.
|
||||
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests at HTTP `200`. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,429` extracted characters).
|
||||
- Ran `56` exact CPVA client/system searches and `84` client/system contractor-procurement query ladders at HTTP `200`. CPVA broad-token pages and search-provider output remained discovery only.
|
||||
- Repeated both documented CVP IS routes with bounded identity variants. Exact-authority basic search retained `47` complete rows and reviewed `11` broad IT/digital candidates. Organization-first discovery retained `20` identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed `197` published-notice rows and reviewed `53` broad IT/digital candidates without forcing near-name identities. Candidate rows and counts were unchanged from the preceding `101`–`120` review; existing tender and award-stage classifications remained supported, and no table status or tender body was promoted into a signed engagement, delivery, production use or hosting claim.
|
||||
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates were already `2026-08-28`, so no documentation source changed and no empty commit was created.
|
||||
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact.
|
||||
- Documentation `main` remains exactly equal to remote commit `be9349a2c65a8cb0e8adafbe65add2b000a514a4`; authenticated exact-SHA source readback verified client `110`. Exact-head Gitea Actions task `1563`, run `133` (`build`), remains `success`, including the guarded Pages publication step. Public Pages returned the expected OAuth `302`; authorized deployed page-body readback was unavailable in this runtime because `kubectl` is not installed, so the authentication boundary—not changed page content—was verified.
|
||||
- The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/`.
|
||||
- Next ordered dossier rotation: `121`–`140`.
|
||||
|
||||
### Previous scheduled rotation — 2026-08-28 16:07 UTC
|
||||
|
||||
- Followed the latest durable wiki cursor after clients `101`–`120` and completed clients `121`–`140`; the already completed extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the ordered sequence.
|
||||
- Reopened all `72` distinct current dossier evidence URLs with browser-equivalent requests at HTTP `200`. Re-downloaded, verified and text-extracted all `17` cited PDFs (`69` pages; `115,244` extracted characters); all `51` cited CVP IS order, notice-list and document-detail routes returned HTTP `200`.
|
||||
- Ran `42` exact CPVA client/system searches and `42` client/system contractor-procurement query ladders at HTTP `200`. CPVA broad-token pages and search-provider output remained discovery only.
|
||||
- Repeated both documented CVP IS routes with bounded identity variants. Exact-authority basic search retained `240` complete rows and reviewed `66` broad IT/digital candidates. Organization-first discovery retained `17` identity-checked profiles, parsed `238` published-notice rows and reviewed `51` broad IT/digital candidates without forcing near-name identities. Newly observed changes were client `123`'s electric functional-bed tender, client `126`'s heat/hot-water market consultation, and non-IT status changes for food, building-repair and boiler procurements; none establishes a new information system, supplier engagement, signed contract, delivery, production use, hosting, kickoff, release or completion.
|
||||
- This was a genuine conservative no-new-claim review. Existing statuses, `71` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates were already `2026-08-28`, so no documentation source changed and no empty commit was created.
|
||||
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `121`, `130` and `140`, the Systems and Contractors directories, and client `130`'s raw artifact; Chrome could not be launched.
|
||||
- Documentation `main` remains exactly equal to remote commit `be9349a2c65a8cb0e8adafbe65add2b000a514a4`; authenticated exact-SHA source readback verified client `130`. Exact-head Gitea Actions task `1563`, run `133` (`build`), remains `success`, including the guarded Pages publication step. Public Pages returned the expected OAuth `302`; authorized Kubernetes `pages/pages` service-proxy page-body readback verified deployed clients `121`, `130` and `140`, the Systems and Contractors directories, and client `130`'s raw artifact with current markers.
|
||||
- The latest `100` live Discord messages were read through `1542899303553433630` (`2026-08-28T14:10:59.650000+00:00`); all were bot-authored, with no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/`.
|
||||
- Next ordered dossier rotation: `141`–`160`.
|
||||
|
||||
### Previous scheduled rotation — 2026-08-28 14:09 UTC
|
||||
|
||||
- Followed the task's explicit ordered cursor after `081`–`100` and completed clients `101`–`120`; the already completed extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the ordered sequence.
|
||||
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests at HTTP `200`. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,331` extracted characters); all `39` cited CVP IS order, notice-list and document-detail routes returned HTTP `200`.
|
||||
- Ran `54` exact CPVA client/system searches at HTTP `200` and `54` client/system contractor-procurement query ladders. Google returned `44` readable responses and rate-limited `10`; all ten were retried through Bing at HTTP `200`. CPVA broad-token pages and search-provider output remained discovery only.
|
||||
- Repeated both documented CVP IS routes with bounded identity variants. Exact-authority basic search retained `47` complete rows and reviewed `11` broad IT/digital candidates. Organization-first discovery retained `20` identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed `197` published-notice rows and reviewed `54` broad IT/digital candidates without forcing near-name identities. Existing tender and award-stage classifications remained supported; no table status or tender body was promoted into a signed engagement, delivery, production-use or hosting claim.
|
||||
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates were already `2026-08-28`, so no documentation source changed and no empty commit was created.
|
||||
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact; Chrome could not be launched.
|
||||
- Documentation `main` remains exactly equal to remote commit `be9349a2c65a8cb0e8adafbe65add2b000a514a4`; authenticated exact-SHA source readback verified client `110`. Exact-head Gitea Actions task `1563`, run `133` (`build`), remains `success`, including the guarded Pages publication step. Public Pages returned the expected OAuth `302`; authorized Kubernetes `pages/pages` service-proxy page-body readback verified deployed clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact with current markers.
|
||||
- The latest `100` live Discord messages were read through `1542869089297633300` (`2026-08-28T12:10:56.010000+00:00`); all were bot-authored, with no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/`.
|
||||
- Next ordered dossier rotation: `121`–`140`.
|
||||
|
||||
### Previous scheduled rotation — 2026-08-28 12:08 UTC
|
||||
|
||||
- Followed the task's explicit ordered cursor after `081`–`100` and completed clients `101`–`120`; the already completed extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the ordered sequence.
|
||||
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests at HTTP `200`. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,429` extracted characters).
|
||||
- Ran `54` de-duplicated exact CPVA client/system searches at HTTP `200` and `54` client/system contractor-procurement query ladders; `45` Google responses were readable and `9` rate-limited responses were retried through Bing at HTTP `200`. CPVA broad-token pages and search-provider output remained discovery only.
|
||||
- Repeated both documented CVP IS routes with bounded identity variants. Exact-authority basic search retained `47` complete rows and reviewed `11` broad IT/digital candidates. Organization-first discovery retained `20` identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed `197` published-notice rows and reviewed `54` broad IT/digital candidates without forcing near-name identities. The current client `109` short/800-number bodies remain tender-stage communications scope; the current client `110` register-maintenance notice is already represented as planned procurement. No discovery row or result status was treated as an award, signed contract, supplier engagement, delivery or production-use claim.
|
||||
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates were already `2026-08-28`, so no documentation source changed and no empty commit was created.
|
||||
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact.
|
||||
- Documentation `main` remains exactly equal to remote commit `be9349a2c65a8cb0e8adafbe65add2b000a514a4`; authenticated exact-SHA source readback verified client `110`. Exact-head Gitea Actions task `1563`, run `133` (`build`), remains `success`, including the guarded Pages publication step. Public Pages DNS was unavailable from this runtime; authorized Kubernetes `pages/pages` service-proxy page-body readback verified deployed clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact, including the `2026-08-28` date and current registry markers.
|
||||
- The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/`.
|
||||
- Next ordered dossier rotation: `121`–`140`.
|
||||
|
||||
### Previous scheduled rotation — 2026-08-28 10:07 UTC
|
||||
|
||||
- Followed the task's explicit ordered cursor after `081`–`100` and completed clients `101`–`120`; the already completed extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the ordered sequence.
|
||||
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests at HTTP `200`. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,373` extracted characters).
|
||||
- Ran `56` exact CPVA client/system searches at HTTP `200` and `84` deduplicated Bing client/system contractor-procurement query ladders at HTTP `200`; CPVA broad-token pages and search-provider output remained discovery only.
|
||||
- Repeated both documented CVP IS routes with bounded identity variants. Exact-authority basic search retained `47` complete rows and reviewed `4` IT/digital candidates. Organization-first discovery retained `19` identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed `197` published-notice rows and reviewed `30` IT/digital candidates without forcing near-name identities. The newly reopened client `109` short/800-number notice body is an open tender for telephone and data-transmission services; a portal result status saying a winner was determined does not replace an award or signed-contract body, so no supplier engagement, delivery or production-use claim was added.
|
||||
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates were already `2026-08-28`, so no documentation source changed and no empty commit was created.
|
||||
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact.
|
||||
- Documentation `main` remains exactly equal to remote commit `be9349a2c65a8cb0e8adafbe65add2b000a514a4`; authenticated exact-SHA source readback verified client `101` and the index. Exact-head Gitea Actions task `1563`, run `133` (`build`), remains `success`, including the guarded Pages publication step. The public ingress currently returns a self-referential HTTP `301`; authorized Kubernetes `pages/pages` service-proxy page-body readback nevertheless verified deployed clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact, including the `2026-08-28` date and current registry counts.
|
||||
- The latest `100` live Discord messages were read through `1542807985569669180` (`2026-08-28T08:08:07.746000+00:00`); all were bot-authored, with no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/`.
|
||||
- Next ordered dossier rotation: `121`–`140`.
|
||||
|
||||
### Previous scheduled rotation — 2026-08-28 08:06 UTC
|
||||
|
||||
- Followed the durable channel cursor after clients `121`–`140` and completed clients `141`–`160`; the already completed extra `001`–`020` rerun did not reset or repeat the ordered sequence.
|
||||
- Reopened all `59` distinct current dossier evidence URLs with browser-equivalent requests at HTTP `200`. Re-downloaded, verified and text-extracted all `17` cited PDFs (`110` pages; `219,195` extracted characters).
|
||||
- Ran `65` exact CPVA client/system searches at HTTP `200` and `65` deduplicated Bing client/system contractor-procurement query ladders at HTTP `200`; CPVA broad-token pages and search-provider output remained discovery only.
|
||||
- Repeated both documented CVP IS routes with bounded identity variants. Organization-first discovery retained `19` identity-checked profiles, parsed `331` published-notice rows and reviewed `147` broad candidates without forcing a near-name identity. Exact-authority basic search retained `342` rows and reviewed `166` broad candidates. The newly opened client `147` tender body covered four special-purpose road-control vehicles and equipment; it does not establish an information system, supplier engagement, delivery, production use, hosting, kickoff, release or completion.
|
||||
- This was a genuine conservative no-new-claim review. Existing statuses, `69` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved; all twenty dossier and matching index dates advanced to `2026-08-28` without status promotion.
|
||||
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned exact-name/path/date/six-column checks, evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `141`, `150` and `160`, the Systems and Contractors directories, and client `150`'s raw artifact.
|
||||
- Documentation commit `be9349a2c65a8cb0e8adafbe65add2b000a514a4` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1563`, run `133` (`build`), reached `success`, including the guarded Pages publication step. Public Pages returned the expected OAuth `302`; authorized Kubernetes `pages/pages` service-proxy page-body readback verified deployed clients `141`, `150` and `160`, the Systems and Contractors directories, and client `150`'s raw artifact, including the `2026-08-28` date and current registry counts.
|
||||
- The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/`.
|
||||
- Next ordered dossier rotation: `161`–`180`.
|
||||
|
||||
### Previous scheduled rotation — 2026-08-28 04:08 UTC
|
||||
|
||||
- Followed the durable channel cursor after clients `101`–`120` and completed clients `121`–`140`; the already completed extra `001`–`020` rerun did not reset or repeat the ordered sequence.
|
||||
- Reopened all `72` distinct current dossier evidence URLs with browser-equivalent requests at HTTP `200`. Re-downloaded, verified and text-extracted all `17` cited PDFs (`69` pages; `115,348` extracted characters).
|
||||
- Ran `46` deduplicated exact CPVA client/system searches at HTTP `200` and `97` contractor-procurement query ladders at HTTP `200`; CPVA broad-token pages and search-provider output remained discovery only.
|
||||
- Repeated both documented CVP IS routes with bounded identity variants. Organization-first discovery retained `20` identity-checked profiles, parsed `510` published-notice rows and reviewed `99` broad candidates. Exact-authority basic search retained `470` rows and reviewed `90` broad candidates. The only notice published on or after the prior review was client `123`'s already-reviewed functional-bed tender; it does not establish an information system, supplier engagement, delivery, production use, hosting, kickoff, release or completion.
|
||||
- This was a genuine conservative no-new-claim review. Existing statuses, `71` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved; all twenty dossier and matching index dates advanced to `2026-08-28` without status promotion.
|
||||
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned exact-name/path/date/six-column checks, evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `121`, `130` and `140`, the Systems and Contractors directories, and client `130`'s raw artifact; Chrome could not launch.
|
||||
- Documentation commit `0ef966df017200e39a5e65ae62d25aaf18607c32` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1562`, run `132` (`build`), reached `success`, including the guarded Pages publication step. Public Pages returned the expected OAuth `302`; authorized Kubernetes `pages/pages` service-proxy page-body readback verified deployed clients `121`, `130` and `140`, the Systems and Contractors directories, and client `130`'s raw artifact, including the `2026-08-28` date and current registry counts.
|
||||
- The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/`.
|
||||
- Next ordered dossier rotation: `141`–`160`.
|
||||
|
||||
### Previous scheduled rotation — 2026-08-28 02:13 UTC
|
||||
|
||||
- Followed the task's explicit ordered cursor after `081`–`100` and completed clients `101`–`120`; the already completed extra `001`–`020` rerun did not reset or repeat the ordered sequence.
|
||||
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests at HTTP `200`. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,429` extracted characters).
|
||||
|
||||
Reference in New Issue
Block a user