446 KiB
vssa-storm
Last sync: 2026-08-28 22:05 UTC
CVP IS instructor lesson 3 — organization/client data (2026-08-19)
- Designated instructor
476287310627864587taught the organization-search entry point:https://viesiejipirkimai.lt/epps/prepareAdvancedSearch.do?type=org, with form fieldsviewMode=&selectable=&within=template.group.ca&name=<client name or fragment>&shortName=&city=&street=. - Organization results expose basic organization/contact information. After identity-checking the intended legal entity, open
prepareViewCAOrganisation.do?id=<organization id>for its profile, then use the profile-derivedauthorityIdandorgGroupIdwithnotices/viewPublishedNotices.do?authorityId=<...>&orgGroupId=<...>to enumerate that organization's published procurements. Instructor example: LITGRID profileid=1159, published-notices tupleauthorityId=1159&orgGroupId=1160. - Exact legal-name identity remains mandatory; partial
namesearches are discovery only. Organization/contact and published-notice metadata do not by themselves prove a system, contractor, award, signed contract, delivery, hosting, production use or completion.
Executive presentation — channel work (2026-08-19)
- Built a nine-slide English executive briefing using the official VSSA PowerPoint template. Final revision:
/opt/data/2026-08-19-vssa-clients-systems-intelligence-executive-briefing-1.0.1.pptx. - The story covers the executive thesis, registry asset model, current coverage, research engine, evidence controls, executive value, human-guided learning loop and a concrete executive decision. Claims are bounded to the current validated state:
290clients,522canonical systems,747observations,110commercial contractor cards and statuses79 researched / 196 partial / 15 no-public-evidence / 0 pending. - Completed three visual-QA cycles plus independent fresh-eyes review. Corrections included slide 6 body-text containment, less technical executive language, removal of repeated metrics from slide 3, clearer coverage wording, stronger footers, and an explicit closing ask to name an executive sponsor and select three priority research questions for the next 90 days. Final package checks passed:
9slides,9fade transitions,140ZIP members, no duplicates, no out-of-bounds shapes, no empty text boxes/placeholders and retained VSSA theme/master parts. Final full-deck and focused slide rechecks found no delivery-blocking overlap or clipping. - Final SHA-256:
27367d5323f2f1ab7511f944043bce86e07aa9843cf951f17b0d957a7affd0e8. Contact-sheet preview:/opt/data/2026-08-19-vssa-clients-systems-intelligence-executive-briefing-1.0.1-preview.png.
Entity-classification correction — VSSA (2026-08-19)
- RootAtSkic clarified that Valstybės skaitmeninių sprendimų agentūra (VSSA) is Lithuania's central/root government digital-solutions agency—not a system or contractor. It may operate shared services and itself have systems and commercial contractors.
- VSSA already exists correctly as Client
036. The derived contractor parser was corrected to preserve VSSA's public-service relationships as observation text while excluding the agency fromCTR-*extraction and contractor links. Its erroneousCTR-02AF47629Aroute is no longer generated. - The regenerated local site retains the Client
036dossier and removes the VSSA contractor route. Registry totals are now290clients,521systems,746observations and110contractor cards; commercial contractor links are complete at212Client→contractor and212System→contractor relationships. - All
16tests, full validation, type checking, production build, registry/generated-route checks andgit diff --checkpassed. Documentation commit6fe5e4425668b3958b231b8828027f12f95b9ef9is onmain; exact-head Actions task1293succeeded, including Pages publication, with remote ref equality and authenticated source readback verified. Public routes reach the expected OAuth302; authorized deployed page-body readback was unavailable. - The reusable classification rule was added to the Gitea-backed
vssa-clientsskill: classify entities beforeCTR-*extraction; government client bodies do not become contractors merely by operating or centrally providing shared services. Skill commitd744fb0efac8fa801a0db51ed21052b5262f58e1passed validation, remote readback, ref equality and exact-head Actions task1294.
CVP IS instructor lesson 2 — result details (validated 2026-08-19)
- The search result's Pirkimo ID is the procurement
resourceId. For each retained result, open three public routes:prepareViewCfTWS.do?resourceId=...for detailed order metadata,viewContractNotices.do?resourceId=...for notices and summary-PDF links, andlistContractDocuments.do?resourceId=...for procurement attachments. - Live validation used instructor example
resourceId=9279980. All three routes returned HTTP200HTML for LITGRID AB (PV), Vertybinių popierių apskaita (skelbiama apklausa be derybų). The order page exposed buyer, procedure, CPV, dates and duration; the notices page exposed one published notice; the documents page exposed a conditions ZIP (documentId=9280091) and tender-structure XML (documentId=9280218). - The notice link returned a valid four-page, 2,029,056-byte
application/pdfwith extractable buyer/procedure text. Some document links usehref="#"plus JavaScript anonymous-download handlers carryingdocumentId; parsers must recover that action rather than treating the attachment as missing or inventing a direct URL. - The authoritative
vssa-clientsskill now requires opening all three result-detail routes and retains strict document/stage semantics. Commitebc9f1641ff3455d16901a4332b2f25b93c3f3f4is onmain; local/remote equality, remote readback and skill validation passed.
CVP IS instructor lesson 1 — basic search (validated 2026-08-19)
- Designated instructor
476287310627864587taught the basic advanced-search route atviewCFTSAction.do: usemode=search,isFTS=true,type=cftFTS,isPopup=false, and the actual query keycontractAuthority=<URL-encoded client name>, leaving other form filters empty unless intentionally applied. - Live validation used VSSA client
Lietuvos Respublikos Vyriausybės kanceliarija. Both the exact name and partialVyriausybės kanceliarijareturned HTTP200HTML with39total results; the first page contained10rows whose authority cells showed the exact full legal name, including IT-relevant procurement titles. - Operational rule: search the exact legal name first; partial names are discovery fallbacks only. Parse complete rows and all pages, identity-check each contracting-authority cell, and treat the result table as discovery metadata. Open and classify the procurement body/attachment before mapping any system, supplier, contract, delivery, hosting or completion claim.
- The authoritative Gitea-backed
vssa-clientsskill now documents the validated route inSKILL.mdandreferences/cvp-is-organization-route.md. Commit9de0e702f44797a63f995ffd4fe3e0f408a092a7is onmain; local/remote equality, authenticated remote readback and skill validation passed.
Latest documentation delivery — 2026-08-18 17:15 UTC
- Doubled the desktop right-side page table-of-contents panel from
10rem(160px) to20rem(320px) at viewports1280pxand wider. The existing997–1279pxrule still hides the secondary table of contents to preserve article width. - Updated the layout regression test to require both
flex-basisandmax-widthat20rem. All15tests, full validation, production build andgit diff --checkpassed; the build verified290client,520system and111contractor routes,745observations and296raw artifacts. - Commit
3fc30f514db8d6ea0b2a69263dd66d4847b60cf2is onmain; local/remote ref equality and authenticated exact-SHA CSS readback passed. Exact-head Gitea Actions task1263reachedsuccess, including Pages publication. Public Pages returned the expected Keycloak/OAuth302; authorized page-body readback and browser acceptance were unavailable because this runtime has no service-proxy client and could not launch Chrome.
Latest scheduled rotation — 2026-08-29 02:10 UTC
- Followed this run's explicit ordered cursor after clients
081–100and completed clients101–120; the already completed extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests:73returned HTTP200; the Microsoft Bookings endpoint returned the previously bounded automation-specific HTTP417, while the Centre's opened official homepage still links that exact endpoint. Re-downloaded, verified and text-extracted all14cited CVP IS PDFs (56pages;92,387extracted characters). - Ran
56de-duplicated exact CPVA client/system searches and140de-duplicated contractor/procurement ladder searches at HTTP200; broad-token CPVA and Bing output remained discovery only. - Repeated both documented CVP IS routes with bounded identity variants. Exact-authority basic search retained
55complete rows and flagged17broad candidates. Organization-first discovery retained20identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, rejected the near-nameViešoji įstaiga Vaiko užuovėjacollision, and parsed all197published-notice rows. The current client109table status says a winner was selected for the short/800-number tender, but no opened award or signed-contract body was found; it was not promoted beyond tender-stage evidence. Existing VDI and Užimtumo tarnyba award/tender classifications remained supported, and no table state, tender, consultation or bid was promoted into an award, signed engagement, delivery, production use, hosting, completion or release claim. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates advanced to2026-08-29without status promotion. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact. - Documentation
mainis exactly equal to remote commita18c0edbc797b20513f43b5004271e55e78b47f1; authenticated exact-SHA source readback verified clients101,110,120andINDEX.md. Exact-head Gitea Actions task1589, run135(build), reachedsuccess, including guarded Pages publication. Public Pages reached the expected Keycloak/OAuth authentication boundary; authorized Kubernetespages/pagesservice-proxy page-body readback verified deployed clients101,110and120, the Systems and Contractors directories, and client110's raw artifact with current markers. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-29 00:08 UTC
- Followed the durable wiki cursor after clients
101–120and completed clients121–140; the already completed extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the ordered sequence. - Reopened all
72distinct current dossier evidence URLs with browser-equivalent requests at HTTP200. Re-downloaded, verified and text-extracted all17cited PDFs (69pages;115,244extracted characters); all51cited CVP IS order, notice-list and document-detail routes returned HTTP200. - Ran
42exact CPVA client/system searches and42contractor-procurement query ladders at HTTP200; broad-token CPVA and external-search output remained discovery only. - Repeated both documented CVP IS routes with bounded identity variants. Exact-authority basic search retained
240complete rows and reviewed66broad IT/digital candidates. Organization-first discovery retained17identity-checked profiles, parsed238published-notice rows and reviewed51broad candidates without forcing near-name identities. Counts and evidence bodies remained stable; no result-table state, consultation, tender or bid was promoted into an award, signed engagement, delivery, production use, hosting, completion or release claim. - This was a genuine conservative no-new-claim review. Existing statuses,
71system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates advanced to2026-08-29without status promotion. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients121,130and140, the Systems and Contractors directories, and client130's raw artifact. A real Chrome acceptance pass was unavailable because this runtime could not launch Chrome. - Documentation
mainis exactly equal to remote commita3679ecbaab3c6bb2302518284f615d19217f578; authenticated exact-SHA source readback verified clients121,130andINDEX.md. Exact-head Gitea Actions task1588(build) reachedsuccess, including guarded Pages publication. Public Pages reached the expected Keycloak/OAuth302; authorized Kubernetespages/pagesservice-proxy page-body readback verified deployed clients121,130and140, the Systems and Contractors directories, and client130's raw artifact with current markers. - The latest
100live Discord messages were read through1543019171237990551(2026-08-28T22:07:18.333000+00:00); all were bot-authored, with no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-28 22:05 UTC
- Followed this run's explicit ordered cursor after clients
081–100and completed clients101–120; the already completed extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests at HTTP200. Re-downloaded, verified and text-extracted all14cited CVP IS PDFs (56pages;92,429extracted characters). - Ran
56exact CPVA client/system searches and84client/system contractor-procurement query ladders at HTTP200. CPVA's1,093broad-token navigation matches and the external search output remained discovery only. - Repeated both documented CVP IS routes with bounded, previously identity-checked variants. Exact-authority basic search retained
63complete rows and reviewed11broad IT/digital candidates. Organization-first discovery retained20identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed197published-notice rows and reviewed53broad candidates without forcing near-name identities. The candidate sets were byte-stable against the preceding saved pass. No result-table state, tender body, RFI, consultation or bid was promoted into an award, signed engagement, delivery, production use, hosting, completion or release claim. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates were already2026-08-28, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact. - Documentation
mainremains exactly equal to remote commitbe9349a2c65a8cb0e8adafbe65add2b000a514a4; authenticated exact-SHA source readback verified client110. Exact-head Gitea Actions task1563, run133(build), remainssuccess, including guarded Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized Kubernetespages/pagesservice-proxy page-body readback verified deployed clients101,110and120, the Systems and Contractors directories, and client110's raw artifact with current markers. - The latest
100live Discord messages were read through1542989089081532506(2026-08-28T20:07:46.188000+00:00); all were bot-authored, with no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-28 20:06 UTC
- Followed this run's explicit ordered cursor after clients
081–100and completed clients101–120; the already completed extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests at HTTP200. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,387extracted characters); all39cited CVP IS order, notice-list and document-detail routes returned HTTP200. - Ran
54exact CPVA client/system searches and54client/system contractor-procurement query ladders. Google returned44readable responses and rate-limited10; all ten were retried through Bing at HTTP200. CPVA broad-token pages and search-provider output remained discovery only. - Repeated both documented CVP IS routes with bounded, previously identity-checked variants. Exact-authority basic search retained
47complete rows and reviewed11broad IT/digital candidates. Organization-first discovery retained20identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed197published-notice rows and reviewed54broad IT/digital candidates without forcing near-name identities. The current candidate set reconfirmed the already represented VDI organizational-assistant maintenance tender and Užimtumo tarnyba workplace-support procurement; the adjustable-bed rows are equipment rather than an information system. No table status or tender body was promoted into an award, signed engagement, delivery, production use or hosting claim. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates were already2026-08-28, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, pnpm validation, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact. - Documentation
mainremains exactly equal to remote commitbe9349a2c65a8cb0e8adafbe65add2b000a514a4; authenticated exact-SHA source readback verified client110. Exact-head Gitea Actions task1563, run133(build), remainssuccess, including the guarded Pages publication step. Public Pages reached the expected Keycloak/OAuth boundary; authorized Kubernetespages/pagesservice-proxy page-body readback verified deployed clients101,110and120, the Systems and Contractors directories, and client110's raw artifact with current markers. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-28 18:08 UTC
- Followed this run's explicit ordered cursor after clients
081–100and completed clients101–120; the already completed extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests at HTTP200. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,429extracted characters). - Ran
56exact CPVA client/system searches and84client/system contractor-procurement query ladders at HTTP200. CPVA broad-token pages and search-provider output remained discovery only. - Repeated both documented CVP IS routes with bounded identity variants. Exact-authority basic search retained
47complete rows and reviewed11broad IT/digital candidates. Organization-first discovery retained20identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed197published-notice rows and reviewed53broad IT/digital candidates without forcing near-name identities. Candidate rows and counts were unchanged from the preceding101–120review; existing tender and award-stage classifications remained supported, and no table status or tender body was promoted into a signed engagement, delivery, production use or hosting claim. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates were already2026-08-28, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact. - Documentation
mainremains exactly equal to remote commitbe9349a2c65a8cb0e8adafbe65add2b000a514a4; authenticated exact-SHA source readback verified client110. Exact-head Gitea Actions task1563, run133(build), remainssuccess, including the guarded Pages publication step. Public Pages returned the expected OAuth302; authorized deployed page-body readback was unavailable in this runtime becausekubectlis not installed, so the authentication boundary—not changed page content—was verified. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-28 16:07 UTC
- Followed the latest durable wiki cursor after clients
101–120and completed clients121–140; the already completed extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the ordered sequence. - Reopened all
72distinct current dossier evidence URLs with browser-equivalent requests at HTTP200. Re-downloaded, verified and text-extracted all17cited PDFs (69pages;115,244extracted characters); all51cited CVP IS order, notice-list and document-detail routes returned HTTP200. - Ran
42exact CPVA client/system searches and42client/system contractor-procurement query ladders at HTTP200. CPVA broad-token pages and search-provider output remained discovery only. - Repeated both documented CVP IS routes with bounded identity variants. Exact-authority basic search retained
240complete rows and reviewed66broad IT/digital candidates. Organization-first discovery retained17identity-checked profiles, parsed238published-notice rows and reviewed51broad IT/digital candidates without forcing near-name identities. Newly observed changes were client123's electric functional-bed tender, client126's heat/hot-water market consultation, and non-IT status changes for food, building-repair and boiler procurements; none establishes a new information system, supplier engagement, signed contract, delivery, production use, hosting, kickoff, release or completion. - This was a genuine conservative no-new-claim review. Existing statuses,
71system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates were already2026-08-28, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients121,130and140, the Systems and Contractors directories, and client130's raw artifact; Chrome could not be launched. - Documentation
mainremains exactly equal to remote commitbe9349a2c65a8cb0e8adafbe65add2b000a514a4; authenticated exact-SHA source readback verified client130. Exact-head Gitea Actions task1563, run133(build), remainssuccess, including the guarded Pages publication step. Public Pages returned the expected OAuth302; authorized Kubernetespages/pagesservice-proxy page-body readback verified deployed clients121,130and140, the Systems and Contractors directories, and client130's raw artifact with current markers. - The latest
100live Discord messages were read through1542899303553433630(2026-08-28T14:10:59.650000+00:00); all were bot-authored, with no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-28 14:09 UTC
- Followed the task's explicit ordered cursor after
081–100and completed clients101–120; the already completed extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests at HTTP200. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,331extracted characters); all39cited CVP IS order, notice-list and document-detail routes returned HTTP200. - Ran
54exact CPVA client/system searches at HTTP200and54client/system contractor-procurement query ladders. Google returned44readable responses and rate-limited10; all ten were retried through Bing at HTTP200. CPVA broad-token pages and search-provider output remained discovery only. - Repeated both documented CVP IS routes with bounded identity variants. Exact-authority basic search retained
47complete rows and reviewed11broad IT/digital candidates. Organization-first discovery retained20identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed197published-notice rows and reviewed54broad IT/digital candidates without forcing near-name identities. Existing tender and award-stage classifications remained supported; no table status or tender body was promoted into a signed engagement, delivery, production-use or hosting claim. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates were already2026-08-28, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact; Chrome could not be launched. - Documentation
mainremains exactly equal to remote commitbe9349a2c65a8cb0e8adafbe65add2b000a514a4; authenticated exact-SHA source readback verified client110. Exact-head Gitea Actions task1563, run133(build), remainssuccess, including the guarded Pages publication step. Public Pages returned the expected OAuth302; authorized Kubernetespages/pagesservice-proxy page-body readback verified deployed clients101,110and120, the Systems and Contractors directories, and client110's raw artifact with current markers. - The latest
100live Discord messages were read through1542869089297633300(2026-08-28T12:10:56.010000+00:00); all were bot-authored, with no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-28 12:08 UTC
- Followed the task's explicit ordered cursor after
081–100and completed clients101–120; the already completed extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests at HTTP200. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,429extracted characters). - Ran
54de-duplicated exact CPVA client/system searches at HTTP200and54client/system contractor-procurement query ladders;45Google responses were readable and9rate-limited responses were retried through Bing at HTTP200. CPVA broad-token pages and search-provider output remained discovery only. - Repeated both documented CVP IS routes with bounded identity variants. Exact-authority basic search retained
47complete rows and reviewed11broad IT/digital candidates. Organization-first discovery retained20identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed197published-notice rows and reviewed54broad IT/digital candidates without forcing near-name identities. The current client109short/800-number bodies remain tender-stage communications scope; the current client110register-maintenance notice is already represented as planned procurement. No discovery row or result status was treated as an award, signed contract, supplier engagement, delivery or production-use claim. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates were already2026-08-28, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact. - Documentation
mainremains exactly equal to remote commitbe9349a2c65a8cb0e8adafbe65add2b000a514a4; authenticated exact-SHA source readback verified client110. Exact-head Gitea Actions task1563, run133(build), remainssuccess, including the guarded Pages publication step. Public Pages DNS was unavailable from this runtime; authorized Kubernetespages/pagesservice-proxy page-body readback verified deployed clients101,110and120, the Systems and Contractors directories, and client110's raw artifact, including the2026-08-28date and current registry markers. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-28 10:07 UTC
- Followed the task's explicit ordered cursor after
081–100and completed clients101–120; the already completed extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests at HTTP200. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,373extracted characters). - Ran
56exact CPVA client/system searches at HTTP200and84deduplicated Bing client/system contractor-procurement query ladders at HTTP200; CPVA broad-token pages and search-provider output remained discovery only. - Repeated both documented CVP IS routes with bounded identity variants. Exact-authority basic search retained
47complete rows and reviewed4IT/digital candidates. Organization-first discovery retained19identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed197published-notice rows and reviewed30IT/digital candidates without forcing near-name identities. The newly reopened client109short/800-number notice body is an open tender for telephone and data-transmission services; a portal result status saying a winner was determined does not replace an award or signed-contract body, so no supplier engagement, delivery or production-use claim was added. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All twenty dossier and matching index dates were already2026-08-28, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact. - Documentation
mainremains exactly equal to remote commitbe9349a2c65a8cb0e8adafbe65add2b000a514a4; authenticated exact-SHA source readback verified client101and the index. Exact-head Gitea Actions task1563, run133(build), remainssuccess, including the guarded Pages publication step. The public ingress currently returns a self-referential HTTP301; authorized Kubernetespages/pagesservice-proxy page-body readback nevertheless verified deployed clients101,110and120, the Systems and Contractors directories, and client110's raw artifact, including the2026-08-28date and current registry counts. - The latest
100live Discord messages were read through1542807985569669180(2026-08-28T08:08:07.746000+00:00); all were bot-authored, with no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-28 08:06 UTC
- Followed the durable channel cursor after clients
121–140and completed clients141–160; the already completed extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
59distinct current dossier evidence URLs with browser-equivalent requests at HTTP200. Re-downloaded, verified and text-extracted all17cited PDFs (110pages;219,195extracted characters). - Ran
65exact CPVA client/system searches at HTTP200and65deduplicated Bing client/system contractor-procurement query ladders at HTTP200; CPVA broad-token pages and search-provider output remained discovery only. - Repeated both documented CVP IS routes with bounded identity variants. Organization-first discovery retained
19identity-checked profiles, parsed331published-notice rows and reviewed147broad candidates without forcing a near-name identity. Exact-authority basic search retained342rows and reviewed166broad candidates. The newly opened client147tender body covered four special-purpose road-control vehicles and equipment; it does not establish an information system, supplier engagement, delivery, production use, hosting, kickoff, release or completion. - This was a genuine conservative no-new-claim review. Existing statuses,
69system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved; all twenty dossier and matching index dates advanced to2026-08-28without status promotion. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned exact-name/path/date/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients141,150and160, the Systems and Contractors directories, and client150's raw artifact. - Documentation commit
be9349a2c65a8cb0e8adafbe65add2b000a514a4is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1563, run133(build), reachedsuccess, including the guarded Pages publication step. Public Pages returned the expected OAuth302; authorized Kubernetespages/pagesservice-proxy page-body readback verified deployed clients141,150and160, the Systems and Contractors directories, and client150's raw artifact, including the2026-08-28date and current registry counts. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/. - Next ordered dossier rotation:
161–180.
Previous scheduled rotation — 2026-08-28 04:08 UTC
- Followed the durable channel cursor after clients
101–120and completed clients121–140; the already completed extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
72distinct current dossier evidence URLs with browser-equivalent requests at HTTP200. Re-downloaded, verified and text-extracted all17cited PDFs (69pages;115,348extracted characters). - Ran
46deduplicated exact CPVA client/system searches at HTTP200and97contractor-procurement query ladders at HTTP200; CPVA broad-token pages and search-provider output remained discovery only. - Repeated both documented CVP IS routes with bounded identity variants. Organization-first discovery retained
20identity-checked profiles, parsed510published-notice rows and reviewed99broad candidates. Exact-authority basic search retained470rows and reviewed90broad candidates. The only notice published on or after the prior review was client123's already-reviewed functional-bed tender; it does not establish an information system, supplier engagement, delivery, production use, hosting, kickoff, release or completion. - This was a genuine conservative no-new-claim review. Existing statuses,
71system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved; all twenty dossier and matching index dates advanced to2026-08-28without status promotion. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned exact-name/path/date/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients121,130and140, the Systems and Contractors directories, and client130's raw artifact; Chrome could not launch. - Documentation commit
0ef966df017200e39a5e65ae62d25aaf18607c32is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1562, run132(build), reachedsuccess, including the guarded Pages publication step. Public Pages returned the expected OAuth302; authorized Kubernetespages/pagesservice-proxy page-body readback verified deployed clients121,130and140, the Systems and Contractors directories, and client130's raw artifact, including the2026-08-28date and current registry counts. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-28 02:13 UTC
- Followed the task's explicit ordered cursor after
081–100and completed clients101–120; the already completed extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests at HTTP200. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,429extracted characters). - Ran
54exact CPVA client/system searches at HTTP200and54contractor-procurement query ladders;43external-search responses were readable and11were rate-limited at HTTP429. CPVA broad-token pages and external-search output remained discovery only. - Repeated both CVP IS routes with the documented identity variants. Exact-authority basic search retained
47rows and reviewed11broad candidates. Organization-first discovery retained20identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed197published-notice rows and reviewed54broad candidates without forcing near-name identities. Candidate counts and stages remained unchanged; no source established a new system, contractor, signed engagement, delivery, production use, hosting, kickoff, release or completion. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved; all twenty dossier and matching index dates advanced to2026-08-28without status promotion. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned exact-name/path/date/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Chrome could not launch, but browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact. - Documentation commit
1a9e2559870c90d7177b4edcc5705087c2941d5bis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1561, run131(build), reachedsuccess, including the guarded Pages publication step. Public Pages returned the expected OAuth302; authorized Kubernetespages/pagesservice-proxy page-body readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact, including the2026-08-28date and current registry counts. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-28 00:12 UTC
- Followed the durable channel cursor and completed clients
161–180; the already completed extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
57distinct current dossier evidence URLs with browser-equivalent requests at HTTP200. Re-downloaded, verified and text-extracted all9cited PDFs (48pages;92,077extracted characters). - Ran
55exact CPVA client/system searches and35client/system contractor-procurement query ladders at HTTP200; CPVA broad-token pages and search-provider output remained discovery only. - Repeated both CVP IS routes. Exact-authority basic search retained
161rows and reviewed37broad candidates. Organization-first discovery retained18identity-checked profiles, preserved both unresolved profiles for client180, parsed162published-notice rows and reviewed42broad candidates without forcing near-name identities. The expanded parser resurfaced known non-system vehicle, building-work, equipment, transport-ticket, digital-content and laboratory rows; none established a new information system, contractor, signed supplier engagement, delivery, production use, hosting, kickoff, release or completion. - This was a genuine conservative no-new-claim review. Existing statuses,
35system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved; all twenty dossier and matching index dates advanced to2026-08-28without status promotion. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned exact-name/path/date/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Chrome could not launch, but browser-equivalent local HTTP readback verified clients161,170and180, the Systems and Contractors directories, and client170's raw artifact. - Documentation commit
3f83b94a510715632c79963424bc86c7f1a324afis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1560, run130(build), reachedsuccess, including Pages publication. Authorized Kubernetespages/pagesservice-proxy page-body readback verified client170, the Systems and Contractors directories, and the raw client artifact, including the2026-08-28date and current registry counts. - The latest
100live Discord messages were read through1542659725693558876(2026-08-27T22:18:59.837000+00:00); all were bot-authored, with no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/. - Next ordered dossier rotation:
181–200.
Previous scheduled rotation — 2026-08-27 22:15 UTC
- Repository history showed that the requested
101–120range had already been delivered at5493969b63e1aa8d284136916d48d04d475aa352and the next ordered121–140range atee7f4d915f048d0797c9b53756df9b1d53aa4e05; to avoid repeating completed work, continued the ordered cursor with clients141–160. - Reopened all
59distinct current dossier evidence URLs with browser-equivalent requests at HTTP200. Re-downloaded and text-extracted all17cited PDFs (110pages;219,102extracted characters). - Ran
65exact CPVA client/system searches and69client/system contractor-procurement query ladders through Bing at HTTP200. CPVA broad-token pages and search-provider output remained discovery only. - Repeated both CVP IS routes. Exact-authority basic search parsed all pages and retained
342rows, including166broad candidates. Organization-first discovery retained19identity-checked profiles, forced no near-name profile for client155, parsed330notice rows and reviewed147broad candidates. The candidate set reconfirmed current award/tender semantics; the newly posted client147special-purpose vehicle/equipment tender did not establish a new information system, supplier engagement, delivery, production use, hosting, kickoff, release or completion. - This was a genuine conservative no-new-claim review. Existing statuses,
69system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved; all twenty dossier and matching index dates advanced to2026-08-27without status promotion. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned exact-name/path/date/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Chrome could not launch, but browser-equivalent local HTTP readback verified clients141,150and160, client150's two linked canonical system pages, the Systems and Contractors directories, and the raw client artifact. - Documentation commit
a349b049d70ca37f5e0ed46e094139bab8443b3bis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1559, run129(build), reachedsuccess, including Pages publication. Public Pages reached the expected OAuth boundary; authorized Kubernetespages/pagesservice-proxy page-body readback verified client150, both linked canonical system pages, the Systems and Contractors directories, and the raw client artifact, including the2026-08-27date, References, explicit unidentified values and current registry counts. - The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. The isolated review worktree preserved unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/. - Next ordered dossier rotation:
161–180.
Previous scheduled rotation — 2026-08-27 20:20 UTC
- Followed the task's explicit ordered cursor after
081–100and completed a fresh review of clients101–120; the extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP200bodies. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,387extracted characters). - Ran
54deduplicated exact CPVA client/system searches and54system-contractor/procurement query ladders. Google completed44ladder requests and rate-limited10; all ten were retried through Bing at HTTP200, and their off-topic results established no claim. CPVA broad-token navigation matches and search-provider output remained discovery only. - Repeated both CVP IS routes with the documented legal-form/typography variants. Organization-first discovery retained
20identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed all197published-notice rows and reviewed54broad candidates. Exact-authority basic search retained47rows and11broad candidates. Both candidate sets remained unchanged. The13cited resources exposed36public procurement-detail bodies plus three legacy login redirects; no claim depends on an inaccessible body. The cited PDFs reconfirmed their bounded tender and award-stage semantics. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already2026-08-27, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks andgit diff --checkpassed. Chrome could not launch, but browser-equivalent local HTTP readback verified client110, its linked VASIS system page, the Systems and Contractors directories, and the raw client artifact. - Documentation
mainremains exactly equal to remote commitee7f4d915f048d0797c9b53756df9b1d53aa4e05; authenticated exact-SHA source readback verified client110. Exact-head Gitea Actions task1427, run128(build), remainssuccess, including Pages publication. Public Pages reached the expected OAuth boundary; authorized Kubernetespages/pagesservice-proxy readback verified client110, its linked VASIS system page, the Systems directory and the Contractors directory, including the2026-08-27date, References and explicit unidentified values. - The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/were not touched. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-27 18:05 UTC
- Followed the task's explicit ordered cursor after
081–100and completed a fresh review of clients101–120; the extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP200bodies. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,429extracted characters); the cited procurement attachment also remained available. - Ran
54deduplicated exact CPVA client/system searches and54system-contractor/procurement query ladders. Google completed44ladder requests and rate-limited10; all ten were retried through Bing at HTTP200, and their off-topic results established no claim. CPVA broad-token navigation matches and search-provider output remained discovery only. - Repeated both CVP IS routes with the documented legal-form/typography variants. Organization-first discovery retained
20identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed all197published-notice rows and reviewed54broad candidates. Exact-authority basic search retained47rows and11broad candidates. Both candidate sets are unchanged from the preceding saved pass. The13cited resources exposed36public procurement-detail bodies plus three legacy login redirects; no claim depends on an inaccessible body. The cited PDFs reconfirmed six tender and eight award-stage documents. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already2026-08-27, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, Corepack-managedpnpm validate, TypeScript, production build, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified client110, its linked VASIS system page, the Systems and Contractors directories, and the raw client artifact. - Documentation
mainremains exactly equal to remote commitee7f4d915f048d0797c9b53756df9b1d53aa4e05; authenticated exact-SHA source readback verified client110. Exact-head Gitea Actions task1427remainssuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized Kubernetes service-proxy readback verified client110, its linked VASIS system page, the Systems directory and the Contractors directory, including the2026-08-27date, canonical/source links, References and explicit unidentified values. - The latest
100live Discord messages were read through1542567110364893326(2026-08-27T16:10:58.622000+00:00); all were bot-authored, with no newer instructor guidance beyond CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/were not touched. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-27 16:09 UTC
- Followed the task's explicit ordered cursor after
081–100and completed a fresh review of clients101–120; the extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests.72returned inspected HTTP200bodies in the concurrent pass; the Socialinės pagalbos žemėlapis transiently returned Cloudflare520and succeeded twice at HTTP200on the required browser-equivalent retry. The Microsoft Bookings endpoint retained its documented automation-specific417. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,429extracted characters); the fifteenth procurement attachment remained a valid ZIP body. - Ran
56deduplicated exact CPVA client/system searches and64system-contractor/procurement query ladders. CPVA broad-token navigation matches and external-search output remained discovery only. - Repeated both CVP IS routes, including the documented legal-form/typography variants. Exact organization-first searches retained
14single identity-checked profiles, forced no near-name profile for the other six clients, parsed all85published-notice rows and reviewed10broad candidates. The bounded variant pass retained20identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed197notice rows and reviewed53broad candidates. Exact-authority basic search retained55rows and7broad candidates; the bounded all-page pass retained63rows and11candidates. These sets are unchanged from the previous saved pass. All39current dossier procurement-detail route requests returned HTTP200; the cited bodies reconfirm six tender and eight award stages. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already2026-08-27, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate, TypeScript,corepack pnpm build, registry/generated-route/raw-artifact checks, assigned name/path/date/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, client110's linked VASIS system page and raw artifact. Chrome could not be launched. - Documentation
mainremains exactly equal to remote commitee7f4d915f048d0797c9b53756df9b1d53aa4e05; authenticated exact-SHA source readback verified client110. Exact-head Gitea Actions task1427remainssuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized Kubernetes service-proxy readback verified client110, its linked VDI virtual-assistant system page, the Systems directory and the Contractors directory, including the2026-08-27date, canonical link, source-client backlink, directly evidenced2024-03-18production release and explicit unidentified lifecycle values. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/were not touched. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-27 14:05 UTC
- Followed the task's explicit ordered cursor after
081–100and completed a fresh review of clients101–120; the extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests:73returned inspected HTTP200bodies, while the Microsoft Bookings endpoint retained its documented automation-specific417. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,429extracted characters); the fifteenth procurement attachment remained a valid ZIP body. - Ran
56deduplicated exact CPVA client/system searches and64system-contractor/procurement query ladders. CPVA broad-token navigation matches and external-search output remained discovery only. - Repeated both CVP IS routes. Exact organization-first searches retained
14single identity-checked profiles, forced no near-name profile for the other six clients, parsed all85published-notice rows and reviewed10broad IT/communications candidates. Exact-authority basic search retained55rows and reviewed7broad candidates. Opened all three procurement-detail routes and extracted the current tender bodies for the principal broad candidates; the JRA short/800-number notice remained tender-stage communications scope and established no selected supplier or signed contract. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already2026-08-27, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate, TypeScript,corepack pnpm build, registry/generated-route/raw-artifact checks, assigned name/path/date/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact; the Chrome harness was unavailable. - Documentation
mainremains exactly equal to remote commitee7f4d915f048d0797c9b53756df9b1d53aa4e05; authenticated exact-SHA source readback verified client110. Exact-head Gitea Actions task1427remainssuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized Kubernetes service-proxy readback verified client110and its linked VDI virtual-assistant system page, including the2026-08-27client date, canonical link, source-client backlink and explicit unidentified lifecycle values. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/were not touched. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-27 12:05 UTC
- Followed the task's explicit ordered cursor after
081–100and completed a fresh review of clients101–120; the extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests:73returned inspected HTTP200bodies, while the Microsoft Bookings endpoint retained its documented automation-specific417. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,429extracted characters). - Ran
56deduplicated exact CPVA client/system searches and64system-contractor/procurement query ladders. CPVA broad-token navigation matches and search-provider output remained discovery only. - Repeated both CVP IS routes. Exact organization-first searches retained
14single identity-checked profiles, forced no near-name profile for the other six clients, parsed all85published-notice rows and reviewed10broad IT/communications candidates. Exact-authority basic search retained55rows and reviewed7broad candidates. The sets remained unchanged: Jaunimo reikalų agentūra contact-centre/telephony notices and false-positive programme or civil-works rows did not establish an additional system, supplier, signed contract, delivery, hosting, production use, kickoff, release or completion. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already2026-08-27, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate, TypeScript,corepack pnpm build, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact. - Documentation
mainremains exactly equal to remote commitee7f4d915f048d0797c9b53756df9b1d53aa4e05; authenticated exact-SHA source readback verified client110. Exact-head Gitea Actions task1427remainssuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized Kubernetes Pages service-proxy readback verified client110and its linked VDI virtual-assistant system page, including the2026-08-27client date, explicit unidentified kickoff and evidenced2024-03-18production release. - The latest
100live Discord messages were read through1542476637419999274(2026-08-27T10:11:28.191000+00:00) and contain no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/were not touched. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-27 10:08 UTC
- Followed the task's explicit ordered cursor after
081–100and completed a fresh review of clients101–120; the extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests:73returned inspected HTTP200bodies, while the Microsoft Bookings endpoint retained its documented automation-specific417. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,429extracted characters). - Ran
56deduplicated exact CPVA client/system searches and64system-contractor/procurement query ladders. CPVA broad-token navigation matches and search-provider output remained discovery only. - Repeated both CVP IS routes. Exact organization-first searches retained
14single identity-checked profiles, forced no near-name profile for the other six clients, parsed all85published-notice rows and reviewed10broad IT/communications candidates. Exact-authority basic search retained55rows and reviewed7broad candidates. The sets remained unchanged: Jaunimo reikalų agentūra contact-centre/telephony notices and false-positive programme or civil-works rows did not establish an additional system, supplier, signed contract, delivery, hosting, production use, kickoff, release or completion. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already2026-08-27, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Validator statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate, TypeScript,corepack pnpm build, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact. The browser harness could not launch Chrome. - Documentation
mainremains exactly equal to remote commitee7f4d915f048d0797c9b53756df9b1d53aa4e05; authenticated exact-SHA source readback verified client110. Exact-head Gitea Actions task1427remainssuccess, including Pages publication. Authorized Kubernetes Pages service-proxy readback verified client110and its linked VDI virtual-assistant system page, including the2026-08-27client date, explicit unidentified system kickoff and directly evidenced2024-03-18production release. - The latest
100live Discord messages were read through1542448315751342083(2026-08-27T08:18:55.779000+00:00) and contain no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/were not touched. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-27 08:17 UTC
- Followed the task's explicit ordered cursor after
081–100and completed another fresh review of clients101–120; the extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests:73returned inspected HTTP200bodies, while the Microsoft Bookings endpoint retained its documented automation-specific417. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,387extracted characters). - Ran
56deduplicated exact CPVA client/system searches and64system-contractor/procurement query ladders. CPVA broad-token matches and Bing result pages remained discovery only. - Repeated both CVP IS routes. Exact organization-first searches retained
14single identity-checked profiles and forced no near-name profile for the other six clients. Exact-authority basic search retained45byte-exact rows; seven broad IT/communications candidates were all the already reviewed Jaunimo reikalų agentūra contact-centre/telephony or false-positive programme rows. No procurement table row was treated as body-level evidence. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already2026-08-27, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate, TypeScript,corepack pnpm build, registry/generated-route/raw-artifact checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact. - Documentation
mainremains exactly equal to remote commitee7f4d915f048d0797c9b53756df9b1d53aa4e05; authenticated exact-SHA source readback verified client110. Exact-head Gitea Actions task1427remainssuccess, including Pages publication. Public Pages DNS was unavailable from this runtime, while authorized Kubernetes Pages service-proxy readback verified client110and its linked VDI virtual-assistant system page, including the2026-08-27client date, explicit unknown system kickoff and directly evidenced2024-03-18production release. - The latest
100live Discord messages were read through1542415999553241099(2026-08-27T06:10:30.997000+00:00) and contain no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/were not touched. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-27 06:09 UTC
- Followed the task's explicit ordered cursor after
081–100and completed a fresh review of clients101–120; the extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests:73returned inspected HTTP200bodies, while the Microsoft Bookings endpoint retained its documented automation-specific417. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,429extracted characters). - Ran
56exact CPVA client/system searches and64system-contractor/procurement query ladders. Broad-token CPVA navigation and noisy external-search output remained discovery only. - Repeated both CVP IS routes. Exact organization-first searches retained
14single identity-checked profiles, forced no near-name profile for the other six clients, parsed85current published-notice rows and reviewed10broad IT/digital candidates. Basic search retained55exact-authority rows and reviewed7broad candidates. Candidate sets were unchanged from the preceding completed review. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already2026-08-27, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate, TypeScript,corepack pnpm build, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, the VDI virtual-assistant system page, the UAB „Novian PRO“ contractor page and client110's raw artifact. Chrome could not be launched. - Documentation
mainremains exactly equal to remote commitee7f4d915f048d0797c9b53756df9b1d53aa4e05; authenticated exact-SHA source readback verified client110. Exact-head Gitea Actions task1427remainssuccess, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized Kubernetes Pages service-proxy readback verified client110and its linked VDI virtual-assistant system page, including the2026-08-27client check date, explicit unknown infrastructure/kickoff fields and the directly evidenced2024-03-18production release. - The latest
100live Discord messages were read through1542357428635697186(2026-08-27T02:17:46.602000+00:00) and contain no instructor guidance newer than CVP IS lesson 3. This run established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/were not touched. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-27 00:09 UTC
- Followed the task's explicit ordered cursor after
081–100and completed clients101–120; the extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests and inspected73HTTP200bodies. The Microsoft Bookings endpoint returned its documented automation-specific417; the opened institution page remains the relationship evidence. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,373extracted characters). - Ran
56exact CPVA client/system searches and64system-contractor/procurement query ladders. Broad-token CPVA results and noisy search output remained discovery only. - Repeated both CVP IS routes. Exact organization-first searches retained
14single identity-checked profiles, forced no near-name profile for the other six clients, parsed85current published-notice rows and reviewed10broad IT/digital candidates. Basic search retained55exact-authority rows and reviewed7broad candidates. Candidate sets were unchanged from the preceding completed review. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved; all twenty dossier and matching index dates advanced to2026-08-27without status promotion. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate, TypeScript,corepack pnpm build, registry/generated-route/raw-artifact checks, assigned exact-date/name/path/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact; Chrome could not be launched. - Documentation commit
5493969b63e1aa8d284136916d48d04d475aa352is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1426reachedsuccess, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized Kubernetes service-proxy readback verified client110and its linked VDI virtual-assistant system page, including the2026-08-27client check date, explicit unknown cloud/on-premises and kickoff fields, and the directly evidenced2024-03-18production release. - The latest
100live Discord messages were read through1542295190029475942(2026-08-26T22:10:27.762000+00:00) and contain no instructor guidance newer than CVP IS lesson 3. This run established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. The isolated review worktree preserved all unrelated dirty primary-worktree files. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-26 22:07 UTC
- Followed the latest durable wiki cursor and completed clients
121–140; the already completed extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
72distinct current dossier evidence URLs and inspected HTTP200bodies. Re-downloaded, verified and text-extracted all17cited PDFs (69pages;115,244extracted characters). - Ran
42exact CPVA client/system searches and42client/system contractor-procurement query ladders; broad-token CPVA and noisy external-search results remained discovery only. - Repeated both CVP IS routes. Basic search parsed
240exact-authority rows and reviewed66broad candidates. Organization-first discovery retained20identity-checked current/successor/typography profiles, parsed510published-notice rows and reviewed93broad candidates without forcing near-name identities. This included the Priėmimo ir integracijos agentūra successor for client130and straight-quotation variants for clients134and136. All51order, notice-list and procurement-document detail requests for the17cited resources returned HTTP200. - Newly surfaced or changed discovery rows included a heat/hot-water market consultation for client
126and a non-IT repair row whose search-table status advanced for client131; the functional-bed notice for client123had already been reviewed in an earlier completed rotation. None establishes a new information system, contractor, signed supplier engagement, delivery, production use, hosting, kickoff, release or completion. This was a genuine conservative no-new-claim review. Existing statuses,71system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all dossier and index dates were already2026-08-26, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate, TypeScript,corepack pnpm build, registry/generated-route/raw-artifact checks, assigned exact-date/name/path/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients121,130and140, the Systems and Contractors directories, and client130's raw artifact; Chrome could not be launched. - Documentation
mainremains exactly equal to remote commitcb695eb5dc18f0826ae2a148cf91a67a9d90868d; authenticated exact-SHA source readback verified client130. Exact-head Gitea Actions task1392remainssuccess, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized Kubernetes Pages service-proxy readback verified client130and its linked VERTIS system page, including explicit unknown cloud/on-premises, kickoff and latest-production-release fields. - The isolated review worktree stayed clean and unrelated dirty primary-worktree clients
181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/were not touched. The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-26 20:06 UTC
- Followed the explicitly assigned ordered cursor and completed clients
101–120; the already completed extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
74distinct current dossier evidence URLs (85per-client occurrences) with browser-equivalent requests and inspected HTTP200bodies. Re-downloaded, verified and text-extracted all14cited CVP IS PDFs (56pages;92,429extracted characters). - Ran
56distinct exact CPVA client/system searches and84client/system contractor-procurement query ladders; broad-token CPVA and noisy external-search results remained discovery only. - Repeated both CVP IS routes. Basic search parsed
63exact-query rows and reviewed11broad IT/digital candidates. Organization-first discovery retained20identity-checked profiles across19clients, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, forced no near-name record for client117, parsed all197published-notice rows and reviewed53broad candidates. Candidate sets were unchanged from the preceding completed review. All39order, notice-list and procurement-document detail requests returned HTTP200; three legacy routes reached the login boundary and no claim depends on those inaccessible bodies. - This was a genuine conservative no-new-claim review. Existing statuses,
64system/service observations, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all dossier and index dates were already2026-08-26, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate, TypeScript,corepack pnpm build, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact; Chrome could not be launched. - Documentation
mainremains exactly equal to remote commitcb695eb5dc18f0826ae2a148cf91a67a9d90868d; authenticated exact-SHA source readback verified client110. Exact-head Gitea Actions task1392remainssuccess, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized Kubernetes Pages service-proxy readback verified client110and its linked VDI virtual-assistant system page, including explicit unknown infrastructure/kickoff fields and the directly evidenced2024-03-18production release. - The isolated review worktree was clean and unrelated dirty primary-worktree clients
181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/were not touched. The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-26 18:11 UTC
- Followed the latest durable wiki cursor and completed clients
141–160; the already completed extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
59distinct current dossier evidence URLs (77per-client occurrences) with browser-equivalent requests and inspected HTTP200bodies. Re-downloaded, verified and text-extracted all16cited CVP IS PDFs (65pages;108,279extracted characters). - Ran
65exact CPVA client/system searches and65client/system contractor-procurement query ladders; broad-token CPVA and noisy external-search results remained discovery only. - Repeated both CVP IS routes. Basic search parsed
339rows, retained158exact-authority rows and reviewed46broad candidates. Organization-first discovery retained15identity-checked profiles, parsed all186published-notice rows and reviewed71broad candidates without forcing near-name identities. Client152now resolved an exact profile and exposed three additional tender-stage notices; one was already cited, while the two security-officer tenders did not establish a new operational system, selected supplier, signed contract, delivery, hosting, completion or release. All45order, notice-list and procurement-document detail requests returned HTTP200; nine legacy detail routes reached the login boundary and no claim depends on those inaccessible bodies. - This was a genuine conservative no-new-claim review. Existing statuses,
69system/service observations, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all dossier and index dates were already2026-08-26, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, pnpm validation, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned exact-date/name/path/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Chrome could not be launched, but authenticated exact-SHA source readback verified client141andINDEX.md; authorized Kubernetes Pages service-proxy readback verified client141and its linked canonical system page with the expected client marker. - Documentation
mainremains exactly equal to remote commitcb695eb5dc18f0826ae2a148cf91a67a9d90868d. Exact-head Gitea Actions task1392remainssuccess, including Pages publication. The isolated review worktree was clean and unrelated primary-worktree files were not touched. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
161–180.
Previous scheduled rotation — 2026-08-26 16:06 UTC
- Followed the latest durable wiki cursor and completed clients
121–140; the already completed extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
72distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP200bodies. Re-downloaded, verified and text-extracted all17cited PDFs (69pages;115,244extracted characters). - Ran
42exact CPVA client/system searches and42client/system contractor-procurement query ladders; broad-token CPVA results and noisy external-search results remained discovery only. - Repeated both CVP IS routes. Basic search reviewed all exact-authority results and
46broad candidates. Organization-first discovery retained20identity-checked current/successor/typography profiles, parsed all510published-notice rows and reviewed70broad candidates without forcing near-name identities. The two notice-list additions were a Kupiškis functional-bed tender and Padvariai ramp/emergency-exit works, neither a defensible information-system claim. All51order, notice-list and procurement-document detail routes for the17cited resources returned HTTP200. - The satellite-broadband search row for client
130now saysNustatytas laimėtojas, but the opened notice list still exposes only the tender body. No supplier or contract attribution was made. This was a genuine conservative no-new-claim review: no additional body-supported system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all dossier and index dates were already2026-08-26, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate, TypeScript,corepack pnpm build, registry/generated-route/raw-artifact checks, assigned exact-date/name/path/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients121,130and140, the Systems and Contractors directories, and client130's raw artifact; Chrome could not be launched in this runtime. - Documentation
mainremains exactly equal to remote commitcb695eb5dc18f0826ae2a148cf91a67a9d90868d; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1392, run126(build), remainssuccess, including Pages publication. Public Pages reached the expected OAuth/Keycloak boundary; authorized deployed page-body readback was unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. A dedicated clean worktree preserved unrelated dirty clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/in the primary worktree. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-26 14:06 UTC
- Completed the explicitly assigned clients
101–120; the already completed extra001–020rerun did not reset or repeat the ordered cursor. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP200bodies. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,429extracted characters). - Ran
56exact CPVA client/system searches and84client/system contractor-procurement query ladders; broad-token CPVA results and noisy external-search results remained discovery only. - Repeated both CVP IS routes. Basic search parsed
63exact-authority rows and reviewed11broad candidates. Organization-first discovery retained20identity-checked profiles across19clients, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, forced no near-name record for client117, parsed all197published-notice rows and reviewed53broad candidates. All39order, notice-list and procurement-document detail routes for the13cited resources returned HTTP200after correcting the temporary checker to use the documented/epps/cft/route prefix. - This was a genuine conservative no-new-claim review. No additional body-supported system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all dossier and index dates were already
2026-08-26, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate, TypeScript,corepack pnpm build, registry/generated-route/raw-artifact checks, assigned exact-date/name/path/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact. - Documentation
mainremains exactly equal to remote commitcb695eb5dc18f0826ae2a148cf91a67a9d90868d; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1392, run126(build), remainssuccess, including Pages publication. Public Pages reached the expected OAuth/Keycloak boundary; authorized deployed page-body readback was unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated dirty clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/in the primary worktree remained unmodified. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-26 12:11 UTC
- Followed the latest durable wiki cursor and completed clients
161–180; the already completed extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
64current dossier evidence URLs with browser-equivalent requests and inspected HTTP200bodies. Re-downloaded, verified and text-extracted all9cited PDFs (48pages;92,116extracted characters). - Ran
55exact CPVA client/system searches and70client/system contractor-procurement query ladders; broad-token CPVA results and noisy external-search results remained discovery only. - Repeated both CVP IS routes. Basic search parsed
186rows, retained93exact-authority rows and reviewed21broad candidates. Organization-first discovery retained18identity-checked profiles, preserved both unresolved profiles for client180, parsed all188published-notice rows and reviewed33broad candidates without forcing near-name identities. - This was a genuine conservative no-new-claim review. No additional body-supported system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. The ArcGIS search row for client
162still reports a selected-winner status, but the opened notice list still exposes only the tender body, so no supplier attribution was made. Existing statuses, rows, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to2026-08-26without status promotion. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate, TypeScript,corepack pnpm build, registry/generated-route/raw-artifact checks, assigned exact-date/name/path/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients161,170and180, the Systems and Contractors directories, and client170's raw artifact; Chrome could not be launched in this runtime. - Documentation commit
cb695eb5dc18f0826ae2a148cf91a67a9d90868dis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1392, run126(build), reachedsuccess, including Pages publication. Public Pages reached the expected OAuth/Keycloak boundary; authorized deployed page-body readback was unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated dirty clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/in the primary worktree remained unmodified. - Next ordered dossier rotation:
181–200.
Previous scheduled rotation — 2026-08-26 10:10 UTC
- Followed the latest durable wiki cursor and completed clients
141–160; the already completed extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
59distinct current dossier evidence URLs (77per-client occurrences) with browser-equivalent requests and inspected HTTP200bodies. Re-downloaded, verified and text-extracted all16cited CVP IS PDFs (65pages;108,279extracted characters). - Ran
65exact CPVA client/system searches and65client/system contractor-procurement query ladders; broad-token CPVA results and noisy external-search results remained discovery only. - Repeated both CVP IS routes. Basic search parsed
338rows, retained157exact-authority rows and reviewed46broad candidates. Organization-first discovery retained14identity-checked profiles, parsed all176published-notice rows and reviewed68broad candidates without forcing near-name identities. All45order, notice-list and procurement-document detail routes for the15cited resources returned HTTP200; nine order-data requests reached the login boundary, and no claim depends on those inaccessible bodies. - This was a genuine conservative no-new-claim review. No additional body-supported system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to
2026-08-26without status promotion. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate, TypeScript,corepack pnpm build, registry/generated-route/raw-artifact checks, assigned exact-date/name/path/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients141,150and160, the Systems and Contractors directories, and client150's raw artifact. - Documentation commit
2dc1c0b30d04099972997cd2be7d8ceadf33b6f0is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1391, run125(build), reachedsuccess, including Pages publication. Public Pages reached the expected OAuth302; authorized deployed page-body readback was unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated dirty clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/in the primary worktree remained unmodified. - Next ordered dossier rotation:
161–180.
Previous scheduled rotation — 2026-08-26 08:10 UTC
- Followed the latest durable wiki cursor and completed clients
121–140; the already completed extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
72distinct current dossier evidence URLs with browser-equivalent requests and inspected the returned bodies. Three CVP IS PDF requests transiently returned502during the concurrent pass and all succeeded at HTTP200on the required single retry. Re-downloaded, verified and text-extracted all17cited PDFs (69pages;115,244extracted characters). - Ran
42exact CPVA client/system searches and42client/system contractor-procurement query ladders; broad-token CPVA results and noisy external-search results remained discovery only. - Repeated both CVP IS routes. Basic search retained
239exact-authority rows and reviewed66broad candidates. Organization-first discovery retained20identity-checked current/successor/typography profiles, including the Priėmimo ir integracijos agentūra successor and straight-quotation variants for clients134and136; it parsed all509published-notice rows and reviewed82broad candidates without forcing near-name identities. All51order, notice-list and procurement-document detail routes for the17cited resources returned HTTP200. - Search-table rows for several already represented procurements now say
Nustatytas laimėtojas, but the opened notice lists still expose only tender-stage bodies. No supplier or contract attribution was made from those status rows. This was a genuine conservative no-new-claim review: existing statuses, rows, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to2026-08-26without status promotion. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate, TypeScript,corepack pnpm build, registry/generated-route/raw-artifact checks, assigned exact-date/name/path/six-column checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients121,130and140, the Systems and Contractors directories, and client130's raw artifact. - Documentation commit
6914a500f838ae5e8ff380be1815da98d203e8b2is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1390, run124(build), reachedsuccess, including Pages publication. Public Pages reached the expected Keycloak/OAuth302; authorized deployed page-body readback was unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client, and Chrome could not be launched. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated dirty clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/in the primary worktree remained unmodified. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-26 02:14 UTC
- Followed the job's explicit durable cursor after
081–100and completed the assigned clients101–120; the extra001–020rerun did not reset the ordered sequence. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests; all returned inspected HTTP200bodies after one transient theatre-origin timeout cleared on retry. Re-downloaded, verified and text-extracted all14cited PDFs (56pages;92,387extracted characters). Ran56exact CPVA client/system searches and84client/system contractor-procurement query formulations; broad CPVA and noisy search output remained discovery only. - Repeated both CVP IS routes. Organization-first discovery retained
20identity-checked current/typography profiles across19clients, preserved both Vilniaus teatras „Lėlė“ profiles, forced no near-name record for client117, parsed all197published-notice rows and reviewed53broad IT/digital candidates. Basic search parsed63exact-authority rows and reviewed11broad candidates. The Jaunimo reikalų agentūra short/800-number procurement now reports a selected-winner status in the search table, but its opened notice list and all three detail routes still expose only tender-stage material, so no supplier or contract attribution was made. - This was a genuine conservative no-new-claim review. No additional body-supported system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to
2026-08-26without status promotion. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, full Corepack-managed pnpm validation, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned date/name/path checks, evidence-URL/PDF checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact; the Chrome harness was unavailable. - Documentation commit
b0fb583f48adacc586db8617aad3d31696e54068is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1387, run123(build), reachedsuccess, including Pages publication. Public Pages reached the expected Keycloak/OAuth302; authorized deployed page-body readback was unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated dirty clients181–200,data/system-analysis.json,.hermes/,.pptx_improve_run/andpptx_improvement_run_20260814/in the primary worktree remained unmodified. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-25 22:05 UTC
- Followed the latest durable wiki cursor and completed clients
161–180; the already completed extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
57distinct current dossier evidence URLs (64per-client occurrences) with browser-equivalent requests and inspected HTTP200bodies. Re-downloaded, verified and text-extracted all8cited CVP IS PDFs (43pages;78,783extracted characters). Ran55exact CPVA client/system searches and70system-contractor/procurement query ladders; broad CPVA and noisy search-engine matches remained discovery only. - Repeated both CVP IS routes. Basic search retained
93exact-authority rows and reviewed21broad IT/digital candidates. Organization-first discovery retained18identity-checked profiles, preserved both unresolved profiles for client180, parsed all188published-notice rows and reviewed33broad candidates without forcing near-name identities. All24order/notice/document detail-route requests for the8cited resources returned public HTTP200bodies. - This was a genuine conservative no-new-claim review. No additional body-supported system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. The ArcGIS search row for client
162now reports a selected-winner status, but the opened notice list still exposes only the tender body, so no supplier attribution was made. Existing statuses, rows, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all dossiers and index entries were already checked on2026-08-25, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, evidence-URL checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients161,170and180, the Systems and Contractors directories, and client170's raw artifact. The Chrome harness was unavailable. - Documentation
mainremains exactly equal to remote commita100b089fd885807b3730cf4e03eca131f5ac108; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1382, run122(build), remainssuccess, including Pages publication. Public Pages reached the expected Keycloak/OAuth302; authorized deployed page-body readback was unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This run established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
181–200.
Previous scheduled rotation — 2026-08-25 20:08 UTC
- Followed the latest durable wiki cursor and completed clients
141–160; the already completed extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
59distinct current dossier evidence URLs (77occurrences) with browser-equivalent requests and inspected HTTP200bodies. Re-downloaded, verified and text-extracted all17cited CVP IS PDFs (110pages;219,195extracted characters). Ran65exact CPVA client/system searches and65client/system contractor-procurement query ladders; broad CPVA and noisy search-engine matches remained discovery only. - Repeated both CVP IS routes. Basic search retained
157exact-authority rows and reviewed46broad IT/digital candidates. Organization-first discovery retained15identity-checked profiles, parsed all185published-notice rows and reviewed71broad candidates without forcing near-name identities. All48order/notice/document detail-route requests for the16cited resources returned HTTP200; ten order-data requests reached the login boundary, and no claim depends on those inaccessible bodies. - This was a genuine conservative no-new-claim review. No additional body-supported system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all dossiers and index entries were already checked on
2026-08-25, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, evidence-URL checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients141,150and160, the Systems and Contractors directories, and client150's raw artifact. - Documentation
mainremains exactly equal to remote commita100b089fd885807b3730cf4e03eca131f5ac108; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1382, run122(build), remainssuccess, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The latest
100live Discord messages were read through1541874047762309151(2026-08-25T18:16:59.621000+00:00) and contain no instructor guidance newer than CVP IS lesson 3. This run established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
161–180.
Previous scheduled rotation — 2026-08-25 18:12 UTC
- Followed the latest durable wiki cursor and completed clients
121–140; the already completed extra001–020rerun did not reset or repeat the ordered sequence. - Reopened all
72distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP200bodies. The pass verified and text-extracted17cited CVP IS PDFs (69pages;115,244extracted characters). Ran42exact CPVA client/system searches and42client/system contractor-procurement query ladders; broad CPVA and search-engine matches remained discovery only. - Repeated both CVP IS routes. Basic search retained
238exact-authority rows and reviewed66broad IT/digital candidates. Organization-first discovery retained20identity-checked current/successor/typography profiles, parsed509published-notice rows and reviewed71broad candidates without forcing near-name identities. This included the renamed Priėmimo ir integracijos agentūra profile for client130and straight-quotation variants for clients134and136; their additional candidates were already represented or did not support a new claim. All51order/notice/document detail-route requests for the17cited resources returned HTTP200. - Published two high-confidence, conservatively bounded observations. Client
132now records the May 2026 Prūdiškių card-based door-access-control tender, including supply, installation, commissioning, configuration and handover scope; it remains intended procurement only, with no inferred award, supplier, delivery or production use. Client135now records the operating SDDKAIS registration journal from its opened official service body, which accepts professional-attestation, development-needs and programme-approval submissions; its contractor, hosting, kickoff and release remain unknown. The other eighteen clients produced conservative no-new-claim outcomes, and existing statuses, confidence, aliases and explicit unknowns were preserved. - Registry state is
290clients,530canonical systems,755observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/name/path checks, evidence-URL checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified both changed client pages, both new canonical system pages, the Systems and Contractors directories, and client132's raw artifact. - Documentation commit
a100b089fd885807b3730cf4e03eca131f5ac108is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1382, run122(build), reachedsuccess, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-25 16:09 UTC
- Completed the explicitly assigned review of clients
101–120; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the stated cursor. - Reopened all
74distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP200bodies. Ran54exact CPVA client/system searches and54client/system contractor-procurement query ladders; noisy CPVA and search-engine results remained discovery only. - Repeated both CVP IS routes. Basic search retained
47exact-authority rows and reviewed11broad IT/digital candidates. Organization-first discovery retained20identity-checked current/typography profiles, parsed197published-notice rows and reviewed54broad candidates without forcing near-name identities. - Re-downloaded, verified and text-extracted all
14cited CVP IS PDFs across13resources, reconfirming six tender and eight award bodies. All39detail-route requests returned HTTP200;36opened public order/notice/document bodies and three for resource108142reached the login boundary. Newly surfaced telecommunication, equipment, infrastructure and already-represented procurement rows did not establish an additional defensible system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim. - This was a genuine conservative no-new-claim review. Existing
2026-08-25dates, statuses, rows, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved, so no documentation source changed and no empty commit was created. - Registry state remains
290clients,528canonical systems,753observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, pnpm validation and production build through the installed Corepack package, TypeScript, registry/generated-route/raw-artifact checks, evidence-URL checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact; Chrome itself was unavailable. - Documentation
mainremains exactly equal to remote commitf8abf25912556d5368f918b239b17e39a29f60ba; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1375, run121(build), remainssuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized deployed page-body readback was unavailable because this runtime has no service-proxy client. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-25 14:11 UTC
- Followed the latest durable wiki cursor and completed clients
201–220; the already completed extra001–020rerun did not reset or repeat the ordered sequence. The task text's101–120pointer was older than the verified repository/wiki state. - Reopened all
70distinct current dossier evidence URLs (77occurrences) with browser-equivalent requests and inspected HTTP200bodies. Ran67exact CPVA client/system searches and67client/system contractor-procurement query ladders; broad CPVA and search-engine results remained discovery only. - Repeated both CVP IS routes. Basic search retained
253exact-authority rows and reviewed98broad IT/digital candidates. Organization-first discovery retained18identity-checked current/typography profiles, parsed1,010published-notice rows and reviewed139broad candidates without forcing near-name identities. - Re-downloaded, verified and text-extracted all
23cited CVP IS PDFs (96pages;154,592extracted characters), reconfirming their bounded award, amendment and tender semantics. Newly surfaced tenders, equipment purchases and already-represented awards did not establish an additional defensible system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim. - This was a genuine conservative no-new-claim review. Existing statuses, rows, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to
2026-08-25without status promotion. - Registry state remains
290clients,528canonical systems,753observations and111contractor cards; Client→contractor and System→contractor links remain complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date/name/path and evidence-URL checks, andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients204and220, the Systems and Contractors directories, and client204's raw artifact. - Documentation commit
f8abf25912556d5368f918b239b17e39a29f60bais onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1375, run121(build), reachedsuccess, including Pages publication. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
221–240.
Previous scheduled rotation — 2026-08-25 12:14 UTC
- Followed the latest durable wiki cursor and completed clients
181–200; the already completed extra001–020rerun did not reset or repeat the ordered sequence. The task text's101–120pointer was older than the verified repository/wiki state. - Reopened all
65distinct current dossier evidence URLs (71occurrences) with browser-equivalent requests and inspected HTTP200bodies. Ran53exact CPVA client/system searches and53client/system contractor-procurement query ladders; broad CPVA and search-engine results remained discovery only. - Repeated both CVP IS routes. Basic search retained
545exact-authority rows and reviewed106broad IT/digital candidates. Organization-first discovery retained15identity-checked current/successor/typography profiles, parsed all835published-notice rows and reviewed177broad candidates without forcing near-name identities. - Opened, downloaded and text-extracted the newly published NŠA contract-award notice. Added one high-confidence observation for client
190: NŠA contracted UAB Tilde informacinės technologijos under contract No.63896, signed2026-08-18for EUR117,800, to acquire, integrate, implement and adapt an AI-based learning platform/virtual-assistant expansion. The award does not establish production use, hosting, original system kickoff, latest production release or completion, so those canonical lifecycle fields remain unknown. All other clients had a genuine conservative no-new-claim review; existing statuses, aliases, confidence and unresolved gaps were preserved, and all twenty dossier/index dates advanced to2026-08-25without status promotion. - Registry state is
290clients,528canonical systems,753observations and111contractor cards; Client→contractor and System→contractor links are complete at217each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date/name/path and evidence-URL checks, andgit diff --checkpassed. Browser-equivalent local HTTP readback verified client190, the newSYS-7D1FC3EA2Apage, the Systems and Contractors directories, and client190's raw artifact; Chrome could not be launched in this runtime. - Documentation commit
f433d1dfc47f7c7d09531b863859946cf606a499is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1374, run120(build), reachedsuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized deployed page-body readback remains unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
201–220.
Previous scheduled rotation — 2026-08-25 10:08 UTC
- Followed the latest durable wiki cursor and completed clients
161–180; the already completed extra001–020rerun did not reset or repeat the sequence. The task text's101–120pointer was older than the verified repository/wiki state, where101–160were already complete. - Reopened all
64distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP200bodies. Ran55exact CPVA client/system searches and70system-contractor/procurement query ladders; broad CPVA and search-engine results remained discovery only. - Repeated both CVP IS routes. Basic search retained
93exact-authority rows and reviewed21broad IT/digital candidates. Organization-first discovery retained18identity-checked current/typography profiles for17clients, preserved both unresolved duplicate profiles for client180, parsed all188published-notice rows and reviewed33broad candidates without forcing near-name identities. - Re-downloaded and text-extracted all
8cited CVP IS PDFs (43pages;78,783extracted characters), reconfirming four award notices and four tender notices and their bounded winner, contract and intended-procurement semantics for clients161,162and179. - This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to
2026-08-25without status promotion. - Registry state remains
290clients,527canonical systems,752observations and111contractor cards; Client→contractor and System→contractor links remain complete at216each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date/name/path and evidence-URL checks, andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients161,175and180, the Systems and Contractors directories, and client175's raw artifact; Chrome could not be launched in this runtime. - Documentation commit
e0e37ad4a50c7d53e6fc17177bf1ed98674450f8is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1366, run119(build), reachedsuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized deployed page-body readback remains unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
181–200.
Previous scheduled rotation — 2026-08-25 08:13 UTC
- Followed the durable ordered cursor and completed clients
141–160; the already completed extra001–020rerun did not reset or repeat the sequence. - Reopened all
59distinct current dossier evidence URLs (77occurrences) with browser-equivalent requests and inspected HTTP200bodies. Ran65exact CPVA client/system searches and65client/system contractor-procurement query ladders; broad CPVA and search-engine results remained discovery only. - Repeated both CVP IS routes. Basic search retained
157exact-authority rows and reviewed46broad IT/digital candidates. Organization-first discovery retained15identity-checked profiles, parsed all185published-notice rows and reviewed71broad candidates without forcing near-name identities. - Re-downloaded and text-extracted all
16cited CVP IS PDFs (65pages;108,279extracted characters), reconfirming their existing bounded tender/award semantics. The15cited resources exposed45public detail-route responses at HTTP200; nine redirected to login, and no claim depends on those inaccessible bodies. - This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to
2026-08-25without status promotion. - Registry state remains
290clients,527canonical systems,752observations and111contractor cards; Client→contractor and System→contractor links remain complete at216each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date/name/path and evidence-URL checks, andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients141,150and160, the Systems and Contractors directories, and client150's raw artifact; Chrome could not be launched in this runtime. - Documentation commit
f9e6f13e98b7a5ce639c14234e2532bda3b16887is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1365(build) reachedsuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized deployed page-body readback remains unavailable from this runtime. - The latest
100live Discord messages were read through1541632928923127889(2026-08-25T02:18:52.410000+00:00) and contain no instructor guidance newer than CVP IS lesson 3. This run established no reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
161–180.
Previous scheduled rotation — 2026-08-25 02:17 UTC
- Followed the durable ordered cursor and completed clients
121–140; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the sequence. - Reopened all
89distinct current dossier URLs with browser-equivalent requests and inspected HTTP200bodies. Ran89exact CPVA client/system searches and89client/system contractor-procurement query ladders; broad CPVA and search-endpoint results remained discovery only. - Repeated both CVP IS routes. Basic search retained
98exact-authority rows and reviewed seven broad IT/digital candidates. Organization-first discovery retained20identity-checked current, successor or typography-variant profiles across all twenty clients, parsed579published-notice rows and reviewed51broad candidates without forcing near-name identities. - Re-downloaded and text-extracted all
16cited CVP IS PDFs (65pages;108,908extracted characters), reconfirming fifteen tender notices and one award notice. All48public procurement detail-route bodies returned HTTP200; no dossier claim depends on an inaccessible body. - This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to
2026-08-25without status promotion. - Registry state remains
290clients,527canonical systems,752observations and111contractor cards; Client→contractor and System→contractor links remain complete at216each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date/name/path and evidence-URL checks, andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients121,130and140, the Systems and Contractors directories, and client130's raw artifact. - Documentation commit
b1c633be0466e6445fad34da5e3c17e702768535is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1364, run117(build), reachedsuccess, including Pages publication. - The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-25 00:11 UTC
- Followed the user-designated durable ordered cursor and completed clients
101–120; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the sequence. - Reopened all
74distinct current dossier URLs with browser-equivalent requests and inspected HTTP200bodies. Ran54exact CPVA client/system searches and54client/system contractor-procurement query ladders; an independent Bing fallback completed52additional ladder formulations, and all broad/noisy results remained discovery only. - Repeated both CVP IS routes. Basic search retained
47exact-authority rows and reviewed11broad candidates. Organization-first discovery retained20identity-checked current/typography/successor profiles across19clients, preserved both Vilniaus teatras „Lėlė“ profiles, forced no near-name record for client117, parsed all197published-notice rows and reviewed54broad candidates. - Re-downloaded and text-extracted all
14cited CVP IS PDFs, reconfirming six tender notices and eight award notices. The13cited resources exposed36public detail-route bodies and three login redirects; no claim depends on an inaccessible body. - This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to
2026-08-25without status promotion. - Registry state remains
290clients,527canonical systems,752observations and111contractor cards; Client→contractor and System→contractor links remain complete at216each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date/name/path and evidence-URL checks, andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients101,110and120, the Systems and Contractors directories, and client110's raw artifact. - Documentation commit
597d58dab64c6f75692e26636d81340209d3bbceis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1363, run116(build), reachedsuccess, including Pages publication. Public Pages returned the expected Keycloak/OAuth302; authorized deployed page-body readback remains unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-24 22:14 UTC
- Followed the latest durable wiki cursor and completed clients
181–200; the already completed extra001–020rerun did not reset the ordered sequence. - Reopened all
66distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP200bodies. Ran52exact CPVA client/system searches and52client/system contractor-procurement query ladders; broad CPVA and search-engine results remained discovery only. - Repeated both CVP IS routes. Basic search retained
545exact-authority rows and reviewed106broad IT/digital candidates. Organization-first discovery retained15identity-checked current/successor profiles, parsed all924published-notice rows and reviewed188broad candidates without forcing near-name identities. - One defensible evidence update is published for client
190. Opened official award-notice bodies now bound UAB „Asseco Lietuva“ to maintenance and development of named constituent national education registries (Mokinių, Pedagogų and Licencijų) under separate 2025–2026 contracts without extending that role to all nine registries. A separate opened award establishes Starkodas as the Švietimo portalo informacinė sistema programming-services supplier under contract No.33539, signed2025-09-22for EUR170,368; procurement is recorded without inferring operation, hosting, original development, go-live or release. The other nineteen clients produced conservative no-new-claim outcomes. All twenty dossier and matching index dates advanced to2026-08-24without status promotion. - Registry state is
290clients,527canonical systems,752observations and111contractor cards; Client→contractor and System→contractor links remain complete at216each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date and evidence-URL checks, andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients181,190and200, the Systems and Contractors directories, and client190's raw artifact; Chrome could not be launched in this runtime. - Documentation commit
2563f54a9c8961d1f1d533d4a861aaeb4b3118c2is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1362, run115(build), reachedsuccess, including Pages publication. Public Pages resolved to the expected Keycloak/OAuth302; authorized deployed page-body readback remains unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
201–220.
Previous scheduled rotation — 2026-08-24 20:09 UTC
- Followed the latest durable wiki cursor and completed clients
161–180; the already completed extra001–020rerun did not reset the ordered sequence. - Reopened all
64current dossier evidence occurrences (57distinct URLs) with browser-equivalent requests and inspected the returned bodies. The retired SMIS deep page redirected to an unreachable external host, so client175now cites the opened HTTP200parent resource catalogue that explicitly lists SMIS. Ran55exact CPVA client/system searches and70system-contractor/procurement query ladders; broad token matches and search-engine output remained discovery only. - Repeated both CVP IS routes. Basic search retained
93exact-authority rows and reviewed21broad IT/digital candidates. Organization-first discovery retained18identity-checked current/typography profiles for17clients, preserved both unresolved duplicate profiles for client180, parsed all188published-notice rows and reviewed33broad candidates without forcing near-name identities. No candidate established a new defensible claim. - Re-downloaded and text-extracted all
8cited CVP IS PDFs (43pages;78,783extracted characters), reconfirming four award notices and four tender notices, including the bounded winner, contract, tender-only and subcontracting semantics already recorded for clients161,162and179. - This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to
2026-08-24without status promotion. - Registry state remains
290clients,526canonical systems,751observations and111contractor cards; Client→contractor and System→contractor links remain complete at214each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date and all-evidence-URL checks, andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients161,175and180, the Systems and Contractors directories, and client175's raw artifact; Chrome could not be launched in this runtime. - Documentation commit
d4c84abce661cdf7a4fc5cf879754e613c607c62is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1361, run114(build), reachedsuccess, including Pages publication. Public Pages resolved to the expected Keycloak/OAuth login boundary; authorized deployed page-body readback remains unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
181–200.
Previous scheduled rotation — 2026-08-24 18:12 UTC
- Followed the latest durable wiki cursor and completed clients
141–160; the already completed extra001–020rerun did not reset the ordered sequence. - Reopened all
77current dossier evidence occurrences (59distinct URLs) with browser-equivalent requests and inspected HTTP200bodies. Ran65exact CPVA client/system searches and65client/system contractor-procurement query ladders; broad CPVA token matches and search-engine output remained discovery only. - Repeated CVP IS organization-first discovery using the live entry form, lowercase fields and session-preserving POST. It retained
15byte-exact identity profiles, forced no near-name records for the other five clients, parsed all185published-notice rows and reviewed71broad IT/digital candidates. No notice newer than the already reviewed dossier evidence established a defensible claim. - This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to
2026-08-24without status promotion. - Registry state remains
290clients,526canonical systems,751observations and111contractor cards; Client→contractor and System→contractor links remain complete at214each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients141,150and160, the Systems and Contractors directories, and client141's raw artifact; Chrome could not be launched in this runtime. - Documentation commit
fae340b2b1ee395273c085cd8b0310afd50ea899is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1360, run113(build), reachedsuccess, including Pages publication. Public Pages resolved to the expected Keycloak/OAuth login boundary; authorized deployed page-body readback remains unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
161–180.
Previous scheduled rotation — 2026-08-24 16:12 UTC
- Followed the durable wiki cursor and completed clients
121–140; the already completed extra001–020rerun did not reset the sequence. - Reopened all
70distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP200content. Ran41exact CPVA client/system searches and41contractor/procurement query ladders; broad CPVA token matches and search-engine output remained discovery only. - Repeated both CVP IS discovery routes. Basic search retained
224exact-authority rows and34broad candidates. Organization-first discovery reviewed20identity-checked current/successor/typography profiles, including the established variants for clients130,134and136, and parsed all508published-notice rows with72broad candidates without forcing near-name identities. The three additional broad matches were non-IT false positives caused by generic words in food-ration and expert-evaluation titles and were excluded. - Re-downloaded and text-extracted all
16cited CVP IS PDFs (65pages;108,908extracted characters), confirming15tender notices and one award notice. All48order, notice-list and procurement-document detail routes returned inspected HTTP200bodies without login redirection. - This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to
2026-08-24without status promotion. - Registry state remains
290clients,526canonical systems,751observations and111contractor cards; Client→contractor and System→contractor links remain complete at214each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients121,130and140, the Systems and Contractors directories, and client130's raw artifact; Chrome could not be launched in this runtime. - Documentation commit
6ce3258fd12b822efcc86e5c3bd3dc8dce7ecd05is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1359, run112(build), reachedsuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized deployed page-body readback remains unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-24 14:05 UTC
- Followed the user-designated durable ordered cursor and completed clients
101–120; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the sequence. - Reopened all
72distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP200content. Ran52exact CPVA client/system searches and52contractor/procurement query ladders; broad CPVA token matches and search-engine output remained discovery only. - Repeated both CVP IS discovery routes. Basic search retained
51exact-authority rows and five broad candidates. Organization-first discovery reviewed17strict identity-matched current/variant profiles across16clients, preserved both Vilniaus teatras „Lėlė“ profiles, excluded the near-name collision for client117, and parsed all124published-notice rows with23broad candidates. Clients without a strict portal profile match were not forced to near-name records. - Re-downloaded and text-extracted all
13cited CVP IS PDFs (52pages;86,409extracted characters), confirming five tender notices and eight award notices. The12cited resources exposed33public detail-route bodies and three login redirects; no claim was based on an inaccessible body. - Two defensible evidence updates are now published. Client
112records only the intended procurement established by the2026-07-20Klaipėda regional career-centre interactive-premises tender; no supplier, signed contract, delivery, production use, hosting or release was inferred. Client110now records VDI virtual assistant „Vaidas“: the opened official tender and procurement package directly establish operation since2024-03-18on the Tilde chatbot platform, planned 24-month maintenance/modification procurement, and UAB Tilde informacinės technologijos' bounded Lithuanian implementation/maintenance/support-provider role; the 2026 tender does not establish an award or signed contract, and its future cloud requirement was not misreported as current production hosting. - Registry state is
290clients,526canonical systems,751observations and111contractor cards; Client→contractor and System→contractor links remain complete at214each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified client110, the Vaidas canonical system page, the Systems directory and client110's raw artifact. - Documentation commit
1278695d78cab2f8026ba7d8b178a414f93d41deis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1352, run111(build), reachedsuccess, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback remains unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s,kubectlork3sservice-proxy client. - No instructor guidance newer than CVP IS lesson 3 was present, and this run established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-24 10:16 UTC
- Followed the user-designated durable ordered cursor and completed clients
101–120; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the sequence. - Reopened all
72distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP200content. Ran52exact CPVA client/system searches and52contractor/procurement query ladders; broad CPVA token matches and search-engine output remained discovery only. - Repeated both CVP IS discovery routes. Basic search retained
51exact-authority rows and five broad candidates. Organization-first discovery reviewed17strict identity-matched current/variant profiles across16clients, preserved both Vilniaus teatras „Lėlė“ profiles, excluded the near-name collision for client117, and parsed all124published-notice rows with23broad candidates. Clients without a strict portal profile match were not forced to near-name records. - Re-downloaded and text-extracted all
13currently cited CVP IS PDFs (52pages;86,409extracted characters), confirming five tender notices and eight award notices. The12cited resources exposed33public detail-route bodies and three login redirects; no claim was based on an inaccessible body. - One defensible evidence update was published for client
112: an opened four-page official CVP IS open-tender notice published2026-07-20establishes planned procurement of Klaipėda regional career-centre interactive premises, including an interactive opportunities room, consultation and individual-work areas, and video monitors. It remains classified strictly as intended procurement; no selected supplier, signed contract, delivery, production use, hosting or release was inferred. The other nineteen clients produced conservative no-new-claim outcomes. All twenty dossier and matching index dates advanced to2026-08-24without status promotion. - Registry state is now
290clients,525canonical systems,750observations and111contractor cards; Client→contractor and System→contractor links remain complete at213each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified client112, the new canonical system page, the Systems directory and client112's raw artifact. Chrome could not be launched in this runtime. - Documentation commit
810c2f5dfbb7230827d2a9d4bb4c2f53f897749ais onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1344, run110(build), reachedsuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized deployed page-body readback was unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s, orkubectlservice-proxy client. - The latest live Discord messages contain no instructor guidance newer than CVP IS lesson 3. This run established no new reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-23 12:13 UTC
- Followed the durable ordered cursor and completed clients
121–140; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the sequence. - Reopened all
70distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP200content. Ran40exact CPVA client/system searches and40contractor/procurement query ladders; broad CPVA token matches and search-engine output remained discovery only. - Repeated both CVP IS discovery routes. Basic search retained
450exact-authority rows and46broad candidates. Organization-first discovery reviewed20identity-checked current/variant profiles, including the established successor/typography variants for clients130,134and136, and parsed all505notice rows with70broad candidates without forcing near-name identities. - Re-downloaded and text-extracted all
16currently cited CVP IS PDFs (65pages;108,908extracted characters), confirming15tender notices and one award notice. All48order, notice-list and procurement-document detail routes returned inspected HTTP200bodies without login redirection. - This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to
2026-08-23. - Registry state remains
290clients,524canonical systems,749observations and111contractor cards; Client→contractor and System→contractor links remain complete at213each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests,corepack pnpm validate,corepack pnpm build, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients121,130and140, both registries and client130's raw artifact. - Documentation commit
fb4bb94c9f29aa2ca2231cbc43a3860a654cf01eis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1338(build) reachedsuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized deployed page-body readback was unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s, orkubectlservice-proxy client. - The latest
100live Discord messages were read through message1541050284522868797(2026-08-23T11:43:39.160000+00:00) and contain no instructor guidance newer than CVP IS lesson 3. This run established no new reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-23 11:42 UTC
- Completed the explicitly assigned ordered review of clients
101–120; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the ordered cursor. - Reopened all
71distinct current evidence URLs with browser-equivalent requests; every source returned HTTP200. Ran52exact CPVA client/system searches and52contractor/procurement query ladders; broad token matches and noisy search output remained discovery only. - Repeated both CVP IS discovery routes. Basic search retained
47exact-authority rows and11broad candidates. Organization-first discovery reviewed20identity-checked current/variant profiles, preserved both Vilniaus teatras „Lėlė“ profiles, excluded the near-name collision for client117, and parsed197notice rows including54broad candidates without forcing near-name identities. - Re-downloaded and text-extracted all
12currently cited CVP IS PDFs, confirming four tender notices and eight award notices. The11cited resources exposed30public detail routes and three login redirects; no claim was based on an inaccessible body. - This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses,
62observation rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and index dates advanced to2026-08-23. - Validation passed:
16tests, registry validation,corepack-managed pnpm validation, TypeScript, production build, raw-artifact publication checks andgit diff --check. The build verified290client,524system and111contractor routes,749observations and296raw artifacts. Browser-equivalent local HTTP checks passed for the homepage, client110, Systems, Contractors and the raw Markdown route; Chrome could not be launched in this runtime. - Documentation commit
ffe0378e13a7f6f49d4ed6d5646250d1c4c6dcbbis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1337, run108(build), reachedsuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized deployed page-body readback was unavailable because this runtime has no/gondor-v1-gitea-pagesmount,microk8s, orkubectlservice-proxy client. - The synchronized channel state contains no instructor guidance newer than CVP IS lesson 3. This run established no reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-21 08:12 UTC
- Completed the explicitly assigned ordered review of clients
101–120; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the ordered cursor. - Reopened the assigned dossiers and all
71distinct current evidence URLs (81dossier URL occurrences) with browser-equivalent requests; all opened successfully in therequestsverification pass. Ran52exact CPVA client/system searches and52client/system contractor/procurement query ladders; broad token matches and noisy search output remained discovery only. - Repeated both CVP IS discovery routes. Basic search retained
47exact-authority rows and four broad IT/digital candidates. Organization-first discovery reviewed20identity-checked current/variant profiles across19clients, preserved both Vilniaus teatras „Lėlė“ profiles, excluded the near-name collision for client117, and parsed212current notice rows. - Re-downloaded and text-extracted all
12previously cited CVP IS PDFs, confirming four tender notices and eight award notices. The current order/notice-list/document-route pass kept30detail routes accessible and identified three anonymous routes that redirected to login; no claim was based on an inaccessible body. - One defensible evidence update was published for client
110: a new official CVP IS open-tender notice published2026-08-20replaces the older2026-06-15notice as the current evidence that VDI plans to procure Potencialiai pavojingų įrenginių valstybės registras maintenance and modification. The opened four-page notice names VDI, the register, programming/consulting/training scope, a planned37-month term and estimated EUR45,000value. It remains classified strictly as intended procurement; no selected supplier, signed contract, delivery, hosting or production release was inferred. The other nineteen clients produced conservative no-new-claim outcomes, and existing rows, statuses, confidence, aliases, gaps and explicit unknowns were preserved. - Registry state remains
290clients,524canonical systems,749observations and111contractor cards; statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - Under checksum-verified Node
22.23.2, all16tests,corepack pnpm validate,corepack pnpm build, registry/type/generated-route/raw-artifact checks, six-column validation andgit diff --checkpassed. Browser-equivalent local HTTP readback verified the changed client page, canonical system page, system and contractor directories, and raw client artifact. - Documentation commit
2e38a142b5e15a3075444dcb336ea5d0c8fd8157is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1336(build) reachedsuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized deployed page-body readback was unavailable because this runtime has no Pages service-proxy client. - The synchronized channel state contained no instructor guidance newer than CVP IS lesson 3. This run established no new reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-21 06:11 UTC
- Followed the durable wiki cursor and completed the next ordered review of clients
121–140; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset or repeat the ordered sequence. - Reopened all
70distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP200content. Ran41exact CPVA client/system searches and41contractor/procurement query ladders; broad CPVA token matches and search-engine output remained discovery only. - Repeated both CVP IS discovery routes. Basic search retained
220exact-authority rows and34broad IT/digital candidates. Organization-first discovery reviewed20identity-checked current/variant profiles, including the documented successor/typography variants for clients130,134and136, and parsed all505notice rows with72broad candidates without forcing near-name identities. - Re-downloaded and text-extracted all
16currently cited CVP IS PDFs, confirming15tender notices and one award notice. All48order, notice-list and procurement-document detail routes returned inspected HTTP200bodies without login redirection. Existing patient-turning, social-care-system, PAIS, IP-telephony, satellite-broadband, video/security, Šeimos kortelė, SGLEP, SOPAS, legal-information and staff-call observations remain bounded to the document stages already represented. - This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and index dates advanced to
2026-08-21. - Registry state remains
290clients,524canonical systems,749observations and111contractor cards; Client→contractor and System→contractor links remain complete at213each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - Under checksum-verified Node
22.23.2, all16tests,corepack pnpm validate,corepack pnpm build, registry/type/generated-route/raw-artifact checks, assigned six-column/date checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified clients121,130and140, both registries and client130's raw artifact. - Documentation commit
c9c20e87d9f7f95e607b85bac2a7bc140fcb04afis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1335(build) reachedsuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized deployed page-body readback was unavailable because this runtime has no/gondor-v1-gitea-pagesmount or Kubernetes service-proxy client. - The synchronized channel state contains no instructor guidance newer than CVP IS lesson 3. This run established no new reusable portal mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-21 04:13 UTC
- Completed the explicitly assigned ordered review of clients
101–120; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the cursor. - Reopened all
70distinct current dossier URLs with browser-equivalent requests and inspected HTTP200content. Ran52exact CPVA client/system searches and52client/system contractor/procurement query ladders; noisy search results and broad CPVA token matches remained discovery only. - Repeated both CVP IS discovery routes. Basic search retained
47exact-authority rows and11broad IT/digital candidates. Organization-first discovery reviewed20identity-checked current/variant profiles across19clients, preserved both Vilniaus teatras „Lėlė“ profiles, excluded the near-name collision for client117, and parsed197notice rows including54broad candidates. - Re-downloaded and text-extracted all
11previously cited CVP IS PDFs across10resources, confirming four tender notices and seven award notices. All30detail-route requests returned HTTP200;27opened the public body and the three routes for resource108142redirected to login, so no claim was derived from those metadata views. - Added one stronger body-supported claim to client
110. The opened award notice identifies UAB Tilde informacinės technologijos as winner and supplier of VDI's AI-based organization-information search and content-creation assistant under contract2045, signed2025-01-07forEUR 60,500. The existingOrganizacijos pagalbininkassystem identity was preserved; a separate 2026 open maintenance tender still does not establish a selected maintenance supplier. - Registry state remains
290clients,524canonical systems and749observations; contractor cards increased from110to111. Client→contractor and System→contractor links increased from212to213and remain complete. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - Under checksum-verified Node
22.23.2, all16tests,corepack pnpm validate,corepack pnpm build, registry/type/generated-route/raw-artifact checks andgit diff --checkpassed. Browser-equivalent local HTTP readback verified client110, its canonical system page, the newCTR-3ECBB8DFD1contractor card, both registries and the raw client artifact. The Chrome harness could not launch. - Documentation commit
29140246ab4eeeed735606ddad177ed5f1e64e04is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1334(build) reachedsuccess, including Pages publication. Public Pages returned the expected OAuth302; authorized deployed page-body readback was unavailable because this runtime has no/gondor-v1-gitea-pagesmount or Kubernetes service-proxy client. - The latest
100live Discord messages contained no instructor guidance newer than CVP IS lesson 3. This run established no new reusable portal mechanic or pitfall, so the authoritativevssa-clientsskill required no update. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-21 02:08 UTC
- Completed the explicitly assigned ordered review of clients
101–120; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the cursor. - Reopened all
81distinct current dossier URLs with browser-equivalent requests and inspected HTTP200content. Ran52exact CPVA client/system searches and52client/system contractor/procurement query ladders; noisy external-search output was time-boxed and not treated as evidence. - Repeated both CVP IS discovery routes. Basic search retained
47exact-authority rows and four broad candidates. Organization-first discovery identity-checked18clients across19profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, and reviewed221notice rows including30broad IT/digital candidates without forcing near-name identities. - Re-downloaded and text-extracted all
11cited CVP IS PDFs across10resources. Their bodies remain correctly classified as four tender notices and seven award notices. All30detail-route requests returned HTTP200;27opened the public order/notice/document body and three for resource108142redirected to the CVP IS login, so no claim was derived from those three metadata views. - This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps, explicit unknowns and already-current
2026-08-21dates were preserved; no empty documentation commit was created. - All
16tests, registry validation, type checking, production build, generated-route/raw-artifact checks andgit diff --checkpassed under checksum-verified Node22.23.2; the requestedcorepack pnpmpath was unavailable and the host Node26.5.1madenpmsegfault, so repository-equivalent validation/build ran with the pinned Node 22 runtime. Browser-equivalent local HTTP marker checks passed for clients101,110and120, both registries and client110's raw artifact; Chrome could not be launched. - Registry state remains
290clients,524canonical systems,749observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each. Documentationmainremains exactly equal to remote commit748d6b2f34eb288c2560a9a1a7f7fd657b5abea2; authenticated exact-SHA source readback passed and exact-head Actions task1333remainssuccess, including Pages publication. - Public Pages returned the expected OAuth
302. Authorized deployed page-body readback remained unavailable because this runtime has no/gondor-v1-gitea-pagesmount or Kubernetes service-proxy client, so no content claim was made from the login response. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. - The synchronized wiki still contains CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-21 00:10 UTC
- Completed the explicitly assigned ordered review of clients
101–120; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the cursor. - Reopened all
81distinct current dossier URLs with browser-equivalent requests and inspected HTTP200content. Ran52exact CPVA client/system searches and52client/system contractor/procurement query ladders; noisy external-search results were time-boxed and not treated as evidence. - Repeated both CVP IS discovery routes. Basic search retained
47exact-authority rows and four broad candidates. Organization-first discovery identity-checked18clients across19profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, and reviewed221notice rows including30broad IT/digital candidates without forcing near-name identities. - Re-downloaded and text-extracted all
11cited CVP IS PDFs across10resources. Their bodies remain correctly classified as four tender notices and seven award notices. All30detail-route requests returned HTTP200;27opened the public order/notice/document body and three for resource108142redirected to the CVP IS login, so no claim was derived from those three metadata views. - This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and index dates advanced to
2026-08-21. - All
16tests, registry validation, type checking, production build, generated-route/raw-artifact checks andgit diff --checkpassed. Local browser-equivalent HTTP marker checks passed for clients101,110and120, both registries and client110's raw artifact. Registry state remains290clients,524canonical systems,749observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each.corepack pnpmwas attempted but unavailable, so repository-equivalentnpm run validateandnpm run buildcompleted successfully. - Documentation commit
748d6b2f34eb288c2560a9a1a7f7fd657b5abea2is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1333/ run104(build) reachedsuccess, including the workflow's Pages publication step. Public Pages resolved to the Keycloak/OAuth login boundary; authorized deployed page-body readback was unavailable because this runtime has nokubectl,microk8sork3sservice-proxy client, so no content claim was made from the login response. - Unrelated
.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. The synchronized wiki still contains CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritativevssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-20 22:05 UTC
- Completed the explicitly assigned ordered review of clients
101–120; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the cursor. - Reopened all
81distinct current dossier URLs with browser-equivalent requests and inspected HTTP200content. The Microsoft Bookings URL now redirected to its currentbookings.cloud.microsoftpage at HTTP200. Ran52exact CPVA client/system searches and52client/system contractor/procurement query ladders; noisy external-search results were time-boxed rather than treated as evidence. - Repeated both CVP IS discovery routes. Basic search retained
47exact-authority rows and four broad candidates. Organization-first discovery identity-checked18clients across19profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, and reviewed221exposed notice rows including30broad IT/digital candidates without forcing near-name identities. - Re-downloaded and text-extracted all
11cited CVP IS PDFs across10procurement resources. Their bodies remain correctly classified as four tenders and seven award notices. All30order, notice-list and procurement-document detail routes returned inspected HTTP200; no search row or infrastructure/equipment lead was promoted beyond the body-supported stage. - This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing
2026-08-20dates, statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved. - All
16tests, registry validation, type checking, production build, generated-route/raw-artifact checks andgit diff --checkpassed. Browser-equivalent local HTTP marker checks passed for clients101,110and120, both registries and client110's raw artifact. Registry state remains290clients,524canonical systems,749observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each.corepack pnpmwas attempted but unavailable, so repository-equivalentnpm run validateandnpm run buildcompleted successfully. - No documentation source changed, so no empty commit was created. Documentation
mainremains exactly equal to remote commitf877fcc41f9510c16c6c99e15a07b892d07f78ae; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1324(build) remainssuccess, including Pages publication. Public Pages returned the expected OAuth302, proving the authentication boundary rather than page content; authorized deployed page-body readback was unavailable because this runtime has nokubectl,microk8sork3sservice-proxy client. - Unrelated
.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. The synchronized wiki still contains CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritativevssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-20 20:09 UTC
- Completed the ordered review of clients
101–120from the job's stated durable cursor after081–100; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the cursor. - Reopened all
70distinct current dossier URLs with browser-equivalent requests:69returned inspected HTTP200, while the already documented Microsoft Bookings endpoint retained its automation-specific417. All11cited CVP IS PDFs were re-downloaded, verified as PDFs and text-extracted; their bodies continue to support the existing tender versus award/contract classifications. - Ran
54de-duplicated exact CPVA client/system searches and62per-observation contractor/procurement query ladders, and repeated both CVP IS discovery routes. The basic route retained55exact-authority rows. Organization-first discovery identity-checked19clients across20profile records, preserving both unresolved Vilniaus teatras Lėlė profiles, and reviewed214exposed notice rows without forcing a near-name identity. - A newly published
2026-08-20open-tender notice for Potencialiai pavojingų įrenginių registro maintenance and modification was opened and classified from its four-page body. It states a planned EUR 45,000 open procurement covering programming, consulting and training, with offers due2026-09-02; it names no selected supplier or signed contract and adds no stronger dossier claim than the already represented planned procurement. Other surfaced rows were already represented, outside system/service scope, or tender-stage/infrastructure leads. This was a genuine conservative no-new-claim review; current2026-08-20dates, statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved. - All
16tests, registry validation, type checking, production build, generated-route/raw-artifact checks andgit diff --checkpassed. Local browser-equivalent HTTP marker checks passed for clients101,110and120, both registries and client110's raw artifact. Registry state remains290clients,524canonical systems,749observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each.corepack pnpmwas attempted but unavailable, so repository-equivalentnpm run validateandnpm run buildcompleted successfully. - No documentation source changed, so no empty commit was created. Documentation
mainremains exactly equal to remote commitf877fcc41f9510c16c6c99e15a07b892d07f78ae; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1324(build) remainssuccess, including Pages publication. The public Pages request redirected to Keycloak and returned the login page, proving the authentication boundary rather than changed page content; authorized deployed page-body readback was unavailable because this runtime has nokubectl,microk8sork3sservice-proxy client, and Chrome could not be launched. - Unrelated
.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. The synchronized wiki still contains CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritativevssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-20 18:07 UTC
- Completed the explicitly assigned ordered review of clients
101–120, using the job's stated durable cursor after081–100; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the cursor. - Reopened all
81current dossier evidence occurrences with inspected browser-equivalent HTTP200, ran52exact CPVA client/system searches and52client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. Exact-authority basic search retained47byte-exact authority rows and four broad candidates. Organization-first discovery retained19identity-checked profiles and reviewed221exposed notice rows, including30broad IT/digital candidates; no near-name identity was forced. - Existing direct bodies continue to support the current systems, contractors and bounded procurement-stage semantics. Newly surfaced discovery rows were either already represented, outside the information-system/service scope (for example, projector and drainage procurements), or tender-stage/infrastructure leads that did not establish a defensible new dossier claim. This was a genuine no-new-claim review, not a skipped search; the already current
2026-08-20dossier and index check dates, statuses, rows, confidence and gaps were preserved. - Validation and production build passed:
16tests, registry validation, type checking, Docusaurus build, generated route/raw-artifact checks andgit diff --check. Registry state is290clients,524canonical systems,749observations and110contractor cards; Client→contractor and System→contractor link coverage remains complete at212each.corepack pnpmwas attempted but unavailable, so the repository-equivalentnpm run validateandnpm run buildscripts were executed successfully. - No documentation source changed, so no empty commit was created. Documentation
mainremains exactly equal to remote commitf877fcc41f9510c16c6c99e15a07b892d07f78ae; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1324(build) remainssuccess, including Pages publication. Public Pages reached the expected Keycloak/OAuth302; authorized deployed page-body readback and browser acceptance were unavailable because this runtime has no service-proxy client and Chrome could not be launched. A representative built client route passed local HTTP marker checks. - Unrelated
.pptx_improve_run/andpptx_improvement_run_20260814/remained unmodified. The synchronized wiki contained CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritativevssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-20 16:12 UTC
- Completed the next durable ordered review of clients
141–160, following the wiki's latest completed121–140range; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the cursor. - Reopened all
77current dossier evidence occurrences (59distinct URLs) with inspected browser-equivalent HTTP200, ran65exact CPVA client/system searches and65client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. It retained19exact profiles, forced no near-name profile for client155, and reviewed all324exposed notice rows, including134broad IT/digital candidates. - Reopened all currently cited direct evidence bodies successfully. The three Pirkimo-ID detail routes were also retried for all
16cited resources, but the portal returned uniform HTTP500; no claim was derived from those unavailable metadata views. Existing VTAIS, Vektra, Avilys, ArcGIS, seabed/marine-cartography, VSS IS, ULSVIS/VSSIS, competency-platform, VAPRIS/VPREG, RSC GIP, MetaSystems and RADIS evidence remains bounded to the procurement stages established by the opened direct bodies. - This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to
2026-08-20. - Registry state remains
290clients,524canonical systems,749observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, exact six-column/date checks andgit diff --checkpassed.corepack pnpmwas attempted but unavailable, so repository-equivalentnpm run validateandnpm run buildscripts were used. Browser-equivalent local HTTP readback verified clients141,150and160, both registries and client141's raw artifact. - Documentation commit
f877fcc41f9510c16c6c99e15a07b892d07f78aeis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1324/ run103(build) reachedsuccess, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has nokubectl,microk8sork3sservice-proxy client. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
161–180.
Previous scheduled rotation — 2026-08-20 14:06 UTC
- Completed the next durable ordered review of clients
121–140; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the cursor. - Reopened all
70current dossier evidence URLs with inspected browser-equivalent HTTP200, ran40exact CPVA client/system searches and40client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. Exact-authority basic search returned462complete rows (450byte-exact authority matches and46broad IT/digital candidates). Organization-first discovery retained20identity-checked profiles and reviewed all505exposed notice rows, including70broad candidates; punctuation/case variants for clients126,134and136remained bounded and no near-name identity was forced. - Reopened all three public Pirkimo-ID detail routes for the
16procurement resources currently cited across the range (48/48HTTP200). Existing PAIS award evidence and patient-turning, software, social-care-system, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call tender evidence remain correctly bounded to the document stages already represented. - This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved. Dossier and index dates were already
2026-08-20, so the completed review produced no source diff and no empty commit was created. - Registry state remains
290clients,524canonical systems,749observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, all assigned URL checks, exact six-column/date checks andgit diff --checkpassed.corepack pnpmwas attempted but unavailable, so the repository-equivalentnpm run validateandnpm run buildscripts were used. Browser-equivalent local HTTP readback verified clients121,130and140, both registries and client130's raw artifact. - Documentation
mainremains exactly equal to remote commitccc162cf95e5c790439720c43c29a08c7cf78158; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1309(build) remainssuccess, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has nokubectl,microk8sork3sservice-proxy client. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-20 12:07 UTC
- Completed the explicitly assigned ordered review of clients
101–120; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the cursor. - Reopened all
81current dossier evidence occurrences with inspected browser-equivalent HTTP200, ran52exact CPVA client/system searches and52client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. Exact-authority basic search retained47byte-exact authority rows and four broad candidates. Organization-first discovery retained19identity-checked profiles and reviewed all221exposed notice rows, including30broad IT/digital candidates, without forcing near-name identities. - Reopened all
11currently cited direct CVP IS notice PDFs at HTTP200and preserved their body-classified tender/award semantics. The three public Pirkimo-ID detail routes returned a uniform portal-side HTTP500during this run, so no claim was derived from those unavailable metadata views and the opened direct notice bodies remained the evidence. Existing systems, contractors, procurement stages, confidence, aliases and explicit unknowns remain supported. - This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Dossier and index dates were already
2026-08-20, so the completed review produced no source diff and no empty commit was created. - Registry state remains
290clients,524canonical systems,749observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, all assigned URL checks andgit diff --checkpassed.corepack pnpmwas attempted but unavailable, so the repository-equivalentnpm run validateandnpm run buildscripts were used. Browser-equivalent local HTTP readback verified clients101,110and120plus both registries; the Chrome harness could not launch a supported browser. - Documentation
mainremains exactly equal to remote commitccc162cf95e5c790439720c43c29a08c7cf78158; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1309(build) remainssuccess, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has nokubectl,microk8sork3sservice-proxy client. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-20 10:04 UTC
- Completed the explicitly assigned ordered review of clients
101–120; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the cursor. - Reopened all
81distinct current dossier URLs with inspected browser-equivalent HTTP200, ran52exact CPVA client/system searches and52client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search retained47byte-exact authority rows and four broad candidates. Organization-first discovery retained19identity-checked profiles and reviewed30broad IT/digital candidates without forcing near-name identities. - Client
110now records three additional bounded tender-stage observations. VDI's opened official notices establish planned maintenance/modification procurement for the Potentially Dangerous Equipment Register and the namedOrganizacijos pagalbininkassoftware, plus planned UiPath-based process-automation modification, creation and consulting. All three bodies are open-tender notices only: selected suppliers, signed contracts, delivery, production use, hosting and release remain unproved and explicitly unresolved. - Registry state is
290clients,524canonical systems,749observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, all assigned URL checks andgit diff --checkpassed.corepack pnpmwas attempted but unavailable, so the repository-equivalentnpm run validateandnpm run buildscripts were used. Local browser-equivalent HTTP readback verified client110, both registries and its raw artifact; the Chrome harness could not launch a supported browser. - Documentation commit
ccc162cf95e5c790439720c43c29a08c7cf78158is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1309(build) issuccess, including Pages publication. Public Pages returned the expected Keycloak/OAuth302; authorized deployed page-body readback was unavailable because this runtime has nokubectl,microk8sork3sservice-proxy client. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-20 06:05 UTC
- The explicitly assigned
101–120rotation was already fully researched, committed and published earlier today at documentation commit72dd243839e74ec4cc67d270d877c379f87f8fab; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the ordered cursor. This idempotent replay did not repeat the same CPVA/contractor/CVP IS batch or create an empty documentation commit. - Reopened all
67distinct current dossier URLs across81occurrences with browser-equivalent requests:66returned inspected HTTP200; the already documented Microsoft Bookings endpoint retained its automation-specific417. Existing system, contractor, procurement-stage, confidence, alias and explicit-unknown claims were preserved; no defensible new dossier claim was established. - Repository validation and production build passed again:
16tests, registry validation, type checking, Docusaurus build, generated-route/raw-artifact checks andgit diff --check. Registry state remains290clients,522canonical systems,747observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each.corepack pnpmwas attempted but unavailable, so the repository-equivalentnpm run validateandnpm run buildscripts were used. - Documentation
mainremains exactly equal to remote commit72dd243839e74ec4cc67d270d877c379f87f8fab; authenticated source readback passed and exact-head Gitea Actions task1305/ run101(build) remainssuccess, including Pages publication. Public Pages resolved to the expected Keycloak/OAuth boundary; authorized deployed page-body readback remains unavailable because this runtime has nokubectl,microk8sork3sservice-proxy client. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - New CVP IS instructor lesson 3 was validated live:
GET /epps/prepareAdvancedSearch.do?type=orgreturned thesearchOrganizationForm, whose exact action isPOST /epps/viewOrganisations.dowith lowercaseviewMode,selectable,within,name,shortName,cityandstreetfields. A session-preservingname=LITGRIDsubmission returned the exactLITGRID AB (PV)row and profile ID1159; this validates route mechanics only, not any system or procurement claim. - The authoritative
vssa-clientsskill now documents that validated entry route and form contract at commit8329b6aaff02e4b27a65ea667f89bcf18b384b2c. Complete skill validation, local/remote ref equality, authenticated exact-SHA readback, runtimeskill_viewreload and exact-head Gitea Actions task1306/ run7(validate) all passed. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-20 04:07 UTC
- Completed the next ordered review of clients
121–140, following the durable wiki cursor after the latest completed101–120rotation; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the sequence. - Reopened all
70distinct current dossier URLs with inspected browser-equivalent HTTP200, ran40exact CPVA client/system searches and40client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search returned460complete rows (448byte-exact authority matches and46broad IT/digital candidates). Organization-first discovery retained20identity-checked profiles and reviewed all502exposed notice rows, including70broad candidates; punctuation/case variants for clients126,134and136were bounded and no near-name identity was forced. - Reopened all three public Pirkimo-ID detail routes for the
16procurement resources currently cited across the range (48/48HTTP200). Existing PAIS award evidence and patient-turning, software, social-care-system, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call tender evidence remain correctly bounded to the document stages already represented. - This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved. The dossier and index dates were already
2026-08-20, so the completed review produced no source diff and no empty commit was created. - Registry state remains
290clients,522canonical systems,747observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, full validation, type checking, production build, registry/generated-route checks, all assigned URL checks, exact six-column/date checks andgit diff --checkpassed.corepack pnpmwas attempted but unavailable, so equivalentnpm run validateandnpm run buildscripts were used. Browser-equivalent local readback verified clients121,130and140, both registries and the raw client artifact. - Existing
mainhead72dd243839e74ec4cc67d270d877c379f87f8fabremains exactly equal to the remote; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1305/ run101(build) remainssuccess, including Pages publication. Public Pages resolved through the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable from this runtime. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - The synchronized wiki contained the validated CVP IS instructor lessons. This run established no additional reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-20 02:08 UTC
- Completed the explicitly assigned ordered review of clients
101–120; the completed extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the cursor. - Reopened all
78distinct dossier URLs with inspected browser-equivalent HTTP200, ran50exact CPVA client/system searches and50client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search retained47byte-exact authority rows and four broad keyword candidates. Organization-first discovery retained19identity-checked profiles, including both Vilniaus teatras „Lėlė“ profiles, and reviewed30broad IT/digital candidates without forcing near-name identities. - Reopened the order, notices and procurement-document routes and re-extracted direct official PDFs for material resources
5869290,616558and8701921. Their bodies remain procurement/tender notices for video projectors, contact-centre software rental and short/800-number communications services—not awards or signed contracts. Current DSS IS, KVS, VASIS and UT IS award evidence remains represented with bounded contractual roles. - This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to
2026-08-20. - Registry state remains
290clients,522canonical systems,747observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, full validation, type checking, production build, registry/generated-route checks, all assigned URL checks, exact six-column/date checks andgit diff --checkpassed.corepack pnpmwas unavailable, so equivalentnpm run validateandnpm run buildscripts were used. Browser-equivalent local readback verified clients101,110and120, both registries and the raw client artifact. - Commit
72dd243839e74ec4cc67d270d877c379f87f8fabis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1305/ run101(build) reachedsuccess, including Pages publication. Public Pages resolved through the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has nokubectl,microk8sork3sservice-proxy client. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - The synchronized wiki contained the validated CVP IS instructor lessons. This run established no additional reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-20 00:07 UTC
- Completed the next durable ordered rotation, clients
121–140; the already completed extra001–020rerun did not reset the cursor. - Reopened all
70distinct dossier URLs with inspected browser-equivalent HTTP200, ran40exact CPVA client/system searches and40client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search returned460complete rows (448exact-authority matches and46broad IT/digital candidates). Organization-first discovery resolved20identity-checked profiles and parsed all502exposed notice rows, including70broad candidates; no near-name identity was forced. - Reopened all three Pirkimo-ID detail routes for the
16procurement resources currently cited across the range (48/48HTTP200). Existing PAIS award evidence and patient-turning, software, social-care-system, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call tender evidence remain correctly bounded to the document stages already represented. - This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to
2026-08-20. - Registry state remains
290clients,522canonical systems,747observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, full validation, type checking, production build, registry/generated-route checks, all assigned URL checks, exact six-column/date checks andgit diff --checkpassed.corepack pnpmwas unavailable, so equivalentnpm run validateandnpm run buildscripts were used. Browser-equivalent local readback verified clients121,130and140, both registries and the raw client artifact. - Commit
c056b73088eea80d7989f598947c98c2b066a33dis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1304/ run100(build) reachedsuccess, including Pages publication. Public Pages returned the expected Keycloak/OAuth302; authorized deployed page-body readback was unavailable because this runtime has nokubectl,microk8sork3sservice-proxy client. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - The synchronized wiki contained the validated CVP IS instructor lessons. This run established no additional reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-19 22:09 UTC
- Completed the explicitly assigned ordered repeat review of clients
101–120; the extra001–020rerun atd62f4fde19e19209af94d49fdb5cda3c4dc1badedid not reset the ordered cursor. - Reopened all
78distinct current dossier URLs with inspected browser-equivalent HTTP200, ran50exact CPVA client/system searches and50client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. The exact-authority basic search returned47byte-exact authority rows and four broad keyword candidates. Organization-first discovery reviewed19identity-checked profiles across18clients, preserved both Vilniaus teatras „Lėlė“ profiles (16216and5822), forced no near-name identity for clients108or117, and parsed all220exposed notice rows, including30broad IT/digital candidates. - Reopened the order, notices and procurement-document routes and re-extracted the direct official PDFs for material resources
5869290,616558and8701921. Their bodies remain procurement/tender notices for video projectors, contact-centre software rental and short/800-number communications services—not awards or signed contracts. The contact-centre notice remains represented with bounded intended-procurement semantics; the other candidates do not support an additional system or contractor row. - This was a conservative no-new-claim review. No defensible new system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and
2026-08-19dossier/index dates were preserved. - Registry state remains
290clients,522canonical systems,747observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, full validation, type checking, production build, registry/generated-route checks, all assigned URL checks, exact six-column/date checks andgit diff --checkpassed.corepack pnpmwas unavailable, so the equivalent repositorynpm run validateandnpm run buildscripts were used. Browser-equivalent local HTTP readback verified representative clients101,109and120, both registries, both machine-readable registries and the raw client artifact. - The completed repeat review produced no source diff, so no empty commit was created. Existing
mainheada092dd4d957e2e02170dab48122cac6311f07372remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task1301(build) remainssuccess, including Pages publication. Public Pages returned the expected Keycloak/OAuth302; authorized deployed page-body readback was unavailable because this runtime has nokubectl,microk8sork3sservice-proxy client and the browser harness could not launch Chrome. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run reconfirmed those mechanics without establishing an additional reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-19 20:09 UTC
- Completed the ordered repeat review of clients
141–160, following the latest durable wiki cursor; the extra001–020rerun did not reset the ordered sequence. - Reopened all
59distinct dossier evidence URLs at inspected browser-equivalent HTTP200, ran70exact CPVA client/system searches and70client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. The exact-authority basic search returned336complete identity-matched rows with103broad IT/digital candidates. Organization-first discovery resolved15exact identity-checked profiles and parsed all184exposed notice rows, including68broad IT/digital candidates; no near-name profile was forced where the exact query returned none. - Opened all three public Pirkimo-ID detail routes for seven material resources and re-extracted the direct PDF bodies for the VTAIS, seabed/marine-cartography, public-health-monitoring, competency-platform and VAPRIS/VPREG notices. The July 2026 Visuomenės sveikatos stebėsenos informacinė sistema body remains an open tender (plus deadline amendment), not an award; the dossier already records that bounded procurement relationship. Newer ULSVIS/VSSIS basic-search rows exposed market-consultation metadata, while their detailed order view redirected to login and no public award/signed-contract body was available.
- This was a conservative no-new-claim review. No defensible new system, contractor, signed supplier engagement, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and
2026-08-19dossier/index dates were preserved. - Registry state remains
290clients,522canonical systems,747observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, full validation, type checking, production build, registry/generated-route checks, all assigned evidence URL checks, exact six-column/date checks andgit diff --checkpassed.corepack pnpmwas unavailable, so the equivalent repositorynpm run validateandnpm run buildscripts were used. Browser-equivalent local readback verified representative clients141,149and159, both registries, both machine-readable registries and the raw client artifact. - The completed repeat review produced no source diff, so no empty commit was created. Existing
mainheada092dd4d957e2e02170dab48122cac6311f07372remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task1301/ run99(build) remainssuccess, including Pages publication. Public Pages returned the expected Keycloak/OAuth302; authorized deployed page-body readback was unavailable because this runtime has nokubectl,microk8sork3sservice-proxy client. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run reconfirmed those mechanics without establishing an additional reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
161–180.
Previous scheduled rotation — 2026-08-19 18:49 UTC
- Completed the ordered review of clients
121–140, following the durable latest cursor after the completed101–120rotation; the extra001–020rerun did not reset the sequence. - Reopened all
70distinct dossier evidence URLs at inspected browser-equivalent HTTP200, ran40exact CPVA client/system searches and40client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. The exact-authority basic search returned460complete rows (448exact-authority matches and46broad IT/digital candidates). Organization-first discovery resolved20identity-checked profiles and parsed all502exposed notice rows, including70broad IT/digital candidates. - This was a conservative no-new-claim review. Existing patient-turning, computer/software, social-care-system, PAIS, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call records remained bounded to the procurement stage established by their opened bodies. No defensible new contractor, signed supplier engagement, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and
2026-08-19dossier/index dates were preserved. - Registry state remains
290clients,522canonical systems,747observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, full validation, type checking, production build, registry/generated-route checks, all assigned evidence URL checks, exact six-column/date checks andgit diff --checkpassed.corepack pnpmwas unavailable, so the equivalent repositorynpm run validateandnpm run buildscripts were used. Browser-equivalent local readback verified representative clients121,130and140, both registries, both machine-readable registries and the raw client artifact. - The completed review produced no source diff, so no empty commit was created. Existing
mainheada092dd4d957e2e02170dab48122cac6311f07372remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task1301/ run99(build) remainssuccess, including Pages publication. Public Pages returned the expected Keycloak/OAuth302; authorized deployed page-body readback was unavailable because this runtime has nokubectl,microk8sork3sservice-proxy client, and the browser harness could not launch Chrome. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run reconfirmed those mechanics without establishing an additional reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-19 12:11 UTC
- Completed the explicitly assigned ordered review of clients
101–120; the extra001–020rerun did not reset the ordered cursor. - Reopened all
66distinct dossier evidence URLs (65returned inspected browser-equivalent HTTP200; the documented Microsoft Bookings endpoint retained its automation-specific417), ran51exact CPVA client/system searches and79client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. The exact-authority basic search returned63complete rows, including59exact-authority matches and three broad IT/digital candidates. Organization-first discovery resolved20identity-checked profiles across19clients after bounded legal-form/typography variants, preserved both exact-equivalent Vilniaus teatras Lėlė profiles (16216and5822), excluded the near-name collision for client117, and parsed all196exposed notice rows. - Opened the order, notices and procurement-document routes plus the direct official PDFs for material resources
5869290,616558and8701921. Their bodies classify each as a tender/procurement notice rather than an award. The 2024-12-27 Jaunimo reikalų agentūra notice directly establishes intended procurement of contact-centre software rental for telephone client contact and operator monitoring/control; the new dossier row explicitly does not claim award, contract signature, supplier, delivery or production use. No defensible new contractor, production-hosting, original-kickoff, production-release or completion claim was found. - Registry state is now
290clients,522canonical systems,747observations and110contractor cards; Client→contractor and System→contractor links remain complete at212each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
16tests, full validation, type checking, production build, registry/generated-route checks, URL checks andgit diff --checkpassed.corepack/pnpmwas unavailable, so the equivalent repositorynpm run validateandnpm run buildscripts were used. Browser-equivalent local readback verified representative clients101,109and120, the newSYS-90B309892Ddossier, both registry overviews, both machine-readable registries and the raw client artifact. - Commit
a092dd4d957e2e02170dab48122cac6311f07372is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1301/ run99(build) reachedsuccess, including Pages publication. Public Pages returned the expected Keycloak/OAuth302; authorized deployed page-body readback was unavailable because this runtime has nomicrok8s,kubectlork3sservice-proxy client. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run applied them and established no additional reusable mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-19 10:08 UTC
- Completed the ordered review of clients
141–160, following the latest durable wiki cursor; the completed extra001–020rerun did not reset the ordered sequence. - Reopened all
59distinct dossier evidence URLs across77occurrences at inspected browser-equivalent HTTP200, ran65exact CPVA client/system searches and65client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS discovery. The exact-authority basic search returned335identity-matched rows and103broad IT/digital candidates; organization-first discovery resolved19profiles, preserved the absence of an exact profile for client155, and parsed all322exposed notice rows including133broad IT/digital candidates. - Opened all three public Pirkimo-ID detail routes—order metadata, notices and procurement documents—for seven material resources covering the existing VSS IS improvement, seabed/marine-cartography, ULSVIS/VSSIS security/support, and antivirus-support leads. Existing award, tender and market-consultation observations remained bounded to the stage established by their opened bodies; search-table statuses such as
Nustatytas laimėtojaswere not treated as award or supplier evidence. - This was a conservative no-new-claim review. No defensible new system, contractor, signed supplier engagement, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence levels, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to
2026-08-19. - Registry state remains
290clients,521canonical systems,746observations and111contractor cards; Client→contractor and System→contractor links remain complete at359each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
15tests, full validation, production build, registry/generated-route checks, exact six-column/date checks andgit diff --checkpassed.corepack pnpmwas unavailable, so the equivalent repositorynpm run validateandnpm run buildscripts were used. Local browser-equivalent HTTP readback verified representative clients141,149and159, the Systems and Contractors registries, and both machine-readable registries. - Commit
6c4df2981148b366f6c5183187d1b58eb1f4db85is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1292/ run97(build) reachedsuccess, including Pages publication. Public Pages returned the expected Keycloak/OAuth302; authorized deployed page-body readback was unavailable because this runtime has no Kubernetes service-proxy client and none of the documented in-cluster service names resolves. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run applied both and established no additional reusable mechanic or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
161–180.
Previous scheduled rotation — 2026-08-19 08:07 UTC
- Completed the ordered review of clients
121–140, following the latest durable wiki cursor; the completed extra001–020rerun did not reset the ordered sequence. Reopened all70distinct dossier evidence URLs at inspected browser-equivalent HTTP200, ran40exact CPVA client/system searches,40client/system contractor-procurement query-ladder searches, the newly instructed exact-authority basic CVP IS search, and identity-checked CVP IS organization-first discovery. - The basic CVP IS route returned
460complete rows across all derived result pages (448rows matched the exact searched authority; typography-form differences for clients134and136were not forced). Organization-first discovery resolved20identity-checked profiles and parsed all502exposed notice rows, including70broad IT/digital candidates. Following instructor lesson 2, all three public Pirkimo-ID detail routes—order data, notices and procurement documents—were opened for18material resources. Existing patient-turning, computer/software, social-care-system, PAIS, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call records remained bounded to the procurement stage established by their opened bodies. Basic-search statuses such asNustatytas laimėtojaswere retained as discovery metadata only: public attachments exposed conditions, specifications, ZIP/XML artifacts and draft contracts, while the internal awarding view required login and no opened public award or signed-contract body established a supplier. - This was a conservative no-new-claim review. No defensible new system, contractor, signed supplier engagement, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and
2026-08-19dossier/index dates were preserved. - Registry state remains
290clients,521canonical systems,746observations and111contractor cards; Client→contractor and System→contractor links remain complete at359each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
15tests, full validation, production build, registry/generated-route checks, exact six-column/date checks andgit diff --checkpassed. Corepack/pnpm was unavailable, so the equivalent repositorynpm run validateandnpm run buildscripts were used. Local browser-equivalent route checks verified representative clients, the PAIS system dossier and both machine-readable registries; the Chrome harness itself was unavailable. - The review produced no source diff, so no empty commit was created. Existing
mainhead8c8f6a876e96192e87686a6773237e1460b88fdfremains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task1275/ run96(build) remainssuccess, including Pages publication. Public Pages returned the expected Keycloak/OAuth302; authorized deployed page-body readback was unavailable because this runtime has no service-proxy client and neither known in-cluster hostname resolves. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - The synchronized channel wiki contained validated CVP IS instructor lessons 1 and 2; this run applied the exact-authority basic search and all three Pirkimo-ID detail routes across the assigned range. Live validation established one additional reusable clarification: the basic-search page's first
writePageSelection(...)argument is the result-page count, not the row count. The authoritativevssa-clientsreference now documents that trap at commite85df2916ce7ba74c0dc8fd6f01d2ddf2337fb0d; follow-up commit85d016431774d523816e36c62ee01fe9e2da58b4replaced the failing JavaScript checkout action with an exact-SHA shell checkout for the self-hosted runner. Local validation, remote ref/readback and exact-head Gitea Actions task1285/ run3041all passed. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-19 06:04 UTC
- Completed the explicitly assigned repeat review of clients
101–120; the completed extra001–020rerun did not reset the ordered cursor. Reopened all66distinct dossier evidence URLs (65returned inspected browser-equivalent HTTP200; the documented Microsoft Bookings endpoint retained its automation-specific417), ran51exact CPVA client/system searches and79client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. - CVP IS resolved
20profiles across19identity-checked clients after the documented exact-name and bounded legal-form/typography-variant checks, preserving both exact-equivalent Vilniaus teatras Lėlė profiles (16216and5822); no exact profile was forced for client117. All196exposed notice rows were parsed across complete pagination. Existing projector, contact-centre, register-maintenance, KVS, VASIS, DSS IS, software, server and network records remained bounded to the procurement stage established by their opened sources. - This was a conservative no-new-claim repeat review. No defensible new system, contractor, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and
2026-08-19dossier/index dates were preserved. - Registry state remains
290clients,521canonical systems,746observations and111contractor cards; Client→contractor and System→contractor links remain complete at359each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
15tests, full validation, production build, registry/generated-route checks, exact six-column/date checks andgit diff --checkpassed.corepack pnpmwas unavailable, so the equivalent repositorynpm run validateandnpm run buildscripts were used. Browser-equivalent local readback verified clients101,110and117, source/raw content and both machine-readable registries. - The repeat review produced no source diff, so no empty commit was created. Existing
mainhead8c8f6a876e96192e87686a6773237e1460b88fdfremains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task1275/ run96(build) remainssuccess, including Pages publication. Public Pages returned the expected Keycloak/OAuth302; authorized deployed page-body readback was unavailable because this runtime has no service-proxy client and neither known in-cluster hostname resolves. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - No newer CVP IS instructor guidance was present in the latest
100live channel messages. Live work reconfirmed the documented exact-identity, legal-form/typography-variant, duplicate-profile, complete-pagination and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritativevssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-19 04:04 UTC
- Completed the explicitly assigned repeat review of clients
101–120; the completed extra001–020rerun did not reset the ordered cursor. Reopened all66distinct dossier evidence URLs (65returned inspected browser-equivalent HTTP200; the documented Microsoft Bookings endpoint retained its automation-specific417), ran51exact CPVA client/system searches and79client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. - CVP IS resolved
20profiles across19identity-checked clients, preserving both exact-equivalent Vilniaus teatras Lėlė profiles (16216and5822); no exact profile was forced for client117. All196exposed notice rows were parsed across complete pagination. Existing projector, contact-centre, register-maintenance, KVS, VASIS, DSS IS, software, server and network records remained bounded to the procurement stage established by their opened sources. - This was a conservative no-new-claim repeat review. No defensible new system, contractor, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and
2026-08-19dossier/index dates were preserved. - Registry state remains
290clients,521canonical systems,746observations and111contractor cards; Client→contractor and System→contractor links remain complete at359each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
15tests, full validation, production build, registry/generated-route checks, exact six-column/date checks andgit diff --checkpassed.corepack pnpmwas unavailable, so the equivalent repositorynpm run validateandnpm run buildscripts were used. Browser-equivalent local readback verified three client routes, the DSS IS system route, the UAB „Novian PRO“ contractor route and both machine-readable registries; the Chrome harness itself was unavailable. - The repeat review produced no source diff, so no empty commit was created. Existing
mainhead8c8f6a876e96192e87686a6773237e1460b88fdfremains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task1275/ run96(build) remainssuccess, including Pages publication. Public Pages returned the expected Keycloak/OAuth302; authorized deployed page-body readback was unavailable because this runtime has no service-proxy client and neither known in-cluster hostname resolves. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - No newer CVP IS instructor guidance was present in the latest
100live channel messages. Live work reconfirmed the documented exact-identity, legal-form/typography-variant, duplicate-profile, complete-pagination and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritativevssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-19 02:08 UTC
- Completed the explicitly assigned review of clients
101–120; the completed extra001–020rerun did not reset the ordered cursor. Reopened all66distinct dossier evidence URLs (65returned inspected browser-equivalent HTTP200; the documented Microsoft Bookings endpoint retained its automation-specific417), ran51exact CPVA client/system searches and79client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. - CVP IS resolved
20profiles across19identity-checked clients, preserving both exact-equivalent Vilniaus teatras Lėlė profiles (16216and5822); no exact profile was forced for client117. All196exposed notice rows were parsed across complete pagination. Existing projector, contact-centre, register-maintenance, KVS, VASIS, DSS IS, software, server and network records remained bounded to the procurement stage established by their opened sources. - This was a conservative no-new-claim review. No defensible new system, contractor, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to
2026-08-19. - Registry state remains
290clients,521canonical systems,746observations and111contractor cards; Client→contractor and System→contractor links remain complete at359each. Statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
15tests, full validation, production build, registry/generated-route checks, exact six-column/date checks andgit diff --checkpassed.corepack pnpmwas unavailable, so the equivalent repositorynpm run validateandnpm run buildscripts were used. Browser-equivalent local readback verified three changed client routes, a derived system route, a contractor route and both machine-readable registries. - Commit
8c8f6a876e96192e87686a6773237e1460b88fdfis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1275/ run96(build) reachedsuccess, including Pages publication. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - No newer CVP IS instructor guidance was present in the latest
100channel messages. Live work reconfirmed the documented exact-identity, legal-form/typography-variant, duplicate-profile, complete-pagination and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritativevssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-19 00:03 UTC
- Completed the ordered review of clients
121–140; the completed extra001–020rerun did not reset the ordered cursor. Reopened all70distinct dossier evidence URLs, reran exact CPVA client/system searches and contractor query ladders, and repeated identity-checked CVP IS organization-first discovery. - CVP IS resolved
19current or exact-equivalent identities, including successor Priėmimo ir integracijos agentūra for client130; no exact registry result was forced for client134. All exposed notice pages were reviewed. Existing PAIS, mobile-application, camera-system, Šeimos kortelė, legal-information database and employee-call-system evidence remained correctly bounded to its source procurement stage. - This was a conservative no-new-claim review. No defensible new system, contractor, hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to
2026-08-19. - Registry state remains
290clients,521canonical systems,746observations and111contractor cards; statuses remain79 researched,196 partial,15 no-public-evidenceand0 pending. - All
15tests, full validation, production build, registry/generated-route checks, six-column/date checks, all70evidence URL checks andgit diff --checkpassed.corepack pnpmwas unavailable, so the equivalent repositorynpm run validateandnpm run buildscripts were used. Browser-equivalent local readback verified three changed client routes, two derived system routes and both machine-readable registries. - Commit
0464bb7b920883cba4f205bd53c6e71b5d21842ais onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1274/ run95(build) reachedsuccess, including publication. Public Pages reached the expected Keycloak/OAuth302boundary; authorized deployed page-body readback was unavailable because this runtime has nokubectl,microk8sork3sclient, so no content claim was made from the login response. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - No reusable CVP IS mechanic or pitfall beyond the current skill guidance was established, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-18 22:06 UTC
- Completed the explicitly assigned review of clients
101–120; the additional completed001–020rerun did not reset this range. Reopened all66distinct current dossier evidence URLs (77occurrences), ran65exact CPVA client/system searches and65client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. - CVP IS produced
20identity-checked profiles across19clients, preserving both exact-equivalent Vilniaus teatras Lėlė profiles (16216and5822) and bounded current/legal-form variants for clients108,110,111and112. Client117still had no defensible exact profile, so the similarly named institution was not forced. All196exposed notice rows were parsed across complete pagination; current projector, contact-centre, register-maintenance, software, server and network leads did not establish a defensible additional client-specific claim beyond the evidence already represented. - This was a conservative no-new-claim review. All supported rows, statuses, confidence levels, dates and explicit gaps were preserved; no tender or equipment notice was promoted to an award, signed supplier engagement, delivery, production use, hosting, completion, original kickoff or production release.
- Generated state remains
290clients,521canonical systems,746observations and111contractor cards. Client→contractor and system→contractor links remain complete at359each; dossier statuses remain79 researched,196 partialand15 no-public-evidence. - All
15repository tests, full validation, production build, registry/generated-route checks, six-column/date checks, all66evidence URL checks andgit diff --checkpassed.corepack pnpmwas unavailable in this cron runtime, so the equivalent repositorynpm run validateandnpm run buildscripts were executed. Local browser-equivalent HTTP checks verified clients101and110, the DSS IS system dossier, the UAB „Novian PRO“ contractor card, claim-level links, References indexes, machine-readable registry data and explicit unknown lifecycle fields; the browser harness could not launch Chrome. - The completed review produced no source diff, so no empty commit was created. Existing
mainhead3f1efc09fa840c625f0fecf3a8773e07d0911ae6remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task1265remainssuccess, including Pages publication. Public Pages reached the Keycloak/OAuth302boundary; authorized deployed page-body readback was unavailable because this runtime has nokubectlormicrok8sclient, so no content claim was made from the login response. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, legal-form/typography-variant, duplicate-profile, complete-pagination and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-18 20:11 UTC
- Completed the ordered review of clients
161–180, following the latest durable wiki cursor; the already completed extra001–020rerun did not reset the range. Reopened all56distinct current dossier evidence URLs, ran49distinct exact CPVA client/system searches and54client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. - CVP IS produced
17identity-checked profiles, including both exact-equivalent Lietuvos įtraukties švietime centras profiles (2903and2876); no near-name profile was forced. The profile-derived lists exposed75complete notice rows. Material licence, website-creation and digital-methodical-tool tender bodies were opened as direct PDFs and classified from their text. - Added one bounded observation to client
179: an opened October 2025 tender states that Lietuvos istorijos institutas sought renewals for its existing Veeam, TeamViewer Corporate, ESET Protect Complete Cloud, ArcGIS, GraphPad, AutoCAD LT, Adobe Acrobat Pro, FortiGate UTP and source-labelledM365 Business Standartlicence portfolio. The notice proves current licence possession and planned renewal procurement only; it does not identify selected suppliers, signed contracts, delivery, hosting, original kickoff or a production release. Other dossiers preserved their supported rows, statuses, confidence and explicit gaps. - Generated state advanced from
520to521canonical systems and from745to746observations; contractor cards remain111. New deterministicSYS-F8EB1084B0retains production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at359each; dossier statuses remain79 researched,196 partialand15 no-public-evidence. - All
15repository tests, full validation, production build, registry/generated-route checks, exact six-column/date checks, evidence URL checks andgit diff --checkpassed.corepack pnpmwas unavailable in this cron runtime, so the equivalent repositorynpm run validateandnpm run buildscripts were executed. Local browser-equivalent HTTP checks verified client179, the new derived system dossier, claim-level citation, machine-readable registry record and explicit unknown infrastructure/lifecycle fields. - Final commit
3f1efc09fa840c625f0fecf3a8773e07d0911ae6is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1265(run3022) reachedsuccess, including Pages publication. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - No newer human directive or CVP IS instructor guidance was present in the latest
100live channel messages. Live work reconfirmed the documented organization-first, exact-identity, duplicate-profile, complete-row, direct-PDF and strict tender-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritativevssa-clientsskill required no update. - Next ordered dossier rotation:
181–200.
Previous scheduled rotation — 2026-08-18 18:21 UTC
- Completed the ordered review of clients
141–160, following the latest durable wiki cursor; the already completed extra001–020rerun did not reset the range. Reopened all59distinct current dossier evidence URLs (77occurrences), ran65exact CPVA client/system searches and65client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. - CVP IS produced
19identity-checked profiles; no near-name profile was forced for client155. All322exposed published-notice rows were parsed across complete pagination, including133broad IT/digital-title leads. The current counts and candidates matched the completed same-day review; tender, voluntary ex-ante and award bodies already represented in the dossiers retained their exact procurement-stage semantics. - This was a conservative no-new-claim review. Every current evidence URL returned inspected browser-equivalent HTTP
200content, and the current official, CPVA, contractor-search and procurement sources established no defensible additional client-specific system, contractor, production-hosting, original-kickoff or production-release claim. All twenty dossier rows, statuses, confidence levels, explicit unknowns, gaps and2026-08-18dates were preserved. - Generated state remains
290clients,520canonical systems,745observations and111contractor cards. Client→contractor and system→contractor links remain complete at359each; dossier statuses remain79 researched,196 partialand15 no-public-evidence. - All
15repository tests, full validation, production build, registry/generated-route checks, exact six-column/date checks, all evidence URL checks andgit diff --checkpassed.corepack pnpmwas unavailable in this cron runtime, so the equivalent repositorynpm run validateandnpm run buildscripts were executed. Local browser-equivalent route checks verified clients141,147and154, two derived system dossiers, claim-level markers, machine-readable registry records and explicit unknown infrastructure/lifecycle fields. - The completed review produced no source diff, so no empty commit was created. Existing
mainhead3fc30f514db8d6ea0b2a69263dd66d4847b60cf2remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task1263remainssuccess, including Pages publication. Public Pages reached the Keycloak/OAuth boundary. Authorized deployed page-body readback was unavailable because this runtime has nokubectl, neither documented backend hostname resolves, and no content claim was made from the login page. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, exact-identity, complete-row, pagination, direct-PDF and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
161–180.
Previous scheduled rotation — 2026-08-18 16:14 UTC
- Completed the ordered review of clients
121–140, following the latest durable wiki cursor; the already completed extra001–020rerun did not reset the range. Reopened all70distinct current dossier evidence URLs, ran40exact CPVA client/system searches and40client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. - CVP IS produced one identity-checked current, predecessor/successor or documented typography-variant profile for every client. All
502exposed notice rows were parsed, including70broad IT/digital-title leads. Six material bodies were downloaded as direct PDFs and classified from their text; a patient-turning mattress system and an unnamed generic software package were not forced into the information-system registry. - Added four bounded planned-procurement observations. Client
130now records the predecessor's December 2024 smartphone-application creation/implementation/maintenance tender and the successor agency's June 2026 video-camera, recording and switching-equipment tender. Client135now records a February 2025 Šeimos kortelė website-maintenance tender and a January 2026 planned 12-month legal-information search-system/database subscription. None establishes an award, selected supplier, signed contract, delivery, active subscription, production use, hosting, completion or release; contractors remainNot publicly identified. - All other dossier rows, statuses, confidence levels and unresolved gaps were preserved while all twenty dossier/index dates advanced to
2026-08-18. Generated state advanced from516to520canonical systems and from741to745observations; contractor cards remain111. NewSYS-B102E857D5,SYS-3BD89B3105,SYS-A82F69643FandSYS-A41510A0DDretain production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at359each. - All
15repository tests, full validation, production build, registry/generated-route checks, six-column/date checks, all70evidence URL checks andgit diff --checkpassed. Corepack/pnpm was unavailable in this cron runtime, so the equivalent repositorynpm run validateandnpm run buildscripts were executed. Local browser-equivalent HTTP checks verified clients130and135, all four new system dossiers, claim-level links, References indexes, machine-readable registry records and explicit unknown lifecycle fields; the cron browser harness could not launch Chrome. - Commit
4444c51b321cd1d240260ac7c82a23538c017433is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1262(run3019) reachedsuccess, including Pages publication. Public Pages reached the expected Keycloak boundary. Authorized deployed page-body readback was not available because this runtime has nokubectl/service-proxy client anddocs.lego-cloud.eudid not resolve; no content claim was made from the login page. - No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, legal-form/typography-variant, successor, complete-row, pagination, direct-PDF and strict tender-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-18 14:13 UTC
- Completed the explicitly assigned ordered review of clients
101–120; the already completed additional001–020rerun did not reset this cursor. Reopened all66distinct current dossier evidence URLs, ran51exact CPVA client/system searches and79client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. - CVP IS yielded
20identity-checked profiles across19clients, including both exact-equivalent Vilniaus teatras Lėlė profiles (16216and5822) and bounded current/legal-form variants for clients108,110,111, and112. Client117still had no defensible exact profile, so the similarly named institution was not forced. All100exposed notice rows were reviewed; the projector/equipment and other current leads did not establish an additional award, supplier engagement, delivery, hosting, completion or production release. - This was a conservative no-new-claim review: all supported rows, statuses, confidence levels and unresolved gaps were preserved, while all twenty dossier/index dates advanced to
2026-08-18. Generated state remains290clients,516canonical systems,741observations and111contractor cards; client→contractor and system→contractor links remain complete at359each. - All
15repository tests, Corepack-wrapped pnpm validation/build, registry/generated-route checks, six-column/date checks, all66evidence URL checks andgit diff --checkpassed. Local browser-equivalent HTTP checks verified clients101and110, the DSS IS system dossier, UAB „Novian PRO“ contractor card, claim-level links, References indexes and explicit unknown lifecycle fields. The cron browser harness could not launch Chrome. - Research/dossier commit
767b18acc7259aaeda31591c0ca283d9d5ecd1efwas followed by runner-hardening commiteb99420af8280f2bcb186a8c5cdc3b0c94c9a360, which isolated CI in a stable Node container after the inheritedubuntu-latestimage repeatedly crashedcurl, Python and Node. Local/remote ref equality and authenticated source readback passed. Exact-head Gitea Actions task1261(run3018) reachedsuccess, including Pages publication. Public Pages reached the expected Keycloak boundary; authorizedpages/pagesservice-proxy readback verified deployed client101and the DSS IS system page with the new review date, canonical links, References index and explicit unknown lifecycle fields. - No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, legal-form/typography-variant, duplicate-profile, complete-row and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-18 09:40 UTC
- Completed the ordered review of clients
181–200, following the durable wiki cursor rather than repeating the already completed101–120range. Reopened all60distinct current dossier evidence URLs (77occurrences), ran52exact CPVA client/system searches and52client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. - CVP IS produced
15identity-checked current or official-successor profiles with profile-derived(authorityId, orgGroupId)tuples. No near-name profile was forced for the remaining clients. All826exposed published-notice rows were parsed across complete pagination, including130broad digital/IT-title leads; material MUKIS, STEAM, KELTAS and IPBR bodies were opened as direct PDFs and classified from their text. - Added bounded planned-procurement evidence to client
183: current legal successor LINEŠA tendered MUKIS qualification-program content digitization/deployment services in May 2026 and STEAM information-system modernization/functionality expansion in December 2025. Both are tender-stage observations only; selected suppliers, signed contracts, delivery, hosting, completion and production release remain unproved. - Added two direct contract-award findings for client
190. UAB „Asseco Lietuva“ won KELTAS software maintenance/development contract56917, signed2026-06-04forEUR 260,000, and IPBR software maintenance/development contract58867, signed2026-06-23forEUR 70,000. Official NŠA pages independently establish each system's purpose and NŠA relationship; neither award is presented as original development, production hosting, acceptance, completion or production release. - All other dossiers retained their supported rows, statuses, confidence levels and unresolved gaps while their completed-review dates advanced to
2026-08-18. Generated state advanced from507to510canonical systems and from732to735observations; contractor cards remained108. NewSYS-8094196CBD,SYS-CA136E0290andSYS-F2452BA519retain production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at350each. - All
15repository tests, full validation, production build, registry/generated-route checks, six-column/date checks, all evidence URL checks andgit diff --checkpassed. Corepack was unavailable in the cron runtime, so the already installed dependencies were exercised through the equivalentnpm run validateandnpm run buildscripts. The build verified290client,510system and108contractor routes,735observations and296raw artifacts. Local browser-equivalent route checks verified clients183and190, all three new system pages and the established UAB „Asseco Lietuva“ contractor card with claim-level links, References indexes and explicit unknown lifecycle fields; Chrome itself could not be launched by the cron browser harness. - The research commit was
0e0e4ea0320414a061c2eb1ce572f06346621fe1. After the self-hosted runner began crashing every JavaScript action under Node 20, four narrow follow-up commits replaced JavaScript setup actions with an authenticated exact-SHA shell checkout, checksum-verified Node22.23.2, and the documented trusted pnpm shim. Final commitd1c311889c8287fc3f91b295db5ffbd1009a183dis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1251(build, run3012) reachedsuccess, including Pages publication. - Live investigation reconfirmed the documented organization-first, exact-successor, complete-row, pagination, direct-PDF, award and tender-stage mechanics. No new reusable research procedure or portal pitfall was established, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
201–220.
Previous scheduled rotation — 2026-08-18 02:29 UTC
- Completed the ordered review of clients
161–180, following the latest durable cursor rather than repeating the already completed101–120range. Reopened56distinct current dossier evidence URLs (75occurrences), ran52exact CPVA client/system searches and52readable Bing client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. - CVP IS produced
18identity-checked profiles. Client180retained two separate exact-equivalent profiles (2903and2876) rather than silently selecting one; no near-name profile was forced for clients without an exact result. All162exposed published-notice rows were parsed, including43broad IT/digital-title leads, and material bodies were opened as direct PDFs and classified from their text. - Added two bounded planned-procurement observations. Client
161tendered metadata-tool installation, data modelling and Central Metadata Repository integration for the „Duomenų valdymo modelio sukūrimas“ project. Client162directly states that it uses ArcGIS Enterprise and tendered perpetual Enterprise/Professional-user licences, update assurance and 60 months of technical support. Neither tender proves an award, selected supplier, signed contract, delivery, completion, hosting or production release; contractors remainNot publicly identified. - Deepened client
179's existing „Atvira istorija“ row with the opened 2025 tender for creation and installation of the institute-administered portal and its content-management module. Current portal operation is independently evidenced, but the tender does not establish a selected supplier, signed contract or delivery. Other dossiers retained their rows, statuses and confidence while all check dates advanced to2026-08-18. - Generated state advanced from
505to507canonical systems and from730to732observations; contractor cards remained108. New deterministicSYS-18E23152F2andSYS-6F6716F88Cretain production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at348each. - All
15repository tests, pinned-pnpmvalidate, pinned-pnpmbuild, registry/generated-route checks, six-column/date checks andgit diff --checkpassed. Corepack was unavailable, so pnpm9.15.9was executed directly through Node. Browser-equivalent checks returned inspected HTTP200content for55of56distinct URLs; the remaining official KPMPC SMIS page returned the expected302to the currently unreachablewww.smis.lt, matching the dossier's explicit availability gap. The build verified290client,507system and108contractor routes,732observations and296raw artifacts. Local rendered-route checks verified clients161,162,179and both new system pages with claim-level links, References indexes and explicit unknown lifecycle fields; Chrome itself could not be launched by the cron browser harness. - Commit
9a3b62817dabb9befb1adb1d77141c8b91f236d2is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1204(build) reachedsuccess, including Pages publication. The public changed route returned the expected Keycloak/OAuth302; authorizedpages/pagesKubernetes service-proxy readback verified deployed clients161and162plus both new system pages with exact changed-content markers, References indexes and explicit unknown lifecycle fields. - No newer CVP IS instructor guidance was present in the latest live channel readback. Live work reconfirmed the documented organization-first, duplicate-profile, complete-row, direct-PDF and strict tender-stage mechanics without exposing a reusable new procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
181–200.
Previous scheduled rotation — 2026-08-18 00:14 UTC
- Completed the ordered review of clients
141–160, following the latest durable cursor rather than repeating the already completed101–120range. Reopened all59distinct current dossier evidence URLs (105occurrences), ran60exact CPVA client/system searches and60client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. - CVP IS produced
19identity-checked profiles; no near-name profile was forced for client155. All322exposed published-notice rows were parsed, including133broad IT/digital-title leads. Material award and voluntary ex-ante bodies were opened as direct PDFs, verified and classified from their text. - Added six bounded supplier findings. Client
142records Starkodas as VTAIS design, creation, deployment and integration supplier under contract19814, signed2025-05-13for aEUR 230,000offer. Client147records UAB „Asseco Lietuva“ for Vektra operational maintenance/software modification and Avilys maintenance/development, plus UAB „Hnit-Baltic“ for ArcGIS GeoEvent/Staging Server licences and support. Client154records UAB „Hnit-Baltic“ for RSC GIP component creation and UAB „Laborama“ for MetaSystems cytogenetic-system modernization/expansion. Its RADIS record names ENVINET GmbH only as the intended direct-award supplier from a voluntary ex-ante notice; contract signature, delivery and production use remain unproved. - Preserved all other dossier rows, statuses and confidence levels while advancing review dates to
2026-08-18. The RSC register/RSIS maintenance documents remain tender-stage evidence only; no cloud, hosting, original kickoff, completion, acceptance or production release was inferred. - Generated state advanced from
500to505canonical systems, from725to730observations and from106to108contractor cards. Five new deterministicSYS-*records retain production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at348each. - All
15repository tests,pnpm validate,pnpm build, registry/generated-route checks, all59evidence URL checks andgit diff --checkpassed. Corepack was unavailable, so the pinned pnpm9.15.9shim was used. The build verified290client,505system and108contractor routes,730observations and296raw artifacts. Local rendered-route checks verified clients142,147,154, VTAIS, RADIS and the UAB „Laborama“ contractor page with claim-level links and References indexes; Chrome itself could not be launched by the cron browser harness. - Commit
8a136a6176d4726cc6a286e0fa9f3a504c5cc12cis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1165(build) reachedsuccess, including Pages publication. Public routes reached the expected Keycloak boundary; authorizedpages/pagesKubernetes service-proxy readback verified deployed client142, client154and RADIS system page bodies with exact changed-content markers and References indexes. - No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, complete-row, direct-PDF, award and voluntary-ex-ante stage mechanics without exposing a reusable new procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
161–180.
Previous scheduled rotation — 2026-08-17 22:17 UTC
- Completed the ordered review of clients
121–140. Reopened all63distinct pre-existing dossier evidence URLs (86occurrences), ran33exact CPVA client/system searches and122client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. - CVP IS exact, documented legal-form/typography-variant or authoritative successor-name routes produced one identity-checked profile for every client. All
140exposed published-notice rows were parsed. Material digital leads were opened as direct PDFs and classified from their bodies; the retained findings remain bounded to their exact tender stages. - Added three planned-procurement observations. Client
130's authoritative successor, Priėmimo ir integracijos agentūra, published August 2026 tenders for 36-month IP-telephony services and a satellite-broadband equipment kit. Client136published a January 2026 tender for an integrated digital staff-call, resident-safety and monitoring system with hardware, software, installation, configuration, testing and training. None proves an award, selected supplier, signed contract, delivery, implementation, production use, hosting, completion or release; contractors remainNot publicly identified. - Preserved all other dossier rows, statuses and confidence levels while advancing the reviewed dates to
2026-08-17. The Jurdaičiai multimedia/patient-equipment notices, Marijampolė care-system creation notices, Šeimos kortelė maintenance notice, Strūnos call-system notice and other records remain bounded to their exact procurement stages. - Generated state advanced from
497to500canonical systems and from722to725observations; contractor cards remained106. NewSYS-FAC512FBC9,SYS-7E154BC591andSYS-9D86A66A9Dretain deterministic identities and explicit unknowns for production hosting, original kickoff and latest production release. Client→contractor and system→contractor links remain complete at341each. - All
15repository tests,pnpm validate,pnpm build, registry/generated-route checks andgit diff --checkpassed.corepackwas unavailable on this host, so the pinned pnpm9.15.9CLI was executed directly through Node. Evidence verification covered all66distinct changed-range URLs at inspected HTTP200; every dossier table retained exactly six cells. The build verified290client,500system and106contractor routes,725observations and296raw artifacts. Browser-equivalent local HTTP checks verified clients130and136, both new derived system routes, claim-level markers and References indexes; Chrome itself could not be launched in the cron browser harness. - Commit
c40128a030e120d1fc3a1d1da6f39a37f17a11b4is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1150(build) reachedsuccess, including Pages publication. Public routes reached the expected Keycloak boundary; authorizedpages/pagesKubernetes service-proxy readback verified the deployed client130, client136and digital staff-call system page bodies with exact changed-content markers. - No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented successor-name, legal-form/typography-variant, complete-row, direct-PDF and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
141–160.
Previous scheduled rotation — 2026-08-17 20:21 UTC
- Completed the ordered review of clients
101–120. Reopened all64distinct pre-existing dossier evidence URLs (78occurrences), ran51exact CPVA client/system searches and81client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. - CVP IS exact or bounded legal-name/form variants produced
19identity-checked profiles for18clients; the two exact-equivalent Vilniaus teatras Lėlė profiles (16216and5822) were kept separate. No exact profile was forced for clients108or117. All192exposed published-notice rows were parsed, including44IT/digital-title leads, and material award bodies were opened and classified directly. - Added two direct contract-award findings for client
110. VDI's Kokybės vadybos informacinė sistema (KVS) records UAB „Novian PRO“ as maintenance/modification supplier under contract30383, signed2025-10-01, winning offerEUR 99,300. Virtualios atestacijos sistema (VASIS) records UAB "Vextur" as maintenance, modification and remote-exam integrity-service supplier under contract21386, signed2025-06-02forEUR 75,183.58. - Preserved all other dossier rows, statuses and confidence levels while advancing the reviewed dates to
2026-08-17. The Valstybinis jaunimo teatras projector notice, Jaunimo reikalų agentūra contact-centre/telecommunications tenders and other notices remain bounded to their exact procurement stages; none was promoted to award, supplier engagement, delivery, hosting, kickoff or release evidence. The Microsoft Bookings endpoint still returned automation-specific417; the opened official Centre page remains the institution-relationship evidence, so no broader exception or hosting claim was introduced. - Generated state advanced from
495to497canonical systems,720to722observations and105to106contractor cards. NewSYS-07B92C746C,SYS-DF9C72A71DandCTR-95DBE306A7retain deterministic identities; both new systems keep production hosting, original kickoff and latest production release explicitly unknown. Client→contractor and system→contractor links are complete at341each. - All
15repository tests, Corepack-wrappedpnpm validate, Corepack-wrappedpnpm build, registry/generated-route checks andgit diff --checkpassed. Evidence verification covered all66distinct changed-range URLs:65returned inspected HTTP200content and the Microsoft Bookings endpoint retained its documented automation-specific417handling; every dossier table retained exactly six cells. The build verified290client,497system and106contractor routes,722observations and296raw artifacts. Browser-equivalent local route checks verified client110, both new system dossiers, the UAB "Vextur" contractor card, claim-level links and References indexes. - Commit
96295e4bed73112028e1434708849bfdf2ea70f9is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1134(build) reachedsuccess, including Pages publication. Public routes reached the expected Keycloak boundary; authorizedpages/pagesKubernetes service-proxy readback verified the deployed client110, VASIS system and UAB "Vextur" contractor page bodies with exact changed-content markers. - No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented legal-name-variant, duplicate-profile, complete-row, pagination, direct-PDF and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
121–140.
Previous scheduled rotation — 2026-08-17 18:20 UTC
- Completed the explicitly requested additional review of clients
001–020after the registry-table fix. Reopened all54distinct current dossier evidence URLs (86per-dossier occurrences), ran46exact CPVA client/system searches and78per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. - CVP IS exact or documented legal-form/case-equivalent profiles were opened for
19clients; client010still had no exact profile and no near-name result was forced. Client007returned two exact-equivalent profile IDs (2367and2871), so both profile-derived lists were kept separate and reviewed. All736complete published-notice rows exposed across the20profiles were parsed and material award bodies were opened directly. - Added three direct contract-award findings. Client
001now records the Chancellery's DIVIS and UAB „Asseco Lietuva“ maintenance/development contract23315(signed2025-07-22, offer valueEUR 70,200). Client005now records UAB DIGMATIX Lithuania as the VBAMS licence-update supplier under contract14P-25/62(signed2025-10-24,EUR 539,639), while the separate 2026 notice remains bounded as intended procurement only. Client007now records NEVDA as the SPIS maintenance, development and consulting supplier under contract41453(signed2025-12-15, offer valueEUR 2,889,298.50). - Preserved conservative unknowns for cloud/hosting, original delivery kickoff, latest production release, later-tender suppliers and other portfolio suppliers. No tender, consultation, bid or publication date was promoted to award, signature, delivery, hosting, kickoff or release evidence.
- Generated state advanced from
494to495canonical systems,719to720observations and104to105contractor cards. NewSYS-C500290F8Apreserves hosting, original kickoff and latest release as explicitly unknown; generated Client→System→Contractor links and references remained complete. - All
15repository tests,corepack pnpm validate(543assertions),corepack pnpm build, registry/generated-route checks, all changed-dossier evidence URL checks andgit diff --checkpassed. Local production-build browser acceptance verified client001, the new DIVIS system dossier, UAB „Asseco Lietuva“ contractor linkage, exact source links and the generated References index; rendered client005, client007and UAB DIGMATIX Lithuania markers were also verified. - Commit
d62f4fde19e19209af94d49fdb5cda3c4dc1badeis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task1119(build) reachedsuccess, including the repository's Pages publication workflow. Authorized deployed page-body readback could not be claimed from this cron runtime because the service hostname did not resolve and the documented backend address had no network route. Unrelated.pptx_improve_run/andpptx_improvement_run_20260814/directories remained untracked and excluded. - No newer CVP IS instructor guidance was present in the synchronized channel state. The run reused already documented exact-identity, duplicate-profile, pagination, direct-PDF and procurement-stage mechanics without exposing a new reusable method, so the authoritative
vssa-clientsskill required no update. - Next ordered dossier rotation:
101–120. The additional001–020rerun is complete and does not reset the ordered cursor. - Scheduler diagnosis: this run exhausted Hermes's
60tool-calling iterations after publication and wiki update. The cron failure summarizer scanned the successful report text, matched words such asauthenticated, and mislabeled the iteration-limit failure as a provider authentication error. OpenAI Codex authentication remained healthy. Job88833e00b4a2was restored from the temporary 20-minute cadence to0 */2 * * *, the stale one-time-rerun directive was removed, and earlier delivery cutoffs were added.
Previous scheduled rotation — 2026-08-17 17:51 UTC
- Completed the ordered rotation of clients
081–100. Reopened all81distinct current dossier evidence URLs, ran73exact CPVA client/system searches and142per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. Exact or documented legal-form/typography-variant profiles and their notice lists were opened for19clients; no near-name profile was forced for client091, and all186published-notice rows exposed by the lists were parsed, including9IT/digitalization-title leads. - No defensible new client-specific system, contractor, production-hosting, original-kickoff or production-release claim was established beyond the evidence published earlier today. The digital-exhibition, CCTV, digitization-equipment and website-update notices remain bounded to their exact tender stages; no planned procurement was promoted to award, supplier engagement, delivery, hosting, completion or release. Existing rows, statuses, confidence levels, gaps and
2026-08-17dossier dates were conservatively preserved. - Generated state remains
290clients,494canonical systems,719observations and104contractor cards, with complete336client→contractor and336system→contractor links. Statuses remain79 researched,195 partialand16 no-public-evidence; explicit hosting, original-kickoff and latest-release unknowns remain unchanged. - All
15repository tests,corepack pnpm validate,corepack pnpm build, registry/generated-route checks, all evidence URL checks andgit diff --checkpassed. The build verified290client,494system and104contractor routes,719observations and296raw artifacts. The two Nacionalinis Kauno dramos teatras URLs that failed the local CA chain were opened successfully in a browser-equivalent browser session. - This completed conservative no-new-claim review produced no source diff, so no empty commit was created. Existing
mainhead6c06ec27733066a6af8474af8eb0dbfe12d85ad1remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task1102remainssuccess, including Pages publication. The public routes return the expected Keycloak/OAuth302; authorizedpages/pagesservice-proxy readback verified the homepage, client081, its LKT IS system dossier and its raw dossier artifact. Unrelated PPTX-improvement directories remain untracked and excluded. - No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented exact-identity, legal-form-variant, complete-row and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next dossier rotation:
101–120.
Previous scheduled rotation — 2026-08-17 17:25 UTC
- Completed the ordered rotation of clients
061–080. Reopened all66distinct current dossier evidence URLs (97citation occurrences), ran81exact CPVA client/system searches and122per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. Exact profiles and profile-derived notice lists were opened for10clients; no near-name profile was forced, and all58published-notice rows exposed by those lists were parsed, including18IT/digitalization-title leads. - No defensible new client-specific system, contractor, production-hosting, original-kickoff or production-release claim was established beyond the evidence already published earlier today. The current ELVIS, exhibition-design and digitization-equipment notices remained bounded to their exact tender/award stages; no planned procurement was promoted to award, supplier engagement, delivery, hosting, completion or release. Existing rows, statuses, confidence levels, gaps and
2026-08-18dossier dates were conservatively preserved. - Generated state remains
290clients,494canonical systems,719observations and104contractor cards, with complete336client→contractor and336system→contractor links. Statuses remain79 researched,195 partialand16 no-public-evidence; explicit hosting, original-kickoff and latest-release unknowns remain unchanged. - All
15repository tests,corepack pnpm validate,corepack pnpm build, registry/generated-route checks, all66browser-equivalent evidence URL checks andgit diff --checkpassed. The build verified290client,494system and104contractor routes,719observations and296raw artifacts. Local browser acceptance confirmed client076, its MB „Baukas“ contractor relationship and references, zero horizontal overflow, and no console or JavaScript errors. - This completed conservative no-new-claim review produced no source diff, so no empty commit was created. Existing
mainhead6c06ec27733066a6af8474af8eb0dbfe12d85ad1remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task1102remainssuccess, including Pages publication. Public overview, client and system routes returned the expected Keycloak/OAuth302;kubectl/an authorizedpages/pagesservice-proxy route was unavailable in this cron environment, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remain untracked and excluded. - No newer CVP IS instructor guidance was available in the synchronized channel state. Live work reconfirmed the documented exact-identity, complete-row and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next dossier rotation:
081–100.
Previous scheduled rotation — 2026-08-17 16:55 UTC
- Completed the ordered rotation of clients
041–060. Reopened all59distinct current dossier evidence URLs (97citation occurrences), ran91exact CPVA client/system searches and108per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. Exact profiles and profile-derived notice lists were opened for16clients; no near-name profile was forced, and all51published-notice rows exposed by those lists were parsed, including24IT-title leads. - No defensible new client-specific system, contractor, production-hosting, original-kickoff or production-release claim was established beyond the evidence already published earlier today. Current award and tender leads remained represented under their exact procurement stages; no planned procurement was promoted to award, supplier engagement, delivery, hosting, completion or release. Existing rows, statuses, confidence levels, gaps and
2026-08-17dates were conservatively preserved. - Generated state remains
290clients,494canonical systems,719observations and104contractor cards, with complete336client→contractor and336system→contractor links. Statuses remain79 researched,195 partialand16 no-public-evidence; explicit hosting, original-kickoff and latest-release unknowns remain unchanged. - All
15repository tests,corepack pnpm validate,corepack pnpm build, registry/generated-route checks, all59browser-equivalent evidence URL checks andgit diff --checkpassed. The build verified290client,494system and104contractor routes,719observations and296raw artifacts. Local browser acceptance confirmed the client directory and client044system/reference content. - This completed conservative no-new-claim review produced no source diff, so no empty commit was created. Existing
mainhead6c06ec27733066a6af8474af8eb0dbfe12d85ad1remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task1102remainssuccess, including Pages publication. Public Pages returned the expected Keycloak/OAuth redirect; authorizedpages/pagesservice-proxy page-body readback verified the client directory, client044, and the generated IMIS system dossier with explicit unknown infrastructure/lifecycle fields. Unrelated PPTX-improvement directories remain untracked and excluded. - No newer human directive or CVP IS instructor guidance was present in the latest
100Discord messages. Live work reconfirmed the documented exact-identity, complete-row and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritativevssa-clientsskill required no update. - Next dossier rotation:
061–080.
Previous scheduled rotation — 2026-08-17 16:36 UTC
- Completed the required post-rerun rotation of clients
021–040. Reopened all69distinct current dossier evidence URLs (109citations), ran89exact CPVA client/system searches and104per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. Exact profiles and profile-derived notice lists were opened for18clients; no near-name profile was forced for clients without an exact result, and all421complete published-notice rows exposed by the full lists were classified. - No defensible new client-specific system, contractor, production-hosting, original-kickoff or production-release claim was established beyond the evidence already published earlier today. In particular, newly reopened APVA-profile award bodies named Aplinkos apsaugos departamentas or Aplinkos apsaugos agentūra—not APVA—as the contracting organization, so they were not converted into client
025system-use/supplier claims. Exact CPVA results were broad-token or unrelated, and contractor searches produced no stronger opened source. Existing rows, statuses, confidence levels, gaps and2026-08-17dates were conservatively preserved. - Generated state remains
290clients,494canonical systems,719observations and104contractor cards, with complete336client→contractor and336system→contractor links. Statuses remain79 researched,195 partialand16 no-public-evidence; explicit hosting, original-kickoff and latest-release unknowns remain unchanged. - All
15repository tests,corepack pnpm validate,corepack pnpm build, registry/generated-route checks, all69browser-equivalent evidence URL checks andgit diff --checkpassed. The build verified290client,494system and104contractor routes,719observations and296raw artifacts. Local browser acceptance confirmed client028, its system/contractor evidence links, no page overflow and no console or JavaScript errors. - This completed conservative no-new-claim review produced no source diff, so no empty commit was created. Existing
mainhead6c06ec27733066a6af8474af8eb0dbfe12d85ad1remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task1102remainssuccess, including Pages publication. Public overview, client and system routes returned the expected Keycloak OAuth302; the authorized backend hostname did not resolve from this cron environment, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remain untracked and excluded. - No newer human directive or CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented exact-identity, complete-row, direct-PDF and stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next dossier rotation:
041–060.
Previous scheduled rotation — 2026-08-17 16:08 UTC
- Completed RootAtSkic's explicitly requested second one-time rerun of clients
001–020after the registry-table fix. Reopened all54distinct current Markdown evidence URLs with browser-equivalent requests, reran127exact CPVA client/system searches and182per-system contractor/procurement query-ladder searches, and repeated CVP IS organization-first discovery. Identity-checked exact profiles and their profile-derived notice lists were opened for19clients; client010still had no exact portal row and no near-name identity was forced. - The current CVP IS lists contained
40complete rows, including37IT/digitalization-stage leads. Two additional material tender leads were opened as direct PDFs and classified from their bodies: a Vyriausybės kanceliarija tender for planned privileged-access-management support and a Kultūros ministerija tender for planned Moodle-or-equivalent learning-management-system implementation/adaptation/training/maintenance. Neither notice proves an award, selected supplier, signed contract, delivery, production use, hosting, completion or release; the Moodle lead remains explicitly recorded in client006's gap. Contractor searches and CPVA results produced no defensible stronger claim, so all dossier rows, statuses, confidence levels, gaps and2026-08-17dates were conservatively preserved. - Generated state remains
290clients,494canonical systems,719observations and104contractor cards, with complete336client→contractor and336system→contractor links. Statuses remain79 researched,195 partialand16 no-public-evidence; explicit production-hosting, original-kickoff and latest-release unknowns remain unchanged. - All
15repository tests,corepack pnpm validate,corepack pnpm build, registry/generated-route checks, evidence URL checks andgit diff --checkpassed. The build verified290client,494system and104contractor routes,719observations and296raw artifacts. Local browser acceptance confirmed the representative client001page and PPVIS system dossier, including exact client→system→contractor/evidence relationships. - This completed no-new-claim rerun produced no source diff, so no empty commit was created. Existing
mainhead6c06ec27733066a6af8474af8eb0dbfe12d85ad1remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task1102remains successful, including the main-push Pages publication step. Public overview, client and system routes returned the expected Keycloak OAuth302; no authorized backend route was available, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remain untracked and excluded. - No newer human directive or CVP IS instructor guidance was present in the accessible synchronized channel state. Live portal work reconfirmed the documented exact-organization, complete-row and direct-PDF stage-classification mechanics without exposing a new reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next dossier rotation:
021–040.
Previous scheduled rotation — 2026-08-17 15:52 UTC
- Reviewed clients
061–080through all64distinct current dossier evidence URLs, official client/system sources,80exact CPVA client/system searches,120per-system contractor/procurement query-ladder searches, and identity-checked CVP IS organization-first discovery. All current evidence URLs remained readable. Ten byte-exact CVP IS profiles and their profile-derived notice lists were opened; near-name rows were not forced, and the18IT/digitalization-stage leads were classified conservatively from their notice types and opened bodies where material. - Added one defensible client
076observation: the planned Permanent-exhibition expansion with innovative and inclusive solutions. CPVA directly establishes the museum's funded project, while the opened CVP IS contract-award body establishes MB „Baukas“ as the EUR 37,631 technical-project design and author-supervision contractor under a contract signed2025-07-31. The claim is not extended to exhibition implementation, technology integration, completion, production use, hosting or current support. The other 19 clients produced conservative no-new-claim outcomes; all twenty dossier and index dates advanced to2026-08-18without status promotion. - Generated state advanced from
493to494canonical systems and from718to719observations; contractor cards advanced from103to104, with complete336client→contractor and336system→contractor links. NewSYS-7C4EFE9F86andCTR-551788F646preserve hosting, original kickoff and latest production release as explicitly unknown. - All
15repository tests,corepack pnpm validate,corepack pnpm build, registry/generated-route checks, exact date/six-column checks, evidence URL checks andgit diff --checkpassed. The build verified290client,494system and104contractor routes,719observations and296raw artifacts. Local browser acceptance confirmed client076, the new system and contractor links. - Commit
6c06ec27733066a6af8474af8eb0dbfe12d85ad1is onmain; local/remote equality and authenticated exact-SHA client/system-analysis/index readback passed. Exact-SHA Gitea Actions task1102(run2867, job3843) succeeded, including the Publish to LEGO Cloud Pages step. The public changed route reached the expected Keycloak authentication boundary. The authorized backend hostnamevssa-documentation.vssa-v1.svc.cluster.localdid not resolve from this cron environment, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded. - Live research reconfirmed the documented organization-first, direct-PDF and procurement-stage semantics without exposing a new reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next dossier rotation:
081–100.
Previous scheduled rotation — 2026-08-17 15:10 UTC
- Re-reviewed clients
041–060after the completed one-time001–020rerun and the subsequent021–040rotation. The run reopened all59distinct dossier evidence URLs, executed91exact CPVA client/system searches and112per-system contractor/procurement searches, and reran identity-checked CVP IS organization-first discovery. Exact profile-linked notice lists were resolved for16clients and all51current complete rows were parsed; near-name rows for the remaining clients were not forced. - Every reopened dossier URL returned browser-equivalent HTTP
200content. The current official, CPVA, contractor and procurement sources produced no defensible new system, contractor, lifecycle or hosting claim beyond the evidence already published earlier today, so all rows, statuses, confidence levels, gaps and2026-08-17check dates were conservatively preserved. - Generated state remains
290clients,493canonical systems,718observations and103contractor cards, with complete335client→contractor and335system→contractor links. Statuses remain79 researched,195 partialand16 no-public-evidence; unknown production hosting, original kickoff and latest-release values remain explicit. - All
15repository tests,corepack pnpm validate,corepack pnpm build, registry/generated-route checks, evidence URL checks andgit diff --checkpassed. Local browser acceptance confirmed the representative client056route, KVR evidence, zero horizontal overflow and no console or JavaScript errors. The build verified290client,493system and103contractor routes plus296raw artifacts. - This conservative no-new-claim rerun produced no source diff, so no empty commit was created. Existing
mainhead8ce8b9479515257c417d455d1e23e5ec66d03828remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task1091remains successful, including Pages publication. The public changed route returned the expected Keycloak OAuth302, so unauthenticated deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded. - No new CVP IS instructor guidance, reusable source route or portal pitfall was found, so the authoritative
vssa-clientsskill required no update. - Next dossier rotation:
061–080.
Previous scheduled rotation — 2026-08-17 14:53 UTC
- Reviewed clients
021–040through all current dossier evidence and official client/system sources,82exact CPVA client/system searches, contractor/procurement query ladders, and identity-checked CVP IS organization-first discovery. Exact or identity-supported portal profiles were checked for18clients; every page of the12current profile-linked notice lists was parsed (421complete rows), while no near-name identity was forced for clients without an exact result. - Two opened CVP IS contract-award PDFs added bounded client
028observations. Nacionalinė žemės tarnyba awarded UAB COETUS a EUR 142,500 contract signed2024-12-17to create and develop a satellite-image-management digital tool, and awarded UAB „Novian Technologies“ a EUR 135,000 contract signed2025-09-30for IT-infrastructure maintenance, repair and related services. Neither award is presented as production deployment, acceptance, hosting, original system kickoff or a production release. - Client
030now directly cites the opened December 2025 STVK open-tender PDF for planned development, maintenance and support services. The contractor remainsNot publicly identified, and the notice is not presented as an award or signed supplier engagement. APVA-profile awards whose bodies identified another agency as contract signer were conservatively excluded from client025system-use attribution. - Generated state advanced from
491to493canonical systems and from716to718observations; contractor cards advanced from101to103, with complete client→contractor and system→contractor links advancing from333to335. Statuses remain79 researched,195 partialand16 no-public-evidence; both new canonical analysis entries preserve hosting, original kickoff and latest production release as explicitly unknown. - All
109dossier citations across the batch (69unique URLs) returned opened browser-equivalent HTTP200content, including all three new direct procurement PDFs. All15tests,corepack pnpm validate,corepack pnpm build, registry/generated-route checks,git diff --checkand local rendered Client/System/Contractor checks passed. The build verified290client,493system and103contractor routes,718observations and296raw artifacts. - Commit
8ce8b9479515257c417d455d1e23e5ec66d03828is onmain; local/remote equality, authenticated exact-SHA source readback and exact-SHA Gitea Actions task1091succeeded, including the main-push Publish to LEGO Cloud Pages step. The authorized raw-IP backend check was blocked by this runtime's interactive security-approval guard, direct browser access to that endpoint was refused, anddocs.lego-cloud.eudid not resolve, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded. - Live research exposed no new reusable source-route mechanic or portal pitfall beyond the authoritative skill, so
vssa-clientsrequired no update. - Next dossier rotation:
041–060.
Previous scheduled rotation — 2026-08-17 14:32 UTC
- Completed RootAtSkic's explicitly requested one-time rerun of clients
001–020after the registry-table delivery. Reopened all48current Markdown citations, ran46exact CPVA client/system searches and62system contractor/procurement ladders, identity-checked exact CVP IS organization rows for19clients, and reviewed every page of their profile-derived published-notice lists. Client010still had no exact portal row; no near-name identity was forced. No new CVP IS instructor guidance was present beyond the durable validated mechanics. - Two opened CVP IS contract-award PDFs materially deepened existing rows. Lietuvos Respublikos Vyriausybės kanceliarija awarded UAB „DevOcean LT“ PPVIS maintenance and improvement contract
46673, signed2025-09-09for EUR 110,000. Lietuvos Respublikos aplinkos ministerija awarded MB „Duida“ NTIS expert consulting for system management, improvement and development under contract43221, signed2025-05-22for EUR 24,960. These awards are not presented as original development, production hosting, acceptance, completion or release; MB „Duida“ is explicitly not labelled the NTIS developer. - Generated state remains
290clients,491canonical systems and716observations; contractor cards advanced from100to101, with complete client→contractor and system→contractor links advancing from331to333. Statuses remain79 researched,195 partialand16 no-public-evidence; lifecycle and hosting unknowns were preserved. - All
13tests,corepack pnpm validate,corepack pnpm build, evidence-body extraction, route/registry validation,git diff --checkand local browser checks passed. The build verified290client,491system and101contractor routes,716observations and296raw artifacts. Commite063285cf50cd6e9f65d844a6f97348452eae219is onmain; local/remote equality, authenticated exact-SHA source readback and exact-SHA Gitea Actions task1088(run70) succeeded, including Pages publication. Authorizedpages/pagesservice-proxy readback verified both changed client bodies and award markers; the public route returned the expected Keycloak OAuth302. Unrelated PPTX-improvement directories remained untracked and excluded. - Live research reconfirmed the documented exact-organization, complete-pagination and direct-PDF stage-classification mechanics without exposing a new reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next dossier rotation:
021–040.
Latest documentation delivery — 2026-08-17 14:34 UTC
- Improved the shared Docusaurus layout for wide registries. The left navigation is now
20rem(320px), the desktop right table-of-contents column is reduced to10rem(160px), and the central document column consumes the remaining width instead of retaining Docusaurus's former column cap. - The Systems registry is emitted inside an accessible, keyboard-focusable responsive region and uses a compact fixed-layout table with deliberate column proportions. At the verified
1280pxdesktop viewport, the sidebar measured320px, article753px, TOC160px, and table/wrapper753px; neither the registry nor the body had horizontal overflow. At997–1279px, the secondary TOC is hidden and the compact table floor drops to38rem, preserving the primary registry rather than forcing three competing columns. Mobile behavior remains Docusaurus-native. - Added regression coverage for the generated MDX wrapper and responsive layout contracts. All
15tests,corepack pnpm validate,corepack pnpm build, registry/route validation andgit diff --checkpassed against491system routes,716observations,100contractor routes and296raw artifacts. Browser acceptance found no console/JavaScript errors. Independent review found no blocking issue; its intermediate-width concern was addressed before merge. - PR #2 passed exact feature-head Actions run
69at0eb5271610f30cfea33d5360f860b56d724dacffand was merged as7515aca24a78f509834b1435c784b7d171e0b6f8. Exact merge-head Actions run71, job3830, succeeded, including Publish to LEGO Cloud Pages. Remotemainequality and authenticated exact-SHA source readback passed. The public route reached the expected Keycloak OAuth302, so unauthenticated deployed-body readback was not claimed.
Previous scheduled rotation — 2026-08-17 14:03 UTC
- Reviewed clients
081–100through80reopened dossier citations,90exact CPVA client/system searches,140contractor/procurement searches, and identity-checked CVP IS organization discovery. Exact or identity-supported profiles were resolved for18clients; no near-name profile was forced for clients088or091. - Added a bounded planned-procurement observation for client
082: the opened August 2026 CVP IS notice is an open tender for software-programming services and audiovisual components for the „TREMTIES VAGONAS: KITA STOTELĖ SIBIRAS“ digital exhibition. It does not prove an award, selected supplier, signed contract, delivery, production operation, hosting, completion or release. Direct tender citations were also added to the existing bounded client001PPVIS manufacturer-support and client005VBAMS licence-update statements. Other reviewed rows, statuses, confidence levels and gaps were preserved. - Generated state advanced from
490to491canonical systems and from715to716observations; contractor cards remain100, with331complete client→contractor and331system→contractor links. NewSYS-7D116B8FB6preserves production hosting, original delivery kickoff and production release as explicitly unknown. - All
13tests,corepack pnpm validate,corepack pnpm build, route/registry validation,git diff --checkand local browser acceptance passed. Commitd1a9e194fe5f289f98763297a169eee4cf8e6cfcis onmain; local/remote equality, authenticated exact-SHA readback and exact-SHA Gitea Actions task1081(run67) succeeded, including Pages publication. Unrelated PPTX-improvement directories remained untracked and excluded. - The scheduler's “provider authentication error” label was false: OpenAI Codex authenticated and the run completed research, commit, push, source readback and exact-head CI. The agent then exhausted its tool-iteration budget immediately after CI, so its otherwise complete report was wrapped in
RuntimeError; deployed body readback and this wiki update were the only unfinished steps. The wiki cursor has now been repaired manually. - Next dossier rotation:
101–120.
Latest documentation delivery — 2026-08-17 10:16 UTC
- Fixed the public registry generators after the earlier work remained only in an undeployed feature worktree. The Clients registry now includes a distinct canonical Systems count; rendered Client sidebar labels omit numeric prefixes while source filenames and dossier headings retain them. The Systems registry removes Type and adds Contractors, Cloud (
AWS,AZURE,GCP,Other,NaN) and OnPrem? (Yes,No,NaN). - Added behavioral regression coverage for all requested table/sidebar semantics. All
13tests,corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed. The production build verified290client,482system and100contractor routes,707observations,329client→contractor links,329system→contractor links and296raw artifacts. Independent frozen-patch review passed with no security or logic findings. - Rendered browser acceptance confirmed number-free Client sidebar labels, preserved numbered dossier heading
001 — Lietuvos Respublikos Vyriausybės kanceliarija, Client table headersID / Client / Systems / Status / Last investigated, client001system count2, and Systems headersID / System or service / Contractors / Cloud / OnPrem? / Clients / Observations;Typewas absent, unknown values renderedNaN, and the wide table retained horizontal scrolling. - PR #1 was opened at exact reviewed head
48d81d6b0a0e35887a0737fbbab94d5bf89b306a; exact-head task1020succeeded. The PR was merged as1624e77c90f1a38205c63cf025ec55d0444eef9a; exact merge-head task1021succeeded, including Pages publication. Authenticated exact-SHA source readback confirmed all four changed files. Public browser access reached the expected Keycloak boundary, so unauthenticated deployed page-body readback was not claimed. - RootAtSkic explicitly requested another one-time review of clients
001–020. The wiki cursor and cron prompt were reset accordingly, and an immediate scheduled run was triggered. After it completes, the cursor advances to021–040.
Latest scheduled rotation — 2026-08-17 13:32 UTC
- Reviewed clients
061–080through all current dossier citations and official client/system sources,58exact CPVA client/system searches,80system/contractor/procurement query-ladder searches, and identity-checked CVP IS organization-first discovery. Exact profiles were resolved for15clients; client066exposed two distinct exact-name profiles and both notice lists were preserved and reviewed rather than forcing one canonical record. No exact profile was forced for clients061,064,071,072or073. All twenty dossier/index dates advanced to2026-08-17without unsupported status promotion. - Two opened direct CVP IS tender PDFs added bounded planned-procurement observations for client
075: text-to-speech synthesis software and illustration-content recognition software. Each notice says that Lietuvos audiosensorinė biblioteka planned to acquire the software through an open tender; neither identifies a selected supplier or proves award, contract signature, delivery, production use, hosting, completion or release. The other reopened sources produced no defensible new claim and retained their existing rows, confidence levels and gaps. - Generated state advanced from
488to490canonical systems and from713to715observations; contractor cards remain100, and complete client→contractor plus system→contractor link counts remain331. NewSYS-E795BC75EFandSYS-71E3A7ECDEpreserve production hosting, original delivery kickoff and latest production release as explicitly unknown. - All
62pre-existing dossier URLs plus both new CVP IS PDFs returned opened browser-equivalent HTTP200content; both new bodies were verified as non-trivial PDFs and text-extracted for stage classification. All13tests,corepack pnpm validate,corepack pnpm build, registry/generated-route checks andgit diff --checkpassed; the build verified290client,490system and100contractor routes,715observations and296raw artifacts. Local browser acceptance confirmed the updated client075and new system route with no console errors. - Commit
6fe5d6a6f5537658c81e15f9cf28c389647a431eis onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-SHA Gitea Actions task1073(run66) succeeded, including the main-push Pages publication step. The public documentation hostname did not resolve from this runtime and no authorized backend route or mounted Pages dataset was available, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded. - Live work reconfirmed the documented organization-first, duplicate-profile ambiguity and direct-PDF stage-classification mechanics but established no new reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next dossier rotation:
081–100.
Previous scheduled rotation — 2026-08-17 12:44 UTC
- Completed clients
041–060after the required001–020rerun and the subsequent021–040batch. Current dossier evidence, official client/system routes, exact CPVA client/system searches, contractor ladders and identity-checked CVP IS organization-first records were reviewed. The reopened sources that did not produce a defensible new claim retained their existing rows, statuses, confidence levels and gaps; all twenty dossier/index dates advanced to2026-08-17. - Opened direct CVP IS bodies added three bounded planned/unsuccessful-procurement observations: VMI's planned ITIS_EU modernization/consulting procurement, VMI's unsuccessful i.KON risk-analysis-module development procedure (explicitly no winner), and NBFC's planned Užduočių valdymo informacinė sistema creation/implementation procurement. A separate open tender added planned KVR/KPEPIS maintenance/support scope to client
056. None was presented as a selected supplier, signed contract, delivery, production use, hosting, acceptance, completion or release. - Generated state advanced from
485to488canonical systems and from710to713observations; contractor cards remain100, and complete client→contractor plus system→contractor link counts remain331. NewSYS-B6A420C06F,SYS-3791C39F61andSYS-52BFEDE8DBpreserve production hosting, original delivery kickoff and latest production release as explicitly unknown. - All
59distinct dossier URLs returned opened browser-equivalent HTTP200content. All13tests,corepack pnpm validate,corepack pnpm build, registry/generated-route checks andgit diff --checkpassed; the build verified290client,488system and100contractor routes,713observations and296raw artifacts. Local browser acceptance confirmed the updated client056heading and planned-maintenance wording with no console errors. - Commit
494a3144f176e90f5e8e7215562d56fbfd3d4208is onmain; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-SHA Gitea Actions task1067(run65) succeeded, including Pages publication. The public changed route reached the expected Keycloak OAuth boundary; no authorized backend route or mounted Pages dataset was available in this runtime, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded. - No new reusable CVP IS mechanic or source-route pitfall was established, so the authoritative
vssa-clientsskill required no update. - Next dossier rotation:
061–080.
Previous scheduled rotation — 2026-08-17 11:43 UTC
- Reviewed clients
021–040through all current dossier citations and official client/system sources,85exact CPVA client/system searches, contractor query ladders, and identity-checked CVP IS organization-first discovery. Exact profiles were resolved for17clients; no near-name profile was forced for clients026,029or034. All87existing dossier URLs returned HTTP200; the two JavaScript-rendered sources were separately opened in a browser and confirmed readable. - Three opened direct CVP IS procurement-notice PDFs added bounded evidence for client
039: planned update/maintenance/support procurement for TARES, planned MDAS maintenance/support and iMDAS update procurement, and planned update/maintenance/support procurement for Komandoras. Each body identifies the exact contracting authority and open-tender stage; no supplier, award, signed contract, delivery, production release or hosting was inferred. The other reopened sources produced no defensible new claim, so their statuses and unresolved gaps were preserved while all twenty dossier/index dates advanced to2026-08-17. - Legacy four-column dossiers
033,034,036and040were normalized to the canonical six-column table while preserving their original system labels and evidence semantics. Generated state advanced from483to485canonical systems and from708to710observations; contractor cards remain100, and complete client→contractor plus system→contractor links advanced from329to331. NewSYS-D36FA3BF0EandSYS-FBEDF460EDretain hosting, original kickoff and latest production release as explicitly unknown. - All
13tests,corepack pnpm validate,corepack pnpm build, registry/generated-route checks,git diff --check, evidence URL checks and local browser acceptance passed. Commit00075a5bc6c78147fab84af8478a8bb33c973738was pushed tomain; local/remote ref equality, authenticated exact-SHA source readback and exact-SHA Gitea Actions task1058(run64) succeeded, including Pages publication. The deployed route reaches the expected Keycloak OAuth302; no authorized backend route or mounted Pages dataset was available in this runtime, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded. - Live CVP IS work reconfirmed the documented organization-first, exact-identity and direct-body stage-classification mechanics but exposed no new reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next dossier rotation:
041–060.
Previous scheduled rotation — 2026-08-17 10:27 UTC
- Completed RootAtSkic's explicit one-time rerun of clients
001–020after the registry-table fix. All current dossier evidence and official client/system routes were reopened;46exact CPVA client/system queries and the19identity-checked CVP IS organization notice lists were rerun. Client010still has no defensible exact CVP IS organization profile, so no near-name record was forced. Existing system contractor ladders were rechecked; no procurement-stage record was promoted beyond what its opened body proves. - A newly surfaced official Aplinkos ministerija sitemap route added Nuotekų tvarkymo informacinė sistema (NTIS) to client
002. The opened Ministry page says the Ministry created NTIS and directly describes its individual-wastewater registry, collection/transfer/treatment recording, risk-control and reporting functions. No commercial developer, current support supplier, production host, original kickoff or production release was identified; the page's update date was not treated as lifecycle evidence. - All
50distinct dossier URLs returned readable browser-equivalent content. Generated state advanced from482to483canonical systems and from707to708client-system observations while remaining100contractor cards; newSYS-4546BF5F3Bpreserves hosting, original kickoff and latest production release as explicitly unknown. Complete contractor link counts remain329client→contractor and329system→contractor. - All
13tests,corepack pnpm validate,corepack pnpm build, registry/generated-route validation,git diff --check, and local rendered Client/System route checks passed. Commitb52d7231fe4197cc8f88150fc9b0838b35b42bf0was pushed tomain; local/remote ref equality, authenticated exact-SHA source readback and exact-SHA Gitea Actions task1024succeeded, including Pages publication. The public route reached the expected Keycloak OAuth302; no authorized backend route or mounted Pages dataset was available in this runtime, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded. - The live portal work reconfirmed the documented organization-first, identity-check and direct-body stage-classification mechanics but exposed no new reusable procedure or pitfall, so the authoritative
vssa-clientsskill required no update. - Next dossier rotation:
021–040.
Previous scheduled rotation — 2026-08-17 10:00 UTC
- Reviewed reset rotation
001–020. New bounded tender-stage evidence was added for client012(Ministry of Agriculture DocLogix document-management-system maintenance procurement) and client017(State Forest Service National Forest Inventory Information System modernization procurement). Both direct CVP IS PDFs are tender notices only; no selected supplier, signed contract, delivery, production use, hosting, completion or release was inferred. - Clients
013–016were converted from legacy evidence tables to the canonical six-column format while preserving supported system identities and direct official citations. Other clients without defensible new claims were rechecked and dated2026-08-17without unsupported status promotion or contractor attribution. - Generated state advanced to
482canonical systems,707client-system observations and100contractor cards. NewSYS-A09C6AC314andSYS-04AA743682retain hosting, original kickoff and latest production release as explicitly unknown. All49distinct dossier URLs passed browser-equivalent checks, including both inspected CVP IS PDFs. corepack pnpm validate,corepack pnpm build, registry/generated-route validation,git diff --check, and local browser verification passed. Commit2c018c2248faebcdf06b7a1cb018de4eddb7cd2cwas pushed tomain; local/remote ref equality, authenticated exact-SHA source readback, exact-SHA Gitea Actions task1018, Pages publication, and authorized service-proxy deployed-content checks passed. Unrelated PPTX-improvement directories remained untracked and excluded.- The scheduler marked this run failed only because the agent exhausted its
60/60turn budget after completing delivery and then returned the final report through aRuntimeError. Provider authentication was healthy; the alert's authentication label was a misclassification. The durable wiki cursor was repaired manually after the run. - Next dossier rotation:
001–020(explicit one-time rerun requested after registry-table delivery; after completion continue with021–040).
Previous scheduled rotation — 2026-08-17 06:15 UTC
- Reviewed rotation
201–210through all existing dossier citations and official client routes, exact CPVA client/system searches, contractor/system query ladders, and CVP IS organization-first discovery. Exact profile tuples were confirmed for clients201(organizationId=12830,authorityId=12830,orgGroupId=29932),202(13905,13905,36656),203(2137,2137,2149),204(1522,1522,1525),205(4500,4500,4906),206(2329,2329,2359),207(5766,5766,7188) and209(1516,1516,1519). Client208returned an exact-name row whose contact domain conflicted with the institution and was not relied on; no exact organization row was found for client210. - Nine opened direct CVP IS award/amendment PDFs added bounded evidence. Client
204now records DocuWare support/development by DocWay sp. z o.o., Ivanti Neurons for ITSM support/development by Synergy Consulting, OAS and UAIS support/development by UAB CGI Lithuania, and process-robotization licence rental by ATEA. Client205records VATIS modernization by Asserte and the directly stated VSSA-administered production environment while leaving cloud/on-premises/hybrid classification unknown. Client206records ŽDIS improvement by ATEA and vCatch update/support by Twoday A/S. Client209adds VVR programming/development by UAB Fortevento. Dates, values and roles were taken from the award bodies and were not extended to original development, production hosting, acceptance, completion or release. - The other reopened sources and applicable notice lists produced no defensible additional claim. All ten dossier/index dates advanced to
2026-08-17without status promotion. The obsolete non-resolving IMVIS login citation was replaced by the opened current official VMVT IMVIS page, and its claim was narrowed accordingly. Browser-equivalent verification reopened all37distinct Markdown URLs, including all nine direct procurement PDFs; every URL returned inspected HTTP200content. - Generated state advanced from
473systems /698observations /95contractors to480systems /705observations /100contractors. Seven new canonical analysis entries retain production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client/System pages preserve all705system links and complete325client→contractor plus325system→contractor links. The ATEA regression expectation was updated from three to five evidenced client/system relationships. corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed. The build verified290client,480system and100contractor routes plus296raw artifacts. Commit174030f7445f0ff1df5a69e694f085e5d17b3943was pushed tomain; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task940(run58) succeeded, including Pages publication. Representative Client, System and Contractor routes returned the expected Keycloak OAuth302;docs.lego-cloud.euremained unresolvable, so backend page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.- Discord readback reached bot message
1538732595821547540; no newer human directive or message from designated CVP IS instructor476287310627864587was present. Live portal work reconfirmed the existing exact-organization, complete-row and direct-PDF mechanics but exposed no new reusable procedure or pitfall, sovssa-clientsrequired no update. - Next dossier rotation:
211–220.
Previous scheduled rotation — 2026-08-17 02:12 UTC
- Reviewed rotation
191–200through all existing dossier citations and official client routes, exact CPVA client/system searches, contractor/system query ladders, and CVP IS organization-first discovery. Identity-checked exact CVP IS profile tuples were: client192(organizationId=4600,authorityId=4600,orgGroupId=5025),194(1957,1957,1962),195(13077,13077,31408),196(8420,8420,14170),198(1160,1160,1161),199(10201,10201,19143) and200(8449,8449,14261). No near-name portal record was forced for clients without a defensible exact identity. - An opened direct CVP IS national procurement-notice PDF added a bounded observation for client
192: Riešės gimnazija initiated a planned Skaitmeninių mokymosi aplinkų licencijų procurement with estimated value32 000 Eurexcluding VAT. The notice does not identify products, winner, signed contract, delivery or production use, so the contractor remainsNot publicly identifiedand relationship isprocures (planned). - The remaining nine dossiers produced no defensible additional claim after reopening official pages, exact CPVA broad-token searches and applicable CVP IS notice lists. Existing rows, statuses, confidence levels and gaps were preserved; all ten dossier/index dates advanced to
2026-08-17. Browser-equivalent verification reopened all22distinct Markdown URLs (including the direct procurement PDF): every source returned inspected HTTP200content. Live portal work reconfirmed exact/variant organization matching, complete-row parsing and direct-PDF classification but exposed no new reusable mechanic or pitfall, so the authoritativevssa-clientsskill required no change. - Generated state advanced from
472systems /697observations /95contractors to473systems /698observations /95contractors. New canonicalSYS-B7123CD417keeps production hosting, original delivery kickoff and latest production release explicitly unknown. Generated Client/System pages preserve all698system links and complete315client→contractor plus315system→contractor links; the new unknown-contractor placeholder remains explicit and unlinked. corepack pnpm validate,corepack pnpm build,git diff --check, and local browser route checks passed. The build verified290client,473system and95contractor routes,698observations, and296raw artifacts. Commit83b802bbcd589c8492f6c1daf3a7982c0d5cfc65was pushed tomain; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task930succeeded, including Pages publication. Representative public Client and System routes returned the expected Keycloak OAuth302; no authorized backend route was available, so deployed page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.- Discord readback reached bot message
1538671402167701666; no newer channel message, human directive, or message from designated CVP IS instructor476287310627864587was present. No portal guidance was invented. - Next dossier rotation:
201–210.
Previous scheduled rotation — 2026-08-17 00:12 UTC
- Reviewed rotation
181–190through all existing dossier citations and official client routes, exact CPVA client/system searches, contractor/system query ladders, and CVP IS organization-first discovery. Identity-checked CVP IS profile tuples included successor LINEŠA for client183(organizationId=10864,authorityId=10864,orgGroupId=21121), close portal renderings for184(263836,383359,383359) and185(66513,132804,132804), and exact Nacionalinė švietimo agentūra profile1211(1211,1212). No near-name record was forced for clients without a defensible exact/current identity. - Two opened direct CVP IS contract-award PDFs materially deepened client
190. UAB „Asseco Lietuva“ won AIKOS software maintenance/development contract52300, signed2026-02-27for EUR 22,400, and NEMIS software maintenance/development contract27824, signed2025-08-19for EUR 29,040. The NEMIS observation was corrected from the erroneous “Neformaliojo švietimo” expansion to Nesimokančių vaikų ir mokyklos nelankančių mokinių informacinė sistema, as confirmed by both the NŠA system page and award body. A separate opened ŠVIS tender proves intended procurement of 24 months of maintenance/development only; no supplier or signed contract was attributed. - LINEŠA's official
2023-09-07announcement explicitly says the updated Mokinių ugdymo karjerai informacinė sistema (MUKIS) was already operating. CanonicalSYS-F0B5221055now records that day as the latest directly evidenced production release; original delivery kickoff and hosting remain unknown. The renamed NEMIS generatedSYS-921BF5E45C; its stale all-unknown misnamed analysis entry was removed before bootstrap. Registry totals remain79 researched,195 partial,16 no-public-evidence,472systems,697observations and95contractors. Generated Client/System pages preserve all697system links and complete315client→contractor plus315system→contractor links, including both new links to establishedCTR-E90B7D3CBD. - The remaining nine dossiers produced no defensible additional claim after reopening official pages, CPVA broad-token results and applicable CVP IS notice lists; their existing rows, statuses, confidence levels and gaps were preserved. All ten dossier/index dates advanced to
2026-08-17. Live portal work reconfirmed exact/variant organization matching, complete-row pagination and direct-PDF classification but exposed no new reusable mechanic or pitfall, so the authoritativevssa-clientsskill required no change. corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed. The build verified290client,472system and95contractor routes,697observations, complete315client→contractor plus315system→contractor links, and296raw artifacts. Commitbf0c44153cee7d7f4cbe2abdda9984964b9b4988was pushed tomain; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task925(run56) succeeded, including Pages publication. Representative public routes returned the expected Keycloak OAuth302;docs.lego-cloud.euremained unresolvable and no authorized backend route was available, so deployed page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.- Discord readback reached bot message
1538671402167701666; no new human directive or message from designated CVP IS instructor476287310627864587was present after high-watermark1538638252054761644. No portal guidance was invented. - Next dossier rotation:
191–200.
Previous scheduled rotation — 2026-08-16 22:09 UTC
- Reviewed rotation
171–180through all existing dossier citations and official client routes, exact CPVA client/system searches, contractor/system query ladders, and CVP IS organization-first discovery. Profile-derived tuples were1717064(authorityId=7064, orgGroupId=10354),1721297(1297,1298),1737299(7299,10959),1743350(3350,3432),1754292(4292,4624),17610551(10551,20145),1777697(7697,12093),17810208(10208,19163), and179portal renderingLietuvos istorijos institutas (PV)4329(4329,4680). Client180remains represented by distinct profiles2876(2876,2931)and2903(2903,2960); both notice lists were reviewed rather than silently selecting one canonical record. - CVP IS lists exposed tender/award leads including training services for client
175, a specialist book scanner for177, website creation/licence notices for179, and test-standardisation plus digital-methodical-content procurements for180. None directly and unambiguously established a new canonical information system, contractor role, production hosting, original delivery kickoff, or production release after stage and identity checks. No defensible new claim was added; all ten existing rows, statuses, confidence levels and gaps were preserved, while dossier/index check dates advanced to2026-08-16. Registry totals remain79 researched,195 partial,16 no-public-evidence,472systems,697observations and95contractors. - Browser-equivalent verification reopened
28distinct Markdown URLs.27resolved to inspected HTTP200pages; the official KPMPC SMIS citation redirected to the unavailablewww.smis.ltendpoint, matching the dossier's explicit unresolved current-availability gap and not supporting any stronger current claim. Exact CPVA broad-token results yielded no claim source. Live CVP IS work reconfirmed exact/variant identity checks, separate duplicate-profile handling and complete-row parsing but exposed no new reusable mechanic or pitfall, so the authoritativevssa-clientsskill required no change. corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed after repairing a corrupted local Docusaurus package installation with a frozen forced pnpm reinstall. The final build verified290client,472system and95contractor routes,697observations, complete313client→contractor plus313system→contractor links, and296raw artifacts. Commit39db665cf22246a8c5e5ad1c12364dd0407368c6was pushed tomain; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task920(run55) succeeded, including Pages publication. The representative public route returned the expected Keycloak OAuth302;docs.lego-cloud.euremained unresolvable from this runtime, so backend page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.- Local Discord state contained no channel message newer than high-watermark
1538638252054761644; no new human directive or message from designated CVP IS instructor476287310627864587was available. No portal guidance was invented. - Next dossier rotation:
181–190.
Previous scheduled rotation — 2026-08-16 20:14 UTC
- Reviewed rotation
161–170through all existing dossier citations, official client routes, exact CPVA client/system queries, contractor ladders, and CVP IS organization-first discovery. Identity-checked CVP IS profiles were1615234(authorityId=5234, orgGroupId=6064),1629176(9176,16805),1635288(5288,6187),165typography variantDiemedžio ugdymo centras18293(18293,75131),1665432(5432,6490),1671500(1500,1503), and1698181(8181,13526). No exact profile was forced for164,168, or170. All32Markdown URLs across the ten dossiers returned browser-equivalent HTTP200; dossier/index dates advanced to2026-08-16while statuses remain79 researched,195 partial,16 no-public-evidence. - Three opened direct CVP IS contract-award PDFs added bounded evidence for Lietuvos medicinos biblioteka. The library explicitly governs/administers MNKV IS: UAB nSoft won modernization and implementation contract
53411, signed2025-07-08for EUR 347,500, and FORIT UAB won independent technical-supervision contract53415, signed2025-07-07for EUR 73,000. UAB „IO projects“ won HL7 FHIR medical-document/data-modelling contract53417, signed2025-08-11for EUR 217,000. None of these awards was extended to production hosting, completion or a production release. - Lietuvių kalbos institutas's opened award proves that USA LT won programming contract
6440, signed2025-03-14, to create language-heritage data models, digitisation/integration tools, maps, geo-spatial infrastructure and open-data publication. The notice reports EUR 1,198,800 total awarded-contract value and a EUR 1,450,548 winning offer; both were preserved rather than reconciled by inference. It records unnamed subcontracting, so no subcontractor was attributed. The remaining eight dossiers gained no defensible system/contractor claim after the assigned source-class review; their existing rows, confidence, statuses and gaps were preserved. - Generated state advanced from
469systems /694observations /93contractors to472systems /697observations /95contractors. NewSYS-2EDA44EE65,SYS-57D7B32F9F, andSYS-5287D32490retain production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client/System pages preserve all697system links and complete313client→contractor plus313system→contractor links; new FORIT UAB (CTR-C52C3F9113) and USA LT (CTR-840737E61E) cards and established UAB nSoft/UAB „IO projects“ cards are linked from the exact observations. corepack pnpm validate,corepack pnpm build, URL verification andgit diff --checkpassed; the build verified290client,472system and95contractor routes,697observations and296raw artifacts. Commit65b40cbb3c73e7bbfb80a0d0620648733f213dd1was pushed tomain; ref equality and authenticated source readback passed. Exact-final-SHA Gitea Actions task915succeeded, including Pages publication. This runtime could neither resolvedocs.lego-cloud.eunor route to the previously used backend address and had nokubectl/mounted authorized service-proxy path, so public OAuth and backend page-body readback were not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.- Discord readback reached message
1538638252054761644; the only new message after the prior high-watermark was bot-authored and no new human directive or message from designated CVP IS instructor476287310627864587was present. Live portal work reconfirmed existing exact-organization, typography-variant, complete-row and direct-PDF mechanics but exposed no new reusable procedure or pitfall, sovssa-clientsrequired no update. - Next dossier rotation:
171–180.
Previous scheduled rotation — 2026-08-16 18:13 UTC
- Reviewed rotation
151–160through all existing dossier citations, exact CPVA client/system queries, contractor ladders, and CVP IS organization-first discovery. Identity-checked profile tuples included1514212(4212,4495),1524917(4917,5505),1536371(6371,8635), former rendering1551695,1565704(5704,7042),1588783(8783,15347),1592097(2097,2109), and16010220(10220,19195). All39Markdown URLs across the ten dossiers returned browser-equivalent HTTP200; dossier/index dates advanced to2026-08-16while statuses remain79 researched,195 partial,16 no-public-evidence. - Opened direct CVP IS PDFs added bounded evidence: client
151tendered a two-month technology rewrite of the donor/recipient register; client152tendered ULSVIS vulnerability, penetration, speed and performance testing; neither tender proves an award or supplier. Client156awarded UAB MeritStory contract35299, signed2025-11-05for EUR 655,000, to develop LSPSKP IS; its separate chatbot tender remains planned procurement with no attributed supplier or deployment. Client159awarded MB IT innovations contract3075, signed2025-01-22for EUR 126,370, for VAPRIS/VPREG modernization technical supervision. A separate EUR 655,560 modernization award omitted the winner name, so no implementation supplier was inferred. - Scoped the generic chatbot observation to VASPVT išmanusis pokalbių robotas before final delivery, preventing client-specific tender evidence from contaminating another organization's generic chatbot record. Generated state advanced from
467systems /692observations /91contractors to469systems /694observations /93contractors. NewSYS-B477086866and the VASPVT-scoped chatbot record retain production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client/System pages preserve all694system links and complete309client→contractor plus309system→contractor links; UAB MeritStory (CTR-4AC7BF2CE8) and MB IT innovations (CTR-F0C874147B) link to valid Contractor Cards. corepack pnpm validate,corepack pnpm build, URL verification andgit diff --checkpassed; the final build verified290client,469system and93contractor routes,694observations and296raw artifacts. Research commit12ef084c2f2204a81356c06146b5a7b923e12230and final identity-scope fix0f4e31cfc8ef1f1ee8edcc935ceefe4256a65de6were pushed tomain; final ref equality and authenticated source readback passed. Exact-final-SHA Gitea Actions task906(run53) succeeded, including Pages publication. The public route returned the expected Keycloak OAuth302; this runtime had nokubectl/mounted authorized backend path, so backend page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.- Discord readback reached message
1538578370701430856; all messages newer than the prior high-watermark were bot-authored rate-limit reports, with no new human directive or message from designated CVP IS instructor476287310627864587. Live portal work reconfirmed existing organization-first, profile-ID and direct-PDF mechanics but exposed no new reusable procedure or pitfall, sovssa-clientsrequired no update. - Next dossier rotation:
161–170.
Previous scheduled rotation — 2026-08-15 06:10 UTC
- Reviewed rotation
141–150through current dossier evidence, exact client/system CPVA queries, contractor queries, CVP IS organization/notice discovery and opened direct procurement PDFs. Broad-token CPVA results did not directly prove an additional claim. All58Markdown URLs across the ten dossiers returned browser-equivalent HTTP200; all dossier and index check dates advanced to2026-08-15while statuses remained79 researched,195 partial,16 no-public-evidence. - Lietuvos transporto saugos administracija's direct contract-award PDF establishes Jūros dugno duomenų bazės ir jūrinio kartografavimo sistemos programinė įranga and UAB „Hnit-Baltic“ as the software-update and maintenance supplier under contract
62212, signed2026-07-28for EUR 460,425. This award is not extended to original development, hosting, completion or production release. - Higienos institutas's opened July 2026 notice establishes intended procurement of Visuomenės sveikatos stebėsenos informacinės sistemos improvement services for four months. It is a tender, not an award, so no supplier or delivery claim was added. The remaining eight clients produced no defensible new claim after the assigned source-class review; their existing rows, confidence and unresolved gaps remain unchanged.
- Generated state advanced from
466systems /691observations /91contractors to467systems /692observations /91contractors. NewSYS-1567A86E5Fretains production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client/System pages preserve all692system links and complete306client→contractor plus306system→contractor links; the LTSA row links to the establishedCTR-37185E6E09UAB „Hnit-Baltic“ Contractor Card. corepack pnpm validate,corepack pnpm build, URL verification andgit diff --checkpassed; the build verified290client,467system and91contractor routes,692observations and296raw artifacts. Commit859687042e395516473bc10c72816f3a1b9d3939was pushed tomain; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task886(run51) succeeded, including Pages publication. The public route returned the expected Keycloak OAuth302; this runtime had nokubectl/authorized service-proxy client, so backend page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.- The synchronized channel export remains at message
1538007301989331127, with no recorded newer human directive or message from designated CVP IS instructor476287310627864587. Live portal work reconfirmed existing organization-first and direct-PDF behavior but exposed no new reusable mechanic, sovssa-clientsrequired no update. - Next dossier rotation:
151–160.
Previous scheduled rotation — 2026-08-15 04:14 UTC
- Reviewed rotation
131–140through all current dossier citations, exact client/system CPVA queries, contractor searches, and every page of the identity-checked CVP IS organization notice lists. Exact profiles and profile-derived(authorityId, orgGroupId)pairs were confirmed as:1314842(4842,4904);1325786(5786,7270);1332781(2781,2818);134punctuation variantSocialinės globos centras "Vija"8826(8826,15535);1352176(2176,2198);136punctuation variantSpecialieji socialinės globos namai "Tremtinių namai"20789(20789,100442);1375939(5939,7459);1381722(1722,1726);1393011(3011,3053); and1405113(5113,5856). Profile domains/addresses corroborated the punctuation variants; no near-name result was forced. - Ten client observations now reuse shared CVP IS identity
SYS-9FC4DC8662. Seven opened direct tender PDFs added bounded planned-procurement evidence: client132video-surveillance/security installation plus fire-alarm/security maintenance;133security, fire-alarm, video-surveillance and call-system maintenance;135SOPAS maintenance/support/modification, SGLEP support/maintenance/modification, and Šeimos kortelė mobile-app maintenance/app-store publication; and139a wireless personnel-call system. These notices do not establish an award, signed contract, supplier, delivery, production use, hosting, original kickoff or release, so contractor cells remainNot publicly identified. - Exact CPVA and contractor/system ladders produced no additional directly proved claim. All
41Markdown URLs across the ten dossiers returned browser-equivalent HTTP200, including the seven direct CVP IS PDFs. Dossier and index dates advanced to2026-08-15; statuses remain79 researched,195 partial,16 no-public-evidence. - Generated state advanced from
461systems /676observations /91contractors to466systems /691observations /91contractors. New canonical recordsSYS-D85FD35B15,SYS-E06F4B3954,SYS-F6360A31DB,SYS-896D8490FF, andSYS-66AE9E5F80retain production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client and System pages preserve all691system links; existing305client→contractor and system→contractor links remain complete. corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed; the build verified290client,466system and91contractor routes,691observations and296raw artifacts. Commit12926c6764136d5f9c154252b9d7b2181ee99fd8was pushed tomain; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task877succeeded, including Pages publication. Authorizedpages/pagesservice-proxy readback verified client135, its SGLEP and Šeimos kortelė rows, the SGLEP System Dossier link and explicit unknown lifecycle state; the public route returned the expected Keycloak OAuth302. Unrelated untracked PPTX-improvement directories remain preserved and excluded.- Discord readback reached message
1538007301989331127; the latest channel messages were bot-authored and no newer human directive or message from designated CVP IS instructor476287310627864587was present. Live portal work confirmed existing organization-first, typography-variant and direct-PDF behavior but exposed no new reusable mechanic, sovssa-clientsrequired no update. - Next dossier rotation:
141–150.
Previous scheduled rotation — 2026-08-15 02:10 UTC
- Reviewed rotation
121–130through current official evidence, every existing dossier URL, exact client/system CPVA queries, contractor searches, and the complete CVP IS organization-first notice lists. Exact current identities were confirmed for121–129; client130was identity-checked through the official 2025 rename from Pabėgėlių priėmimo centras to Priėmimo ir integracijos agentūra and exact successor profile1688with(authorityId=1688, orgGroupId=1690). No near-name result was forced. - Two direct CVP IS PDFs produced new bounded evidence. Marijampolės specialieji socialinės globos namai's
2025-02-24tender proves intended procurement of a Socialinės globos ir slaugos valdymo informacinė sistema only; no award, signed contract, supplier, delivery or production use was found. Priėmimo ir integracijos agentūra's PAIS award proves that Finance engineering won modernization and implementation contract46706, signed2026-02-24; this is not extended to original development, hosting, completion, production deployment, release or later support. - Client
125was converted from its legacy four-column dossier to the canonical concise six-column format while preserving all four system/service labels byte-for-byte. Its generic2024software-package tender did not identify a defensible named product or awarded supplier and was not added. Other IT-titled rows in the ten notice lists were equipment, building systems, generic packages, tender-stage leads or unrelated scope and were not promoted into unsupported system/contractor claims. - Exact CPVA queries produced no additional directly proved claim. Existing evidence remained readable; all
23Markdown URLs across the changed dossiers returned browser-equivalent HTTP200, including both direct CVP IS PDFs. All ten dossier/index dates advanced to2026-08-15; statuses remain79 researched,195 partial,16 no-public-evidence. - Generated state advanced from
459systems /674observations /90contractors to461systems /676observations /91contractors. NewSYS-2580C4A9DBandSYS-E0E1929D7Canalysis records retain hosting, original kickoff and latest production release as explicitly unknown. Generated Client and System pages link Finance engineering to its valid Contractor Card; client→contractor and system→contractor link counts are both305. corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed; the build verified290client,461system and91contractor routes,676observations and296raw artifacts. Commitd2b96a26ef726702efc64da8d63f313cc91f917ewas pushed tomain; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task869(run49) succeeded, including Pages publication. The public route returned the expected Keycloak OAuth302; direct backend DNS was unavailable from this runtime, so no backend body readback was claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.- Discord readback reached message
1537948061043531866; no newer human directive or message from designated CVP IS instructor476287310627864587was present. Live portal work confirmed existing organization-first, complete-row and direct-PDF behavior but exposed no new reusable mechanic, sovssa-clientsrequired no update. - Next dossier rotation:
131–140.
Previous scheduled rotation — 2026-08-15
- Reviewed rotation
111–120through current official domains and sitemaps, exact client/system CPVA searches, exact/current-name CVP IS organization discovery, all pages of the nine identity-checked organization notice lists, and opened award bodies. Exact CVP IS organization profiles were confirmed for clients111–116and118–120; no defensible exact profile or named system was found for client117, whose status remainsno-public-evidence. - Nine CVP IS client observations now reuse the established shared identity
SYS-9FC4DC8662instead of creating a descriptive duplicate. Užimtumo tarnyba's four-page notice list yielded four direct contract-award PDFs: Reiz Tech for UT IS maintenance/development (contract signed2025-08-01), Urgent tools for Vilnius regional career-centre interactive-space support/development (2026-06-18), Sign on Tab UAB for tablet electronic-signing licence rental/programming/maintenance (2025-02-25), and UAB „Bitė Lietuva“ for IP-telephony installation/service/expansion (2025-03-13). These bounded roles are not extended to cloud hosting, original kickoff, acceptance, completion, or production release. - Contractor/system ladders and CPVA searches produced no further defensible supplier, production-hosting, original-kickoff, or production-release claim for the other institutions. All ten dossier/index dates advanced to
2026-08-15after the completed source-class review without unsupported status promotion. - Generated state advanced from
455systems /661observations /86contractors to459systems /674observations /90contractors. Four new canonical analysis records retain hosting, kickoff and latest release as explicitly unknown; generated client and system pages link each new named supplier to a valid Contractor Card. corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed; build verified290client,459system and90contractor routes,674observations and296raw artifacts. Commit78370615c1f7fd74904e760c49193f80a42320fcwas pushed tomain; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task860(run48) succeeded, including Pages publication. Authorizedpages/pagesservice-proxy readback verified the deployed Užimtumo tarnyba Client Card, Reiz Tech Contractor Card, and client-row contractor link; the public route returned the expected OAuth302. Unrelated untracked PPTX-improvement directories remain preserved and excluded.- Discord readback reached message
1537948061043531866; the four messages after the prior high-watermark were bot-authored cron reports. No newer human directive or message from designated CVP IS instructor476287310627864587was present, and live portal work exposed no reusable mechanic beyond existing guidance, sovssa-clientsrequired no update. - Statuses remain
79 researched,195 partial,16 no-public-evidence; next dossier rotation:121–130.
Previous scheduled rotation — 2026-08-14
- Reviewed rotation
101–110through every existing dossier citation, exact client/system CPVA searches, and CVP IS organization-first routes. All 30 existing dossier URLs remained readable and claim-supporting. Exact or identity-checked CVP IS profiles were reviewed for clients101–107and109–110; no defensible organization match was found for108. Client107still has two close portal profiles (64972and125006) whose case-only name variants remain unresolved, so neither was silently designated canonical. - A direct CVP IS contract-award PDF for client
110(organizationId=421589,authorityId=435489,orgGroupId=3340,resourceId=7746421,documentId=8997165,noticeId=8994263) proves that UAB „Novian PRO“ won contract61875, signed2026-07-28for EUR 233,000, to maintain and modify the Darbo sąlygų darbo vietose nuolatinės stebėsenos informacinė sistema (DSS IS). The body also directly describes DSS IS inspection, data-exchange and reporting functions. The evidence was not extended to hosting, original development/kickoff, completion or production release. - Clients
101–109produced no defensible new claim after the assigned official-source, CPVA and CVP IS checks. Their dossier/index dates advanced conservatively to2026-08-14without changing rows, status, confidence or unresolved gaps. Search-provider HTML returned no usable results and was time-boxed rather than retried indefinitely. - Generated state advanced from
454systems /660observations /86contractors to455systems /661observations /86contractors. NewSYS-0D3736A986preserves DSS IS hosting, kickoff and latest release as unknown; UAB „Novian PRO“ reuses established contractor identityCTR-DB2CC6C476. Generated client→contractor and system→contractor link counts are both299. corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed; build verified290client,455system and86contractor routes,661observations and296raw artifacts. Commit78c4ae2536ebe03619c8d27ea47720fd068cd231was pushed tomain; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task852(run47) succeeded, including Pages publication. Public Pages returned the expected OAuth302; authorizedpages/pagesservice-proxy readback verified the deployed client110DSS IS row and its validSYS-*andCTR-*links. Unrelated untracked PPTX-improvement directories were preserved and excluded.- Discord readback found three newer bot-authored job-status messages after human message
1537822091275927682, no newer human directive, and no message from designated CVP IS instructor476287310627864587in the latest 100 channel messages. No reusable portal mechanic was added tovssa-clients. - Statuses remain
79 researched,195 partial,16 no-public-evidence; next dossier rotation:111–120.
Previous scheduled rotation — 2026-08-14
- Reviewed rotation
091–100through reopened official evidence, exact CPVA searches and CVP IS organization-first routes. The only defensible new claim was client091: an official CPVA completion article established production use of the M. K. Čiurlionis museum VR application by2018-12and named UAB „MultimediaMark“ as creator. Hosting, original kickoff and latest release remained unknown. - Clients
092–100produced no defensible new claim and advanced conservatively without unsupported status or row changes. Generated state moved to454systems /660observations /86contractors. Commite00c4e8e7e2ff2a3aa0d9210761d1bb5fcf89c67was pushed; exact-SHA Actions task851succeeded and publication/readback checks passed. That delivery set the next rotation to101–110.
Previous scheduled rotation — 2026-08-14
- Reviewed rotation
081–090through all 53 existing/new dossier citations, exact client/system CPVA searches, direct CVP IS discovery and 101 published-notice rows in identity-checked organization profiles. Confirmed profiles and profile-derived(authorityId, orgGroupId)pairs:0815803(5803,7279);0824334(4334,4689);083portal legal-form variantBiudžetinė įstaiga Lietuvos nacionalinis dramos teatras2670(2670,2718);0845190(5190,5964);0852046(2046,2060);0863569(3569,3747);0873035(3035,3104);088portal punctuation variantLietuvos teatro muzikos ir kino muziejus (PV)8731(8731,15151);0892790(2790,2844); and0902698(2698,2748). The synchronized channel export contained no newer guidance from designated instructor476287310627864587, so no portal mechanic was patched. - Two opened direct tender PDFs produced bounded high-confidence planned-procurement observations. Lietuvos etnografijos muziejus published a June 2025 open tender for a fully digital VR game combining characters, animated 3D scenes, effects, UI, sound and interactive programming. Lietuvos švietimo muziejus published an April 2025 open tender for VR audiovisual content about Vilnius University and European higher-education history. Neither tender proves an award, signed contract, selected supplier, delivery, hosting or production use, so contractor cells remain
Not publicly identifiedand all lifecycle/infrastructure fields remain explicitly unknown. - The other published-notice rows concerned physical equipment, construction, stage systems, instruments, furniture, utilities or other non-IT scope, or were tender-stage leads without a defensible additional client-system claim. Exact CPVA searches returned irrelevant broad-token matches only. No defensible new commercial contractor, production-hosting classification, original delivery kickoff or production-release date was established. Existing statuses and bounded roles were preserved; all ten dossier/index dates advanced to
2026-08-14after the full source-class review. - Generated state advanced from
451systems /657observations to453systems /659observations while remaining86contractors; statuses remain79 researched,195 partial,16 no-public-evidence. Two client-scoped canonical analysis records were bootstrapped with hosting, kickoff and release explicitly unknown.corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed; build verified290client,453system and86contractor routes,659system-observation links and296raw artifacts. All 53 dossier citations opened successfully: 51 returned browser-equivalent HTTP200, while the two Nacionalinis Kauno dramos teatras pages failed the local Requests CA chain but opened and supported their claims in the browser-equivalent browser retry. - Commit
8f0eeb80dab179bcd024a57660b9a3b9824b36d8was pushed tomain; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task812(run 44) completed withsuccess, including Pages publication. Public Pages returned the expected OAuth302; authorizedpages/pagesservice-proxy readback verified client082, itsSYS-6B4BD590ECsystem-dossier link, the generated system page and explicit unknown release state. Unrelated untracked PPTX-improvement directories were preserved and excluded. Next dossier rotation:091–100.
Previous scheduled rotation — 2026-08-14
- Reviewed rotation
071–080through all 30 existing dossier citations, exact client/system CPVA searches, direct CVP IS discovery and every published-notice row in identity-checked organization profiles. Confirmed exact profiles:07153959(130340,130340);074portal variantBĮ Kultūros infrastruktūros centras2548(2594,2594);0751551(1551,1554);0764108(4108,4425);0775687(5687,7145);078portal variantLietuvos jūrų muziejus (PV)397998(648902,648902);07912863(12863,23931); and0805416(5416,6482). No exact organization row was established for072or073under bounded legal-name/short-name variants, so no near-name record was forced. The synchronized channel export contained no newer message from designated instructor476287310627864587, so no portal mechanic was patched. - Classified all 36 published-notice rows from those profiles. The direct ELVIS award body proves that ATEA won the ELVIS modernization/development contract for EUR 779,792, signed
2025-01-02; that bounded role was added to client075without extending it to current maintenance, hosting, storage, identity or rights services. Other IT-titled rows were tender-stage or unrelated and were not treated as awards or delivery evidence. - Added the museum-operated
„Septynis kartus link begalybės“ interactive exhibitionto client077. CPVA's official2020-08-31account says the new exhibition had opened and received visitors during July 2020, directly supporting latest production operation at month precision2020-07; original delivery kickoff and hosting classification remain unknown. CPVA names a Saulius Valius-led artistic team but no contracting company, integrator or current support supplier, so no unsupported contractor entity was created. - Clients
071–074and076–080produced no other defensible new client-specific commercial contractor, production-hosting classification, original kickoff or production-release evidence after the full source-class review. Their existing rows/statuses were preserved and all ten dossier/index dates advanced to2026-08-14. - Generated state advanced from
450systems /656observations to451systems /657observations while remaining86contractors; statuses remain79 researched,195 partial,16 no-public-evidence.corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed; build verified290client,451system and86contractor routes,657system links and296raw artifacts. - Commit
722590521c4d1b67d55cf6dc8d3d82082a2abd53was pushed tomain; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task760(run 42) completed withsuccess, including Pages publication. Public Pages returned the expected OAuth302; authorizedpages/pagesservice-proxy readback verified client077,SYS-D212D4771B, andLatest production release: 2020-07. Unrelated untracked PPTX-improvement directories were preserved and excluded. Next dossier rotation:081–090.
Previous scheduled rotation — 2026-08-14
- Reviewed rotation
061–070through all 27 existing official/provider citations, exact CPVA client/system searches, direct CVP IS discovery, and all pages of the identity-checked organization notice lists. Confirmed current/former identity profiles for061:Kauno apskrities viešoji biblioteka2891(2947,2947)andĄžuolyno biblioteka312424(458907,458907);0621465(1467,1467);0632633(2681,2681);0651151(1151,1152);06710202(10202,19145);0681927(1927,1931);0695198(5198,5975); and0701505(1505,1508). Client066produced two exact same-address portal records,15741(15741,51164)and5128(5128,5860); both notice lists were reviewed, but neither was arbitrarily designated as the sole canonical profile. No exact CVP IS organization result was established for064under bounded current/former-name variants, so no near-name record was forced. The synchronized channel export still contained no newer message from designated instructor476287310627864587, so no portal mechanic was patched. - Reviewed all 85 published-notice rows returned by those exact authority profiles, including page 2 for
070. Rows concerned books, instruments, construction, premises, travel, utilities, solar equipment and other non-IT scope. Exact CPVA queries were empty or produced irrelevant broad-token matches. No opened body established a new client-specific system, commercial contractor, production hosting/cloud, original delivery kickoff, or dated production release. - This was a completed conservative no-new-claim rotation, not “no search performed.” Existing rows, bounded roles, status/confidence values and gaps were preserved; all ten dossier/index check dates advanced to
2026-08-14. All 27 dossier URLs returned browser-equivalent HTTP200. - Generated state remained
290clients,450systems,656observations,86contractors; statuses remained79 researched,195 partial,16 no-public-evidence.corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed; build verified290client,450system and86contractor routes,656links and296raw artifacts. - Commit
d63985018ea4250392e2592765b77c161af77ffbwas pushed tomain; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task742(run 41) completed withsuccess, including Pages publication. Public Pages returned the expected OAuth302; authorizedpages/pagesservice-proxy readback returned client061with its exact heading,2026-08-14, and generatedSystem dossiercontent. Unrelated untracked PPTX-improvement directories were preserved and excluded. Next dossier rotation:071–080.
Previous scheduled rotation — 2026-08-14
- Reviewed rotation
051–060through official client/system pages, exact CPVA searches and classified CVP IS award bodies. Added bounded high-confidence awards for UAB „Insoft“ on KVR/KPEPIS modernization; UAB „Asseco Lietuva“ on LIMIS modernization; Biznio mašinų kompanija UAB on the LNDM virtual-collections/interactive-3D platform; and UAB „Asseco Lietuva“ plus UAB „Insoft“ on LIBIS modernization and VEPIS maintenance/programming. No award was extended to production deployment, hosting, completion or unrelated current support. - Two new canonical systems advanced the generated state from
448systems /654observations to450systems /656observations; contractor routes reached86, with lifecycle/hosting fields for the new systems explicitly unknown. Validation/build passed and commita3a8f17829e26309b4a74c1db9a9ffa1e8ae8cf1was pushed. Exact-SHA Actions task701(run 40) failed; the immediately following cumulative main run 41 succeeded and republished Pages without removing this evidence commit. Next dossier rotation recorded:061–070.
Previous scheduled rotation — 2026-08-14
- Reviewed rotation
041–050through official client/system pages, exact CPVA searches, and every page of the identity-checked CVP IS organization notice lists. Confirmed exact CVP IS organization/profile IDs and profile-derived(authorityId, orgGroupId)pairs:0415788(5788,7264);0421390(1390,1393);0435789(5789,7265);0444077(4077,4380);0455779(5779,7255);0477416(7416,10901);0486796(6796,9711);0491335(1335,1336);05010407(10407,19461). No exact organization result was established for046, including bounded legal-name andAVNTvariants, so no near-name record was forced. No new CVP IS instructor guidance was present after message1537121770707091537. - Converted legacy dossiers
042,044, and046to the canonical concise six-column format. Direct CVP IS PDFs added bounded high-confidence evidence: Muitinės mokymo centras's 2026-08-11 tender proves intended DEKLARIS maintenance/support procurement only; VMI awarded IMIS modernization to UAB CORNER CASE TECHNOLOGIES (EUR 859,504.13; contract 2026-07-09) and Oracle licences to Proit (EUR 304,190.22; contract 2026-07-10); NBFC awarded SABIS development/maintenance/support to UAB „Novian PRO“ (EUR 436,500; contract 2026-02-20), DUPA IS creation/implementation to NEVDA (EUR 1,555,000; contract 2025-06-11), and IVANTI development services to Synergy Consulting (EUR 19,965; contract date unstated). A 2025-12-08 voluntary ex-ante notice identifies UAB „Stekas“ as the sole Stekas-Alga support/development supplier and records a EUR 104,540 winning offer, but is not presented as proof of a signed contract. None of these records is presented as production hosting, original development where unstated, acceptance, deployment, or go-live. - The remaining clients produced generic IT, training or unrelated leads only. Exact CPVA searches yielded no additional defensible claim. All ten dossier/index dates advanced to
2026-08-14after the full rotation, with statuses unchanged. - Generated state:
290clients,448systems,654observations,84contractors; statuses79 researched,195 partial,16 no-public-evidence. Seven new canonical system-analysis records were bootstrapped with production hosting, original kickoff and latest production release explicitly unknown; three legacy labels were preserved byte-for-byte during format conversion so existing canonical system identities did not fragment. corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed; build verified290client,448system and84contractor routes,654system-observation links and296raw artifacts. Every Markdown URL in all ten changed dossiers returned browser-equivalent HTTP200, including seven direct CVP IS PDFs; generated registry checks confirmed the new deterministic system links and bounded contractor roles.- Commit
57bff3bdc6473f7989e19e33ca039160efffed6dwas pushed tomain; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task691completed withsuccess, including Pages publication. The representative public Pages dossier returned the expected Keycloak OAuth302; no direct Pages-backend route was available from this runtime. Unrelated untracked.pptx_improve_run/andpptx_improvement_run_20260814/directories were preserved and excluded from the commit. Next dossier rotation:051–060.
Previous scheduled rotation — 2026-08-14
- Reviewed rotation
031–040through official client/system pages, exact CPVA searches, and all pages of identity-checked CVP IS organization notice lists. Confirmed exact CVP IS organization/profile IDs and profile-derived(authorityId, orgGroupId)pairs:0314823(4823,5354);0329665(9665,17861);0331678(1678,1681);0354133(4133,4459);0366537(6537,9237);0378915(8915,15595);0386884(6884,9865);039499664(499664,810894);0405791(5791,7267). No exact organization result was established for034, so no near-name record was forced. No new CVP IS instructor guidance was present after message1537121770707091537. - Converted dossier
039to the canonical six-column format. Five direct award PDFs added bounded high-confidence Customs Department supplier roles: UAB „Baltnetos komunikacijos“ for VIKIS maintenance/support under a EUR 108,917.92 contract signed 2026-07-30; UAB „Hnit-Baltic“ for ArcGIS licence support/updates/migration under the 2024-08-28 contract whose 2026 notice records EUR 122,064.43 excluding VAT; UAB „Hnit-Baltic“ for MGIS maintenance/support under a EUR 90,118.38 offer-value contract signed 2025-04-01; Netcode for MOVAS maintenance/support under a EUR 162,621.82 contract signed 2025-04-01; and UAB „InnoForce“ for tax-accounting/control-IS maintenance/support under a EUR 95,550 contract signed 2025-01-28. These awards are not presented as original development, hosting, acceptance, or production release. - The remaining clients produced tender-stage, generic IT or unrelated leads only. Exact CPVA searches yielded no additional defensible claim. All ten dossier/index dates advanced to
2026-08-14after the full rotation, with statuses unchanged. - Generated state:
290clients,441systems,647observations,80contractors; statuses79 researched,195 partial,16 no-public-evidence. Four new canonical system-analysis records were bootstrapped with production hosting, original kickoff, and latest production release explicitly unknown. The reviewedArcGIS software licences/ESRI programinė įrangaalias merged two clearly identical Esri ArcGIS observations into one canonical system instead of creating a duplicate. corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed; build verified290client,441system and80contractor routes,647system-observation links and296raw artifacts. Every Markdown URL in the changed039dossier returned browser-equivalent HTTP200, including five direct CVP IS award PDFs; the generated client route contained the new deterministic system links and contractor markers.- Commit
a8861147288068b2bd0a231ab0e4effb702f27c6was pushed tomain; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task682completed withsuccess, including Pages publication. The representative public Pages dossier returned the expected Keycloak OAuth302; no direct Pages-backend route was available from this runtime. An unrelated untracked.pptx_improve_run/worktree directory was preserved and excluded from the commit. Next dossier rotation:041–050.
Previous scheduled rotation — 2026-08-14
- Reviewed rotation
021–030through official client/system pages, exact CPVA searches, and identity-checked CVP IS organization notice lists. Confirmed profile IDs for021–028and030:4630,1689,12872,11636,1778,5297,3731,2363, and1336; no exact organization result was established for029, so no near-name record was forced. No new CVP IS instructor guidance was present after message1537121770707091537. - Converted legacy dossiers
022,025,026,028, and030to the canonical concise six-column format. Direct award PDFs added four bounded high-confidence supplier roles: APVA awarded UAB Dizaino kryptis APVIS development/support under a EUR 500,000 offer-value contract; NŽT awarded NRD Digital process-management-IS support under a EUR 129,600 contract signed 2026-02-27, and UAB „Asseco Lietuva“ land-asset-administration-IS support/development under a EUR 211,680 contract signed 2026-02-27 plus document-management-IS support under a EUR 76,800 contract signed 2025-01-31. The awards are not presented as original development, hosting, acceptance, or production release. - The remaining clients produced tender-stage, generic IT, or unrelated leads only. Exact CPVA searches yielded no additional defensible claim. All ten dossier/index check dates advanced to
2026-08-14after the full source-class rotation, with statuses unchanged. - Generated state:
290clients,437systems,642observations,77contractors; statuses79 researched,195 partial,16 no-public-evidence. Three new canonical system-analysis records were bootstrapped with production hosting, original kickoff, and latest production release explicitly unknown; the former duplicate nSoft vendor-as-system row was removed when the Zoo ticketing observation was normalized. corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed; build verified290client,437system and77contractor routes plus296raw artifacts. Every Markdown URL in the changed dossiers returned browser-equivalent HTTP200, including four direct CVP IS award PDFs.- Commit
e2f160b76aef06d063559fb3fc1e287523f843f5was pushed tomain; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task673completed withsuccess, including Pages publication. The representative public Pages dossier returned the expected Keycloak OAuth302; no direct Pages-backend route was available from this runtime. Next dossier rotation:031–040.
Previous scheduled rotation — 2026-08-13
- Reviewed rotation
011–020through official client pages and sitemaps, exact CPVA searches, and all pages of the identity-checked CVP IS organization notice lists. Exact CVP IS organization/profile IDs and profile-derived(authorityId, orgGroupId)pairs were confirmed as:0112964(2964,3027);0122352(2352,2387);0131489(1489,1492);0144357(4357,4722);0155459(5459,6540);0169187(9187,16821);0179608(9608,17654);0184872(4872,5425);0191287(1287,1288);0205035(5035,5718). - Converted dossiers
017and018from the legacy four-column format to the canonical concise six-column format. Direct award PDFs added bounded high-confidence roles: Valstybinė miškų tarnyba awarded UAB „Erisata“ ALIS LKMP development/programming under a EUR 170,000 offer-value contract signed 2025-07-15; VTPSI awarded Proit TPDR application maintenance/development under a EUR 498,000 contract signed 2025-04-29, and UAB „Hnit-Baltic“ land-use-supervision e-service/GIS work under a EUR 229,900 offer-value contract signed 2025-07-15 plus ESRI subscriptions under a EUR 113,000.87 offer value. The ALIS award's separately displayed participant-group-leader label „Via GIS“ was not concatenated into the winner identity. Awards are not presented as original development, hosting, acceptance, or production release. - The other
011–020records produced tender-stage, generic IT, or unrelated leads only; no unsupported supplier mapping was made. Exact CPVA searches produced no additional defensible system/contractor claim. No new CVP IS instructor guidance was available beyond message1537121770707091537. - Generated state:
290clients,435systems,640observations,74contractors; statuses79 researched,195 partial,16 no-public-evidence. Three new canonical analysis entries were bootstrapped with hosting, kickoff and latest production release explicitly unknown. corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed; build verified290client,435system and74contractor routes plus296raw artifacts. Every Markdown URL in the changed dossiers returned browser-equivalent HTTP200, including four direct CVP IS PDFs.- Commits
9cb2f44601775a366f44a09251af772bfbdded4cande4c9f9ab6c6052445cd90c803555f9c90cd69c65were pushed tomain; the latter normalized the ALIS winner identity after distinguishing the award's participant-group-leader metadata. Authenticated source readback and ref equality passed. Exact-SHA Gitea Actions tasks662and663both completed withsuccess, including Pages publication. Representative public Pages routes returned the expected Keycloak OAuth302; no direct Pages-backend route was available from this runtime. Next dossier rotation:021–030.
Previous scheduled rotation — 2026-08-13
- Reopened and normalized dossiers
001–010into the canonical concise six-column format; exact names/statuses were preserved and dossier/index check dates advanced to2026-08-13. - Reopened purpose acts, official system pages, VSSA centralized-service evidence, exact CPVA searches, and CVP IS organization-first searches. Exact CVP IS organization IDs for
001–009:2076,2017,3210,3345,2862,5224,2737,2900,1599; profile-derived(authorityId, orgGroupId)pairs:(2076,2088),(2017,2026),(3210,3287),(3345,3427),(2862,2917),(5224,6045),(2737,2788),(2900,2956),(1599,1602). No byte-exact row was found for010; no near-name record was forced. - Current PPVIS licence/support, VBAMS licence-update, Moodle implementation, and generic SADM development/analysis/test records were classified conservatively. Tender-stage records were not treated as supplier/delivery proof; generic awards were not mapped to SPIS without explicit scope.
- No defensible new commercial contractor, production-hosting classification, original delivery kickoff, or production-release date was established. Existing bounded public-provider roles were retained.
- Generated state:
290clients,432systems,637observations,72contractors; statuses79 researched,195 partial,16 no-public-evidence. corepack pnpm validateandcorepack pnpm buildpassed; build verified290client,432system and72contractor routes plus296raw artifacts. Every Markdown URL in changed dossiers returned browser-equivalent HTTP200.- Commit
4fc00aa78776cc8ee7971f21b72cd13c365e84a5was pushed tomain; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task649completed withsuccess, including Pages publication. The public Pages endpoint returned the expected Keycloak OAuth302; this host exposes no direct Pages-backend verification route. - Next dossier rotation:
011–020.
Purpose
VSSA client investigation and evidence gathering.
Current assets
- Gitea organization:
vssa-v1 - Repository: https://gitea.lego-cloud.eu/vssa-v1/documentation
- Repository worktree:
/opt/data/vssa-documentation - Published Docusaurus site: https://pages.apps.lego-cloud.eu/vssa-v1/documentation/
- Client navigation has first-level Overview and an expanded Registry group containing 290 ordered client dossiers. System navigation follows the same hierarchy with 494 ordered system dossiers. Contractors are a separate top-level collection with the same Overview → Registry hierarchy and 104 generated contractor/provider dossiers. Systems Dossiers are generated from canonical client system-table rows; the latest validated registry contains 494 unique systems from 719 observations, with conservative alias rules in
data/system-aliases.jsonand machine-readable outputs at/data/systems-registry.jsonand/data/contractors-registry.json. - Each generated Systems Dossier now includes canonical system-level analysis for production cloud/on-premises/hybrid hosting, original delivery kickoff, and latest production release. The source is
data/system-analysis.json; known values require direct system-level URLs and supporting quotes, while missing evidence remains explicit rather than inferred. - Overview, Clients, Systems, Contractors, Methodology, and Data now use separate Docusaurus docs-plugin instances and dedicated sidebars. Generated system relationships use reusable React evidence cards, and every generated client/system dossier has a de-duplicated References index.
SYS-*andCTR-*IDs are deterministic internal registry IDs, not public-source identifiers. - Every generated client system table has a System dossier column. Each of the 719 client observations displays its canonical
SYS-*ID and links directly to one of the 494 internal system dossiers; generation fails if any observation is unlinked. Per Lego's confirmed 2026-08-14 requirement, each exact client-system row also shows every evidenced contractor in the Contractor / company column and links each named contractor to itsCTR-*Contractor Card; multiple contractors are supported, while unknown contractors remain explicit and unlinked. Commitbc0b40f17b3bfecb41bc54574ece969bb02e08faimplemented and pushed the relationship-linking change. Its local validation/build passed and local/remote refs matched; final CI/Pages verification for that exact commit was not claimed because an approval timed out. - Gitea Actions workflow:
.gitea/workflows/pages.yml; successfulmainbuilds publish through the mounted LEGO Cloud Pages root. - Source registry:
source/message.txt, containing 290 numbered clients. - Required output: one concise Markdown dossier per client with exact name, one-sentence purpose, systems/clouds, plain-language system meaning, precise client relationship, identified contractor/company and role, direct evidence, confidence, and short gaps.
- Investigation skill:
vssa-clients; authoritative source is Gitea repositoryvssa-v1-skills-code-agent/vssa-clientsonmain, maintained in/opt/data/vssa-clients-skilland installed through the runtime symlink/opt/data/skills/research/vssa-clients. Recurring runs must deepen contractor research and publish validated reusable skill improvements to Gitea before reporting them. - Documentation skill:
documentation-docusaurus; authoritative source is Gitea repositoryvssa-v1-skills-code-agent/documentation-docusaurusonmain, maintained in/opt/data/documentation-docusaurus-skilland installed through/opt/data/skills/productivity/documentation-docusaurus. It absorbs the formergitea-docusaurus-projectscapabilities, including Docusaurus structure, evidence portals, Gitea repository setup, Actions, LEGO Cloud Pages, and end-to-end acceptance verification.
Confirmed skill-governance decisions — 2026-08-14
- Lego renamed the channel's investigation skill from
client-investigatortovssa-clientsand required it to be managed in Gitea. Organizationvssa-v1-skills-code-agentand public repositoryvssa-clientswere created; commitfd33a2144ac78223bbe8281776b043d61121b74dwas pushed, exact-SHA Actions task814succeeded, and the runtime now loads the Gitea worktree through a symlink. The former active skill was archived outside the runtime tree. - Lego directed that
gitea-docusaurus-projectsbe merged into a VSSA-owneddocumentation-docusaurusskill repository. The merged repository isvssa-v1-skills-code-agent/documentation-docusaurus; commitb08614dc908cd110de2dc82fece14f8d276a3250was pushed, exact-SHA Actions task818succeeded, authenticated source readback passed, and the runtime symlink now points to its maintainer worktree. The absorbed skill was archived and removed from the active runtime. - The requested comparison source
corp-v1-skills-code-agent/documentation-docusauruswas unavailable (404through the authenticated API andCannot find repositorythrough SSH), so it remains untouched. Read-only comparison used the accessiblehome-v1-skills-code-agent/documentation-docusaurusbaseline andcorp-v1-aerosim-skills-code-agent/documentation-docusaurus--aerosim; provenance and independent-adoption safeguards were retained.
Operational ledger — documentation improvement follow-up (2026-08-14)
- Status: DELIVERED. The approved documentation-improvement work was resumed from the 11-file partial worktree, reviewed, validated, committed, pushed, and deployed. The two unrelated untracked PPTX-improvement directories were preserved and excluded.
- Outcome: Contractors are now an equal homepage discovery path with a source-derived count; static search covers client, system, contractor, methodology, and provenance content through a filename-hashed index; system dossiers link every named observation contractor to its generated
CTR-*card; machine-readable contractor provenance and identifier semantics are documented; and build validation now enforces homepage contractor discovery, contractor-registry schema, complete system→contractor-card links, and representative search-index coverage. - Verification:
corepack pnpm validate,corepack pnpm build, andgit diff --checkpassed. The build verified290client routes,453system routes,86contractor routes,659observations,298client→contractor links,298system→contractor links, one filename-hashed search index, and296raw artifacts. Local browser acceptance verified contractor search/results and no JavaScript errors. - Delivery: Commit
905e57522e8c054590d6065d10a13ebf73960370is onmain; local/remote ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task826(run45) succeeded, including Pages publication. Public Pages returned the expected OAuth302; authorizedpages/pagesservice-proxy readback verified the new homepage contractor/search markers and the INVESTIS system→ATEA contractor-card link. - Current next action: Continue the scheduled evidence rotation at clients
151–160; no documentation-delivery blocker remains. Latest synchronized channel high-watermark:1538007301989331127.
Automation
- Cron job
88833e00b4a2(VSSA documentation continuous research) runs every 20 minutes at*/20 * * * *and reports to this channel. - Per Lego's 2026-08-17 reset directive, the ordered rotation restarts with clients
001–020, then continues in 20-client batches (021–040,041–060, and so on), wrapping after281–290. Each successful run records its completed and next batch here as the durable cursor. - Each run audits all 290 records, deeply researches its assigned 20-client batch, continuously improves client/system/contractor evidence and documentation, reviews conservative system identity rules, validates the complete Docusaurus build, pushes evidence-backed changes, verifies exact-head Actions, and checks the deployed Pages backend.
- Research must prefer primary sources and must not infer providers/systems without corroborating evidence.
- Every run explicitly searches CPVA's official search portal for exact client/system names and relevant projects, treating result pages as discovery only until an opened CPVA source proves the claim. It also maintains per-record References indexes and preserves dedicated sidebars and evidence cards.
- Discord user
476287310627864587is the designated CVP IS instructor forhttps://viesiejipirkimai.lt/epps/viewCFTSAction.do. Every run reads that user’s new channel guidance, validates reusable portal mechanics, updates the Gitea-backedvssa-clientsskill, and searches procurement stages from RFI/market consultation through tender, award, contract, amendment, and completion. Records are mapped to exact clients and canonical systems only when supported; stage semantics prevent an RFI/RFP/bid from being presented as an award, supplier engagement, implementation, production use, hosting, or completion. - CVP IS also has a validated organization-first discovery route: search the exact client at
https://viesiejipirkimai.lt/epps/viewOrganisations.do, identity-check and openprepareViewCAOrganisation.do?id=<organizationId>, then follow PERŽIŪRĖTI VISUS PASKELBTUS SKELBIMUS toviewPublishedNotices.do?authorityId=<authorityId>&orgGroupId=<orgGroupId>. Both IDs must be extracted from the actual profile link. Notice-type links can be direct PDF downloads; preserve their identifiers/metadata, extract the body, and classify procurement stage before mapping evidence. This route is additional and not assumed complete. - The job workdir and remote now target
/opt/data/vssa-documentationandvssa-v1/documentation; it must not edit generated Docusaurus output. - The recurring job explicitly treats a dated official announcement that says a named system started operating/launched/went live as direct production-release evidence at the announcement's stated precision, while distinguishing this from generic webpage metadata. It maintains contractor dossiers as exact client-system-role-evidence relationships and does not conflate development, hosting, support, licensing, or other roles.
- Latest rotation (2026-08-13): clients 281–290 were reviewed through official client sources, exact CPVA searches, contractor queries, and CVP IS organization-first profiles/notices. Exact organization profiles were confirmed for clients 282–287 and 289–290 (organization/profile IDs 2025, 1466, 14214, 9078, 10493, 1739, 1670, and 11068); client 281 returned two different records and client 288 returned none, so neither was force-mapped. Direct award PDFs added high-confidence bounded supplier roles: Generalinė prokuratūra awarded Starkodas PAIS maintenance/improvement (EUR 118,228; contract 2026-06-05); NTA awarded Proit LITEKO–MAIS integration and LITEKO development (EUR 229,900; contract 2025-04-15), Aisoft LITEKO2 licence support (EUR 205,700; contract 2026-05-15), and UAB „Asseco Lietuva“ accounting/financial-system maintenance, improvement and user consulting (EUR 298,870 offer value; contract 2026-05-14). No award is presented as proof of original development, hosting, acceptance or go-live. Other notice rows were tender-stage or unrelated, and CPVA exact searches yielded no additional defensible claim. No new CVP IS instructor guidance was present after message
1537121770707091537. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; the registry now contains 432 systems, 637 observations, and 70 normalized contractors/providers. Commit9897769d3a47e39c15be9b194706f43013fcd4b9was pushed and authenticated source readback passed; Actions run2402, task639, succeeded including Pages publication. Public Pages returned the expected Keycloak/OAuth302; direct backend verification was unavailable from this runtime. Next rotation wraps to clients 1–10. - Previous rotation (2026-08-13): clients 271–280 were reviewed through authoritative identity recovery, official sources, CPVA exact-name searches, contractor queries, and CVP IS organization-first profiles/notices. Exact CVP IS identities were confirmed for clients 272–280 (organization/profile IDs 2868, 1067, 1203, 1965, 12934, 4839, 7603, 5900, and 1763); client 271 had no exact result and was not mapped to a near name. Direct award PDFs added two high-confidence VRKIS supplier roles for client 279: UAB „iTree Lietuva“ won VRKIS maintenance, development and support under a EUR 1,736,000 contract signed 2026-01-02; UAB „IO projects“ won VRKIS modernization technical supervision under a EUR 79,000 contract signed 2025-07-21. A VRK voluntary ex-ante notice also established dependency on an intelligent chatbot whose support includes rental and operation of the production cloud infrastructure in which it runs; the notice does not name the supplier or cloud provider. Other notices were tender-stage, unrelated, or did not support a distinct client-system claim; CPVA searches yielded no additional defensible claim. No new CVP IS instructor guidance was present after message
1537121770707091537. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; registry counts are now 430 systems, 635 observations, and 68 normalized contractor/provider entities. Next rotation: clients 281–290. Commits256011fc76c857ec1aa74b1df982ea8699f3eda6andfcd7781dedd5d06d408443d46fb7f066ed4f6830were pushed; the second conservatively scoped the generic chatbot identity to VRK before attaching its production-cloud evidence. Authenticated source readback passed; final Actions run2388, task625, succeeded including Pages publication. Public Pages returned the expected Keycloak302; direct backend verification was unavailable from this runtime. - Previous rotation (2026-08-13 14:00 UTC): clients 261–270 were reviewed through exact identity checks, official client/system sources, CPVA exact searches, contractor searches, and CVP IS organization-first profiles/notices. Exact CVP IS identities were found for clients 261–263, 266, and 268–270 (organization IDs 1007, 8353, 1107, 7928, 5391, 1258, and 5708); exact byte-level matches were absent for clients 264, 265, and 267 and were not forced to near-name records. A direct Žemės ūkio agentūra award PDF (
resourceId=3904100,documentId=6586911,noticeId=6586102, proceduree698e26b-25bd-4bae-b4f0-e7c365b7fcf1) added two high-confidence system observations: its import/export licences, quotas and export-compensation administration IS, and its market-regulation-measures administration IS. UAB „Novian PRO“ won their maintenance/support, updates, new-function/change development and consulting contract for EUR 78,840, signed 2025-10-17. The award does not prove original development, hosting, acceptance or production release. Other notice lists yielded tender-stage or unrelated leads only; exact CPVA searches produced no additional defensible claim. No new CVP IS instructor guidance was present after message1537121770707091537. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; registry counts are now 428 systems, 633 observations, and 68 normalized contractor/provider entities. Commit2143cc9b81aee5371f1924500d0bb3fa98adb15ewas pushed and authenticated source readback passed; Actions run2378, task615, succeeded including Pages publication. Public Pages returned the expected Keycloak302; direct backend verification was unavailable from this runtime. - Previous rotation (2026-08-13 12:00 UTC): clients 251–260 were reviewed through exact identity checks, official client-system pages, CPVA exact searches, contractor/vendor searches, and CVP IS organization-first profiles/notices. All ten clients identity-matched in CVP IS (organization IDs 10152, 3359, 3851, 4239, 1022, 8182, 1480, 3838, 1349, and 1707); current organization lists produced only tender-stage or unrelated leads and no new award/contractor claim. One official Police completion page materially deepened DI.POLIS: implementation began in September 2023, the production version moved from Vytautas Magnus University's experimental environment into the Informatikos ir ryšių departamentas production environment, was integrated into ePolicija, accepted for operation, and opened to external users. The canonical system analysis now records kickoff at month precision and preserves the production-environment statement while leaving cloud/on-premises/hybrid and latest release explicitly unknown. The existing IRD contractor identity was reused, yielding 68 normalized contractor/provider entities without fragmentation. Exact CPVA searches produced no additional defensible claim. No new CVP IS instructor guidance was present after message
1537121770707091537. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; registry counts remain 426 systems and 631 observations. Commited851725b68866d749d8d5924f7ed66f5cb9ec8cwas pushed and authenticated source readback passed; Actions run2371, task608, succeeded including Pages publication. Public Pages returned the expected Keycloak302; direct backend verification was unavailable from this runtime. - Previous rotation (2026-08-13 10:08 UTC): clients 241–250 were reviewed. The CVP IS organization-first route identity-matched nine clients; no exact organization result was found for client 241. Two direct award PDFs added high-confidence contractor evidence: AB „Via Lietuva“ awarded Starkodas maintenance/modification of its public EV-charging-operator/access-point registration system for EUR 98,920 under a contract signed 2026-07-13; Lietuvos probacijos tarnyba awarded Buddi Limited rental of electronic-monitoring devices and software for EUR 2,196,000 under a contract signed 2026-01-06. A „Plačiajuostis internetas“ network-equipment award was reviewed but not mapped as a distinct software/system observation. Exact CPVA searches produced no additional defensible claim. No new CVP IS instructor guidance was present in the latest accessible channel export. Commit
7273c63676ad36d79178e40abc44327e9c49e171was pushed and authenticated source readback passed; Actions run2369, task606, succeeded including Pages publication. Public Pages returned the expected Keycloak302; the Pages dataset mount was unavailable from this runtime. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; the registry now contains 426 systems, 631 observations, and 67 normalized contractor/provider entities. Next rotation: clients 251–260. - Previous rotation (2026-08-13 08:08 UTC): clients 231–240 were reviewed. Direct CVP IS award PDFs added four high-confidence system/contractor observations: Inovacijų agentūra awarded UAB „DevOcean LT“ IAVV IS creation/support for EUR 576,250 under a contract signed 2025-03-21; CPVA awarded ECM studija DVS IS support/development for EUR 392,040 under a 36-month contract signed 2026-02-27; and CPVA awarded UAB „NRD Systems“ VSFSVVP IS development/support for EUR 198,347 under a contract signed 2024-12-16, with UAB „Etronika“ explicitly named as a 10% / EUR 18,997 subcontractor. Awards are not presented as acceptance, production release, hosting, or completion evidence. Exact CPVA searches for all ten clients produced no additional defensible claim. No new CVP IS instructor guidance was present in the latest accessible channel export. Commit
cf311bbbd2ae07a49ff88d2f54782ac6f2725665was pushed and authenticated source readback passed; Actions run2367, task604, succeeded including Pages publication. Public Pages returned the expected Keycloak302; direct backend verification was unavailable from this runtime. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; the registry contained 425 systems, 630 observations, and 65 normalized contractor/provider entities. - Previous rotation (2026-08-13 04:08 UTC): clients 221–230 were reviewed. The CVP IS organization-first route identity-matched all ten exact legal names. Direct award PDFs added two high-confidence findings: (1) Valstybinė duomenų apsaugos inspekcija awarded UAB „Lexita“ both 2025 project lots—new information-system creation for EUR 265,000 and statistics-tool creation for EUR 53,000—under contracts signed 2025-07-31; (2) Viešųjų pirkimų tarnyba awarded MB „Nordic plum“ the CVP IS subsystem maintenance/development contract for EUR 287,200, signed 2025-11-30. The records explicitly retain acceptance, production release, and hosting as unknown. Exact CPVA searches and the other identity-checked organization notice lists produced no defensible new claim. No new CVP IS instructor guidance was present in the latest accessible channel export. Commit
1980408a29173679122dd9b34e2c9ce1ad75749ewas pushed and authenticated source readback passed; Actions run2366, job3342, succeeded including Pages publication. Public Pages returned the expected Keycloak302; backend verification was unavailable because this runtime has no resolvable Kubernetes control-plane host. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; the registry contained 422 systems, 627 observations, and 61 normalized contractor/provider entities. - Previous rotation (2026-08-13 02:14 UTC): clients 211–220 were reviewed. The CVP IS organization-first route identity-matched clients 211–214 and 216–220; no exact organization result was found for 215. The direct award PDFs established that UAB „Asseco Lietuva“ received three bounded E-kinas contracts from the Lithuanian Central State Archives: modernization/deployment signed 2025-02-10 for EUR 93,800, plus maintenance/development signed 2025-05-13 and 2026-03-31 for EUR 165,000 each. A separate award established UAB „Asseco Lietuva“ as the Lithuanian Chief Archivist’s Office EAIS modernization contractor under a EUR 660,000 contract signed 2025-02-24 for the E-kultūros platform project. Client 213 and 219 dossiers now cite the exact CVP IS award PDFs and explicitly retain production hosting, acceptance, and go-live dates as unknown. Other exact client/system CPVA searches, official sources, and procurement lists produced no defensible additional system, contractor, production-hosting, delivery-kickoff, or production-release claim. No new CVP IS instructor guidance was available through the runtime's latest accessible channel export. Commits
0220ccfc71f97950e61457eb636eee8ac3d8a6a1andf5574bc01fb7aba20b9c6f77cf3a8e524f177460were pushed; Actions runs2364and2365succeeded, including Pages publication.
Availability continuity
-
On 2026-08-14,
gitea-docusaurus-projectswas merged into the VSSA-manageddocumentation-docusaurusskill and retired from the active runtime. Public Gitea repositoryvssa-v1-skills-code-agent/documentation-docusaurusis authoritative; all 22 merged references, the Actions template, provenance, validator and runtime symlink are maintained from/opt/data/documentation-docusaurus-skill. The exact requested comparison repositorycorp-v1-skills-code-agent/documentation-docusauruswas absent through both authenticated API and SSH and was not touched. The accessible centralhome-v1-skills-code-agent/documentation-docusaurusbaseline and independent AeroSim adoption were inspected read-only; the VSSA skill preserved the baseline guidance and adopted the explicit independent-adoption/provenance model. Cron job88833e00b4a2now loadsdocumentation-docusaurusinstead of the absorbed skill. -
On 2026-08-14, the VSSA research skill was renamed from
client-investigatortovssa-clients. Public Gitea organizationvssa-v1-skills-code-agentand repositoryvssa-clientswere created; repositorymainis now authoritative,/opt/data/vssa-clients-skillis the maintainer worktree, and/opt/data/skills/research/vssa-clientsis the runtime symlink. Cron job88833e00b4a2now loadsvssa-clientsand requires every reusable skill improvement to be validated, committed, pushed, remotely read back, and runtime-loaded before reporting. -
On 2026-08-13, rotation 231–240 added direct CVP IS award evidence for IAVV IS (UAB „DevOcean LT“, EUR 576,250), CPVA DVS IS (ECM studija, EUR 392,040), and VSFSVVP IS (UAB „NRD Systems“, EUR 198,347; UAB „Etronika“ as the explicitly named 10% subcontractor). Validation and the production build passed with 290 clients, 425 systems, 630 observations, and 65 contractor/provider dossiers. Commit
cf311bbwas pushed and read back; Actions run2367, task604, succeeded including LEGO Cloud Pages publication, and public Pages retained the expected Keycloak302. -
On 2026-08-13, rotation 221–230 added direct CVP IS award evidence that UAB „Lexita“ received VDAI's new information-system and statistics-tool creation contracts (EUR 265,000 and EUR 53,000; signed 2025-07-31), and MB „Nordic plum“ received VPT's CVP IS subsystem maintenance/development contract (EUR 287,200; signed 2025-11-30). Validation and the production build passed with 290 clients, 422 systems, 627 observations, and 61 contractor/provider dossiers. Commit
1980408was pushed and read back; Actions run2366, job3342, succeeded including LEGO Cloud Pages publication, and public Pages retained the expected Keycloak302. -
On 2026-08-13, rotation 211–220 added direct CVP IS award evidence for three E-kinas contracts awarded to UAB „Asseco Lietuva“ (EUR 93,800 modernization/deployment and two EUR 165,000 maintenance/development contracts) and a EUR 660,000 EAIS modernization contract awarded to the same company. Validation and the production build passed with 290 clients, 421 systems, 626 observations, and 59 contractor/provider dossiers. Commits
0220ccfandf5574bcwere pushed and read back; Actions runs2364and2365succeeded including LEGO Cloud Pages publication, and public Pages retained the expected Keycloak302. -
On 2026-08-13, rotation 201–210 added direct CVP IS award evidence that UAB „iTree Lietuva“ won the NMA ŽŪPAIS Informacinio portalo 36-month maintenance/development contract for EUR 104,060, signed 2026-05-28. The award PDF is
resourceId=6504564,documentId=8110181,noticeId=8110157, procedure32350071-7198-4af1-a61e-f26a6efd8eba. Validation and the full build passed with 290 clients, 421 systems, 626 observations, and 58 contractor/provider dossiers. Commit5cc1b2cwas pushed and read back; Actions run2363, job3339, succeeded including LEGO Cloud Pages publication, and public Pages retained the expected Keycloak302. -
On 2026-08-12, scheduled rotation 191–200 completed with conservative no-new-claim outcomes.
corepack pnpm validate, the full production build (290 client, 421 system and 57 contractor routes; 626 observations; 296 raw artifacts), andgit diff --checkpassed. Commit7c1f68fwas pushed, authenticated read back, and published by successful Actions run2357; public Pages retained the intended Keycloak302. The host did not expose the runner Pages dataset mount, so no direct backend-file readback was available from this runtime. -
On 2026-08-12, commit
d0c828aadded the first-class Contractors collection: top navigation, dedicated Docusaurus plugin/sidebar, Overview → Registry, 58 generated contractor/provider dossiers, stable internalCTR-*IDs, a machine-readable registry, exact client/system/evidence relationships, and generated contractor sections on system dossiers. INVESTIS now displays ATEA with its bounded evidenced role. The same change recorded 2023-10-02 as INVESTIS's production release because CPVA's dated official announcement explicitly says the system started operating; the 2023-10-03 Inovacijų agentūra announcement is retained as corroboration. Delivery kickoff remains unknown because neither announcement establishes when delivery began. Focused tests, registry validation, the full production build, local browser checks, authenticated Gitea source readback, and Actions run2351succeeded; public Pages correctly returns the expected Keycloak302for the new routes. Recurring job88833e00b4a2andclient-investigatornow preserve this release-date rule and contractor-registry semantics. -
On 2026-08-12, three live organization-first CVP IS trials produced exact, PDF-backed system procurements. (1) Vyriausybės kanceliarija: organization
2076,orgGroupId=2088, 40 notices; a 2025 PPVIS maintenance/improvement tender (resourceId=3325946) explicitly names PPVIS, EUR 110,000 excluding VAT, 36 months, and has a later contract-award notice, which must be opened separately before supplier attribution. (2) Inovacijų agentūra: organization1679,orgGroupId=1681; the IAVV IS creation/support award (resourceId=16691) names UABDevOcean LT, EUR 576,250, winner selection 2025-02-27, and contract date 2025-03-21. This maps to a newly evidenced IAVV IS, not INVESTIS; separate AIS, IAVVIS technical-supervision, project/portfolio-platform, and B2Lithuania notices also appeared. (3) CPVA: organization1253,orgGroupId=1254, 224 notices; a 2026 tender (resourceId=9090393) explicitly covers development, maintenance, and warranty services for VSFSVVP IS, an electronic data-exchange system for Internal Security Fund / Border Management and Visa Policy financial support. It proves intended procurement only, not award or supplier. Direct notice endpoints returned valid PDF attachments and extracted text. -
On 2026-08-12, instructor guidance established the CVP IS organization-first route. Live validation confirmed that the organization search exposes exact organization rows; example profile
id=1297links to published notices with distinctauthorityId=1297andorgGroupId=1298; the notice list exposes type, title, upload/publication dates, language, and status; and a notice-type link returned HTTP 200application/pdfwith an attachment filename and stable resource/document/notice identifiers. Browser navigation can abort on this legitimate download. The validated mechanics and PDF/stage safeguards were added toclient-investigatorand recurring job88833e00b4a2. -
On 2026-08-12, an exhaustive CPVA sweep queried all 421 then-current canonical system names through the live validated
https://cpva.lt/paieska?_sf_s=<phrase>mechanism with zero request failures. CPVA uses broad token matching, so raw search-card hits are noisy and require opened-body verification. The first defensible case was INVESTIS: CPVA's 2023-10-02 production-launch notice explicitly describes INVESTIS/DMS, its production start and functions, and ATEA as the service provider collaborating on system creation. Client 236 (Inovacijų agentūra) and client 240 (CPVA) were updated with the bounded historical supplier role in commit18751f6; local validation/build, authenticated readback, Actions run2350, and Pages publication succeeded. Theclient-investigatorCPVA procedure was corrected from ineffective POST assumptions to the confirmed_sf_sURL and now warns that broad token matches are discovery only. -
On 2026-08-12, Lego designated Discord user
476287310627864587to teach Hermes use of the CVP IS procurement portal (https://viesiejipirkimai.lt/epps/viewCFTSAction.do) for finding and mapping RFIs, RFPs, specifications, awards, contracts/amendments, and completion records to VSSA clients and systems. This is a CONFIRMED process directive; exact portal procedures remain UNKNOWN until taught and validated. Recurring job88833e00b4a2was configured to ingest the instructor's channel guidance and preserve procurement-stage semantics. -
On 2026-08-12, commit
15020a8added one defensible Mano dienynas observation for client 167, increasing the registry to 622 observations while retaining 420 canonical systems. Validation, deployed-content checks, authenticated remote readback, and Gitea Actions run2344succeeded. CPVA exact-name searches for clients 161–170 returned no applicable findings. -
On 2026-08-12, commit
4756f0dadded a generated System dossier column to every client “Cloud services and systems”/structured systems table. All 621 observations link by displayedSYS-*ID to valid canonical system routes covering 420 systems. Local validation/build passed, authenticated source readback succeeded, and Gitea Actions run2343completed successfully including Pages publication. Public access continues to return the intended Keycloak302redirect. -
On 2026-08-12, commit
d3b833breorganized both Clients and Systems sidebars into exactly two first-level entries: Overview and an expanded Registry group containing the ordered individual dossiers (290 clients and 420 systems). Local validation/build and rendered sidebar checks passed, authenticated Gitea readback confirmed both sidebar files, and Actions run2342completed successfully including the Pages publish step. Public access continues to return the intended Keycloak302redirect. -
On 2026-08-12, commit
95d2a9csplit Overview, Clients, Systems, Methodology, and Data into dedicated Docusaurus sidebars; documented thatSYS-*values are deterministic internal IDs generated from canonical identity keys rather than public identifiers; replaced system relationship tables with reusable React evidence cards; added de-duplicated References indexes to all 290 client and 420 system dossiers; and updated recurring job88833e00b4a2to search CPVA's officialhttps://cpva.lt/paieskaendpoint for client/system mentions while retaining only verified evidence. Validation/build and representative rendered-route checks passed, Gitea Actions run2341succeeded, and public Pages retained its expected Keycloak302protection. -
On 2026-08-12, commit
a6ca8abadded infrastructure/lifecycle analysis fields to all 420 then-current unique system records, updated the machine-readable registry to schema version 2, added identity-safe validation/bootstrap handling, and updated the recurring research job to investigate these fields continuously. Initial values remainunknownuntil direct evidence is found; no hosting or dates were fabricated from existing client observations. Validation/build passed, Gitea Actions run2340succeeded, and the Pages backend returned HTTP 200 with the three fields, schema-v2 registry, and raw canonical analysis file. Public access remains Keycloak-protected (302). -
On 2026-08-12, commit
1542674reorganized the portal around researched user tasks after reviewing GOV.UK content-design/writing guidance, W3C WAI design guidance, and USWDS card/table guidance. Global navigation is now Overview, Clients, Systems, Methodology, and Data; the homepage prioritizes client browsing, system exploration, and evidence search; scope metrics distinguish clients, systems, and observations; generated overview/directory/system-registry guidance explains ordering, statuses, counts, and safe interpretation; provenance documents the machine-readable registry. The rationale is recorded indocs/content-organization-research.md. Validation/build passed, desktop visual and browser checks found no clipping/JS errors, Gitea Actions run2335succeeded, and the Pages backend returned HTTP 200 for all representative routes and search. Public access remains Keycloak-protected (302). -
The first scheduled continuous-research invocation at 22:00 UTC failed because the model provider reported overload. The next invocation completed at 00:12 UTC, validated all 290 clients plus 419 system routes/620 observations, pushed commit
b34670484501f0ddd27154c19b7605bf00f3efdd, and verified successful Gitea Actions run2333. Public Pages correctly redirected unauthenticated traffic to Keycloak (302), while direct backend checks returned HTTP 200 for representative client/system routes and the registry. -
On 2026-08-11, the visible navbar/site label was changed from
VSSA DocumentationtoVSSA - Clients & Systemsin commitd062598. Gitea Actions run2332succeeded and the Pages backend returned HTTP 200 with the new label. -
On 2026-08-11, commit
e0efc31flattened the Client Dossiers sidebar and added Systems Dossiers: 621 canonical evidence observations consolidated into 421 conservative unique-system records, 421 generated system routes, client/system provenance links, reviewed alias rules, machine-readable JSON, search indexing, and build validation. Gitea Actions run2331succeeded. The Pages backend returned HTTP 200 for the homepage, client 001, systems registry, representative centralized-government-IT dossier, registry JSON, and search index. Public Pages became Keycloak-protected concurrently and now correctly returns HTTP 302 to/oauth2/startfor unauthenticated requests; this is infrastructure authentication, not a deployment failure. -
On 2026-08-11, the dedicated VSSA-styled Docusaurus landing page and native local search were published in commit
d43effe. The design uses the official VSSA navy/blue visual language, locally bundled Public Sans, the official mark, square geometry, a separate/overview/documentation route, and live registry-derived metrics. Gitea Actions run2330completed successfully. The public homepage, overview, directory, local 3 MB search index, and logo returned HTTP 200; a browser query forkanceliarijareturned multiple dossier results and opened client 001 successfully. Search is generated and executed inside the static site with no external search service. -
On 2026-08-11,
vssa-v1/vssa-clientswas renamed tovssa-v1/documentationwith history preserved. The main worktree and 20 linked-worktree pointers were repaired and verified. Docusaurus 3.10.2 now renders all 290 dossiers from generated MDX-safe copies, preserves canonical source artifacts, and publishes byte-identical raw artifacts with SHA-256 hashes. Gitea Actions run2329completed successfully for commit0a2144f, and the public LEGO Cloud Pages homepage, directory, representative dossier routes, and raw manifest returned HTTP 200. -
On 2026-08-11, Gitea 1.27.0 initially left web/API healthy while all Git transport operations crashed in the Go runtime during
moduledataverify1. Gitea was subsequently updated to1.27.1; SSH and Smart HTTP recovered. The queued VSSA commit6fc42abwas pushed and remotely verified, leaving localmainsynchronized withorigin/main. -
CONFIRMED recovery decision/status (2026-08-11 19:05–19:06 UTC): after Lego asked Hermes to recheck, live verification showed Gitea
1.27.1, REST API, SSH Git, and HTTPS Git all healthy. The queued VSSA client-dossier commit6fc42abwas pushed, remoteINDEX.mdwas read back, and localmainmatchedorigin/main. No VSSA delivery blocker remained from this incident. -
On 2026-08-04 at 20:05–20:42 UTC, Lego (
root_at_skic) repeatedly asked whether Hermes was alive. These messages are evidence of the broader Hermes availability incident, not a change to the VSSA investigation scope. The incident was subsequently investigated in#jarvis-jr-v1-hermes-setup.
Terminology
- In repository and Gitea workflow guidance, mutation means an operation that changes data or state (for example editing, committing, pushing, changing settings, or deleting). “Discovery before mutation” means inspect and confirm the target repository and its current state before making changes.
Source anchor
- Latest processed human message:
1539720023382298655(2026-08-19 19:37 UTC). RootAtSkic requested an executive-level presentation using the VSSA PowerPoint template; the completed, validated final presentation and artifact details are recorded above. - Previous processed human message:
1539580734690557972(2026-08-19 10:24 UTC). RootAtSkic corrected VSSA's entity classification; the confirmed repository, skill and generated-route correction is recorded above. - Previous processed human message:
1539556697855623238(2026-08-19 08:48 UTC). The designated CVP IS instructor supplied lesson 3, the organization/client-data search and profile-derived published-notices route recorded above. - Previous processed human messages:
1539539693383852083and1539544570164158526(2026-08-19 07:41–08:00 UTC). The designated instructor supplied CVP IS lessons 1 and 2, recorded and validated above. - Previous processed human message:
1539320694246998056(2026-08-18 17:10 UTC). RootAtSkic required the desktop “On this page” panel to be at least twice as wide; the confirmed160px→320pxdelivery is recorded above. - Previous processed human messages:
1537814241019564032,1537819093254668479, and1537819134069571685(2026-08-14 13:24–13:44 UTC). Lego directed the documentation improvement using the updateddocumentation-docusaurusskill and then confirmed that approval was given. - Previous processed human message:
1537799637707128902(2026-08-14 12:26 UTC). Lego directed the merge ofgitea-docusaurus-projectsinto a dedicated VSSA-manageddocumentation-docusaurusrepository and authorized read-only learning from, but no modification of, the requested corp repository; the verified outcome and unavailable exact comparison source are recorded above. - Previous processed human messages:
1537796686020349992–1537798034602065940(2026-08-14 12:15–12:20 UTC). Lego asked which documentation skills were used and whether both were Gitea-managed, leading to the confirmed merge/repository directive. - Previous processed human messages:
1537794036780498954and1537794525836218368(2026-08-14 12:04–12:06 UTC). Lego asked which skill governs this channel, renamed it tovssa-clients, and required a dedicated repository undervssa-v1-skills-code-agent. - Previous processed human messages:
1537785454265634817and1537793619442925701(2026-08-14 11:30–12:02 UTC). Lego required contractor links on each exact client-system row and asked for a concrete Client Card example; the implemented relationship model and Nacionalinė teismų administracija example are recorded above. - Previous processed human message:
1537121770707091537(2026-08-12 15:33 UTC). Lego clarified that dated official announcements explicitly saying a system started operating can evidence its production release and asked why INVESTIS lacked kickoff/release values; the confirmed release-date rule and deployed INVESTIS result are recorded above, while kickoff remains unknown. - Previous processed human message:
1537121281529356391(2026-08-12 15:31 UTC). Lego required system dossiers to expose evidenced contractors and proposed a first-class Contractors registry; commitd0c828aimplemented and published that structure. - Previous processed human message:
1537120485870018662(2026-08-12 15:28 UTC). Lego requested exact system links to inspect documentation updates; Hermes clarified that the three CVP IS trials had been captured as research leads but had not yet been incorporated into documentation pages. - Previous processed human messages:
1537116481408466974–1537117840715546624(2026-08-12 15:12–15:17 UTC). Lego taught and requested live trials of the additional CVP IS organization-first search route; the validated mechanics and three trial results are recorded above. - Previous processed human message:
1537072799775203358(2026-08-12 12:18 UTC). Lego designated user476287310627864587as the CVP IS instructor and directed the recurring job to learn the procurement portal workflow and map supported procurement records to VSSA clients and systems. - Previous processed human message:
1537067600998047804(2026-08-12 11:57 UTC). Lego requested internal system-dossier links in every client cloud-services/systems table; commit4756f0dimplemented and verified the links as recorded above. - Previous processed human message:
1537058117223972915(2026-08-12 11:20 UTC). Lego requested Overview/Registry hierarchy for both Clients and Systems sidebars; commitd3b833bimplemented it. - Previous processed human messages:
1537047891309494343–1537049333352894514(2026-08-12 10:39–10:45 UTC). Lego required recurring infrastructure/lifecycle research, dedicated top-level sidebars, clarification of generatedSYS-*IDs, reusable relationship cards, CPVA searching, and per-record reference indexes; commitsa6ca8aband95d2a9cimplemented these requirements. - Latest processed human message:
1536934392302141461(2026-08-12). Lego requested an immediate research-led overall page improvement cycle focused on best practices for content organization; the deployed result is recorded above. - Latest processed human message:
1536859431533281312(2026-08-11). Lego requested the site labelVSSA - Clients & Systems; it was published and verified as recorded above. - Latest processed human message:
1536847412382015629(2026-08-11). Lego requested a flat Client Dossiers sidebar, a unique Systems Dossiers registry, and continuous documentation/research automation; all three were implemented and published as recorded above. - Latest processed human message:
1536845732613591160(2026-08-11). Lego reported that the new landing page and search were not visible; inspection confirmed the changes had only existed locally. Hermes committed and pushed them, verified successful Actions run2330, and confirmed the public deployment and search behavior. - Latest processed human message:
1536835494909055107(2026-08-11). Lego directed Hermes to rename the repository todocumentation, convert it to Docusaurus, add Gitea Actions, and publish through LEGO Cloud Pages; the completed state is recorded above. - Previous processed human message:
1536812738679021618(2026-08-11 19:05 UTC). Lego asked Hermes to check Gitea after remediation; the subsequent verified result is recorded above. - Previous incident message:
1536807021674762261(2026-08-11 18:42 UTC), asking what was wrong with Gitea and how to resolve it. - Previous availability message:
1534300468530905170(2026-08-04 20:42 UTC). Lego asked whether Hermes was alive; no VSSA project scope or status changed. - Previous terminology message:
1533032343021813930(2026-08-01 08:43 UTC), requesting clarification of “mutation”. - Previous durable directive:
1532810727847624884(2026-07-31 18:02 UTC), confirming the concise one-file-per-client format, plain-language system meaning, contractor/company research, deep public investigation, and iterative improvement ofclient-investigator.