wiki: sync 2026-08-20 22:07 UTC — 1 file(s) updated
This commit is contained in:
@@ -1,6 +1,6 @@
|
|||||||
# vssa-storm
|
# vssa-storm
|
||||||
|
|
||||||
_Last sync: 2026-08-20 03:06 UTC_
|
_Last sync: 2026-08-20 22:05 UTC_
|
||||||
|
|
||||||
## CVP IS instructor lesson 3 — organization/client data (2026-08-19)
|
## CVP IS instructor lesson 3 — organization/client data (2026-08-19)
|
||||||
|
|
||||||
@@ -43,7 +43,109 @@ _Last sync: 2026-08-20 03:06 UTC_
|
|||||||
- Updated the layout regression test to require both `flex-basis` and `max-width` at `20rem`. All `15` tests, full validation, production build and `git diff --check` passed; the build verified `290` client, `520` system and `111` contractor routes, `745` observations and `296` raw artifacts.
|
- Updated the layout regression test to require both `flex-basis` and `max-width` at `20rem`. All `15` tests, full validation, production build and `git diff --check` passed; the build verified `290` client, `520` system and `111` contractor routes, `745` observations and `296` raw artifacts.
|
||||||
- Commit `3fc30f514db8d6ea0b2a69263dd66d4847b60cf2` is on `main`; local/remote ref equality and authenticated exact-SHA CSS readback passed. Exact-head Gitea Actions task `1263` reached `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized page-body readback and browser acceptance were unavailable because this runtime has no service-proxy client and could not launch Chrome.
|
- Commit `3fc30f514db8d6ea0b2a69263dd66d4847b60cf2` is on `main`; local/remote ref equality and authenticated exact-SHA CSS readback passed. Exact-head Gitea Actions task `1263` reached `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized page-body readback and browser acceptance were unavailable because this runtime has no service-proxy client and could not launch Chrome.
|
||||||
|
|
||||||
## Latest scheduled rotation — 2026-08-20 02:08 UTC
|
## Latest scheduled rotation — 2026-08-20 22:05 UTC
|
||||||
|
|
||||||
|
- Completed the explicitly assigned ordered review of clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
|
||||||
|
- Reopened all `81` distinct current dossier URLs with browser-equivalent requests and inspected HTTP `200` content. The Microsoft Bookings URL now redirected to its current `bookings.cloud.microsoft` page at HTTP `200`. Ran `52` exact CPVA client/system searches and `52` client/system contractor/procurement query ladders; noisy external-search results were time-boxed rather than treated as evidence.
|
||||||
|
- Repeated both CVP IS discovery routes. Basic search retained `47` exact-authority rows and four broad candidates. Organization-first discovery identity-checked `18` clients across `19` profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, and reviewed `221` exposed notice rows including `30` broad IT/digital candidates without forcing near-name identities.
|
||||||
|
- Re-downloaded and text-extracted all `11` cited CVP IS PDFs across `10` procurement resources. Their bodies remain correctly classified as four tenders and seven award notices. All `30` order, notice-list and procurement-document detail routes returned inspected HTTP `200`; no search row or infrastructure/equipment lead was promoted beyond the body-supported stage.
|
||||||
|
- This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing `2026-08-20` dates, statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved.
|
||||||
|
- All `16` tests, registry validation, type checking, production build, generated-route/raw-artifact checks and `git diff --check` passed. Browser-equivalent local HTTP marker checks passed for clients `101`, `110` and `120`, both registries and client `110`'s raw artifact. Registry state remains `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. `corepack pnpm` was attempted but unavailable, so repository-equivalent `npm run validate` and `npm run build` completed successfully.
|
||||||
|
- No documentation source changed, so no empty commit was created. Documentation `main` remains exactly equal to remote commit `f877fcc41f9510c16c6c99e15a07b892d07f78ae`; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1324` (`build`) remains `success`, including Pages publication. Public Pages returned the expected OAuth `302`, proving the authentication boundary rather than page content; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client.
|
||||||
|
- Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. The synchronized wiki still contains CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
|
||||||
|
- Next ordered dossier rotation: `121`–`140`.
|
||||||
|
|
||||||
|
### Previous scheduled rotation — 2026-08-20 20:09 UTC
|
||||||
|
|
||||||
|
- Completed the ordered review of clients `101`–`120` from the job's stated durable cursor after `081`–`100`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
|
||||||
|
- Reopened all `70` distinct current dossier URLs with browser-equivalent requests: `69` returned inspected HTTP `200`, while the already documented Microsoft Bookings endpoint retained its automation-specific `417`. All `11` cited CVP IS PDFs were re-downloaded, verified as PDFs and text-extracted; their bodies continue to support the existing tender versus award/contract classifications.
|
||||||
|
- Ran `54` de-duplicated exact CPVA client/system searches and `62` per-observation contractor/procurement query ladders, and repeated both CVP IS discovery routes. The basic route retained `55` exact-authority rows. Organization-first discovery identity-checked `19` clients across `20` profile records, preserving both unresolved Vilniaus teatras Lėlė profiles, and reviewed `214` exposed notice rows without forcing a near-name identity.
|
||||||
|
- A newly published `2026-08-20` open-tender notice for Potencialiai pavojingų įrenginių registro maintenance and modification was opened and classified from its four-page body. It states a planned EUR 45,000 open procurement covering programming, consulting and training, with offers due `2026-09-02`; it names no selected supplier or signed contract and adds no stronger dossier claim than the already represented planned procurement. Other surfaced rows were already represented, outside system/service scope, or tender-stage/infrastructure leads. This was a genuine conservative no-new-claim review; current `2026-08-20` dates, statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved.
|
||||||
|
- All `16` tests, registry validation, type checking, production build, generated-route/raw-artifact checks and `git diff --check` passed. Local browser-equivalent HTTP marker checks passed for clients `101`, `110` and `120`, both registries and client `110`'s raw artifact. Registry state remains `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. `corepack pnpm` was attempted but unavailable, so repository-equivalent `npm run validate` and `npm run build` completed successfully.
|
||||||
|
- No documentation source changed, so no empty commit was created. Documentation `main` remains exactly equal to remote commit `f877fcc41f9510c16c6c99e15a07b892d07f78ae`; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1324` (`build`) remains `success`, including Pages publication. The public Pages request redirected to Keycloak and returned the login page, proving the authentication boundary rather than changed page content; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client, and Chrome could not be launched.
|
||||||
|
- Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. The synchronized wiki still contains CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
|
||||||
|
- Next ordered dossier rotation: `121`–`140`.
|
||||||
|
|
||||||
|
### Previous scheduled rotation — 2026-08-20 18:07 UTC
|
||||||
|
|
||||||
|
- Completed the explicitly assigned ordered review of clients `101`–`120`, using the job's stated durable cursor after `081`–`100`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
|
||||||
|
- Reopened all `81` current dossier evidence occurrences with inspected browser-equivalent HTTP `200`, ran `52` exact CPVA client/system searches and `52` client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. Exact-authority basic search retained `47` byte-exact authority rows and four broad candidates. Organization-first discovery retained `19` identity-checked profiles and reviewed `221` exposed notice rows, including `30` broad IT/digital candidates; no near-name identity was forced.
|
||||||
|
- Existing direct bodies continue to support the current systems, contractors and bounded procurement-stage semantics. Newly surfaced discovery rows were either already represented, outside the information-system/service scope (for example, projector and drainage procurements), or tender-stage/infrastructure leads that did not establish a defensible new dossier claim. This was a genuine no-new-claim review, not a skipped search; the already current `2026-08-20` dossier and index check dates, statuses, rows, confidence and gaps were preserved.
|
||||||
|
- Validation and production build passed: `16` tests, registry validation, type checking, Docusaurus build, generated route/raw-artifact checks and `git diff --check`. Registry state is `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor link coverage remains complete at `212` each. `corepack pnpm` was attempted but unavailable, so the repository-equivalent `npm run validate` and `npm run build` scripts were executed successfully.
|
||||||
|
- No documentation source changed, so no empty commit was created. Documentation `main` remains exactly equal to remote commit `f877fcc41f9510c16c6c99e15a07b892d07f78ae`; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1324` (`build`) remains `success`, including Pages publication. Public Pages reached the expected Keycloak/OAuth `302`; authorized deployed page-body readback and browser acceptance were unavailable because this runtime has no service-proxy client and Chrome could not be launched. A representative built client route passed local HTTP marker checks.
|
||||||
|
- Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. The synchronized wiki contained CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
|
||||||
|
- Next ordered dossier rotation: `121`–`140`.
|
||||||
|
|
||||||
|
### Previous scheduled rotation — 2026-08-20 16:12 UTC
|
||||||
|
|
||||||
|
- Completed the next durable ordered review of clients `141`–`160`, following the wiki's latest completed `121`–`140` range; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
|
||||||
|
- Reopened all `77` current dossier evidence occurrences (`59` distinct URLs) with inspected browser-equivalent HTTP `200`, ran `65` exact CPVA client/system searches and `65` client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. It retained `19` exact profiles, forced no near-name profile for client `155`, and reviewed all `324` exposed notice rows, including `134` broad IT/digital candidates.
|
||||||
|
- Reopened all currently cited direct evidence bodies successfully. The three Pirkimo-ID detail routes were also retried for all `16` cited resources, but the portal returned uniform HTTP `500`; no claim was derived from those unavailable metadata views. Existing VTAIS, Vektra, Avilys, ArcGIS, seabed/marine-cartography, VSS IS, ULSVIS/VSSIS, competency-platform, VAPRIS/VPREG, RSC GIP, MetaSystems and RADIS evidence remains bounded to the procurement stages established by the opened direct bodies.
|
||||||
|
- This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to `2026-08-20`.
|
||||||
|
- Registry state remains `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||||
|
- All `16` tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was attempted but unavailable, so repository-equivalent `npm run validate` and `npm run build` scripts were used. Browser-equivalent local HTTP readback verified clients `141`, `150` and `160`, both registries and client `141`'s raw artifact.
|
||||||
|
- Documentation commit `f877fcc41f9510c16c6c99e15a07b892d07f78ae` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1324` / run `103` (`build`) reached `success`, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
|
||||||
|
- The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
|
||||||
|
- Next ordered dossier rotation: `161`–`180`.
|
||||||
|
|
||||||
|
### Previous scheduled rotation — 2026-08-20 14:06 UTC
|
||||||
|
|
||||||
|
- Completed the next durable ordered review of clients `121`–`140`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
|
||||||
|
- Reopened all `70` current dossier evidence URLs with inspected browser-equivalent HTTP `200`, ran `40` exact CPVA client/system searches and `40` client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. Exact-authority basic search returned `462` complete rows (`450` byte-exact authority matches and `46` broad IT/digital candidates). Organization-first discovery retained `20` identity-checked profiles and reviewed all `505` exposed notice rows, including `70` broad candidates; punctuation/case variants for clients `126`, `134` and `136` remained bounded and no near-name identity was forced.
|
||||||
|
- Reopened all three public Pirkimo-ID detail routes for the `16` procurement resources currently cited across the range (`48/48` HTTP `200`). Existing PAIS award evidence and patient-turning, software, social-care-system, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call tender evidence remain correctly bounded to the document stages already represented.
|
||||||
|
- This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved. Dossier and index dates were already `2026-08-20`, so the completed review produced no source diff and no empty commit was created.
|
||||||
|
- Registry state remains `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||||
|
- All `16` tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, all assigned URL checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was attempted but unavailable, so the repository-equivalent `npm run validate` and `npm run build` scripts were used. Browser-equivalent local HTTP readback verified clients `121`, `130` and `140`, both registries and client `130`'s raw artifact.
|
||||||
|
- Documentation `main` remains exactly equal to remote commit `ccc162cf95e5c790439720c43c29a08c7cf78158`; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1309` (`build`) remains `success`, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
|
||||||
|
- The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
|
||||||
|
- Next ordered dossier rotation: `141`–`160`.
|
||||||
|
|
||||||
|
### Previous scheduled rotation — 2026-08-20 12:07 UTC
|
||||||
|
|
||||||
|
- Completed the explicitly assigned ordered review of clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
|
||||||
|
- Reopened all `81` current dossier evidence occurrences with inspected browser-equivalent HTTP `200`, ran `52` exact CPVA client/system searches and `52` client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. Exact-authority basic search retained `47` byte-exact authority rows and four broad candidates. Organization-first discovery retained `19` identity-checked profiles and reviewed all `221` exposed notice rows, including `30` broad IT/digital candidates, without forcing near-name identities.
|
||||||
|
- Reopened all `11` currently cited direct CVP IS notice PDFs at HTTP `200` and preserved their body-classified tender/award semantics. The three public Pirkimo-ID detail routes returned a uniform portal-side HTTP `500` during this run, so no claim was derived from those unavailable metadata views and the opened direct notice bodies remained the evidence. Existing systems, contractors, procurement stages, confidence, aliases and explicit unknowns remain supported.
|
||||||
|
- This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Dossier and index dates were already `2026-08-20`, so the completed review produced no source diff and no empty commit was created.
|
||||||
|
- Registry state remains `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||||
|
- All `16` tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, all assigned URL checks and `git diff --check` passed. `corepack pnpm` was attempted but unavailable, so the repository-equivalent `npm run validate` and `npm run build` scripts were used. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120` plus both registries; the Chrome harness could not launch a supported browser.
|
||||||
|
- Documentation `main` remains exactly equal to remote commit `ccc162cf95e5c790439720c43c29a08c7cf78158`; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1309` (`build`) remains `success`, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
|
||||||
|
- The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
|
||||||
|
- Next ordered dossier rotation: `121`–`140`.
|
||||||
|
|
||||||
|
### Previous scheduled rotation — 2026-08-20 10:04 UTC
|
||||||
|
|
||||||
|
- Completed the explicitly assigned ordered review of clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
|
||||||
|
- Reopened all `81` distinct current dossier URLs with inspected browser-equivalent HTTP `200`, ran `52` exact CPVA client/system searches and `52` client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search retained `47` byte-exact authority rows and four broad candidates. Organization-first discovery retained `19` identity-checked profiles and reviewed `30` broad IT/digital candidates without forcing near-name identities.
|
||||||
|
- Client `110` now records three additional bounded tender-stage observations. VDI's opened official notices establish planned maintenance/modification procurement for the Potentially Dangerous Equipment Register and the named `Organizacijos pagalbininkas` software, plus planned UiPath-based process-automation modification, creation and consulting. All three bodies are open-tender notices only: selected suppliers, signed contracts, delivery, production use, hosting and release remain unproved and explicitly unresolved.
|
||||||
|
- Registry state is `290` clients, `524` canonical systems, `749` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||||
|
- All `16` tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, all assigned URL checks and `git diff --check` passed. `corepack pnpm` was attempted but unavailable, so the repository-equivalent `npm run validate` and `npm run build` scripts were used. Local browser-equivalent HTTP readback verified client `110`, both registries and its raw artifact; the Chrome harness could not launch a supported browser.
|
||||||
|
- Documentation commit `ccc162cf95e5c790439720c43c29a08c7cf78158` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1309` (`build`) is `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
|
||||||
|
- The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
|
||||||
|
- Next ordered dossier rotation: `121`–`140`.
|
||||||
|
|
||||||
|
### Previous scheduled rotation — 2026-08-20 06:05 UTC
|
||||||
|
|
||||||
|
- The explicitly assigned `101`–`120` rotation was already fully researched, committed and published earlier today at documentation commit `72dd243839e74ec4cc67d270d877c379f87f8fab`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the ordered cursor. This idempotent replay did not repeat the same CPVA/contractor/CVP IS batch or create an empty documentation commit.
|
||||||
|
- Reopened all `67` distinct current dossier URLs across `81` occurrences with browser-equivalent requests: `66` returned inspected HTTP `200`; the already documented Microsoft Bookings endpoint retained its automation-specific `417`. Existing system, contractor, procurement-stage, confidence, alias and explicit-unknown claims were preserved; no defensible new dossier claim was established.
|
||||||
|
- Repository validation and production build passed again: `16` tests, registry validation, type checking, Docusaurus build, generated-route/raw-artifact checks and `git diff --check`. Registry state remains `290` clients, `522` canonical systems, `747` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. `corepack pnpm` was attempted but unavailable, so the repository-equivalent `npm run validate` and `npm run build` scripts were used.
|
||||||
|
- Documentation `main` remains exactly equal to remote commit `72dd243839e74ec4cc67d270d877c379f87f8fab`; authenticated source readback passed and exact-head Gitea Actions task `1305` / run `101` (`build`) remains `success`, including Pages publication. Public Pages resolved to the expected Keycloak/OAuth boundary; authorized deployed page-body readback remains unavailable because this runtime has no `kubectl`, `microk8s` or `k3s` service-proxy client. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
|
||||||
|
- New CVP IS instructor lesson 3 was validated live: `GET /epps/prepareAdvancedSearch.do?type=org` returned the `searchOrganizationForm`, whose exact action is `POST /epps/viewOrganisations.do` with lowercase `viewMode`, `selectable`, `within`, `name`, `shortName`, `city` and `street` fields. A session-preserving `name=LITGRID` submission returned the exact `LITGRID AB (PV)` row and profile ID `1159`; this validates route mechanics only, not any system or procurement claim.
|
||||||
|
- The authoritative `vssa-clients` skill now documents that validated entry route and form contract at commit `8329b6aaff02e4b27a65ea667f89bcf18b384b2c`. Complete skill validation, local/remote ref equality, authenticated exact-SHA readback, runtime `skill_view` reload and exact-head Gitea Actions task `1306` / run `7` (`validate`) all passed.
|
||||||
|
- Next ordered dossier rotation: `121`–`140`.
|
||||||
|
|
||||||
|
### Previous scheduled rotation — 2026-08-20 04:07 UTC
|
||||||
|
|
||||||
|
- Completed the next ordered review of clients `121`–`140`, following the durable wiki cursor after the latest completed `101`–`120` rotation; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the sequence.
|
||||||
|
- Reopened all `70` distinct current dossier URLs with inspected browser-equivalent HTTP `200`, ran `40` exact CPVA client/system searches and `40` client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search returned `460` complete rows (`448` byte-exact authority matches and `46` broad IT/digital candidates). Organization-first discovery retained `20` identity-checked profiles and reviewed all `502` exposed notice rows, including `70` broad candidates; punctuation/case variants for clients `126`, `134` and `136` were bounded and no near-name identity was forced.
|
||||||
|
- Reopened all three public Pirkimo-ID detail routes for the `16` procurement resources currently cited across the range (`48/48` HTTP `200`). Existing PAIS award evidence and patient-turning, software, social-care-system, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call tender evidence remain correctly bounded to the document stages already represented.
|
||||||
|
- This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved. The dossier and index dates were already `2026-08-20`, so the completed review produced no source diff and no empty commit was created.
|
||||||
|
- Registry state remains `290` clients, `522` canonical systems, `747` observations and `110` contractor cards; Client→contractor and System→contractor links remain complete at `212` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
|
||||||
|
- All `16` tests, full validation, type checking, production build, registry/generated-route checks, all assigned URL checks, exact six-column/date checks and `git diff --check` passed. `corepack pnpm` was attempted but unavailable, so equivalent `npm run validate` and `npm run build` scripts were used. Browser-equivalent local readback verified clients `121`, `130` and `140`, both registries and the raw client artifact.
|
||||||
|
- Existing `main` head `72dd243839e74ec4cc67d270d877c379f87f8fab` remains exactly equal to the remote; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1305` / run `101` (`build`) remains `success`, including Pages publication. Public Pages resolved through the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable from this runtime. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` directories remained untracked and excluded.
|
||||||
|
- The synchronized wiki contained the validated CVP IS instructor lessons. This run established no additional reusable procedure or pitfall, so the authoritative `vssa-clients` skill required no update.
|
||||||
|
- Next ordered dossier rotation: `141`–`160`.
|
||||||
|
|
||||||
|
### Previous scheduled rotation — 2026-08-20 02:08 UTC
|
||||||
|
|
||||||
- Completed the explicitly assigned ordered review of clients `101`–`120`; the completed extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
|
- Completed the explicitly assigned ordered review of clients `101`–`120`; the completed extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset the cursor.
|
||||||
- Reopened all `78` distinct dossier URLs with inspected browser-equivalent HTTP `200`, ran `50` exact CPVA client/system searches and `50` client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search retained `47` byte-exact authority rows and four broad keyword candidates. Organization-first discovery retained `19` identity-checked profiles, including both Vilniaus teatras „Lėlė“ profiles, and reviewed `30` broad IT/digital candidates without forcing near-name identities.
|
- Reopened all `78` distinct dossier URLs with inspected browser-equivalent HTTP `200`, ran `50` exact CPVA client/system searches and `50` client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search retained `47` byte-exact authority rows and four broad keyword candidates. Organization-first discovery retained `19` identity-checked profiles, including both Vilniaus teatras „Lėlė“ profiles, and reviewed `30` broad IT/digital candidates without forcing near-name identities.
|
||||||
|
|||||||
Reference in New Issue
Block a user