Files
knowledge-wiki/channels/1532415849762127902.md
T

264 KiB
Raw Blame History

vssa-storm

Last sync: 2026-08-20 22:05 UTC

CVP IS instructor lesson 3 — organization/client data (2026-08-19)

  • Designated instructor 476287310627864587 taught the organization-search entry point: https://viesiejipirkimai.lt/epps/prepareAdvancedSearch.do?type=org, with form fields viewMode=&selectable=&within=template.group.ca&name=<client name or fragment>&shortName=&city=&street=.
  • Organization results expose basic organization/contact information. After identity-checking the intended legal entity, open prepareViewCAOrganisation.do?id=<organization id> for its profile, then use the profile-derived authorityId and orgGroupId with notices/viewPublishedNotices.do?authorityId=<...>&orgGroupId=<...> to enumerate that organization's published procurements. Instructor example: LITGRID profile id=1159, published-notices tuple authorityId=1159&orgGroupId=1160.
  • Exact legal-name identity remains mandatory; partial name searches are discovery only. Organization/contact and published-notice metadata do not by themselves prove a system, contractor, award, signed contract, delivery, hosting, production use or completion.

Executive presentation — channel work (2026-08-19)

  • Built a nine-slide English executive briefing using the official VSSA PowerPoint template. Final revision: /opt/data/2026-08-19-vssa-clients-systems-intelligence-executive-briefing-1.0.1.pptx.
  • The story covers the executive thesis, registry asset model, current coverage, research engine, evidence controls, executive value, human-guided learning loop and a concrete executive decision. Claims are bounded to the current validated state: 290 clients, 522 canonical systems, 747 observations, 110 commercial contractor cards and statuses 79 researched / 196 partial / 15 no-public-evidence / 0 pending.
  • Completed three visual-QA cycles plus independent fresh-eyes review. Corrections included slide 6 body-text containment, less technical executive language, removal of repeated metrics from slide 3, clearer coverage wording, stronger footers, and an explicit closing ask to name an executive sponsor and select three priority research questions for the next 90 days. Final package checks passed: 9 slides, 9 fade transitions, 140 ZIP members, no duplicates, no out-of-bounds shapes, no empty text boxes/placeholders and retained VSSA theme/master parts. Final full-deck and focused slide rechecks found no delivery-blocking overlap or clipping.
  • Final SHA-256: 27367d5323f2f1ab7511f944043bce86e07aa9843cf951f17b0d957a7affd0e8. Contact-sheet preview: /opt/data/2026-08-19-vssa-clients-systems-intelligence-executive-briefing-1.0.1-preview.png.

Entity-classification correction — VSSA (2026-08-19)

  • RootAtSkic clarified that Valstybės skaitmeninių sprendimų agentūra (VSSA) is Lithuania's central/root government digital-solutions agency—not a system or contractor. It may operate shared services and itself have systems and commercial contractors.
  • VSSA already exists correctly as Client 036. The derived contractor parser was corrected to preserve VSSA's public-service relationships as observation text while excluding the agency from CTR-* extraction and contractor links. Its erroneous CTR-02AF47629A route is no longer generated.
  • The regenerated local site retains the Client 036 dossier and removes the VSSA contractor route. Registry totals are now 290 clients, 521 systems, 746 observations and 110 contractor cards; commercial contractor links are complete at 212 Client→contractor and 212 System→contractor relationships.
  • All 16 tests, full validation, type checking, production build, registry/generated-route checks and git diff --check passed. Documentation commit 6fe5e4425668b3958b231b8828027f12f95b9ef9 is on main; exact-head Actions task 1293 succeeded, including Pages publication, with remote ref equality and authenticated source readback verified. Public routes reach the expected OAuth 302; authorized deployed page-body readback was unavailable.
  • The reusable classification rule was added to the Gitea-backed vssa-clients skill: classify entities before CTR-* extraction; government client bodies do not become contractors merely by operating or centrally providing shared services. Skill commit d744fb0efac8fa801a0db51ed21052b5262f58e1 passed validation, remote readback, ref equality and exact-head Actions task 1294.

CVP IS instructor lesson 2 — result details (validated 2026-08-19)

  • The search result's Pirkimo ID is the procurement resourceId. For each retained result, open three public routes: prepareViewCfTWS.do?resourceId=... for detailed order metadata, viewContractNotices.do?resourceId=... for notices and summary-PDF links, and listContractDocuments.do?resourceId=... for procurement attachments.
  • Live validation used instructor example resourceId=9279980. All three routes returned HTTP 200 HTML for LITGRID AB (PV), Vertybinių popierių apskaita (skelbiama apklausa be derybų). The order page exposed buyer, procedure, CPV, dates and duration; the notices page exposed one published notice; the documents page exposed a conditions ZIP (documentId=9280091) and tender-structure XML (documentId=9280218).
  • The notice link returned a valid four-page, 2,029,056-byte application/pdf with extractable buyer/procedure text. Some document links use href="#" plus JavaScript anonymous-download handlers carrying documentId; parsers must recover that action rather than treating the attachment as missing or inventing a direct URL.
  • The authoritative vssa-clients skill now requires opening all three result-detail routes and retains strict document/stage semantics. Commit ebc9f1641ff3455d16901a4332b2f25b93c3f3f4 is on main; local/remote equality, remote readback and skill validation passed.

CVP IS instructor lesson 1 — basic search (validated 2026-08-19)

  • Designated instructor 476287310627864587 taught the basic advanced-search route at viewCFTSAction.do: use mode=search, isFTS=true, type=cftFTS, isPopup=false, and the actual query key contractAuthority=<URL-encoded client name>, leaving other form filters empty unless intentionally applied.
  • Live validation used VSSA client Lietuvos Respublikos Vyriausybės kanceliarija. Both the exact name and partial Vyriausybės kanceliarija returned HTTP 200 HTML with 39 total results; the first page contained 10 rows whose authority cells showed the exact full legal name, including IT-relevant procurement titles.
  • Operational rule: search the exact legal name first; partial names are discovery fallbacks only. Parse complete rows and all pages, identity-check each contracting-authority cell, and treat the result table as discovery metadata. Open and classify the procurement body/attachment before mapping any system, supplier, contract, delivery, hosting or completion claim.
  • The authoritative Gitea-backed vssa-clients skill now documents the validated route in SKILL.md and references/cvp-is-organization-route.md. Commit 9de0e702f44797a63f995ffd4fe3e0f408a092a7 is on main; local/remote equality, authenticated remote readback and skill validation passed.

Latest documentation delivery — 2026-08-18 17:15 UTC

  • Doubled the desktop right-side page table-of-contents panel from 10rem (160px) to 20rem (320px) at viewports 1280px and wider. The existing 997–1279px rule still hides the secondary table of contents to preserve article width.
  • Updated the layout regression test to require both flex-basis and max-width at 20rem. All 15 tests, full validation, production build and git diff --check passed; the build verified 290 client, 520 system and 111 contractor routes, 745 observations and 296 raw artifacts.
  • Commit 3fc30f514db8d6ea0b2a69263dd66d4847b60cf2 is on main; local/remote ref equality and authenticated exact-SHA CSS readback passed. Exact-head Gitea Actions task 1263 reached success, including Pages publication. Public Pages returned the expected Keycloak/OAuth 302; authorized page-body readback and browser acceptance were unavailable because this runtime has no service-proxy client and could not launch Chrome.

Latest scheduled rotation — 2026-08-20 22:05 UTC

  • Completed the explicitly assigned ordered review of clients 101–120; the extra 001–020 rerun at d62f4fde19e19209af94d49fdb5cda3c4dc1bade did not reset the cursor.
  • Reopened all 81 distinct current dossier URLs with browser-equivalent requests and inspected HTTP 200 content. The Microsoft Bookings URL now redirected to its current bookings.cloud.microsoft page at HTTP 200. Ran 52 exact CPVA client/system searches and 52 client/system contractor/procurement query ladders; noisy external-search results were time-boxed rather than treated as evidence.
  • Repeated both CVP IS discovery routes. Basic search retained 47 exact-authority rows and four broad candidates. Organization-first discovery identity-checked 18 clients across 19 profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, and reviewed 221 exposed notice rows including 30 broad IT/digital candidates without forcing near-name identities.
  • Re-downloaded and text-extracted all 11 cited CVP IS PDFs across 10 procurement resources. Their bodies remain correctly classified as four tenders and seven award notices. All 30 order, notice-list and procurement-document detail routes returned inspected HTTP 200; no search row or infrastructure/equipment lead was promoted beyond the body-supported stage.
  • This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing 2026-08-20 dates, statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved.
  • All 16 tests, registry validation, type checking, production build, generated-route/raw-artifact checks and git diff --check passed. Browser-equivalent local HTTP marker checks passed for clients 101, 110 and 120, both registries and client 110's raw artifact. Registry state remains 290 clients, 524 canonical systems, 749 observations and 110 contractor cards; Client→contractor and System→contractor links remain complete at 212 each. corepack pnpm was attempted but unavailable, so repository-equivalent npm run validate and npm run build completed successfully.
  • No documentation source changed, so no empty commit was created. Documentation main remains exactly equal to remote commit f877fcc41f9510c16c6c99e15a07b892d07f78ae; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1324 (build) remains success, including Pages publication. Public Pages returned the expected OAuth 302, proving the authentication boundary rather than page content; authorized deployed page-body readback was unavailable because this runtime has no kubectl, microk8s or k3s service-proxy client.
  • Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ remained unmodified. The synchronized wiki still contains CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-20 20:09 UTC

  • Completed the ordered review of clients 101–120 from the job's stated durable cursor after 081–100; the extra 001–020 rerun at d62f4fde19e19209af94d49fdb5cda3c4dc1bade did not reset the cursor.
  • Reopened all 70 distinct current dossier URLs with browser-equivalent requests: 69 returned inspected HTTP 200, while the already documented Microsoft Bookings endpoint retained its automation-specific 417. All 11 cited CVP IS PDFs were re-downloaded, verified as PDFs and text-extracted; their bodies continue to support the existing tender versus award/contract classifications.
  • Ran 54 de-duplicated exact CPVA client/system searches and 62 per-observation contractor/procurement query ladders, and repeated both CVP IS discovery routes. The basic route retained 55 exact-authority rows. Organization-first discovery identity-checked 19 clients across 20 profile records, preserving both unresolved Vilniaus teatras Lėlė profiles, and reviewed 214 exposed notice rows without forcing a near-name identity.
  • A newly published 2026-08-20 open-tender notice for Potencialiai pavojingų įrenginių registro maintenance and modification was opened and classified from its four-page body. It states a planned EUR 45,000 open procurement covering programming, consulting and training, with offers due 2026-09-02; it names no selected supplier or signed contract and adds no stronger dossier claim than the already represented planned procurement. Other surfaced rows were already represented, outside system/service scope, or tender-stage/infrastructure leads. This was a genuine conservative no-new-claim review; current 2026-08-20 dates, statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved.
  • All 16 tests, registry validation, type checking, production build, generated-route/raw-artifact checks and git diff --check passed. Local browser-equivalent HTTP marker checks passed for clients 101, 110 and 120, both registries and client 110's raw artifact. Registry state remains 290 clients, 524 canonical systems, 749 observations and 110 contractor cards; Client→contractor and System→contractor links remain complete at 212 each. corepack pnpm was attempted but unavailable, so repository-equivalent npm run validate and npm run build completed successfully.
  • No documentation source changed, so no empty commit was created. Documentation main remains exactly equal to remote commit f877fcc41f9510c16c6c99e15a07b892d07f78ae; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1324 (build) remains success, including Pages publication. The public Pages request redirected to Keycloak and returned the login page, proving the authentication boundary rather than changed page content; authorized deployed page-body readback was unavailable because this runtime has no kubectl, microk8s or k3s service-proxy client, and Chrome could not be launched.
  • Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ remained unmodified. The synchronized wiki still contains CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-20 18:07 UTC

  • Completed the explicitly assigned ordered review of clients 101–120, using the job's stated durable cursor after 081–100; the extra 001–020 rerun at d62f4fde19e19209af94d49fdb5cda3c4dc1bade did not reset the cursor.
  • Reopened all 81 current dossier evidence occurrences with inspected browser-equivalent HTTP 200, ran 52 exact CPVA client/system searches and 52 client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. Exact-authority basic search retained 47 byte-exact authority rows and four broad candidates. Organization-first discovery retained 19 identity-checked profiles and reviewed 221 exposed notice rows, including 30 broad IT/digital candidates; no near-name identity was forced.
  • Existing direct bodies continue to support the current systems, contractors and bounded procurement-stage semantics. Newly surfaced discovery rows were either already represented, outside the information-system/service scope (for example, projector and drainage procurements), or tender-stage/infrastructure leads that did not establish a defensible new dossier claim. This was a genuine no-new-claim review, not a skipped search; the already current 2026-08-20 dossier and index check dates, statuses, rows, confidence and gaps were preserved.
  • Validation and production build passed: 16 tests, registry validation, type checking, Docusaurus build, generated route/raw-artifact checks and git diff --check. Registry state is 290 clients, 524 canonical systems, 749 observations and 110 contractor cards; Client→contractor and System→contractor link coverage remains complete at 212 each. corepack pnpm was attempted but unavailable, so the repository-equivalent npm run validate and npm run build scripts were executed successfully.
  • No documentation source changed, so no empty commit was created. Documentation main remains exactly equal to remote commit f877fcc41f9510c16c6c99e15a07b892d07f78ae; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1324 (build) remains success, including Pages publication. Public Pages reached the expected Keycloak/OAuth 302; authorized deployed page-body readback and browser acceptance were unavailable because this runtime has no service-proxy client and Chrome could not be launched. A representative built client route passed local HTTP marker checks.
  • Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ remained unmodified. The synchronized wiki contained CVP IS instructor lessons 1–3; this review established no additional reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-20 16:12 UTC

  • Completed the next durable ordered review of clients 141–160, following the wiki's latest completed 121–140 range; the extra 001–020 rerun at d62f4fde19e19209af94d49fdb5cda3c4dc1bade did not reset the cursor.
  • Reopened all 77 current dossier evidence occurrences (59 distinct URLs) with inspected browser-equivalent HTTP 200, ran 65 exact CPVA client/system searches and 65 client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. It retained 19 exact profiles, forced no near-name profile for client 155, and reviewed all 324 exposed notice rows, including 134 broad IT/digital candidates.
  • Reopened all currently cited direct evidence bodies successfully. The three Pirkimo-ID detail routes were also retried for all 16 cited resources, but the portal returned uniform HTTP 500; no claim was derived from those unavailable metadata views. Existing VTAIS, Vektra, Avilys, ArcGIS, seabed/marine-cartography, VSS IS, ULSVIS/VSSIS, competency-platform, VAPRIS/VPREG, RSC GIP, MetaSystems and RADIS evidence remains bounded to the procurement stages established by the opened direct bodies.
  • This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to 2026-08-20.
  • Registry state remains 290 clients, 524 canonical systems, 749 observations and 110 contractor cards; Client→contractor and System→contractor links remain complete at 212 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 16 tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, exact six-column/date checks and git diff --check passed. corepack pnpm was attempted but unavailable, so repository-equivalent npm run validate and npm run build scripts were used. Browser-equivalent local HTTP readback verified clients 141, 150 and 160, both registries and client 141's raw artifact.
  • Documentation commit f877fcc41f9510c16c6c99e15a07b892d07f78ae is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1324 / run 103 (build) reached success, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has no kubectl, microk8s or k3s service-proxy client. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 161–180.

Previous scheduled rotation — 2026-08-20 14:06 UTC

  • Completed the next durable ordered review of clients 121–140; the extra 001–020 rerun at d62f4fde19e19209af94d49fdb5cda3c4dc1bade did not reset the cursor.
  • Reopened all 70 current dossier evidence URLs with inspected browser-equivalent HTTP 200, ran 40 exact CPVA client/system searches and 40 client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. Exact-authority basic search returned 462 complete rows (450 byte-exact authority matches and 46 broad IT/digital candidates). Organization-first discovery retained 20 identity-checked profiles and reviewed all 505 exposed notice rows, including 70 broad candidates; punctuation/case variants for clients 126, 134 and 136 remained bounded and no near-name identity was forced.
  • Reopened all three public Pirkimo-ID detail routes for the 16 procurement resources currently cited across the range (48/48 HTTP 200). Existing PAIS award evidence and patient-turning, software, social-care-system, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call tender evidence remain correctly bounded to the document stages already represented.
  • This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved. Dossier and index dates were already 2026-08-20, so the completed review produced no source diff and no empty commit was created.
  • Registry state remains 290 clients, 524 canonical systems, 749 observations and 110 contractor cards; Client→contractor and System→contractor links remain complete at 212 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 16 tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, all assigned URL checks, exact six-column/date checks and git diff --check passed. corepack pnpm was attempted but unavailable, so the repository-equivalent npm run validate and npm run build scripts were used. Browser-equivalent local HTTP readback verified clients 121, 130 and 140, both registries and client 130's raw artifact.
  • Documentation main remains exactly equal to remote commit ccc162cf95e5c790439720c43c29a08c7cf78158; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1309 (build) remains success, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has no kubectl, microk8s or k3s service-proxy client. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 141–160.

Previous scheduled rotation — 2026-08-20 12:07 UTC

  • Completed the explicitly assigned ordered review of clients 101–120; the extra 001–020 rerun at d62f4fde19e19209af94d49fdb5cda3c4dc1bade did not reset the cursor.
  • Reopened all 81 current dossier evidence occurrences with inspected browser-equivalent HTTP 200, ran 52 exact CPVA client/system searches and 52 client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. Exact-authority basic search retained 47 byte-exact authority rows and four broad candidates. Organization-first discovery retained 19 identity-checked profiles and reviewed all 221 exposed notice rows, including 30 broad IT/digital candidates, without forcing near-name identities.
  • Reopened all 11 currently cited direct CVP IS notice PDFs at HTTP 200 and preserved their body-classified tender/award semantics. The three public Pirkimo-ID detail routes returned a uniform portal-side HTTP 500 during this run, so no claim was derived from those unavailable metadata views and the opened direct notice bodies remained the evidence. Existing systems, contractors, procurement stages, confidence, aliases and explicit unknowns remain supported.
  • This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Dossier and index dates were already 2026-08-20, so the completed review produced no source diff and no empty commit was created.
  • Registry state remains 290 clients, 524 canonical systems, 749 observations and 110 contractor cards; Client→contractor and System→contractor links remain complete at 212 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 16 tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, all assigned URL checks and git diff --check passed. corepack pnpm was attempted but unavailable, so the repository-equivalent npm run validate and npm run build scripts were used. Browser-equivalent local HTTP readback verified clients 101, 110 and 120 plus both registries; the Chrome harness could not launch a supported browser.
  • Documentation main remains exactly equal to remote commit ccc162cf95e5c790439720c43c29a08c7cf78158; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1309 (build) remains success, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has no kubectl, microk8s or k3s service-proxy client. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-20 10:04 UTC

  • Completed the explicitly assigned ordered review of clients 101–120; the extra 001–020 rerun at d62f4fde19e19209af94d49fdb5cda3c4dc1bade did not reset the cursor.
  • Reopened all 81 distinct current dossier URLs with inspected browser-equivalent HTTP 200, ran 52 exact CPVA client/system searches and 52 client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search retained 47 byte-exact authority rows and four broad candidates. Organization-first discovery retained 19 identity-checked profiles and reviewed 30 broad IT/digital candidates without forcing near-name identities.
  • Client 110 now records three additional bounded tender-stage observations. VDI's opened official notices establish planned maintenance/modification procurement for the Potentially Dangerous Equipment Register and the named Organizacijos pagalbininkas software, plus planned UiPath-based process-automation modification, creation and consulting. All three bodies are open-tender notices only: selected suppliers, signed contracts, delivery, production use, hosting and release remain unproved and explicitly unresolved.
  • Registry state is 290 clients, 524 canonical systems, 749 observations and 110 contractor cards; Client→contractor and System→contractor links remain complete at 212 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 16 tests, full validation, type checking, production build, registry/generated-route/raw-artifact checks, all assigned URL checks and git diff --check passed. corepack pnpm was attempted but unavailable, so the repository-equivalent npm run validate and npm run build scripts were used. Local browser-equivalent HTTP readback verified client 110, both registries and its raw artifact; the Chrome harness could not launch a supported browser.
  • Documentation commit ccc162cf95e5c790439720c43c29a08c7cf78158 is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1309 (build) is success, including Pages publication. Public Pages returned the expected Keycloak/OAuth 302; authorized deployed page-body readback was unavailable because this runtime has no kubectl, microk8s or k3s service-proxy client. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • The synchronized wiki contained CVP IS instructor lessons 1–3. This review established no additional reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-20 06:05 UTC

  • The explicitly assigned 101–120 rotation was already fully researched, committed and published earlier today at documentation commit 72dd243839e74ec4cc67d270d877c379f87f8fab; the extra 001–020 rerun at d62f4fde19e19209af94d49fdb5cda3c4dc1bade did not reset the ordered cursor. This idempotent replay did not repeat the same CPVA/contractor/CVP IS batch or create an empty documentation commit.
  • Reopened all 67 distinct current dossier URLs across 81 occurrences with browser-equivalent requests: 66 returned inspected HTTP 200; the already documented Microsoft Bookings endpoint retained its automation-specific 417. Existing system, contractor, procurement-stage, confidence, alias and explicit-unknown claims were preserved; no defensible new dossier claim was established.
  • Repository validation and production build passed again: 16 tests, registry validation, type checking, Docusaurus build, generated-route/raw-artifact checks and git diff --check. Registry state remains 290 clients, 522 canonical systems, 747 observations and 110 contractor cards; Client→contractor and System→contractor links remain complete at 212 each. corepack pnpm was attempted but unavailable, so the repository-equivalent npm run validate and npm run build scripts were used.
  • Documentation main remains exactly equal to remote commit 72dd243839e74ec4cc67d270d877c379f87f8fab; authenticated source readback passed and exact-head Gitea Actions task 1305 / run 101 (build) remains success, including Pages publication. Public Pages resolved to the expected Keycloak/OAuth boundary; authorized deployed page-body readback remains unavailable because this runtime has no kubectl, microk8s or k3s service-proxy client. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • New CVP IS instructor lesson 3 was validated live: GET /epps/prepareAdvancedSearch.do?type=org returned the searchOrganizationForm, whose exact action is POST /epps/viewOrganisations.do with lowercase viewMode, selectable, within, name, shortName, city and street fields. A session-preserving name=LITGRID submission returned the exact LITGRID AB (PV) row and profile ID 1159; this validates route mechanics only, not any system or procurement claim.
  • The authoritative vssa-clients skill now documents that validated entry route and form contract at commit 8329b6aaff02e4b27a65ea667f89bcf18b384b2c. Complete skill validation, local/remote ref equality, authenticated exact-SHA readback, runtime skill_view reload and exact-head Gitea Actions task 1306 / run 7 (validate) all passed.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-20 04:07 UTC

  • Completed the next ordered review of clients 121–140, following the durable wiki cursor after the latest completed 101–120 rotation; the extra 001–020 rerun at d62f4fde19e19209af94d49fdb5cda3c4dc1bade did not reset the sequence.
  • Reopened all 70 distinct current dossier URLs with inspected browser-equivalent HTTP 200, ran 40 exact CPVA client/system searches and 40 client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search returned 460 complete rows (448 byte-exact authority matches and 46 broad IT/digital candidates). Organization-first discovery retained 20 identity-checked profiles and reviewed all 502 exposed notice rows, including 70 broad candidates; punctuation/case variants for clients 126, 134 and 136 were bounded and no near-name identity was forced.
  • Reopened all three public Pirkimo-ID detail routes for the 16 procurement resources currently cited across the range (48/48 HTTP 200). Existing PAIS award evidence and patient-turning, software, social-care-system, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call tender evidence remain correctly bounded to the document stages already represented.
  • This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved. The dossier and index dates were already 2026-08-20, so the completed review produced no source diff and no empty commit was created.
  • Registry state remains 290 clients, 522 canonical systems, 747 observations and 110 contractor cards; Client→contractor and System→contractor links remain complete at 212 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 16 tests, full validation, type checking, production build, registry/generated-route checks, all assigned URL checks, exact six-column/date checks and git diff --check passed. corepack pnpm was attempted but unavailable, so equivalent npm run validate and npm run build scripts were used. Browser-equivalent local readback verified clients 121, 130 and 140, both registries and the raw client artifact.
  • Existing main head 72dd243839e74ec4cc67d270d877c379f87f8fab remains exactly equal to the remote; authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1305 / run 101 (build) remains success, including Pages publication. Public Pages resolved through the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable from this runtime. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • The synchronized wiki contained the validated CVP IS instructor lessons. This run established no additional reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 141–160.

Previous scheduled rotation — 2026-08-20 02:08 UTC

  • Completed the explicitly assigned ordered review of clients 101–120; the completed extra 001–020 rerun at d62f4fde19e19209af94d49fdb5cda3c4dc1bade did not reset the cursor.
  • Reopened all 78 distinct dossier URLs with inspected browser-equivalent HTTP 200, ran 50 exact CPVA client/system searches and 50 client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search retained 47 byte-exact authority rows and four broad keyword candidates. Organization-first discovery retained 19 identity-checked profiles, including both Vilniaus teatras „Lėlė“ profiles, and reviewed 30 broad IT/digital candidates without forcing near-name identities.
  • Reopened the order, notices and procurement-document routes and re-extracted direct official PDFs for material resources 5869290, 616558 and 8701921. Their bodies remain procurement/tender notices for video projectors, contact-centre software rental and short/800-number communications services—not awards or signed contracts. Current DSS IS, KVS, VASIS and UT IS award evidence remains represented with bounded contractual roles.
  • This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to 2026-08-20.
  • Registry state remains 290 clients, 522 canonical systems, 747 observations and 110 contractor cards; Client→contractor and System→contractor links remain complete at 212 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 16 tests, full validation, type checking, production build, registry/generated-route checks, all assigned URL checks, exact six-column/date checks and git diff --check passed. corepack pnpm was unavailable, so equivalent npm run validate and npm run build scripts were used. Browser-equivalent local readback verified clients 101, 110 and 120, both registries and the raw client artifact.
  • Commit 72dd243839e74ec4cc67d270d877c379f87f8fab is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1305 / run 101 (build) reached success, including Pages publication. Public Pages resolved through the expected Keycloak/OAuth boundary; authorized deployed page-body readback was unavailable because this runtime has no kubectl, microk8s or k3s service-proxy client. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • The synchronized wiki contained the validated CVP IS instructor lessons. This run established no additional reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-20 00:07 UTC

  • Completed the next durable ordered rotation, clients 121–140; the already completed extra 001–020 rerun did not reset the cursor.
  • Reopened all 70 distinct dossier URLs with inspected browser-equivalent HTTP 200, ran 40 exact CPVA client/system searches and 40 client/system contractor-procurement query-ladder searches, and repeated both CVP IS routes. Exact-authority basic search returned 460 complete rows (448 exact-authority matches and 46 broad IT/digital candidates). Organization-first discovery resolved 20 identity-checked profiles and parsed all 502 exposed notice rows, including 70 broad candidates; no near-name identity was forced.
  • Reopened all three Pirkimo-ID detail routes for the 16 procurement resources currently cited across the range (48/48 HTTP 200). Existing PAIS award evidence and patient-turning, software, social-care-system, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call tender evidence remain correctly bounded to the document stages already represented.
  • This was a conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to 2026-08-20.
  • Registry state remains 290 clients, 522 canonical systems, 747 observations and 110 contractor cards; Client→contractor and System→contractor links remain complete at 212 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 16 tests, full validation, type checking, production build, registry/generated-route checks, all assigned URL checks, exact six-column/date checks and git diff --check passed. corepack pnpm was unavailable, so equivalent npm run validate and npm run build scripts were used. Browser-equivalent local readback verified clients 121, 130 and 140, both registries and the raw client artifact.
  • Commit c056b73088eea80d7989f598947c98c2b066a33d is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1304 / run 100 (build) reached success, including Pages publication. Public Pages returned the expected Keycloak/OAuth 302; authorized deployed page-body readback was unavailable because this runtime has no kubectl, microk8s or k3s service-proxy client. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • The synchronized wiki contained the validated CVP IS instructor lessons. This run established no additional reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 141–160.

Previous scheduled rotation — 2026-08-19 22:09 UTC

  • Completed the explicitly assigned ordered repeat review of clients 101–120; the extra 001–020 rerun at d62f4fde19e19209af94d49fdb5cda3c4dc1bade did not reset the ordered cursor.
  • Reopened all 78 distinct current dossier URLs with inspected browser-equivalent HTTP 200, ran 50 exact CPVA client/system searches and 50 client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. The exact-authority basic search returned 47 byte-exact authority rows and four broad keyword candidates. Organization-first discovery reviewed 19 identity-checked profiles across 18 clients, preserved both Vilniaus teatras „Lėlė“ profiles (16216 and 5822), forced no near-name identity for clients 108 or 117, and parsed all 220 exposed notice rows, including 30 broad IT/digital candidates.
  • Reopened the order, notices and procurement-document routes and re-extracted the direct official PDFs for material resources 5869290, 616558 and 8701921. Their bodies remain procurement/tender notices for video projectors, contact-centre software rental and short/800-number communications services—not awards or signed contracts. The contact-centre notice remains represented with bounded intended-procurement semantics; the other candidates do not support an additional system or contractor row.
  • This was a conservative no-new-claim review. No defensible new system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and 2026-08-19 dossier/index dates were preserved.
  • Registry state remains 290 clients, 522 canonical systems, 747 observations and 110 contractor cards; Client→contractor and System→contractor links remain complete at 212 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 16 tests, full validation, type checking, production build, registry/generated-route checks, all assigned URL checks, exact six-column/date checks and git diff --check passed. corepack pnpm was unavailable, so the equivalent repository npm run validate and npm run build scripts were used. Browser-equivalent local HTTP readback verified representative clients 101, 109 and 120, both registries, both machine-readable registries and the raw client artifact.
  • The completed repeat review produced no source diff, so no empty commit was created. Existing main head a092dd4d957e2e02170dab48122cac6311f07372 remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task 1301 (build) remains success, including Pages publication. Public Pages returned the expected Keycloak/OAuth 302; authorized deployed page-body readback was unavailable because this runtime has no kubectl, microk8s or k3s service-proxy client and the browser harness could not launch Chrome. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run reconfirmed those mechanics without establishing an additional reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-19 20:09 UTC

  • Completed the ordered repeat review of clients 141–160, following the latest durable wiki cursor; the extra 001–020 rerun did not reset the ordered sequence.
  • Reopened all 59 distinct dossier evidence URLs at inspected browser-equivalent HTTP 200, ran 70 exact CPVA client/system searches and 70 client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. The exact-authority basic search returned 336 complete identity-matched rows with 103 broad IT/digital candidates. Organization-first discovery resolved 15 exact identity-checked profiles and parsed all 184 exposed notice rows, including 68 broad IT/digital candidates; no near-name profile was forced where the exact query returned none.
  • Opened all three public Pirkimo-ID detail routes for seven material resources and re-extracted the direct PDF bodies for the VTAIS, seabed/marine-cartography, public-health-monitoring, competency-platform and VAPRIS/VPREG notices. The July 2026 Visuomenės sveikatos stebėsenos informacinė sistema body remains an open tender (plus deadline amendment), not an award; the dossier already records that bounded procurement relationship. Newer ULSVIS/VSSIS basic-search rows exposed market-consultation metadata, while their detailed order view redirected to login and no public award/signed-contract body was available.
  • This was a conservative no-new-claim review. No defensible new system, contractor, signed supplier engagement, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and 2026-08-19 dossier/index dates were preserved.
  • Registry state remains 290 clients, 522 canonical systems, 747 observations and 110 contractor cards; Client→contractor and System→contractor links remain complete at 212 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 16 tests, full validation, type checking, production build, registry/generated-route checks, all assigned evidence URL checks, exact six-column/date checks and git diff --check passed. corepack pnpm was unavailable, so the equivalent repository npm run validate and npm run build scripts were used. Browser-equivalent local readback verified representative clients 141, 149 and 159, both registries, both machine-readable registries and the raw client artifact.
  • The completed repeat review produced no source diff, so no empty commit was created. Existing main head a092dd4d957e2e02170dab48122cac6311f07372 remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task 1301 / run 99 (build) remains success, including Pages publication. Public Pages returned the expected Keycloak/OAuth 302; authorized deployed page-body readback was unavailable because this runtime has no kubectl, microk8s or k3s service-proxy client. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run reconfirmed those mechanics without establishing an additional reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 161–180.

Previous scheduled rotation — 2026-08-19 18:49 UTC

  • Completed the ordered review of clients 121–140, following the durable latest cursor after the completed 101–120 rotation; the extra 001–020 rerun did not reset the sequence.
  • Reopened all 70 distinct dossier evidence URLs at inspected browser-equivalent HTTP 200, ran 40 exact CPVA client/system searches and 40 client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. The exact-authority basic search returned 460 complete rows (448 exact-authority matches and 46 broad IT/digital candidates). Organization-first discovery resolved 20 identity-checked profiles and parsed all 502 exposed notice rows, including 70 broad IT/digital candidates.
  • This was a conservative no-new-claim review. Existing patient-turning, computer/software, social-care-system, PAIS, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call records remained bounded to the procurement stage established by their opened bodies. No defensible new contractor, signed supplier engagement, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and 2026-08-19 dossier/index dates were preserved.
  • Registry state remains 290 clients, 522 canonical systems, 747 observations and 110 contractor cards; Client→contractor and System→contractor links remain complete at 212 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 16 tests, full validation, type checking, production build, registry/generated-route checks, all assigned evidence URL checks, exact six-column/date checks and git diff --check passed. corepack pnpm was unavailable, so the equivalent repository npm run validate and npm run build scripts were used. Browser-equivalent local readback verified representative clients 121, 130 and 140, both registries, both machine-readable registries and the raw client artifact.
  • The completed review produced no source diff, so no empty commit was created. Existing main head a092dd4d957e2e02170dab48122cac6311f07372 remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task 1301 / run 99 (build) remains success, including Pages publication. Public Pages returned the expected Keycloak/OAuth 302; authorized deployed page-body readback was unavailable because this runtime has no kubectl, microk8s or k3s service-proxy client, and the browser harness could not launch Chrome. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run reconfirmed those mechanics without establishing an additional reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 141–160.

Previous scheduled rotation — 2026-08-19 12:11 UTC

  • Completed the explicitly assigned ordered review of clients 101–120; the extra 001–020 rerun did not reset the ordered cursor.
  • Reopened all 66 distinct dossier evidence URLs (65 returned inspected browser-equivalent HTTP 200; the documented Microsoft Bookings endpoint retained its automation-specific 417), ran 51 exact CPVA client/system searches and 79 client/system contractor-procurement query-ladder searches, and repeated both CVP IS discovery routes. The exact-authority basic search returned 63 complete rows, including 59 exact-authority matches and three broad IT/digital candidates. Organization-first discovery resolved 20 identity-checked profiles across 19 clients after bounded legal-form/typography variants, preserved both exact-equivalent Vilniaus teatras Lėlė profiles (16216 and 5822), excluded the near-name collision for client 117, and parsed all 196 exposed notice rows.
  • Opened the order, notices and procurement-document routes plus the direct official PDFs for material resources 5869290, 616558 and 8701921. Their bodies classify each as a tender/procurement notice rather than an award. The 2024-12-27 Jaunimo reikalų agentūra notice directly establishes intended procurement of contact-centre software rental for telephone client contact and operator monitoring/control; the new dossier row explicitly does not claim award, contract signature, supplier, delivery or production use. No defensible new contractor, production-hosting, original-kickoff, production-release or completion claim was found.
  • Registry state is now 290 clients, 522 canonical systems, 747 observations and 110 contractor cards; Client→contractor and System→contractor links remain complete at 212 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 16 tests, full validation, type checking, production build, registry/generated-route checks, URL checks and git diff --check passed. corepack/pnpm was unavailable, so the equivalent repository npm run validate and npm run build scripts were used. Browser-equivalent local readback verified representative clients 101, 109 and 120, the new SYS-90B309892D dossier, both registry overviews, both machine-readable registries and the raw client artifact.
  • Commit a092dd4d957e2e02170dab48122cac6311f07372 is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1301 / run 99 (build) reached success, including Pages publication. Public Pages returned the expected Keycloak/OAuth 302; authorized deployed page-body readback was unavailable because this runtime has no microk8s, kubectl or k3s service-proxy client. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run applied them and established no additional reusable mechanic or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-19 10:08 UTC

  • Completed the ordered review of clients 141–160, following the latest durable wiki cursor; the completed extra 001–020 rerun did not reset the ordered sequence.
  • Reopened all 59 distinct dossier evidence URLs across 77 occurrences at inspected browser-equivalent HTTP 200, ran 65 exact CPVA client/system searches and 65 client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS discovery. The exact-authority basic search returned 335 identity-matched rows and 103 broad IT/digital candidates; organization-first discovery resolved 19 profiles, preserved the absence of an exact profile for client 155, and parsed all 322 exposed notice rows including 133 broad IT/digital candidates.
  • Opened all three public Pirkimo-ID detail routes—order metadata, notices and procurement documents—for seven material resources covering the existing VSS IS improvement, seabed/marine-cartography, ULSVIS/VSSIS security/support, and antivirus-support leads. Existing award, tender and market-consultation observations remained bounded to the stage established by their opened bodies; search-table statuses such as Nustatytas laimėtojas were not treated as award or supplier evidence.
  • This was a conservative no-new-claim review. No defensible new system, contractor, signed supplier engagement, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence levels, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to 2026-08-19.
  • Registry state remains 290 clients, 521 canonical systems, 746 observations and 111 contractor cards; Client→contractor and System→contractor links remain complete at 359 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 15 tests, full validation, production build, registry/generated-route checks, exact six-column/date checks and git diff --check passed. corepack pnpm was unavailable, so the equivalent repository npm run validate and npm run build scripts were used. Local browser-equivalent HTTP readback verified representative clients 141, 149 and 159, the Systems and Contractors registries, and both machine-readable registries.
  • Commit 6c4df2981148b366f6c5183187d1b58eb1f4db85 is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1292 / run 97 (build) reached success, including Pages publication. Public Pages returned the expected Keycloak/OAuth 302; authorized deployed page-body readback was unavailable because this runtime has no Kubernetes service-proxy client and none of the documented in-cluster service names resolves. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • The synchronized wiki contained the validated CVP IS instructor lessons for exact-authority search and all three Pirkimo-ID detail routes. This run applied both and established no additional reusable mechanic or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 161–180.

Previous scheduled rotation — 2026-08-19 08:07 UTC

  • Completed the ordered review of clients 121–140, following the latest durable wiki cursor; the completed extra 001–020 rerun did not reset the ordered sequence. Reopened all 70 distinct dossier evidence URLs at inspected browser-equivalent HTTP 200, ran 40 exact CPVA client/system searches, 40 client/system contractor-procurement query-ladder searches, the newly instructed exact-authority basic CVP IS search, and identity-checked CVP IS organization-first discovery.
  • The basic CVP IS route returned 460 complete rows across all derived result pages (448 rows matched the exact searched authority; typography-form differences for clients 134 and 136 were not forced). Organization-first discovery resolved 20 identity-checked profiles and parsed all 502 exposed notice rows, including 70 broad IT/digital candidates. Following instructor lesson 2, all three public Pirkimo-ID detail routes—order data, notices and procurement documents—were opened for 18 material resources. Existing patient-turning, computer/software, social-care-system, PAIS, IP-telephony, camera/security, Šeimos kortelė, legal-information, SGLEP, SOPAS and staff-call records remained bounded to the procurement stage established by their opened bodies. Basic-search statuses such as Nustatytas laimėtojas were retained as discovery metadata only: public attachments exposed conditions, specifications, ZIP/XML artifacts and draft contracts, while the internal awarding view required login and no opened public award or signed-contract body established a supplier.
  • This was a conservative no-new-claim review. No defensible new system, contractor, signed supplier engagement, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and 2026-08-19 dossier/index dates were preserved.
  • Registry state remains 290 clients, 521 canonical systems, 746 observations and 111 contractor cards; Client→contractor and System→contractor links remain complete at 359 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 15 tests, full validation, production build, registry/generated-route checks, exact six-column/date checks and git diff --check passed. Corepack/pnpm was unavailable, so the equivalent repository npm run validate and npm run build scripts were used. Local browser-equivalent route checks verified representative clients, the PAIS system dossier and both machine-readable registries; the Chrome harness itself was unavailable.
  • The review produced no source diff, so no empty commit was created. Existing main head 8c8f6a876e96192e87686a6773237e1460b88fdf remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task 1275 / run 96 (build) remains success, including Pages publication. Public Pages returned the expected Keycloak/OAuth 302; authorized deployed page-body readback was unavailable because this runtime has no service-proxy client and neither known in-cluster hostname resolves. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • The synchronized channel wiki contained validated CVP IS instructor lessons 1 and 2; this run applied the exact-authority basic search and all three Pirkimo-ID detail routes across the assigned range. Live validation established one additional reusable clarification: the basic-search page's first writePageSelection(...) argument is the result-page count, not the row count. The authoritative vssa-clients reference now documents that trap at commit e85df2916ce7ba74c0dc8fd6f01d2ddf2337fb0d; follow-up commit 85d016431774d523816e36c62ee01fe9e2da58b4 replaced the failing JavaScript checkout action with an exact-SHA shell checkout for the self-hosted runner. Local validation, remote ref/readback and exact-head Gitea Actions task 1285 / run 3041 all passed.
  • Next ordered dossier rotation: 141–160.

Previous scheduled rotation — 2026-08-19 06:04 UTC

  • Completed the explicitly assigned repeat review of clients 101–120; the completed extra 001–020 rerun did not reset the ordered cursor. Reopened all 66 distinct dossier evidence URLs (65 returned inspected browser-equivalent HTTP 200; the documented Microsoft Bookings endpoint retained its automation-specific 417), ran 51 exact CPVA client/system searches and 79 client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS resolved 20 profiles across 19 identity-checked clients after the documented exact-name and bounded legal-form/typography-variant checks, preserving both exact-equivalent Vilniaus teatras Lėlė profiles (16216 and 5822); no exact profile was forced for client 117. All 196 exposed notice rows were parsed across complete pagination. Existing projector, contact-centre, register-maintenance, KVS, VASIS, DSS IS, software, server and network records remained bounded to the procurement stage established by their opened sources.
  • This was a conservative no-new-claim repeat review. No defensible new system, contractor, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and 2026-08-19 dossier/index dates were preserved.
  • Registry state remains 290 clients, 521 canonical systems, 746 observations and 111 contractor cards; Client→contractor and System→contractor links remain complete at 359 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 15 tests, full validation, production build, registry/generated-route checks, exact six-column/date checks and git diff --check passed. corepack pnpm was unavailable, so the equivalent repository npm run validate and npm run build scripts were used. Browser-equivalent local readback verified clients 101, 110 and 117, source/raw content and both machine-readable registries.
  • The repeat review produced no source diff, so no empty commit was created. Existing main head 8c8f6a876e96192e87686a6773237e1460b88fdf remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task 1275 / run 96 (build) remains success, including Pages publication. Public Pages returned the expected Keycloak/OAuth 302; authorized deployed page-body readback was unavailable because this runtime has no service-proxy client and neither known in-cluster hostname resolves. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • No newer CVP IS instructor guidance was present in the latest 100 live channel messages. Live work reconfirmed the documented exact-identity, legal-form/typography-variant, duplicate-profile, complete-pagination and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-19 04:04 UTC

  • Completed the explicitly assigned repeat review of clients 101–120; the completed extra 001–020 rerun did not reset the ordered cursor. Reopened all 66 distinct dossier evidence URLs (65 returned inspected browser-equivalent HTTP 200; the documented Microsoft Bookings endpoint retained its automation-specific 417), ran 51 exact CPVA client/system searches and 79 client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS resolved 20 profiles across 19 identity-checked clients, preserving both exact-equivalent Vilniaus teatras Lėlė profiles (16216 and 5822); no exact profile was forced for client 117. All 196 exposed notice rows were parsed across complete pagination. Existing projector, contact-centre, register-maintenance, KVS, VASIS, DSS IS, software, server and network records remained bounded to the procurement stage established by their opened sources.
  • This was a conservative no-new-claim repeat review. No defensible new system, contractor, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases, explicit unknowns and 2026-08-19 dossier/index dates were preserved.
  • Registry state remains 290 clients, 521 canonical systems, 746 observations and 111 contractor cards; Client→contractor and System→contractor links remain complete at 359 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 15 tests, full validation, production build, registry/generated-route checks, exact six-column/date checks and git diff --check passed. corepack pnpm was unavailable, so the equivalent repository npm run validate and npm run build scripts were used. Browser-equivalent local readback verified three client routes, the DSS IS system route, the UAB „Novian PRO“ contractor route and both machine-readable registries; the Chrome harness itself was unavailable.
  • The repeat review produced no source diff, so no empty commit was created. Existing main head 8c8f6a876e96192e87686a6773237e1460b88fdf remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task 1275 / run 96 (build) remains success, including Pages publication. Public Pages returned the expected Keycloak/OAuth 302; authorized deployed page-body readback was unavailable because this runtime has no service-proxy client and neither known in-cluster hostname resolves. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • No newer CVP IS instructor guidance was present in the latest 100 live channel messages. Live work reconfirmed the documented exact-identity, legal-form/typography-variant, duplicate-profile, complete-pagination and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-19 02:08 UTC

  • Completed the explicitly assigned review of clients 101–120; the completed extra 001–020 rerun did not reset the ordered cursor. Reopened all 66 distinct dossier evidence URLs (65 returned inspected browser-equivalent HTTP 200; the documented Microsoft Bookings endpoint retained its automation-specific 417), ran 51 exact CPVA client/system searches and 79 client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS resolved 20 profiles across 19 identity-checked clients, preserving both exact-equivalent Vilniaus teatras Lėlė profiles (16216 and 5822); no exact profile was forced for client 117. All 196 exposed notice rows were parsed across complete pagination. Existing projector, contact-centre, register-maintenance, KVS, VASIS, DSS IS, software, server and network records remained bounded to the procurement stage established by their opened sources.
  • This was a conservative no-new-claim review. No defensible new system, contractor, production-hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to 2026-08-19.
  • Registry state remains 290 clients, 521 canonical systems, 746 observations and 111 contractor cards; Client→contractor and System→contractor links remain complete at 359 each. Statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 15 tests, full validation, production build, registry/generated-route checks, exact six-column/date checks and git diff --check passed. corepack pnpm was unavailable, so the equivalent repository npm run validate and npm run build scripts were used. Browser-equivalent local readback verified three changed client routes, a derived system route, a contractor route and both machine-readable registries.
  • Commit 8c8f6a876e96192e87686a6773237e1460b88fdf is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1275 / run 96 (build) reached success, including Pages publication. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • No newer CVP IS instructor guidance was present in the latest 100 channel messages. Live work reconfirmed the documented exact-identity, legal-form/typography-variant, duplicate-profile, complete-pagination and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-19 00:03 UTC

  • Completed the ordered review of clients 121–140; the completed extra 001–020 rerun did not reset the ordered cursor. Reopened all 70 distinct dossier evidence URLs, reran exact CPVA client/system searches and contractor query ladders, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS resolved 19 current or exact-equivalent identities, including successor Priėmimo ir integracijos agentūra for client 130; no exact registry result was forced for client 134. All exposed notice pages were reviewed. Existing PAIS, mobile-application, camera-system, Šeimos kortelė, legal-information database and employee-call-system evidence remained correctly bounded to its source procurement stage.
  • This was a conservative no-new-claim review. No defensible new system, contractor, hosting, original-kickoff, production-release or completion claim was found. Existing rows, statuses, confidence, aliases and explicit unknowns were preserved; all twenty dossier and index dates advanced to 2026-08-19.
  • Registry state remains 290 clients, 521 canonical systems, 746 observations and 111 contractor cards; statuses remain 79 researched, 196 partial, 15 no-public-evidence and 0 pending.
  • All 15 tests, full validation, production build, registry/generated-route checks, six-column/date checks, all 70 evidence URL checks and git diff --check passed. corepack pnpm was unavailable, so the equivalent repository npm run validate and npm run build scripts were used. Browser-equivalent local readback verified three changed client routes, two derived system routes and both machine-readable registries.
  • Commit 0464bb7b920883cba4f205bd53c6e71b5d21842a is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1274 / run 95 (build) reached success, including publication. Public Pages reached the expected Keycloak/OAuth 302 boundary; authorized deployed page-body readback was unavailable because this runtime has no kubectl, microk8s or k3s client, so no content claim was made from the login response. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • No reusable CVP IS mechanic or pitfall beyond the current skill guidance was established, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 141–160.

Previous scheduled rotation — 2026-08-18 22:06 UTC

  • Completed the explicitly assigned review of clients 101–120; the additional completed 001–020 rerun did not reset this range. Reopened all 66 distinct current dossier evidence URLs (77 occurrences), ran 65 exact CPVA client/system searches and 65 client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS produced 20 identity-checked profiles across 19 clients, preserving both exact-equivalent Vilniaus teatras Lėlė profiles (16216 and 5822) and bounded current/legal-form variants for clients 108, 110, 111 and 112. Client 117 still had no defensible exact profile, so the similarly named institution was not forced. All 196 exposed notice rows were parsed across complete pagination; current projector, contact-centre, register-maintenance, software, server and network leads did not establish a defensible additional client-specific claim beyond the evidence already represented.
  • This was a conservative no-new-claim review. All supported rows, statuses, confidence levels, dates and explicit gaps were preserved; no tender or equipment notice was promoted to an award, signed supplier engagement, delivery, production use, hosting, completion, original kickoff or production release.
  • Generated state remains 290 clients, 521 canonical systems, 746 observations and 111 contractor cards. Client→contractor and system→contractor links remain complete at 359 each; dossier statuses remain 79 researched, 196 partial and 15 no-public-evidence.
  • All 15 repository tests, full validation, production build, registry/generated-route checks, six-column/date checks, all 66 evidence URL checks and git diff --check passed. corepack pnpm was unavailable in this cron runtime, so the equivalent repository npm run validate and npm run build scripts were executed. Local browser-equivalent HTTP checks verified clients 101 and 110, the DSS IS system dossier, the UAB „Novian PRO“ contractor card, claim-level links, References indexes, machine-readable registry data and explicit unknown lifecycle fields; the browser harness could not launch Chrome.
  • The completed review produced no source diff, so no empty commit was created. Existing main head 3f1efc09fa840c625f0fecf3a8773e07d0911ae6 remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task 1265 remains success, including Pages publication. Public Pages reached the Keycloak/OAuth 302 boundary; authorized deployed page-body readback was unavailable because this runtime has no kubectl or microk8s client, so no content claim was made from the login response. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, legal-form/typography-variant, duplicate-profile, complete-pagination and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-18 20:11 UTC

  • Completed the ordered review of clients 161–180, following the latest durable wiki cursor; the already completed extra 001–020 rerun did not reset the range. Reopened all 56 distinct current dossier evidence URLs, ran 49 distinct exact CPVA client/system searches and 54 client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS produced 17 identity-checked profiles, including both exact-equivalent Lietuvos įtraukties švietime centras profiles (2903 and 2876); no near-name profile was forced. The profile-derived lists exposed 75 complete notice rows. Material licence, website-creation and digital-methodical-tool tender bodies were opened as direct PDFs and classified from their text.
  • Added one bounded observation to client 179: an opened October 2025 tender states that Lietuvos istorijos institutas sought renewals for its existing Veeam, TeamViewer Corporate, ESET Protect Complete Cloud, ArcGIS, GraphPad, AutoCAD LT, Adobe Acrobat Pro, FortiGate UTP and source-labelled M365 Business Standart licence portfolio. The notice proves current licence possession and planned renewal procurement only; it does not identify selected suppliers, signed contracts, delivery, hosting, original kickoff or a production release. Other dossiers preserved their supported rows, statuses, confidence and explicit gaps.
  • Generated state advanced from 520 to 521 canonical systems and from 745 to 746 observations; contractor cards remain 111. New deterministic SYS-F8EB1084B0 retains production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at 359 each; dossier statuses remain 79 researched, 196 partial and 15 no-public-evidence.
  • All 15 repository tests, full validation, production build, registry/generated-route checks, exact six-column/date checks, evidence URL checks and git diff --check passed. corepack pnpm was unavailable in this cron runtime, so the equivalent repository npm run validate and npm run build scripts were executed. Local browser-equivalent HTTP checks verified client 179, the new derived system dossier, claim-level citation, machine-readable registry record and explicit unknown infrastructure/lifecycle fields.
  • Final commit 3f1efc09fa840c625f0fecf3a8773e07d0911ae6 is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1265 (run 3022) reached success, including Pages publication. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • No newer human directive or CVP IS instructor guidance was present in the latest 100 live channel messages. Live work reconfirmed the documented organization-first, exact-identity, duplicate-profile, complete-row, direct-PDF and strict tender-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 181–200.

Previous scheduled rotation — 2026-08-18 18:21 UTC

  • Completed the ordered review of clients 141–160, following the latest durable wiki cursor; the already completed extra 001–020 rerun did not reset the range. Reopened all 59 distinct current dossier evidence URLs (77 occurrences), ran 65 exact CPVA client/system searches and 65 client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS produced 19 identity-checked profiles; no near-name profile was forced for client 155. All 322 exposed published-notice rows were parsed across complete pagination, including 133 broad IT/digital-title leads. The current counts and candidates matched the completed same-day review; tender, voluntary ex-ante and award bodies already represented in the dossiers retained their exact procurement-stage semantics.
  • This was a conservative no-new-claim review. Every current evidence URL returned inspected browser-equivalent HTTP 200 content, and the current official, CPVA, contractor-search and procurement sources established no defensible additional client-specific system, contractor, production-hosting, original-kickoff or production-release claim. All twenty dossier rows, statuses, confidence levels, explicit unknowns, gaps and 2026-08-18 dates were preserved.
  • Generated state remains 290 clients, 520 canonical systems, 745 observations and 111 contractor cards. Client→contractor and system→contractor links remain complete at 359 each; dossier statuses remain 79 researched, 196 partial and 15 no-public-evidence.
  • All 15 repository tests, full validation, production build, registry/generated-route checks, exact six-column/date checks, all evidence URL checks and git diff --check passed. corepack pnpm was unavailable in this cron runtime, so the equivalent repository npm run validate and npm run build scripts were executed. Local browser-equivalent route checks verified clients 141, 147 and 154, two derived system dossiers, claim-level markers, machine-readable registry records and explicit unknown infrastructure/lifecycle fields.
  • The completed review produced no source diff, so no empty commit was created. Existing main head 3fc30f514db8d6ea0b2a69263dd66d4847b60cf2 remains exactly equal to the remote; authenticated exact-SHA source readback passed, and exact-head Gitea Actions task 1263 remains success, including Pages publication. Public Pages reached the Keycloak/OAuth boundary. Authorized deployed page-body readback was unavailable because this runtime has no kubectl, neither documented backend hostname resolves, and no content claim was made from the login page. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, exact-identity, complete-row, pagination, direct-PDF and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 161–180.

Previous scheduled rotation — 2026-08-18 16:14 UTC

  • Completed the ordered review of clients 121–140, following the latest durable wiki cursor; the already completed extra 001–020 rerun did not reset the range. Reopened all 70 distinct current dossier evidence URLs, ran 40 exact CPVA client/system searches and 40 client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS produced one identity-checked current, predecessor/successor or documented typography-variant profile for every client. All 502 exposed notice rows were parsed, including 70 broad IT/digital-title leads. Six material bodies were downloaded as direct PDFs and classified from their text; a patient-turning mattress system and an unnamed generic software package were not forced into the information-system registry.
  • Added four bounded planned-procurement observations. Client 130 now records the predecessor's December 2024 smartphone-application creation/implementation/maintenance tender and the successor agency's June 2026 video-camera, recording and switching-equipment tender. Client 135 now records a February 2025 Šeimos kortelė website-maintenance tender and a January 2026 planned 12-month legal-information search-system/database subscription. None establishes an award, selected supplier, signed contract, delivery, active subscription, production use, hosting, completion or release; contractors remain Not publicly identified.
  • All other dossier rows, statuses, confidence levels and unresolved gaps were preserved while all twenty dossier/index dates advanced to 2026-08-18. Generated state advanced from 516 to 520 canonical systems and from 741 to 745 observations; contractor cards remain 111. New SYS-B102E857D5, SYS-3BD89B3105, SYS-A82F69643F and SYS-A41510A0DD retain production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at 359 each.
  • All 15 repository tests, full validation, production build, registry/generated-route checks, six-column/date checks, all 70 evidence URL checks and git diff --check passed. Corepack/pnpm was unavailable in this cron runtime, so the equivalent repository npm run validate and npm run build scripts were executed. Local browser-equivalent HTTP checks verified clients 130 and 135, all four new system dossiers, claim-level links, References indexes, machine-readable registry records and explicit unknown lifecycle fields; the cron browser harness could not launch Chrome.
  • Commit 4444c51b321cd1d240260ac7c82a23538c017433 is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1262 (run 3019) reached success, including Pages publication. Public Pages reached the expected Keycloak boundary. Authorized deployed page-body readback was not available because this runtime has no kubectl/service-proxy client and docs.lego-cloud.eu did not resolve; no content claim was made from the login page.
  • No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, legal-form/typography-variant, successor, complete-row, pagination, direct-PDF and strict tender-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 141–160.

Previous scheduled rotation — 2026-08-18 14:13 UTC

  • Completed the explicitly assigned ordered review of clients 101–120; the already completed additional 001–020 rerun did not reset this cursor. Reopened all 66 distinct current dossier evidence URLs, ran 51 exact CPVA client/system searches and 79 client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS yielded 20 identity-checked profiles across 19 clients, including both exact-equivalent Vilniaus teatras Lėlė profiles (16216 and 5822) and bounded current/legal-form variants for clients 108, 110, 111, and 112. Client 117 still had no defensible exact profile, so the similarly named institution was not forced. All 100 exposed notice rows were reviewed; the projector/equipment and other current leads did not establish an additional award, supplier engagement, delivery, hosting, completion or production release.
  • This was a conservative no-new-claim review: all supported rows, statuses, confidence levels and unresolved gaps were preserved, while all twenty dossier/index dates advanced to 2026-08-18. Generated state remains 290 clients, 516 canonical systems, 741 observations and 111 contractor cards; client→contractor and system→contractor links remain complete at 359 each.
  • All 15 repository tests, Corepack-wrapped pnpm validation/build, registry/generated-route checks, six-column/date checks, all 66 evidence URL checks and git diff --check passed. Local browser-equivalent HTTP checks verified clients 101 and 110, the DSS IS system dossier, UAB „Novian PRO“ contractor card, claim-level links, References indexes and explicit unknown lifecycle fields. The cron browser harness could not launch Chrome.
  • Research/dossier commit 767b18acc7259aaeda31591c0ca283d9d5ecd1ef was followed by runner-hardening commit eb99420af8280f2bcb186a8c5cdc3b0c94c9a360, which isolated CI in a stable Node container after the inherited ubuntu-latest image repeatedly crashed curl, Python and Node. Local/remote ref equality and authenticated source readback passed. Exact-head Gitea Actions task 1261 (run 3018) reached success, including Pages publication. Public Pages reached the expected Keycloak boundary; authorized pages/pages service-proxy readback verified deployed client 101 and the DSS IS system page with the new review date, canonical links, References index and explicit unknown lifecycle fields.
  • No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, legal-form/typography-variant, duplicate-profile, complete-row and strict procurement-stage mechanics without establishing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-18 09:40 UTC

  • Completed the ordered review of clients 181–200, following the durable wiki cursor rather than repeating the already completed 101–120 range. Reopened all 60 distinct current dossier evidence URLs (77 occurrences), ran 52 exact CPVA client/system searches and 52 client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS produced 15 identity-checked current or official-successor profiles with profile-derived (authorityId, orgGroupId) tuples. No near-name profile was forced for the remaining clients. All 826 exposed published-notice rows were parsed across complete pagination, including 130 broad digital/IT-title leads; material MUKIS, STEAM, KELTAS and IPBR bodies were opened as direct PDFs and classified from their text.
  • Added bounded planned-procurement evidence to client 183: current legal successor LINEŠA tendered MUKIS qualification-program content digitization/deployment services in May 2026 and STEAM information-system modernization/functionality expansion in December 2025. Both are tender-stage observations only; selected suppliers, signed contracts, delivery, hosting, completion and production release remain unproved.
  • Added two direct contract-award findings for client 190. UAB „Asseco Lietuva“ won KELTAS software maintenance/development contract 56917, signed 2026-06-04 for EUR 260,000, and IPBR software maintenance/development contract 58867, signed 2026-06-23 for EUR 70,000. Official NŠA pages independently establish each system's purpose and NŠA relationship; neither award is presented as original development, production hosting, acceptance, completion or production release.
  • All other dossiers retained their supported rows, statuses, confidence levels and unresolved gaps while their completed-review dates advanced to 2026-08-18. Generated state advanced from 507 to 510 canonical systems and from 732 to 735 observations; contractor cards remained 108. New SYS-8094196CBD, SYS-CA136E0290 and SYS-F2452BA519 retain production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at 350 each.
  • All 15 repository tests, full validation, production build, registry/generated-route checks, six-column/date checks, all evidence URL checks and git diff --check passed. Corepack was unavailable in the cron runtime, so the already installed dependencies were exercised through the equivalent npm run validate and npm run build scripts. The build verified 290 client, 510 system and 108 contractor routes, 735 observations and 296 raw artifacts. Local browser-equivalent route checks verified clients 183 and 190, all three new system pages and the established UAB „Asseco Lietuva“ contractor card with claim-level links, References indexes and explicit unknown lifecycle fields; Chrome itself could not be launched by the cron browser harness.
  • The research commit was 0e0e4ea0320414a061c2eb1ce572f06346621fe1. After the self-hosted runner began crashing every JavaScript action under Node 20, four narrow follow-up commits replaced JavaScript setup actions with an authenticated exact-SHA shell checkout, checksum-verified Node 22.23.2, and the documented trusted pnpm shim. Final commit d1c311889c8287fc3f91b295db5ffbd1009a183d is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1251 (build, run 3012) reached success, including Pages publication.
  • Live investigation reconfirmed the documented organization-first, exact-successor, complete-row, pagination, direct-PDF, award and tender-stage mechanics. No new reusable research procedure or portal pitfall was established, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 201–220.

Previous scheduled rotation — 2026-08-18 02:29 UTC

  • Completed the ordered review of clients 161–180, following the latest durable cursor rather than repeating the already completed 101–120 range. Reopened 56 distinct current dossier evidence URLs (75 occurrences), ran 52 exact CPVA client/system searches and 52 readable Bing client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS produced 18 identity-checked profiles. Client 180 retained two separate exact-equivalent profiles (2903 and 2876) rather than silently selecting one; no near-name profile was forced for clients without an exact result. All 162 exposed published-notice rows were parsed, including 43 broad IT/digital-title leads, and material bodies were opened as direct PDFs and classified from their text.
  • Added two bounded planned-procurement observations. Client 161 tendered metadata-tool installation, data modelling and Central Metadata Repository integration for the „Duomenų valdymo modelio sukūrimas“ project. Client 162 directly states that it uses ArcGIS Enterprise and tendered perpetual Enterprise/Professional-user licences, update assurance and 60 months of technical support. Neither tender proves an award, selected supplier, signed contract, delivery, completion, hosting or production release; contractors remain Not publicly identified.
  • Deepened client 179's existing „Atvira istorija“ row with the opened 2025 tender for creation and installation of the institute-administered portal and its content-management module. Current portal operation is independently evidenced, but the tender does not establish a selected supplier, signed contract or delivery. Other dossiers retained their rows, statuses and confidence while all check dates advanced to 2026-08-18.
  • Generated state advanced from 505 to 507 canonical systems and from 730 to 732 observations; contractor cards remained 108. New deterministic SYS-18E23152F2 and SYS-6F6716F88C retain production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at 348 each.
  • All 15 repository tests, pinned-pnpm validate, pinned-pnpm build, registry/generated-route checks, six-column/date checks and git diff --check passed. Corepack was unavailable, so pnpm 9.15.9 was executed directly through Node. Browser-equivalent checks returned inspected HTTP 200 content for 55 of 56 distinct URLs; the remaining official KPMPC SMIS page returned the expected 302 to the currently unreachable www.smis.lt, matching the dossier's explicit availability gap. The build verified 290 client, 507 system and 108 contractor routes, 732 observations and 296 raw artifacts. Local rendered-route checks verified clients 161, 162, 179 and both new system pages with claim-level links, References indexes and explicit unknown lifecycle fields; Chrome itself could not be launched by the cron browser harness.
  • Commit 9a3b62817dabb9befb1adb1d77141c8b91f236d2 is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1204 (build) reached success, including Pages publication. The public changed route returned the expected Keycloak/OAuth 302; authorized pages/pages Kubernetes service-proxy readback verified deployed clients 161 and 162 plus both new system pages with exact changed-content markers, References indexes and explicit unknown lifecycle fields.
  • No newer CVP IS instructor guidance was present in the latest live channel readback. Live work reconfirmed the documented organization-first, duplicate-profile, complete-row, direct-PDF and strict tender-stage mechanics without exposing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 181–200.

Previous scheduled rotation — 2026-08-18 00:14 UTC

  • Completed the ordered review of clients 141–160, following the latest durable cursor rather than repeating the already completed 101–120 range. Reopened all 59 distinct current dossier evidence URLs (105 occurrences), ran 60 exact CPVA client/system searches and 60 client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS produced 19 identity-checked profiles; no near-name profile was forced for client 155. All 322 exposed published-notice rows were parsed, including 133 broad IT/digital-title leads. Material award and voluntary ex-ante bodies were opened as direct PDFs, verified and classified from their text.
  • Added six bounded supplier findings. Client 142 records Starkodas as VTAIS design, creation, deployment and integration supplier under contract 19814, signed 2025-05-13 for a EUR 230,000 offer. Client 147 records UAB „Asseco Lietuva“ for Vektra operational maintenance/software modification and Avilys maintenance/development, plus UAB „Hnit-Baltic“ for ArcGIS GeoEvent/Staging Server licences and support. Client 154 records UAB „Hnit-Baltic“ for RSC GIP component creation and UAB „Laborama“ for MetaSystems cytogenetic-system modernization/expansion. Its RADIS record names ENVINET GmbH only as the intended direct-award supplier from a voluntary ex-ante notice; contract signature, delivery and production use remain unproved.
  • Preserved all other dossier rows, statuses and confidence levels while advancing review dates to 2026-08-18. The RSC register/RSIS maintenance documents remain tender-stage evidence only; no cloud, hosting, original kickoff, completion, acceptance or production release was inferred.
  • Generated state advanced from 500 to 505 canonical systems, from 725 to 730 observations and from 106 to 108 contractor cards. Five new deterministic SYS-* records retain production hosting, original kickoff and latest production release as explicit unknowns. Client→contractor and system→contractor links remain complete at 348 each.
  • All 15 repository tests, pnpm validate, pnpm build, registry/generated-route checks, all 59 evidence URL checks and git diff --check passed. Corepack was unavailable, so the pinned pnpm 9.15.9 shim was used. The build verified 290 client, 505 system and 108 contractor routes, 730 observations and 296 raw artifacts. Local rendered-route checks verified clients 142, 147, 154, VTAIS, RADIS and the UAB „Laborama“ contractor page with claim-level links and References indexes; Chrome itself could not be launched by the cron browser harness.
  • Commit 8a136a6176d4726cc6a286e0fa9f3a504c5cc12c is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1165 (build) reached success, including Pages publication. Public routes reached the expected Keycloak boundary; authorized pages/pages Kubernetes service-proxy readback verified deployed client 142, client 154 and RADIS system page bodies with exact changed-content markers and References indexes.
  • No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented organization-first, complete-row, direct-PDF, award and voluntary-ex-ante stage mechanics without exposing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 161–180.

Previous scheduled rotation — 2026-08-17 22:17 UTC

  • Completed the ordered review of clients 121–140. Reopened all 63 distinct pre-existing dossier evidence URLs (86 occurrences), ran 33 exact CPVA client/system searches and 122 client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS exact, documented legal-form/typography-variant or authoritative successor-name routes produced one identity-checked profile for every client. All 140 exposed published-notice rows were parsed. Material digital leads were opened as direct PDFs and classified from their bodies; the retained findings remain bounded to their exact tender stages.
  • Added three planned-procurement observations. Client 130's authoritative successor, Priėmimo ir integracijos agentūra, published August 2026 tenders for 36-month IP-telephony services and a satellite-broadband equipment kit. Client 136 published a January 2026 tender for an integrated digital staff-call, resident-safety and monitoring system with hardware, software, installation, configuration, testing and training. None proves an award, selected supplier, signed contract, delivery, implementation, production use, hosting, completion or release; contractors remain Not publicly identified.
  • Preserved all other dossier rows, statuses and confidence levels while advancing the reviewed dates to 2026-08-17. The Jurdaičiai multimedia/patient-equipment notices, Marijampolė care-system creation notices, Šeimos kortelė maintenance notice, Strūnos call-system notice and other records remain bounded to their exact procurement stages.
  • Generated state advanced from 497 to 500 canonical systems and from 722 to 725 observations; contractor cards remained 106. New SYS-FAC512FBC9, SYS-7E154BC591 and SYS-9D86A66A9D retain deterministic identities and explicit unknowns for production hosting, original kickoff and latest production release. Client→contractor and system→contractor links remain complete at 341 each.
  • All 15 repository tests, pnpm validate, pnpm build, registry/generated-route checks and git diff --check passed. corepack was unavailable on this host, so the pinned pnpm 9.15.9 CLI was executed directly through Node. Evidence verification covered all 66 distinct changed-range URLs at inspected HTTP 200; every dossier table retained exactly six cells. The build verified 290 client, 500 system and 106 contractor routes, 725 observations and 296 raw artifacts. Browser-equivalent local HTTP checks verified clients 130 and 136, both new derived system routes, claim-level markers and References indexes; Chrome itself could not be launched in the cron browser harness.
  • Commit c40128a030e120d1fc3a1d1da6f39a37f17a11b4 is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1150 (build) reached success, including Pages publication. Public routes reached the expected Keycloak boundary; authorized pages/pages Kubernetes service-proxy readback verified the deployed client 130, client 136 and digital staff-call system page bodies with exact changed-content markers.
  • No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented successor-name, legal-form/typography-variant, complete-row, direct-PDF and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 141–160.

Previous scheduled rotation — 2026-08-17 20:21 UTC

  • Completed the ordered review of clients 101–120. Reopened all 64 distinct pre-existing dossier evidence URLs (78 occurrences), ran 51 exact CPVA client/system searches and 81 client/system contractor-procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS exact or bounded legal-name/form variants produced 19 identity-checked profiles for 18 clients; the two exact-equivalent Vilniaus teatras Lėlė profiles (16216 and 5822) were kept separate. No exact profile was forced for clients 108 or 117. All 192 exposed published-notice rows were parsed, including 44 IT/digital-title leads, and material award bodies were opened and classified directly.
  • Added two direct contract-award findings for client 110. VDI's Kokybės vadybos informacinė sistema (KVS) records UAB „Novian PRO“ as maintenance/modification supplier under contract 30383, signed 2025-10-01, winning offer EUR 99,300. Virtualios atestacijos sistema (VASIS) records UAB "Vextur" as maintenance, modification and remote-exam integrity-service supplier under contract 21386, signed 2025-06-02 for EUR 75,183.58.
  • Preserved all other dossier rows, statuses and confidence levels while advancing the reviewed dates to 2026-08-17. The Valstybinis jaunimo teatras projector notice, Jaunimo reikalų agentūra contact-centre/telecommunications tenders and other notices remain bounded to their exact procurement stages; none was promoted to award, supplier engagement, delivery, hosting, kickoff or release evidence. The Microsoft Bookings endpoint still returned automation-specific 417; the opened official Centre page remains the institution-relationship evidence, so no broader exception or hosting claim was introduced.
  • Generated state advanced from 495 to 497 canonical systems, 720 to 722 observations and 105 to 106 contractor cards. New SYS-07B92C746C, SYS-DF9C72A71D and CTR-95DBE306A7 retain deterministic identities; both new systems keep production hosting, original kickoff and latest production release explicitly unknown. Client→contractor and system→contractor links are complete at 341 each.
  • All 15 repository tests, Corepack-wrapped pnpm validate, Corepack-wrapped pnpm build, registry/generated-route checks and git diff --check passed. Evidence verification covered all 66 distinct changed-range URLs: 65 returned inspected HTTP 200 content and the Microsoft Bookings endpoint retained its documented automation-specific 417 handling; every dossier table retained exactly six cells. The build verified 290 client, 497 system and 106 contractor routes, 722 observations and 296 raw artifacts. Browser-equivalent local route checks verified client 110, both new system dossiers, the UAB "Vextur" contractor card, claim-level links and References indexes.
  • Commit 96295e4bed73112028e1434708849bfdf2ea70f9 is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1134 (build) reached success, including Pages publication. Public routes reached the expected Keycloak boundary; authorized pages/pages Kubernetes service-proxy readback verified the deployed client 110, VASIS system and UAB "Vextur" contractor page bodies with exact changed-content markers.
  • No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented legal-name-variant, duplicate-profile, complete-row, pagination, direct-PDF and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 121–140.

Previous scheduled rotation — 2026-08-17 18:20 UTC

  • Completed the explicitly requested additional review of clients 001–020 after the registry-table fix. Reopened all 54 distinct current dossier evidence URLs (86 per-dossier occurrences), ran 46 exact CPVA client/system searches and 78 per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery.
  • CVP IS exact or documented legal-form/case-equivalent profiles were opened for 19 clients; client 010 still had no exact profile and no near-name result was forced. Client 007 returned two exact-equivalent profile IDs (2367 and 2871), so both profile-derived lists were kept separate and reviewed. All 736 complete published-notice rows exposed across the 20 profiles were parsed and material award bodies were opened directly.
  • Added three direct contract-award findings. Client 001 now records the Chancellery's DIVIS and UAB „Asseco Lietuva“ maintenance/development contract 23315 (signed 2025-07-22, offer value EUR 70,200). Client 005 now records UAB DIGMATIX Lithuania as the VBAMS licence-update supplier under contract 14P-25/62 (signed 2025-10-24, EUR 539,639), while the separate 2026 notice remains bounded as intended procurement only. Client 007 now records NEVDA as the SPIS maintenance, development and consulting supplier under contract 41453 (signed 2025-12-15, offer value EUR 2,889,298.50).
  • Preserved conservative unknowns for cloud/hosting, original delivery kickoff, latest production release, later-tender suppliers and other portfolio suppliers. No tender, consultation, bid or publication date was promoted to award, signature, delivery, hosting, kickoff or release evidence.
  • Generated state advanced from 494 to 495 canonical systems, 719 to 720 observations and 104 to 105 contractor cards. New SYS-C500290F8A preserves hosting, original kickoff and latest release as explicitly unknown; generated Client→System→Contractor links and references remained complete.
  • All 15 repository tests, corepack pnpm validate (543 assertions), corepack pnpm build, registry/generated-route checks, all changed-dossier evidence URL checks and git diff --check passed. Local production-build browser acceptance verified client 001, the new DIVIS system dossier, UAB „Asseco Lietuva“ contractor linkage, exact source links and the generated References index; rendered client 005, client 007 and UAB DIGMATIX Lithuania markers were also verified.
  • Commit d62f4fde19e19209af94d49fdb5cda3c4dc1bade is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task 1119 (build) reached success, including the repository's Pages publication workflow. Authorized deployed page-body readback could not be claimed from this cron runtime because the service hostname did not resolve and the documented backend address had no network route. Unrelated .pptx_improve_run/ and pptx_improvement_run_20260814/ directories remained untracked and excluded.
  • No newer CVP IS instructor guidance was present in the synchronized channel state. The run reused already documented exact-identity, duplicate-profile, pagination, direct-PDF and procurement-stage mechanics without exposing a new reusable method, so the authoritative vssa-clients skill required no update.
  • Next ordered dossier rotation: 101–120. The additional 001–020 rerun is complete and does not reset the ordered cursor.
  • Scheduler diagnosis: this run exhausted Hermes's 60 tool-calling iterations after publication and wiki update. The cron failure summarizer scanned the successful report text, matched words such as authenticated, and mislabeled the iteration-limit failure as a provider authentication error. OpenAI Codex authentication remained healthy. Job 88833e00b4a2 was restored from the temporary 20-minute cadence to 0 */2 * * *, the stale one-time-rerun directive was removed, and earlier delivery cutoffs were added.

Previous scheduled rotation — 2026-08-17 17:51 UTC

  • Completed the ordered rotation of clients 081–100. Reopened all 81 distinct current dossier evidence URLs, ran 73 exact CPVA client/system searches and 142 per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. Exact or documented legal-form/typography-variant profiles and their notice lists were opened for 19 clients; no near-name profile was forced for client 091, and all 186 published-notice rows exposed by the lists were parsed, including 9 IT/digitalization-title leads.
  • No defensible new client-specific system, contractor, production-hosting, original-kickoff or production-release claim was established beyond the evidence published earlier today. The digital-exhibition, CCTV, digitization-equipment and website-update notices remain bounded to their exact tender stages; no planned procurement was promoted to award, supplier engagement, delivery, hosting, completion or release. Existing rows, statuses, confidence levels, gaps and 2026-08-17 dossier dates were conservatively preserved.
  • Generated state remains 290 clients, 494 canonical systems, 719 observations and 104 contractor cards, with complete 336 client→contractor and 336 system→contractor links. Statuses remain 79 researched, 195 partial and 16 no-public-evidence; explicit hosting, original-kickoff and latest-release unknowns remain unchanged.
  • All 15 repository tests, corepack pnpm validate, corepack pnpm build, registry/generated-route checks, all evidence URL checks and git diff --check passed. The build verified 290 client, 494 system and 104 contractor routes, 719 observations and 296 raw artifacts. The two Nacionalinis Kauno dramos teatras URLs that failed the local CA chain were opened successfully in a browser-equivalent browser session.
  • This completed conservative no-new-claim review produced no source diff, so no empty commit was created. Existing main head 6c06ec27733066a6af8474af8eb0dbfe12d85ad1 remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task 1102 remains success, including Pages publication. The public routes return the expected Keycloak/OAuth 302; authorized pages/pages service-proxy readback verified the homepage, client 081, its LKT IS system dossier and its raw dossier artifact. Unrelated PPTX-improvement directories remain untracked and excluded.
  • No newer CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented exact-identity, legal-form-variant, complete-row and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next dossier rotation: 101–120.

Previous scheduled rotation — 2026-08-17 17:25 UTC

  • Completed the ordered rotation of clients 061–080. Reopened all 66 distinct current dossier evidence URLs (97 citation occurrences), ran 81 exact CPVA client/system searches and 122 per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. Exact profiles and profile-derived notice lists were opened for 10 clients; no near-name profile was forced, and all 58 published-notice rows exposed by those lists were parsed, including 18 IT/digitalization-title leads.
  • No defensible new client-specific system, contractor, production-hosting, original-kickoff or production-release claim was established beyond the evidence already published earlier today. The current ELVIS, exhibition-design and digitization-equipment notices remained bounded to their exact tender/award stages; no planned procurement was promoted to award, supplier engagement, delivery, hosting, completion or release. Existing rows, statuses, confidence levels, gaps and 2026-08-18 dossier dates were conservatively preserved.
  • Generated state remains 290 clients, 494 canonical systems, 719 observations and 104 contractor cards, with complete 336 client→contractor and 336 system→contractor links. Statuses remain 79 researched, 195 partial and 16 no-public-evidence; explicit hosting, original-kickoff and latest-release unknowns remain unchanged.
  • All 15 repository tests, corepack pnpm validate, corepack pnpm build, registry/generated-route checks, all 66 browser-equivalent evidence URL checks and git diff --check passed. The build verified 290 client, 494 system and 104 contractor routes, 719 observations and 296 raw artifacts. Local browser acceptance confirmed client 076, its MB „Baukas“ contractor relationship and references, zero horizontal overflow, and no console or JavaScript errors.
  • This completed conservative no-new-claim review produced no source diff, so no empty commit was created. Existing main head 6c06ec27733066a6af8474af8eb0dbfe12d85ad1 remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task 1102 remains success, including Pages publication. Public overview, client and system routes returned the expected Keycloak/OAuth 302; kubectl/an authorized pages/pages service-proxy route was unavailable in this cron environment, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remain untracked and excluded.
  • No newer CVP IS instructor guidance was available in the synchronized channel state. Live work reconfirmed the documented exact-identity, complete-row and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next dossier rotation: 081–100.

Previous scheduled rotation — 2026-08-17 16:55 UTC

  • Completed the ordered rotation of clients 041–060. Reopened all 59 distinct current dossier evidence URLs (97 citation occurrences), ran 91 exact CPVA client/system searches and 108 per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. Exact profiles and profile-derived notice lists were opened for 16 clients; no near-name profile was forced, and all 51 published-notice rows exposed by those lists were parsed, including 24 IT-title leads.
  • No defensible new client-specific system, contractor, production-hosting, original-kickoff or production-release claim was established beyond the evidence already published earlier today. Current award and tender leads remained represented under their exact procurement stages; no planned procurement was promoted to award, supplier engagement, delivery, hosting, completion or release. Existing rows, statuses, confidence levels, gaps and 2026-08-17 dates were conservatively preserved.
  • Generated state remains 290 clients, 494 canonical systems, 719 observations and 104 contractor cards, with complete 336 client→contractor and 336 system→contractor links. Statuses remain 79 researched, 195 partial and 16 no-public-evidence; explicit hosting, original-kickoff and latest-release unknowns remain unchanged.
  • All 15 repository tests, corepack pnpm validate, corepack pnpm build, registry/generated-route checks, all 59 browser-equivalent evidence URL checks and git diff --check passed. The build verified 290 client, 494 system and 104 contractor routes, 719 observations and 296 raw artifacts. Local browser acceptance confirmed the client directory and client 044 system/reference content.
  • This completed conservative no-new-claim review produced no source diff, so no empty commit was created. Existing main head 6c06ec27733066a6af8474af8eb0dbfe12d85ad1 remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task 1102 remains success, including Pages publication. Public Pages returned the expected Keycloak/OAuth redirect; authorized pages/pages service-proxy page-body readback verified the client directory, client 044, and the generated IMIS system dossier with explicit unknown infrastructure/lifecycle fields. Unrelated PPTX-improvement directories remain untracked and excluded.
  • No newer human directive or CVP IS instructor guidance was present in the latest 100 Discord messages. Live work reconfirmed the documented exact-identity, complete-row and strict stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next dossier rotation: 061–080.

Previous scheduled rotation — 2026-08-17 16:36 UTC

  • Completed the required post-rerun rotation of clients 021–040. Reopened all 69 distinct current dossier evidence URLs (109 citations), ran 89 exact CPVA client/system searches and 104 per-system contractor/procurement query-ladder searches, and repeated identity-checked CVP IS organization-first discovery. Exact profiles and profile-derived notice lists were opened for 18 clients; no near-name profile was forced for clients without an exact result, and all 421 complete published-notice rows exposed by the full lists were classified.
  • No defensible new client-specific system, contractor, production-hosting, original-kickoff or production-release claim was established beyond the evidence already published earlier today. In particular, newly reopened APVA-profile award bodies named Aplinkos apsaugos departamentas or Aplinkos apsaugos agentūra—not APVA—as the contracting organization, so they were not converted into client 025 system-use/supplier claims. Exact CPVA results were broad-token or unrelated, and contractor searches produced no stronger opened source. Existing rows, statuses, confidence levels, gaps and 2026-08-17 dates were conservatively preserved.
  • Generated state remains 290 clients, 494 canonical systems, 719 observations and 104 contractor cards, with complete 336 client→contractor and 336 system→contractor links. Statuses remain 79 researched, 195 partial and 16 no-public-evidence; explicit hosting, original-kickoff and latest-release unknowns remain unchanged.
  • All 15 repository tests, corepack pnpm validate, corepack pnpm build, registry/generated-route checks, all 69 browser-equivalent evidence URL checks and git diff --check passed. The build verified 290 client, 494 system and 104 contractor routes, 719 observations and 296 raw artifacts. Local browser acceptance confirmed client 028, its system/contractor evidence links, no page overflow and no console or JavaScript errors.
  • This completed conservative no-new-claim review produced no source diff, so no empty commit was created. Existing main head 6c06ec27733066a6af8474af8eb0dbfe12d85ad1 remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task 1102 remains success, including Pages publication. Public overview, client and system routes returned the expected Keycloak OAuth 302; the authorized backend hostname did not resolve from this cron environment, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remain untracked and excluded.
  • No newer human directive or CVP IS instructor guidance was present in the synchronized channel state. Live work reconfirmed the documented exact-identity, complete-row, direct-PDF and stage-classification mechanics without exposing a reusable new procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next dossier rotation: 041–060.

Previous scheduled rotation — 2026-08-17 16:08 UTC

  • Completed RootAtSkic's explicitly requested second one-time rerun of clients 001–020 after the registry-table fix. Reopened all 54 distinct current Markdown evidence URLs with browser-equivalent requests, reran 127 exact CPVA client/system searches and 182 per-system contractor/procurement query-ladder searches, and repeated CVP IS organization-first discovery. Identity-checked exact profiles and their profile-derived notice lists were opened for 19 clients; client 010 still had no exact portal row and no near-name identity was forced.
  • The current CVP IS lists contained 40 complete rows, including 37 IT/digitalization-stage leads. Two additional material tender leads were opened as direct PDFs and classified from their bodies: a Vyriausybės kanceliarija tender for planned privileged-access-management support and a Kultūros ministerija tender for planned Moodle-or-equivalent learning-management-system implementation/adaptation/training/maintenance. Neither notice proves an award, selected supplier, signed contract, delivery, production use, hosting, completion or release; the Moodle lead remains explicitly recorded in client 006's gap. Contractor searches and CPVA results produced no defensible stronger claim, so all dossier rows, statuses, confidence levels, gaps and 2026-08-17 dates were conservatively preserved.
  • Generated state remains 290 clients, 494 canonical systems, 719 observations and 104 contractor cards, with complete 336 client→contractor and 336 system→contractor links. Statuses remain 79 researched, 195 partial and 16 no-public-evidence; explicit production-hosting, original-kickoff and latest-release unknowns remain unchanged.
  • All 15 repository tests, corepack pnpm validate, corepack pnpm build, registry/generated-route checks, evidence URL checks and git diff --check passed. The build verified 290 client, 494 system and 104 contractor routes, 719 observations and 296 raw artifacts. Local browser acceptance confirmed the representative client 001 page and PPVIS system dossier, including exact client→system→contractor/evidence relationships.
  • This completed no-new-claim rerun produced no source diff, so no empty commit was created. Existing main head 6c06ec27733066a6af8474af8eb0dbfe12d85ad1 remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task 1102 remains successful, including the main-push Pages publication step. Public overview, client and system routes returned the expected Keycloak OAuth 302; no authorized backend route was available, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remain untracked and excluded.
  • No newer human directive or CVP IS instructor guidance was present in the accessible synchronized channel state. Live portal work reconfirmed the documented exact-organization, complete-row and direct-PDF stage-classification mechanics without exposing a new reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next dossier rotation: 021–040.

Previous scheduled rotation — 2026-08-17 15:52 UTC

  • Reviewed clients 061–080 through all 64 distinct current dossier evidence URLs, official client/system sources, 80 exact CPVA client/system searches, 120 per-system contractor/procurement query-ladder searches, and identity-checked CVP IS organization-first discovery. All current evidence URLs remained readable. Ten byte-exact CVP IS profiles and their profile-derived notice lists were opened; near-name rows were not forced, and the 18 IT/digitalization-stage leads were classified conservatively from their notice types and opened bodies where material.
  • Added one defensible client 076 observation: the planned Permanent-exhibition expansion with innovative and inclusive solutions. CPVA directly establishes the museum's funded project, while the opened CVP IS contract-award body establishes MB „Baukas“ as the EUR 37,631 technical-project design and author-supervision contractor under a contract signed 2025-07-31. The claim is not extended to exhibition implementation, technology integration, completion, production use, hosting or current support. The other 19 clients produced conservative no-new-claim outcomes; all twenty dossier and index dates advanced to 2026-08-18 without status promotion.
  • Generated state advanced from 493 to 494 canonical systems and from 718 to 719 observations; contractor cards advanced from 103 to 104, with complete 336 client→contractor and 336 system→contractor links. New SYS-7C4EFE9F86 and CTR-551788F646 preserve hosting, original kickoff and latest production release as explicitly unknown.
  • All 15 repository tests, corepack pnpm validate, corepack pnpm build, registry/generated-route checks, exact date/six-column checks, evidence URL checks and git diff --check passed. The build verified 290 client, 494 system and 104 contractor routes, 719 observations and 296 raw artifacts. Local browser acceptance confirmed client 076, the new system and contractor links.
  • Commit 6c06ec27733066a6af8474af8eb0dbfe12d85ad1 is on main; local/remote equality and authenticated exact-SHA client/system-analysis/index readback passed. Exact-SHA Gitea Actions task 1102 (run 2867, job 3843) succeeded, including the Publish to LEGO Cloud Pages step. The public changed route reached the expected Keycloak authentication boundary. The authorized backend hostname vssa-documentation.vssa-v1.svc.cluster.local did not resolve from this cron environment, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded.
  • Live research reconfirmed the documented organization-first, direct-PDF and procurement-stage semantics without exposing a new reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next dossier rotation: 081–100.

Previous scheduled rotation — 2026-08-17 15:10 UTC

  • Re-reviewed clients 041–060 after the completed one-time 001–020 rerun and the subsequent 021–040 rotation. The run reopened all 59 distinct dossier evidence URLs, executed 91 exact CPVA client/system searches and 112 per-system contractor/procurement searches, and reran identity-checked CVP IS organization-first discovery. Exact profile-linked notice lists were resolved for 16 clients and all 51 current complete rows were parsed; near-name rows for the remaining clients were not forced.
  • Every reopened dossier URL returned browser-equivalent HTTP 200 content. The current official, CPVA, contractor and procurement sources produced no defensible new system, contractor, lifecycle or hosting claim beyond the evidence already published earlier today, so all rows, statuses, confidence levels, gaps and 2026-08-17 check dates were conservatively preserved.
  • Generated state remains 290 clients, 493 canonical systems, 718 observations and 103 contractor cards, with complete 335 client→contractor and 335 system→contractor links. Statuses remain 79 researched, 195 partial and 16 no-public-evidence; unknown production hosting, original kickoff and latest-release values remain explicit.
  • All 15 repository tests, corepack pnpm validate, corepack pnpm build, registry/generated-route checks, evidence URL checks and git diff --check passed. Local browser acceptance confirmed the representative client 056 route, KVR evidence, zero horizontal overflow and no console or JavaScript errors. The build verified 290 client, 493 system and 103 contractor routes plus 296 raw artifacts.
  • This conservative no-new-claim rerun produced no source diff, so no empty commit was created. Existing main head 8ce8b9479515257c417d455d1e23e5ec66d03828 remains exactly equal to the remote; authenticated immutable source readback passed and exact-SHA Gitea Actions task 1091 remains successful, including Pages publication. The public changed route returned the expected Keycloak OAuth 302, so unauthenticated deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded.
  • No new CVP IS instructor guidance, reusable source route or portal pitfall was found, so the authoritative vssa-clients skill required no update.
  • Next dossier rotation: 061–080.

Previous scheduled rotation — 2026-08-17 14:53 UTC

  • Reviewed clients 021–040 through all current dossier evidence and official client/system sources, 82 exact CPVA client/system searches, contractor/procurement query ladders, and identity-checked CVP IS organization-first discovery. Exact or identity-supported portal profiles were checked for 18 clients; every page of the 12 current profile-linked notice lists was parsed (421 complete rows), while no near-name identity was forced for clients without an exact result.
  • Two opened CVP IS contract-award PDFs added bounded client 028 observations. Nacionalinė žemės tarnyba awarded UAB COETUS a EUR 142,500 contract signed 2024-12-17 to create and develop a satellite-image-management digital tool, and awarded UAB „Novian Technologies“ a EUR 135,000 contract signed 2025-09-30 for IT-infrastructure maintenance, repair and related services. Neither award is presented as production deployment, acceptance, hosting, original system kickoff or a production release.
  • Client 030 now directly cites the opened December 2025 STVK open-tender PDF for planned development, maintenance and support services. The contractor remains Not publicly identified, and the notice is not presented as an award or signed supplier engagement. APVA-profile awards whose bodies identified another agency as contract signer were conservatively excluded from client 025 system-use attribution.
  • Generated state advanced from 491 to 493 canonical systems and from 716 to 718 observations; contractor cards advanced from 101 to 103, with complete client→contractor and system→contractor links advancing from 333 to 335. Statuses remain 79 researched, 195 partial and 16 no-public-evidence; both new canonical analysis entries preserve hosting, original kickoff and latest production release as explicitly unknown.
  • All 109 dossier citations across the batch (69 unique URLs) returned opened browser-equivalent HTTP 200 content, including all three new direct procurement PDFs. All 15 tests, corepack pnpm validate, corepack pnpm build, registry/generated-route checks, git diff --check and local rendered Client/System/Contractor checks passed. The build verified 290 client, 493 system and 103 contractor routes, 718 observations and 296 raw artifacts.
  • Commit 8ce8b9479515257c417d455d1e23e5ec66d03828 is on main; local/remote equality, authenticated exact-SHA source readback and exact-SHA Gitea Actions task 1091 succeeded, including the main-push Publish to LEGO Cloud Pages step. The authorized raw-IP backend check was blocked by this runtime's interactive security-approval guard, direct browser access to that endpoint was refused, and docs.lego-cloud.eu did not resolve, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded.
  • Live research exposed no new reusable source-route mechanic or portal pitfall beyond the authoritative skill, so vssa-clients required no update.
  • Next dossier rotation: 041–060.

Previous scheduled rotation — 2026-08-17 14:32 UTC

  • Completed RootAtSkic's explicitly requested one-time rerun of clients 001–020 after the registry-table delivery. Reopened all 48 current Markdown citations, ran 46 exact CPVA client/system searches and 62 system contractor/procurement ladders, identity-checked exact CVP IS organization rows for 19 clients, and reviewed every page of their profile-derived published-notice lists. Client 010 still had no exact portal row; no near-name identity was forced. No new CVP IS instructor guidance was present beyond the durable validated mechanics.
  • Two opened CVP IS contract-award PDFs materially deepened existing rows. Lietuvos Respublikos Vyriausybės kanceliarija awarded UAB „DevOcean LT“ PPVIS maintenance and improvement contract 46673, signed 2025-09-09 for EUR 110,000. Lietuvos Respublikos aplinkos ministerija awarded MB „Duida“ NTIS expert consulting for system management, improvement and development under contract 43221, signed 2025-05-22 for EUR 24,960. These awards are not presented as original development, production hosting, acceptance, completion or release; MB „Duida“ is explicitly not labelled the NTIS developer.
  • Generated state remains 290 clients, 491 canonical systems and 716 observations; contractor cards advanced from 100 to 101, with complete client→contractor and system→contractor links advancing from 331 to 333. Statuses remain 79 researched, 195 partial and 16 no-public-evidence; lifecycle and hosting unknowns were preserved.
  • All 13 tests, corepack pnpm validate, corepack pnpm build, evidence-body extraction, route/registry validation, git diff --check and local browser checks passed. The build verified 290 client, 491 system and 101 contractor routes, 716 observations and 296 raw artifacts. Commit e063285cf50cd6e9f65d844a6f97348452eae219 is on main; local/remote equality, authenticated exact-SHA source readback and exact-SHA Gitea Actions task 1088 (run 70) succeeded, including Pages publication. Authorized pages/pages service-proxy readback verified both changed client bodies and award markers; the public route returned the expected Keycloak OAuth 302. Unrelated PPTX-improvement directories remained untracked and excluded.
  • Live research reconfirmed the documented exact-organization, complete-pagination and direct-PDF stage-classification mechanics without exposing a new reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next dossier rotation: 021–040.

Latest documentation delivery — 2026-08-17 14:34 UTC

  • Improved the shared Docusaurus layout for wide registries. The left navigation is now 20rem (320px), the desktop right table-of-contents column is reduced to 10rem (160px), and the central document column consumes the remaining width instead of retaining Docusaurus's former column cap.
  • The Systems registry is emitted inside an accessible, keyboard-focusable responsive region and uses a compact fixed-layout table with deliberate column proportions. At the verified 1280px desktop viewport, the sidebar measured 320px, article 753px, TOC 160px, and table/wrapper 753px; neither the registry nor the body had horizontal overflow. At 997–1279px, the secondary TOC is hidden and the compact table floor drops to 38rem, preserving the primary registry rather than forcing three competing columns. Mobile behavior remains Docusaurus-native.
  • Added regression coverage for the generated MDX wrapper and responsive layout contracts. All 15 tests, corepack pnpm validate, corepack pnpm build, registry/route validation and git diff --check passed against 491 system routes, 716 observations, 100 contractor routes and 296 raw artifacts. Browser acceptance found no console/JavaScript errors. Independent review found no blocking issue; its intermediate-width concern was addressed before merge.
  • PR #2 passed exact feature-head Actions run 69 at 0eb5271610f30cfea33d5360f860b56d724dacff and was merged as 7515aca24a78f509834b1435c784b7d171e0b6f8. Exact merge-head Actions run 71, job 3830, succeeded, including Publish to LEGO Cloud Pages. Remote main equality and authenticated exact-SHA source readback passed. The public route reached the expected Keycloak OAuth 302, so unauthenticated deployed-body readback was not claimed.

Previous scheduled rotation — 2026-08-17 14:03 UTC

  • Reviewed clients 081–100 through 80 reopened dossier citations, 90 exact CPVA client/system searches, 140 contractor/procurement searches, and identity-checked CVP IS organization discovery. Exact or identity-supported profiles were resolved for 18 clients; no near-name profile was forced for clients 088 or 091.
  • Added a bounded planned-procurement observation for client 082: the opened August 2026 CVP IS notice is an open tender for software-programming services and audiovisual components for the „TREMTIES VAGONAS: KITA STOTELĖ SIBIRAS“ digital exhibition. It does not prove an award, selected supplier, signed contract, delivery, production operation, hosting, completion or release. Direct tender citations were also added to the existing bounded client 001 PPVIS manufacturer-support and client 005 VBAMS licence-update statements. Other reviewed rows, statuses, confidence levels and gaps were preserved.
  • Generated state advanced from 490 to 491 canonical systems and from 715 to 716 observations; contractor cards remain 100, with 331 complete client→contractor and 331 system→contractor links. New SYS-7D116B8FB6 preserves production hosting, original delivery kickoff and production release as explicitly unknown.
  • All 13 tests, corepack pnpm validate, corepack pnpm build, route/registry validation, git diff --check and local browser acceptance passed. Commit d1a9e194fe5f289f98763297a169eee4cf8e6cfc is on main; local/remote equality, authenticated exact-SHA readback and exact-SHA Gitea Actions task 1081 (run 67) succeeded, including Pages publication. Unrelated PPTX-improvement directories remained untracked and excluded.
  • The scheduler's “provider authentication error” label was false: OpenAI Codex authenticated and the run completed research, commit, push, source readback and exact-head CI. The agent then exhausted its tool-iteration budget immediately after CI, so its otherwise complete report was wrapped in RuntimeError; deployed body readback and this wiki update were the only unfinished steps. The wiki cursor has now been repaired manually.
  • Next dossier rotation: 101–120.

Latest documentation delivery — 2026-08-17 10:16 UTC

  • Fixed the public registry generators after the earlier work remained only in an undeployed feature worktree. The Clients registry now includes a distinct canonical Systems count; rendered Client sidebar labels omit numeric prefixes while source filenames and dossier headings retain them. The Systems registry removes Type and adds Contractors, Cloud (AWS, AZURE, GCP, Other, NaN) and OnPrem? (Yes, No, NaN).
  • Added behavioral regression coverage for all requested table/sidebar semantics. All 13 tests, corepack pnpm validate, corepack pnpm build, and git diff --check passed. The production build verified 290 client, 482 system and 100 contractor routes, 707 observations, 329 client→contractor links, 329 system→contractor links and 296 raw artifacts. Independent frozen-patch review passed with no security or logic findings.
  • Rendered browser acceptance confirmed number-free Client sidebar labels, preserved numbered dossier heading 001 — Lietuvos Respublikos Vyriausybės kanceliarija, Client table headers ID / Client / Systems / Status / Last investigated, client 001 system count 2, and Systems headers ID / System or service / Contractors / Cloud / OnPrem? / Clients / Observations; Type was absent, unknown values rendered NaN, and the wide table retained horizontal scrolling.
  • PR #1 was opened at exact reviewed head 48d81d6b0a0e35887a0737fbbab94d5bf89b306a; exact-head task 1020 succeeded. The PR was merged as 1624e77c90f1a38205c63cf025ec55d0444eef9a; exact merge-head task 1021 succeeded, including Pages publication. Authenticated exact-SHA source readback confirmed all four changed files. Public browser access reached the expected Keycloak boundary, so unauthenticated deployed page-body readback was not claimed.
  • RootAtSkic explicitly requested another one-time review of clients 001–020. The wiki cursor and cron prompt were reset accordingly, and an immediate scheduled run was triggered. After it completes, the cursor advances to 021–040.

Latest scheduled rotation — 2026-08-17 13:32 UTC

  • Reviewed clients 061–080 through all current dossier citations and official client/system sources, 58 exact CPVA client/system searches, 80 system/contractor/procurement query-ladder searches, and identity-checked CVP IS organization-first discovery. Exact profiles were resolved for 15 clients; client 066 exposed two distinct exact-name profiles and both notice lists were preserved and reviewed rather than forcing one canonical record. No exact profile was forced for clients 061, 064, 071, 072 or 073. All twenty dossier/index dates advanced to 2026-08-17 without unsupported status promotion.
  • Two opened direct CVP IS tender PDFs added bounded planned-procurement observations for client 075: text-to-speech synthesis software and illustration-content recognition software. Each notice says that Lietuvos audiosensorinė biblioteka planned to acquire the software through an open tender; neither identifies a selected supplier or proves award, contract signature, delivery, production use, hosting, completion or release. The other reopened sources produced no defensible new claim and retained their existing rows, confidence levels and gaps.
  • Generated state advanced from 488 to 490 canonical systems and from 713 to 715 observations; contractor cards remain 100, and complete client→contractor plus system→contractor link counts remain 331. New SYS-E795BC75EF and SYS-71E3A7ECDE preserve production hosting, original delivery kickoff and latest production release as explicitly unknown.
  • All 62 pre-existing dossier URLs plus both new CVP IS PDFs returned opened browser-equivalent HTTP 200 content; both new bodies were verified as non-trivial PDFs and text-extracted for stage classification. All 13 tests, corepack pnpm validate, corepack pnpm build, registry/generated-route checks and git diff --check passed; the build verified 290 client, 490 system and 100 contractor routes, 715 observations and 296 raw artifacts. Local browser acceptance confirmed the updated client 075 and new system route with no console errors.
  • Commit 6fe5d6a6f5537658c81e15f9cf28c389647a431e is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-SHA Gitea Actions task 1073 (run 66) succeeded, including the main-push Pages publication step. The public documentation hostname did not resolve from this runtime and no authorized backend route or mounted Pages dataset was available, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded.
  • Live work reconfirmed the documented organization-first, duplicate-profile ambiguity and direct-PDF stage-classification mechanics but established no new reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next dossier rotation: 081–100.

Previous scheduled rotation — 2026-08-17 12:44 UTC

  • Completed clients 041–060 after the required 001–020 rerun and the subsequent 021–040 batch. Current dossier evidence, official client/system routes, exact CPVA client/system searches, contractor ladders and identity-checked CVP IS organization-first records were reviewed. The reopened sources that did not produce a defensible new claim retained their existing rows, statuses, confidence levels and gaps; all twenty dossier/index dates advanced to 2026-08-17.
  • Opened direct CVP IS bodies added three bounded planned/unsuccessful-procurement observations: VMI's planned ITIS_EU modernization/consulting procurement, VMI's unsuccessful i.KON risk-analysis-module development procedure (explicitly no winner), and NBFC's planned Užduočių valdymo informacinė sistema creation/implementation procurement. A separate open tender added planned KVR/KPEPIS maintenance/support scope to client 056. None was presented as a selected supplier, signed contract, delivery, production use, hosting, acceptance, completion or release.
  • Generated state advanced from 485 to 488 canonical systems and from 710 to 713 observations; contractor cards remain 100, and complete client→contractor plus system→contractor link counts remain 331. New SYS-B6A420C06F, SYS-3791C39F61 and SYS-52BFEDE8DB preserve production hosting, original delivery kickoff and latest production release as explicitly unknown.
  • All 59 distinct dossier URLs returned opened browser-equivalent HTTP 200 content. All 13 tests, corepack pnpm validate, corepack pnpm build, registry/generated-route checks and git diff --check passed; the build verified 290 client, 488 system and 100 contractor routes, 713 observations and 296 raw artifacts. Local browser acceptance confirmed the updated client 056 heading and planned-maintenance wording with no console errors.
  • Commit 494a3144f176e90f5e8e7215562d56fbfd3d4208 is on main; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-SHA Gitea Actions task 1067 (run 65) succeeded, including Pages publication. The public changed route reached the expected Keycloak OAuth boundary; no authorized backend route or mounted Pages dataset was available in this runtime, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded.
  • No new reusable CVP IS mechanic or source-route pitfall was established, so the authoritative vssa-clients skill required no update.
  • Next dossier rotation: 061–080.

Previous scheduled rotation — 2026-08-17 11:43 UTC

  • Reviewed clients 021–040 through all current dossier citations and official client/system sources, 85 exact CPVA client/system searches, contractor query ladders, and identity-checked CVP IS organization-first discovery. Exact profiles were resolved for 17 clients; no near-name profile was forced for clients 026, 029 or 034. All 87 existing dossier URLs returned HTTP 200; the two JavaScript-rendered sources were separately opened in a browser and confirmed readable.
  • Three opened direct CVP IS procurement-notice PDFs added bounded evidence for client 039: planned update/maintenance/support procurement for TARES, planned MDAS maintenance/support and iMDAS update procurement, and planned update/maintenance/support procurement for Komandoras. Each body identifies the exact contracting authority and open-tender stage; no supplier, award, signed contract, delivery, production release or hosting was inferred. The other reopened sources produced no defensible new claim, so their statuses and unresolved gaps were preserved while all twenty dossier/index dates advanced to 2026-08-17.
  • Legacy four-column dossiers 033, 034, 036 and 040 were normalized to the canonical six-column table while preserving their original system labels and evidence semantics. Generated state advanced from 483 to 485 canonical systems and from 708 to 710 observations; contractor cards remain 100, and complete client→contractor plus system→contractor links advanced from 329 to 331. New SYS-D36FA3BF0E and SYS-FBEDF460ED retain hosting, original kickoff and latest production release as explicitly unknown.
  • All 13 tests, corepack pnpm validate, corepack pnpm build, registry/generated-route checks, git diff --check, evidence URL checks and local browser acceptance passed. Commit 00075a5bc6c78147fab84af8478a8bb33c973738 was pushed to main; local/remote ref equality, authenticated exact-SHA source readback and exact-SHA Gitea Actions task 1058 (run 64) succeeded, including Pages publication. The deployed route reaches the expected Keycloak OAuth 302; no authorized backend route or mounted Pages dataset was available in this runtime, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded.
  • Live CVP IS work reconfirmed the documented organization-first, exact-identity and direct-body stage-classification mechanics but exposed no new reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next dossier rotation: 041–060.

Previous scheduled rotation — 2026-08-17 10:27 UTC

  • Completed RootAtSkic's explicit one-time rerun of clients 001–020 after the registry-table fix. All current dossier evidence and official client/system routes were reopened; 46 exact CPVA client/system queries and the 19 identity-checked CVP IS organization notice lists were rerun. Client 010 still has no defensible exact CVP IS organization profile, so no near-name record was forced. Existing system contractor ladders were rechecked; no procurement-stage record was promoted beyond what its opened body proves.
  • A newly surfaced official Aplinkos ministerija sitemap route added Nuotekų tvarkymo informacinė sistema (NTIS) to client 002. The opened Ministry page says the Ministry created NTIS and directly describes its individual-wastewater registry, collection/transfer/treatment recording, risk-control and reporting functions. No commercial developer, current support supplier, production host, original kickoff or production release was identified; the page's update date was not treated as lifecycle evidence.
  • All 50 distinct dossier URLs returned readable browser-equivalent content. Generated state advanced from 482 to 483 canonical systems and from 707 to 708 client-system observations while remaining 100 contractor cards; new SYS-4546BF5F3B preserves hosting, original kickoff and latest production release as explicitly unknown. Complete contractor link counts remain 329 client→contractor and 329 system→contractor.
  • All 13 tests, corepack pnpm validate, corepack pnpm build, registry/generated-route validation, git diff --check, and local rendered Client/System route checks passed. Commit b52d7231fe4197cc8f88150fc9b0838b35b42bf0 was pushed to main; local/remote ref equality, authenticated exact-SHA source readback and exact-SHA Gitea Actions task 1024 succeeded, including Pages publication. The public route reached the expected Keycloak OAuth 302; no authorized backend route or mounted Pages dataset was available in this runtime, so deployed page-body readback was not claimed. Unrelated PPTX-improvement directories remained untracked and excluded.
  • The live portal work reconfirmed the documented organization-first, identity-check and direct-body stage-classification mechanics but exposed no new reusable procedure or pitfall, so the authoritative vssa-clients skill required no update.
  • Next dossier rotation: 021–040.

Previous scheduled rotation — 2026-08-17 10:00 UTC

  • Reviewed reset rotation 001–020. New bounded tender-stage evidence was added for client 012 (Ministry of Agriculture DocLogix document-management-system maintenance procurement) and client 017 (State Forest Service National Forest Inventory Information System modernization procurement). Both direct CVP IS PDFs are tender notices only; no selected supplier, signed contract, delivery, production use, hosting, completion or release was inferred.
  • Clients 013–016 were converted from legacy evidence tables to the canonical six-column format while preserving supported system identities and direct official citations. Other clients without defensible new claims were rechecked and dated 2026-08-17 without unsupported status promotion or contractor attribution.
  • Generated state advanced to 482 canonical systems, 707 client-system observations and 100 contractor cards. New SYS-A09C6AC314 and SYS-04AA743682 retain hosting, original kickoff and latest production release as explicitly unknown. All 49 distinct dossier URLs passed browser-equivalent checks, including both inspected CVP IS PDFs.
  • corepack pnpm validate, corepack pnpm build, registry/generated-route validation, git diff --check, and local browser verification passed. Commit 2c018c2248faebcdf06b7a1cb018de4eddb7cd2c was pushed to main; local/remote ref equality, authenticated exact-SHA source readback, exact-SHA Gitea Actions task 1018, Pages publication, and authorized service-proxy deployed-content checks passed. Unrelated PPTX-improvement directories remained untracked and excluded.
  • The scheduler marked this run failed only because the agent exhausted its 60/60 turn budget after completing delivery and then returned the final report through a RuntimeError. Provider authentication was healthy; the alert's authentication label was a misclassification. The durable wiki cursor was repaired manually after the run.
  • Next dossier rotation: 001–020 (explicit one-time rerun requested after registry-table delivery; after completion continue with 021–040).

Previous scheduled rotation — 2026-08-17 06:15 UTC

  • Reviewed rotation 201–210 through all existing dossier citations and official client routes, exact CPVA client/system searches, contractor/system query ladders, and CVP IS organization-first discovery. Exact profile tuples were confirmed for clients 201 (organizationId=12830, authorityId=12830, orgGroupId=29932), 202 (13905, 13905, 36656), 203 (2137, 2137, 2149), 204 (1522, 1522, 1525), 205 (4500, 4500, 4906), 206 (2329, 2329, 2359), 207 (5766, 5766, 7188) and 209 (1516, 1516, 1519). Client 208 returned an exact-name row whose contact domain conflicted with the institution and was not relied on; no exact organization row was found for client 210.
  • Nine opened direct CVP IS award/amendment PDFs added bounded evidence. Client 204 now records DocuWare support/development by DocWay sp. z o.o., Ivanti Neurons for ITSM support/development by Synergy Consulting, OAS and UAIS support/development by UAB CGI Lithuania, and process-robotization licence rental by ATEA. Client 205 records VATIS modernization by Asserte and the directly stated VSSA-administered production environment while leaving cloud/on-premises/hybrid classification unknown. Client 206 records ŽDIS improvement by ATEA and vCatch update/support by Twoday A/S. Client 209 adds VVR programming/development by UAB Fortevento. Dates, values and roles were taken from the award bodies and were not extended to original development, production hosting, acceptance, completion or release.
  • The other reopened sources and applicable notice lists produced no defensible additional claim. All ten dossier/index dates advanced to 2026-08-17 without status promotion. The obsolete non-resolving IMVIS login citation was replaced by the opened current official VMVT IMVIS page, and its claim was narrowed accordingly. Browser-equivalent verification reopened all 37 distinct Markdown URLs, including all nine direct procurement PDFs; every URL returned inspected HTTP 200 content.
  • Generated state advanced from 473 systems / 698 observations / 95 contractors to 480 systems / 705 observations / 100 contractors. Seven new canonical analysis entries retain production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client/System pages preserve all 705 system links and complete 325 client→contractor plus 325 system→contractor links. The ATEA regression expectation was updated from three to five evidenced client/system relationships.
  • corepack pnpm validate, corepack pnpm build, and git diff --check passed. The build verified 290 client, 480 system and 100 contractor routes plus 296 raw artifacts. Commit 174030f7445f0ff1df5a69e694f085e5d17b3943 was pushed to main; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task 940 (run 58) succeeded, including Pages publication. Representative Client, System and Contractor routes returned the expected Keycloak OAuth 302; docs.lego-cloud.eu remained unresolvable, so backend page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
  • Discord readback reached bot message 1538732595821547540; no newer human directive or message from designated CVP IS instructor 476287310627864587 was present. Live portal work reconfirmed the existing exact-organization, complete-row and direct-PDF mechanics but exposed no new reusable procedure or pitfall, so vssa-clients required no update.
  • Next dossier rotation: 211–220.

Previous scheduled rotation — 2026-08-17 02:12 UTC

  • Reviewed rotation 191–200 through all existing dossier citations and official client routes, exact CPVA client/system searches, contractor/system query ladders, and CVP IS organization-first discovery. Identity-checked exact CVP IS profile tuples were: client 192 (organizationId=4600, authorityId=4600, orgGroupId=5025), 194 (1957, 1957, 1962), 195 (13077, 13077, 31408), 196 (8420, 8420, 14170), 198 (1160, 1160, 1161), 199 (10201, 10201, 19143) and 200 (8449, 8449, 14261). No near-name portal record was forced for clients without a defensible exact identity.
  • An opened direct CVP IS national procurement-notice PDF added a bounded observation for client 192: Riešės gimnazija initiated a planned Skaitmeninių mokymosi aplinkų licencijų procurement with estimated value 32 000 Eur excluding VAT. The notice does not identify products, winner, signed contract, delivery or production use, so the contractor remains Not publicly identified and relationship is procures (planned).
  • The remaining nine dossiers produced no defensible additional claim after reopening official pages, exact CPVA broad-token searches and applicable CVP IS notice lists. Existing rows, statuses, confidence levels and gaps were preserved; all ten dossier/index dates advanced to 2026-08-17. Browser-equivalent verification reopened all 22 distinct Markdown URLs (including the direct procurement PDF): every source returned inspected HTTP 200 content. Live portal work reconfirmed exact/variant organization matching, complete-row parsing and direct-PDF classification but exposed no new reusable mechanic or pitfall, so the authoritative vssa-clients skill required no change.
  • Generated state advanced from 472 systems / 697 observations / 95 contractors to 473 systems / 698 observations / 95 contractors. New canonical SYS-B7123CD417 keeps production hosting, original delivery kickoff and latest production release explicitly unknown. Generated Client/System pages preserve all 698 system links and complete 315 client→contractor plus 315 system→contractor links; the new unknown-contractor placeholder remains explicit and unlinked.
  • corepack pnpm validate, corepack pnpm build, git diff --check, and local browser route checks passed. The build verified 290 client, 473 system and 95 contractor routes, 698 observations, and 296 raw artifacts. Commit 83b802bbcd589c8492f6c1daf3a7982c0d5cfc65 was pushed to main; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task 930 succeeded, including Pages publication. Representative public Client and System routes returned the expected Keycloak OAuth 302; no authorized backend route was available, so deployed page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
  • Discord readback reached bot message 1538671402167701666; no newer channel message, human directive, or message from designated CVP IS instructor 476287310627864587 was present. No portal guidance was invented.
  • Next dossier rotation: 201–210.

Previous scheduled rotation — 2026-08-17 00:12 UTC

  • Reviewed rotation 181–190 through all existing dossier citations and official client routes, exact CPVA client/system searches, contractor/system query ladders, and CVP IS organization-first discovery. Identity-checked CVP IS profile tuples included successor LINEŠA for client 183 (organizationId=10864, authorityId=10864, orgGroupId=21121), close portal renderings for 184 (263836, 383359, 383359) and 185 (66513, 132804, 132804), and exact Nacionalinė švietimo agentūra profile 1211 (1211, 1212). No near-name record was forced for clients without a defensible exact/current identity.
  • Two opened direct CVP IS contract-award PDFs materially deepened client 190. UAB „Asseco Lietuva“ won AIKOS software maintenance/development contract 52300, signed 2026-02-27 for EUR 22,400, and NEMIS software maintenance/development contract 27824, signed 2025-08-19 for EUR 29,040. The NEMIS observation was corrected from the erroneous “Neformaliojo švietimo” expansion to Nesimokančių vaikų ir mokyklos nelankančių mokinių informacinė sistema, as confirmed by both the NŠA system page and award body. A separate opened ŠVIS tender proves intended procurement of 24 months of maintenance/development only; no supplier or signed contract was attributed.
  • LINEŠA's official 2023-09-07 announcement explicitly says the updated Mokinių ugdymo karjerai informacinė sistema (MUKIS) was already operating. Canonical SYS-F0B5221055 now records that day as the latest directly evidenced production release; original delivery kickoff and hosting remain unknown. The renamed NEMIS generated SYS-921BF5E45C; its stale all-unknown misnamed analysis entry was removed before bootstrap. Registry totals remain 79 researched, 195 partial, 16 no-public-evidence, 472 systems, 697 observations and 95 contractors. Generated Client/System pages preserve all 697 system links and complete 315 client→contractor plus 315 system→contractor links, including both new links to established CTR-E90B7D3CBD.
  • The remaining nine dossiers produced no defensible additional claim after reopening official pages, CPVA broad-token results and applicable CVP IS notice lists; their existing rows, statuses, confidence levels and gaps were preserved. All ten dossier/index dates advanced to 2026-08-17. Live portal work reconfirmed exact/variant organization matching, complete-row pagination and direct-PDF classification but exposed no new reusable mechanic or pitfall, so the authoritative vssa-clients skill required no change.
  • corepack pnpm validate, corepack pnpm build, and git diff --check passed. The build verified 290 client, 472 system and 95 contractor routes, 697 observations, complete 315 client→contractor plus 315 system→contractor links, and 296 raw artifacts. Commit bf0c44153cee7d7f4cbe2abdda9984964b9b4988 was pushed to main; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task 925 (run 56) succeeded, including Pages publication. Representative public routes returned the expected Keycloak OAuth 302; docs.lego-cloud.eu remained unresolvable and no authorized backend route was available, so deployed page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
  • Discord readback reached bot message 1538671402167701666; no new human directive or message from designated CVP IS instructor 476287310627864587 was present after high-watermark 1538638252054761644. No portal guidance was invented.
  • Next dossier rotation: 191–200.

Previous scheduled rotation — 2026-08-16 22:09 UTC

  • Reviewed rotation 171–180 through all existing dossier citations and official client routes, exact CPVA client/system searches, contractor/system query ladders, and CVP IS organization-first discovery. Profile-derived tuples were 171 7064 (authorityId=7064, orgGroupId=10354), 172 1297 (1297,1298), 173 7299 (7299,10959), 174 3350 (3350,3432), 175 4292 (4292,4624), 176 10551 (10551,20145), 177 7697 (7697,12093), 178 10208 (10208,19163), and 179 portal rendering Lietuvos istorijos institutas (PV) 4329 (4329,4680). Client 180 remains represented by distinct profiles 2876 (2876,2931) and 2903 (2903,2960); both notice lists were reviewed rather than silently selecting one canonical record.
  • CVP IS lists exposed tender/award leads including training services for client 175, a specialist book scanner for 177, website creation/licence notices for 179, and test-standardisation plus digital-methodical-content procurements for 180. None directly and unambiguously established a new canonical information system, contractor role, production hosting, original delivery kickoff, or production release after stage and identity checks. No defensible new claim was added; all ten existing rows, statuses, confidence levels and gaps were preserved, while dossier/index check dates advanced to 2026-08-16. Registry totals remain 79 researched, 195 partial, 16 no-public-evidence, 472 systems, 697 observations and 95 contractors.
  • Browser-equivalent verification reopened 28 distinct Markdown URLs. 27 resolved to inspected HTTP 200 pages; the official KPMPC SMIS citation redirected to the unavailable www.smis.lt endpoint, matching the dossier's explicit unresolved current-availability gap and not supporting any stronger current claim. Exact CPVA broad-token results yielded no claim source. Live CVP IS work reconfirmed exact/variant identity checks, separate duplicate-profile handling and complete-row parsing but exposed no new reusable mechanic or pitfall, so the authoritative vssa-clients skill required no change.
  • corepack pnpm validate, corepack pnpm build, and git diff --check passed after repairing a corrupted local Docusaurus package installation with a frozen forced pnpm reinstall. The final build verified 290 client, 472 system and 95 contractor routes, 697 observations, complete 313 client→contractor plus 313 system→contractor links, and 296 raw artifacts. Commit 39db665cf22246a8c5e5ad1c12364dd0407368c6 was pushed to main; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task 920 (run 55) succeeded, including Pages publication. The representative public route returned the expected Keycloak OAuth 302; docs.lego-cloud.eu remained unresolvable from this runtime, so backend page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
  • Local Discord state contained no channel message newer than high-watermark 1538638252054761644; no new human directive or message from designated CVP IS instructor 476287310627864587 was available. No portal guidance was invented.
  • Next dossier rotation: 181–190.

Previous scheduled rotation — 2026-08-16 20:14 UTC

  • Reviewed rotation 161–170 through all existing dossier citations, official client routes, exact CPVA client/system queries, contractor ladders, and CVP IS organization-first discovery. Identity-checked CVP IS profiles were 161 5234 (authorityId=5234, orgGroupId=6064), 162 9176 (9176,16805), 163 5288 (5288,6187), 165 typography variant Diemedžio ugdymo centras 18293 (18293,75131), 166 5432 (5432,6490), 167 1500 (1500,1503), and 169 8181 (8181,13526). No exact profile was forced for 164, 168, or 170. All 32 Markdown URLs across the ten dossiers returned browser-equivalent HTTP 200; dossier/index dates advanced to 2026-08-16 while statuses remain 79 researched, 195 partial, 16 no-public-evidence.
  • Three opened direct CVP IS contract-award PDFs added bounded evidence for Lietuvos medicinos biblioteka. The library explicitly governs/administers MNKV IS: UAB nSoft won modernization and implementation contract 53411, signed 2025-07-08 for EUR 347,500, and FORIT UAB won independent technical-supervision contract 53415, signed 2025-07-07 for EUR 73,000. UAB „IO projects“ won HL7 FHIR medical-document/data-modelling contract 53417, signed 2025-08-11 for EUR 217,000. None of these awards was extended to production hosting, completion or a production release.
  • Lietuvių kalbos institutas's opened award proves that USA LT won programming contract 6440, signed 2025-03-14, to create language-heritage data models, digitisation/integration tools, maps, geo-spatial infrastructure and open-data publication. The notice reports EUR 1,198,800 total awarded-contract value and a EUR 1,450,548 winning offer; both were preserved rather than reconciled by inference. It records unnamed subcontracting, so no subcontractor was attributed. The remaining eight dossiers gained no defensible system/contractor claim after the assigned source-class review; their existing rows, confidence, statuses and gaps were preserved.
  • Generated state advanced from 469 systems / 694 observations / 93 contractors to 472 systems / 697 observations / 95 contractors. New SYS-2EDA44EE65, SYS-57D7B32F9F, and SYS-5287D32490 retain production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client/System pages preserve all 697 system links and complete 313 client→contractor plus 313 system→contractor links; new FORIT UAB (CTR-C52C3F9113) and USA LT (CTR-840737E61E) cards and established UAB nSoft/UAB „IO projects“ cards are linked from the exact observations.
  • corepack pnpm validate, corepack pnpm build, URL verification and git diff --check passed; the build verified 290 client, 472 system and 95 contractor routes, 697 observations and 296 raw artifacts. Commit 65b40cbb3c73e7bbfb80a0d0620648733f213dd1 was pushed to main; ref equality and authenticated source readback passed. Exact-final-SHA Gitea Actions task 915 succeeded, including Pages publication. This runtime could neither resolve docs.lego-cloud.eu nor route to the previously used backend address and had no kubectl/mounted authorized service-proxy path, so public OAuth and backend page-body readback were not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
  • Discord readback reached message 1538638252054761644; the only new message after the prior high-watermark was bot-authored and no new human directive or message from designated CVP IS instructor 476287310627864587 was present. Live portal work reconfirmed existing exact-organization, typography-variant, complete-row and direct-PDF mechanics but exposed no new reusable procedure or pitfall, so vssa-clients required no update.
  • Next dossier rotation: 171–180.

Previous scheduled rotation — 2026-08-16 18:13 UTC

  • Reviewed rotation 151–160 through all existing dossier citations, exact CPVA client/system queries, contractor ladders, and CVP IS organization-first discovery. Identity-checked profile tuples included 151 4212 (4212,4495), 152 4917 (4917,5505), 153 6371 (6371,8635), former rendering 155 1695, 156 5704 (5704,7042), 158 8783 (8783,15347), 159 2097 (2097,2109), and 160 10220 (10220,19195). All 39 Markdown URLs across the ten dossiers returned browser-equivalent HTTP 200; dossier/index dates advanced to 2026-08-16 while statuses remain 79 researched, 195 partial, 16 no-public-evidence.
  • Opened direct CVP IS PDFs added bounded evidence: client 151 tendered a two-month technology rewrite of the donor/recipient register; client 152 tendered ULSVIS vulnerability, penetration, speed and performance testing; neither tender proves an award or supplier. Client 156 awarded UAB MeritStory contract 35299, signed 2025-11-05 for EUR 655,000, to develop LSPSKP IS; its separate chatbot tender remains planned procurement with no attributed supplier or deployment. Client 159 awarded MB IT innovations contract 3075, signed 2025-01-22 for EUR 126,370, for VAPRIS/VPREG modernization technical supervision. A separate EUR 655,560 modernization award omitted the winner name, so no implementation supplier was inferred.
  • Scoped the generic chatbot observation to VASPVT išmanusis pokalbių robotas before final delivery, preventing client-specific tender evidence from contaminating another organization's generic chatbot record. Generated state advanced from 467 systems / 692 observations / 91 contractors to 469 systems / 694 observations / 93 contractors. New SYS-B477086866 and the VASPVT-scoped chatbot record retain production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client/System pages preserve all 694 system links and complete 309 client→contractor plus 309 system→contractor links; UAB MeritStory (CTR-4AC7BF2CE8) and MB IT innovations (CTR-F0C874147B) link to valid Contractor Cards.
  • corepack pnpm validate, corepack pnpm build, URL verification and git diff --check passed; the final build verified 290 client, 469 system and 93 contractor routes, 694 observations and 296 raw artifacts. Research commit 12ef084c2f2204a81356c06146b5a7b923e12230 and final identity-scope fix 0f4e31cfc8ef1f1ee8edcc935ceefe4256a65de6 were pushed to main; final ref equality and authenticated source readback passed. Exact-final-SHA Gitea Actions task 906 (run 53) succeeded, including Pages publication. The public route returned the expected Keycloak OAuth 302; this runtime had no kubectl/mounted authorized backend path, so backend page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
  • Discord readback reached message 1538578370701430856; all messages newer than the prior high-watermark were bot-authored rate-limit reports, with no new human directive or message from designated CVP IS instructor 476287310627864587. Live portal work reconfirmed existing organization-first, profile-ID and direct-PDF mechanics but exposed no new reusable procedure or pitfall, so vssa-clients required no update.
  • Next dossier rotation: 161–170.

Previous scheduled rotation — 2026-08-15 06:10 UTC

  • Reviewed rotation 141–150 through current dossier evidence, exact client/system CPVA queries, contractor queries, CVP IS organization/notice discovery and opened direct procurement PDFs. Broad-token CPVA results did not directly prove an additional claim. All 58 Markdown URLs across the ten dossiers returned browser-equivalent HTTP 200; all dossier and index check dates advanced to 2026-08-15 while statuses remained 79 researched, 195 partial, 16 no-public-evidence.
  • Lietuvos transporto saugos administracija's direct contract-award PDF establishes Jūros dugno duomenų bazės ir jūrinio kartografavimo sistemos programinė įranga and UAB „Hnit-Baltic“ as the software-update and maintenance supplier under contract 62212, signed 2026-07-28 for EUR 460,425. This award is not extended to original development, hosting, completion or production release.
  • Higienos institutas's opened July 2026 notice establishes intended procurement of Visuomenės sveikatos stebėsenos informacinės sistemos improvement services for four months. It is a tender, not an award, so no supplier or delivery claim was added. The remaining eight clients produced no defensible new claim after the assigned source-class review; their existing rows, confidence and unresolved gaps remain unchanged.
  • Generated state advanced from 466 systems / 691 observations / 91 contractors to 467 systems / 692 observations / 91 contractors. New SYS-1567A86E5F retains production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client/System pages preserve all 692 system links and complete 306 client→contractor plus 306 system→contractor links; the LTSA row links to the established CTR-37185E6E09 UAB „Hnit-Baltic“ Contractor Card.
  • corepack pnpm validate, corepack pnpm build, URL verification and git diff --check passed; the build verified 290 client, 467 system and 91 contractor routes, 692 observations and 296 raw artifacts. Commit 859687042e395516473bc10c72816f3a1b9d3939 was pushed to main; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task 886 (run 51) succeeded, including Pages publication. The public route returned the expected Keycloak OAuth 302; this runtime had no kubectl/authorized service-proxy client, so backend page-body readback was not claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
  • The synchronized channel export remains at message 1538007301989331127, with no recorded newer human directive or message from designated CVP IS instructor 476287310627864587. Live portal work reconfirmed existing organization-first and direct-PDF behavior but exposed no new reusable mechanic, so vssa-clients required no update.
  • Next dossier rotation: 151–160.

Previous scheduled rotation — 2026-08-15 04:14 UTC

  • Reviewed rotation 131–140 through all current dossier citations, exact client/system CPVA queries, contractor searches, and every page of the identity-checked CVP IS organization notice lists. Exact profiles and profile-derived (authorityId, orgGroupId) pairs were confirmed as: 131 4842 (4842,4904); 132 5786 (5786,7270); 133 2781 (2781,2818); 134 punctuation variant Socialinės globos centras "Vija" 8826 (8826,15535); 135 2176 (2176,2198); 136 punctuation variant Specialieji socialinės globos namai "Tremtinių namai" 20789 (20789,100442); 137 5939 (5939,7459); 138 1722 (1722,1726); 139 3011 (3011,3053); and 140 5113 (5113,5856). Profile domains/addresses corroborated the punctuation variants; no near-name result was forced.
  • Ten client observations now reuse shared CVP IS identity SYS-9FC4DC8662. Seven opened direct tender PDFs added bounded planned-procurement evidence: client 132 video-surveillance/security installation plus fire-alarm/security maintenance; 133 security, fire-alarm, video-surveillance and call-system maintenance; 135 SOPAS maintenance/support/modification, SGLEP support/maintenance/modification, and Šeimos kortelė mobile-app maintenance/app-store publication; and 139 a wireless personnel-call system. These notices do not establish an award, signed contract, supplier, delivery, production use, hosting, original kickoff or release, so contractor cells remain Not publicly identified.
  • Exact CPVA and contractor/system ladders produced no additional directly proved claim. All 41 Markdown URLs across the ten dossiers returned browser-equivalent HTTP 200, including the seven direct CVP IS PDFs. Dossier and index dates advanced to 2026-08-15; statuses remain 79 researched, 195 partial, 16 no-public-evidence.
  • Generated state advanced from 461 systems / 676 observations / 91 contractors to 466 systems / 691 observations / 91 contractors. New canonical records SYS-D85FD35B15, SYS-E06F4B3954, SYS-F6360A31DB, SYS-896D8490FF, and SYS-66AE9E5F80 retain production hosting, original delivery kickoff and latest production release as explicitly unknown. Generated Client and System pages preserve all 691 system links; existing 305 client→contractor and system→contractor links remain complete.
  • corepack pnpm validate, corepack pnpm build, and git diff --check passed; the build verified 290 client, 466 system and 91 contractor routes, 691 observations and 296 raw artifacts. Commit 12926c6764136d5f9c154252b9d7b2181ee99fd8 was pushed to main; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task 877 succeeded, including Pages publication. Authorized pages/pages service-proxy readback verified client 135, its SGLEP and Šeimos kortelė rows, the SGLEP System Dossier link and explicit unknown lifecycle state; the public route returned the expected Keycloak OAuth 302. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
  • Discord readback reached message 1538007301989331127; the latest channel messages were bot-authored and no newer human directive or message from designated CVP IS instructor 476287310627864587 was present. Live portal work confirmed existing organization-first, typography-variant and direct-PDF behavior but exposed no new reusable mechanic, so vssa-clients required no update.
  • Next dossier rotation: 141–150.

Previous scheduled rotation — 2026-08-15 02:10 UTC

  • Reviewed rotation 121–130 through current official evidence, every existing dossier URL, exact client/system CPVA queries, contractor searches, and the complete CVP IS organization-first notice lists. Exact current identities were confirmed for 121–129; client 130 was identity-checked through the official 2025 rename from Pabėgėlių priėmimo centras to Priėmimo ir integracijos agentūra and exact successor profile 1688 with (authorityId=1688, orgGroupId=1690). No near-name result was forced.
  • Two direct CVP IS PDFs produced new bounded evidence. Marijampolės specialieji socialinės globos namai's 2025-02-24 tender proves intended procurement of a Socialinės globos ir slaugos valdymo informacinė sistema only; no award, signed contract, supplier, delivery or production use was found. Priėmimo ir integracijos agentūra's PAIS award proves that Finance engineering won modernization and implementation contract 46706, signed 2026-02-24; this is not extended to original development, hosting, completion, production deployment, release or later support.
  • Client 125 was converted from its legacy four-column dossier to the canonical concise six-column format while preserving all four system/service labels byte-for-byte. Its generic 2024 software-package tender did not identify a defensible named product or awarded supplier and was not added. Other IT-titled rows in the ten notice lists were equipment, building systems, generic packages, tender-stage leads or unrelated scope and were not promoted into unsupported system/contractor claims.
  • Exact CPVA queries produced no additional directly proved claim. Existing evidence remained readable; all 23 Markdown URLs across the changed dossiers returned browser-equivalent HTTP 200, including both direct CVP IS PDFs. All ten dossier/index dates advanced to 2026-08-15; statuses remain 79 researched, 195 partial, 16 no-public-evidence.
  • Generated state advanced from 459 systems / 674 observations / 90 contractors to 461 systems / 676 observations / 91 contractors. New SYS-2580C4A9DB and SYS-E0E1929D7C analysis records retain hosting, original kickoff and latest production release as explicitly unknown. Generated Client and System pages link Finance engineering to its valid Contractor Card; client→contractor and system→contractor link counts are both 305.
  • corepack pnpm validate, corepack pnpm build, and git diff --check passed; the build verified 290 client, 461 system and 91 contractor routes, 676 observations and 296 raw artifacts. Commit d2b96a26ef726702efc64da8d63f313cc91f917e was pushed to main; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task 869 (run 49) succeeded, including Pages publication. The public route returned the expected Keycloak OAuth 302; direct backend DNS was unavailable from this runtime, so no backend body readback was claimed. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
  • Discord readback reached message 1537948061043531866; no newer human directive or message from designated CVP IS instructor 476287310627864587 was present. Live portal work confirmed existing organization-first, complete-row and direct-PDF behavior but exposed no new reusable mechanic, so vssa-clients required no update.
  • Next dossier rotation: 131–140.

Previous scheduled rotation — 2026-08-15

  • Reviewed rotation 111–120 through current official domains and sitemaps, exact client/system CPVA searches, exact/current-name CVP IS organization discovery, all pages of the nine identity-checked organization notice lists, and opened award bodies. Exact CVP IS organization profiles were confirmed for clients 111–116 and 118–120; no defensible exact profile or named system was found for client 117, whose status remains no-public-evidence.
  • Nine CVP IS client observations now reuse the established shared identity SYS-9FC4DC8662 instead of creating a descriptive duplicate. Užimtumo tarnyba's four-page notice list yielded four direct contract-award PDFs: Reiz Tech for UT IS maintenance/development (contract signed 2025-08-01), Urgent tools for Vilnius regional career-centre interactive-space support/development (2026-06-18), Sign on Tab UAB for tablet electronic-signing licence rental/programming/maintenance (2025-02-25), and UAB „Bitė Lietuva“ for IP-telephony installation/service/expansion (2025-03-13). These bounded roles are not extended to cloud hosting, original kickoff, acceptance, completion, or production release.
  • Contractor/system ladders and CPVA searches produced no further defensible supplier, production-hosting, original-kickoff, or production-release claim for the other institutions. All ten dossier/index dates advanced to 2026-08-15 after the completed source-class review without unsupported status promotion.
  • Generated state advanced from 455 systems / 661 observations / 86 contractors to 459 systems / 674 observations / 90 contractors. Four new canonical analysis records retain hosting, kickoff and latest release as explicitly unknown; generated client and system pages link each new named supplier to a valid Contractor Card.
  • corepack pnpm validate, corepack pnpm build, and git diff --check passed; build verified 290 client, 459 system and 90 contractor routes, 674 observations and 296 raw artifacts. Commit 78370615c1f7fd74904e760c49193f80a42320fc was pushed to main; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task 860 (run 48) succeeded, including Pages publication. Authorized pages/pages service-proxy readback verified the deployed Užimtumo tarnyba Client Card, Reiz Tech Contractor Card, and client-row contractor link; the public route returned the expected OAuth 302. Unrelated untracked PPTX-improvement directories remain preserved and excluded.
  • Discord readback reached message 1537948061043531866; the four messages after the prior high-watermark were bot-authored cron reports. No newer human directive or message from designated CVP IS instructor 476287310627864587 was present, and live portal work exposed no reusable mechanic beyond existing guidance, so vssa-clients required no update.
  • Statuses remain 79 researched, 195 partial, 16 no-public-evidence; next dossier rotation: 121–130.

Previous scheduled rotation — 2026-08-14

  • Reviewed rotation 101–110 through every existing dossier citation, exact client/system CPVA searches, and CVP IS organization-first routes. All 30 existing dossier URLs remained readable and claim-supporting. Exact or identity-checked CVP IS profiles were reviewed for clients 101–107 and 109–110; no defensible organization match was found for 108. Client 107 still has two close portal profiles (64972 and 125006) whose case-only name variants remain unresolved, so neither was silently designated canonical.
  • A direct CVP IS contract-award PDF for client 110 (organizationId=421589, authorityId=435489, orgGroupId=3340, resourceId=7746421, documentId=8997165, noticeId=8994263) proves that UAB „Novian PRO“ won contract 61875, signed 2026-07-28 for EUR 233,000, to maintain and modify the Darbo sąlygų darbo vietose nuolatinės stebėsenos informacinė sistema (DSS IS). The body also directly describes DSS IS inspection, data-exchange and reporting functions. The evidence was not extended to hosting, original development/kickoff, completion or production release.
  • Clients 101–109 produced no defensible new claim after the assigned official-source, CPVA and CVP IS checks. Their dossier/index dates advanced conservatively to 2026-08-14 without changing rows, status, confidence or unresolved gaps. Search-provider HTML returned no usable results and was time-boxed rather than retried indefinitely.
  • Generated state advanced from 454 systems / 660 observations / 86 contractors to 455 systems / 661 observations / 86 contractors. New SYS-0D3736A986 preserves DSS IS hosting, kickoff and latest release as unknown; UAB „Novian PRO“ reuses established contractor identity CTR-DB2CC6C476. Generated client→contractor and system→contractor link counts are both 299.
  • corepack pnpm validate, corepack pnpm build, and git diff --check passed; build verified 290 client, 455 system and 86 contractor routes, 661 observations and 296 raw artifacts. Commit 78c4ae2536ebe03619c8d27ea47720fd068cd231 was pushed to main; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task 852 (run 47) succeeded, including Pages publication. Public Pages returned the expected OAuth 302; authorized pages/pages service-proxy readback verified the deployed client 110 DSS IS row and its valid SYS-* and CTR-* links. Unrelated untracked PPTX-improvement directories were preserved and excluded.
  • Discord readback found three newer bot-authored job-status messages after human message 1537822091275927682, no newer human directive, and no message from designated CVP IS instructor 476287310627864587 in the latest 100 channel messages. No reusable portal mechanic was added to vssa-clients.
  • Statuses remain 79 researched, 195 partial, 16 no-public-evidence; next dossier rotation: 111–120.

Previous scheduled rotation — 2026-08-14

  • Reviewed rotation 091–100 through reopened official evidence, exact CPVA searches and CVP IS organization-first routes. The only defensible new claim was client 091: an official CPVA completion article established production use of the M. K. Čiurlionis museum VR application by 2018-12 and named UAB „MultimediaMark“ as creator. Hosting, original kickoff and latest release remained unknown.
  • Clients 092–100 produced no defensible new claim and advanced conservatively without unsupported status or row changes. Generated state moved to 454 systems / 660 observations / 86 contractors. Commit e00c4e8e7e2ff2a3aa0d9210761d1bb5fcf89c67 was pushed; exact-SHA Actions task 851 succeeded and publication/readback checks passed. That delivery set the next rotation to 101–110.

Previous scheduled rotation — 2026-08-14

  • Reviewed rotation 081–090 through all 53 existing/new dossier citations, exact client/system CPVA searches, direct CVP IS discovery and 101 published-notice rows in identity-checked organization profiles. Confirmed profiles and profile-derived (authorityId, orgGroupId) pairs: 081 5803 (5803,7279); 082 4334 (4334,4689); 083 portal legal-form variant Biudžetinė įstaiga Lietuvos nacionalinis dramos teatras 2670 (2670,2718); 084 5190 (5190,5964); 085 2046 (2046,2060); 086 3569 (3569,3747); 087 3035 (3035,3104); 088 portal punctuation variant Lietuvos teatro muzikos ir kino muziejus (PV) 8731 (8731,15151); 089 2790 (2790,2844); and 090 2698 (2698,2748). The synchronized channel export contained no newer guidance from designated instructor 476287310627864587, so no portal mechanic was patched.
  • Two opened direct tender PDFs produced bounded high-confidence planned-procurement observations. Lietuvos etnografijos muziejus published a June 2025 open tender for a fully digital VR game combining characters, animated 3D scenes, effects, UI, sound and interactive programming. Lietuvos švietimo muziejus published an April 2025 open tender for VR audiovisual content about Vilnius University and European higher-education history. Neither tender proves an award, signed contract, selected supplier, delivery, hosting or production use, so contractor cells remain Not publicly identified and all lifecycle/infrastructure fields remain explicitly unknown.
  • The other published-notice rows concerned physical equipment, construction, stage systems, instruments, furniture, utilities or other non-IT scope, or were tender-stage leads without a defensible additional client-system claim. Exact CPVA searches returned irrelevant broad-token matches only. No defensible new commercial contractor, production-hosting classification, original delivery kickoff or production-release date was established. Existing statuses and bounded roles were preserved; all ten dossier/index dates advanced to 2026-08-14 after the full source-class review.
  • Generated state advanced from 451 systems / 657 observations to 453 systems / 659 observations while remaining 86 contractors; statuses remain 79 researched, 195 partial, 16 no-public-evidence. Two client-scoped canonical analysis records were bootstrapped with hosting, kickoff and release explicitly unknown. corepack pnpm validate, corepack pnpm build, and git diff --check passed; build verified 290 client, 453 system and 86 contractor routes, 659 system-observation links and 296 raw artifacts. All 53 dossier citations opened successfully: 51 returned browser-equivalent HTTP 200, while the two Nacionalinis Kauno dramos teatras pages failed the local Requests CA chain but opened and supported their claims in the browser-equivalent browser retry.
  • Commit 8f0eeb80dab179bcd024a57660b9a3b9824b36d8 was pushed to main; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task 812 (run 44) completed with success, including Pages publication. Public Pages returned the expected OAuth 302; authorized pages/pages service-proxy readback verified client 082, its SYS-6B4BD590EC system-dossier link, the generated system page and explicit unknown release state. Unrelated untracked PPTX-improvement directories were preserved and excluded. Next dossier rotation: 091–100.

Previous scheduled rotation — 2026-08-14

  • Reviewed rotation 071–080 through all 30 existing dossier citations, exact client/system CPVA searches, direct CVP IS discovery and every published-notice row in identity-checked organization profiles. Confirmed exact profiles: 071 53959 (130340,130340); 074 portal variant BĮ Kultūros infrastruktūros centras 2548 (2594,2594); 075 1551 (1551,1554); 076 4108 (4108,4425); 077 5687 (5687,7145); 078 portal variant Lietuvos jūrų muziejus (PV) 397998 (648902,648902); 079 12863 (12863,23931); and 080 5416 (5416,6482). No exact organization row was established for 072 or 073 under bounded legal-name/short-name variants, so no near-name record was forced. The synchronized channel export contained no newer message from designated instructor 476287310627864587, so no portal mechanic was patched.
  • Classified all 36 published-notice rows from those profiles. The direct ELVIS award body proves that ATEA won the ELVIS modernization/development contract for EUR 779,792, signed 2025-01-02; that bounded role was added to client 075 without extending it to current maintenance, hosting, storage, identity or rights services. Other IT-titled rows were tender-stage or unrelated and were not treated as awards or delivery evidence.
  • Added the museum-operated „Septynis kartus link begalybės“ interactive exhibition to client 077. CPVA's official 2020-08-31 account says the new exhibition had opened and received visitors during July 2020, directly supporting latest production operation at month precision 2020-07; original delivery kickoff and hosting classification remain unknown. CPVA names a Saulius Valius-led artistic team but no contracting company, integrator or current support supplier, so no unsupported contractor entity was created.
  • Clients 071–074 and 076–080 produced no other defensible new client-specific commercial contractor, production-hosting classification, original kickoff or production-release evidence after the full source-class review. Their existing rows/statuses were preserved and all ten dossier/index dates advanced to 2026-08-14.
  • Generated state advanced from 450 systems / 656 observations to 451 systems / 657 observations while remaining 86 contractors; statuses remain 79 researched, 195 partial, 16 no-public-evidence. corepack pnpm validate, corepack pnpm build, and git diff --check passed; build verified 290 client, 451 system and 86 contractor routes, 657 system links and 296 raw artifacts.
  • Commit 722590521c4d1b67d55cf6dc8d3d82082a2abd53 was pushed to main; ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task 760 (run 42) completed with success, including Pages publication. Public Pages returned the expected OAuth 302; authorized pages/pages service-proxy readback verified client 077, SYS-D212D4771B, and Latest production release: 2020-07. Unrelated untracked PPTX-improvement directories were preserved and excluded. Next dossier rotation: 081–090.

Previous scheduled rotation — 2026-08-14

  • Reviewed rotation 061–070 through all 27 existing official/provider citations, exact CPVA client/system searches, direct CVP IS discovery, and all pages of the identity-checked organization notice lists. Confirmed current/former identity profiles for 061: Kauno apskrities viešoji biblioteka 2891 (2947,2947) and Ąžuolyno biblioteka 312424 (458907,458907); 062 1465 (1467,1467); 063 2633 (2681,2681); 065 1151 (1151,1152); 067 10202 (10202,19145); 068 1927 (1927,1931); 069 5198 (5198,5975); and 070 1505 (1505,1508). Client 066 produced two exact same-address portal records, 15741 (15741,51164) and 5128 (5128,5860); both notice lists were reviewed, but neither was arbitrarily designated as the sole canonical profile. No exact CVP IS organization result was established for 064 under bounded current/former-name variants, so no near-name record was forced. The synchronized channel export still contained no newer message from designated instructor 476287310627864587, so no portal mechanic was patched.
  • Reviewed all 85 published-notice rows returned by those exact authority profiles, including page 2 for 070. Rows concerned books, instruments, construction, premises, travel, utilities, solar equipment and other non-IT scope. Exact CPVA queries were empty or produced irrelevant broad-token matches. No opened body established a new client-specific system, commercial contractor, production hosting/cloud, original delivery kickoff, or dated production release.
  • This was a completed conservative no-new-claim rotation, not “no search performed.” Existing rows, bounded roles, status/confidence values and gaps were preserved; all ten dossier/index check dates advanced to 2026-08-14. All 27 dossier URLs returned browser-equivalent HTTP 200.
  • Generated state remained 290 clients, 450 systems, 656 observations, 86 contractors; statuses remained 79 researched, 195 partial, 16 no-public-evidence. corepack pnpm validate, corepack pnpm build, and git diff --check passed; build verified 290 client, 450 system and 86 contractor routes, 656 links and 296 raw artifacts.
  • Commit d63985018ea4250392e2592765b77c161af77ffb was pushed to main; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task 742 (run 41) completed with success, including Pages publication. Public Pages returned the expected OAuth 302; authorized pages/pages service-proxy readback returned client 061 with its exact heading, 2026-08-14, and generated System dossier content. Unrelated untracked PPTX-improvement directories were preserved and excluded. Next dossier rotation: 071–080.

Previous scheduled rotation — 2026-08-14

  • Reviewed rotation 051–060 through official client/system pages, exact CPVA searches and classified CVP IS award bodies. Added bounded high-confidence awards for UAB „Insoft“ on KVR/KPEPIS modernization; UAB „Asseco Lietuva“ on LIMIS modernization; Biznio mašinų kompanija UAB on the LNDM virtual-collections/interactive-3D platform; and UAB „Asseco Lietuva“ plus UAB „Insoft“ on LIBIS modernization and VEPIS maintenance/programming. No award was extended to production deployment, hosting, completion or unrelated current support.
  • Two new canonical systems advanced the generated state from 448 systems / 654 observations to 450 systems / 656 observations; contractor routes reached 86, with lifecycle/hosting fields for the new systems explicitly unknown. Validation/build passed and commit a3a8f17829e26309b4a74c1db9a9ffa1e8ae8cf1 was pushed. Exact-SHA Actions task 701 (run 40) failed; the immediately following cumulative main run 41 succeeded and republished Pages without removing this evidence commit. Next dossier rotation recorded: 061–070.

Previous scheduled rotation — 2026-08-14

  • Reviewed rotation 041–050 through official client/system pages, exact CPVA searches, and every page of the identity-checked CVP IS organization notice lists. Confirmed exact CVP IS organization/profile IDs and profile-derived (authorityId, orgGroupId) pairs: 041 5788 (5788,7264); 042 1390 (1390,1393); 043 5789 (5789,7265); 044 4077 (4077,4380); 045 5779 (5779,7255); 047 7416 (7416,10901); 048 6796 (6796,9711); 049 1335 (1335,1336); 050 10407 (10407,19461). No exact organization result was established for 046, including bounded legal-name and AVNT variants, so no near-name record was forced. No new CVP IS instructor guidance was present after message 1537121770707091537.
  • Converted legacy dossiers 042, 044, and 046 to the canonical concise six-column format. Direct CVP IS PDFs added bounded high-confidence evidence: Muitinės mokymo centras's 2026-08-11 tender proves intended DEKLARIS maintenance/support procurement only; VMI awarded IMIS modernization to UAB CORNER CASE TECHNOLOGIES (EUR 859,504.13; contract 2026-07-09) and Oracle licences to Proit (EUR 304,190.22; contract 2026-07-10); NBFC awarded SABIS development/maintenance/support to UAB „Novian PRO“ (EUR 436,500; contract 2026-02-20), DUPA IS creation/implementation to NEVDA (EUR 1,555,000; contract 2025-06-11), and IVANTI development services to Synergy Consulting (EUR 19,965; contract date unstated). A 2025-12-08 voluntary ex-ante notice identifies UAB „Stekas“ as the sole Stekas-Alga support/development supplier and records a EUR 104,540 winning offer, but is not presented as proof of a signed contract. None of these records is presented as production hosting, original development where unstated, acceptance, deployment, or go-live.
  • The remaining clients produced generic IT, training or unrelated leads only. Exact CPVA searches yielded no additional defensible claim. All ten dossier/index dates advanced to 2026-08-14 after the full rotation, with statuses unchanged.
  • Generated state: 290 clients, 448 systems, 654 observations, 84 contractors; statuses 79 researched, 195 partial, 16 no-public-evidence. Seven new canonical system-analysis records were bootstrapped with production hosting, original kickoff and latest production release explicitly unknown; three legacy labels were preserved byte-for-byte during format conversion so existing canonical system identities did not fragment.
  • corepack pnpm validate, corepack pnpm build, and git diff --check passed; build verified 290 client, 448 system and 84 contractor routes, 654 system-observation links and 296 raw artifacts. Every Markdown URL in all ten changed dossiers returned browser-equivalent HTTP 200, including seven direct CVP IS PDFs; generated registry checks confirmed the new deterministic system links and bounded contractor roles.
  • Commit 57bff3bdc6473f7989e19e33ca039160efffed6d was pushed to main; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task 691 completed with success, including Pages publication. The representative public Pages dossier returned the expected Keycloak OAuth 302; no direct Pages-backend route was available from this runtime. Unrelated untracked .pptx_improve_run/ and pptx_improvement_run_20260814/ directories were preserved and excluded from the commit. Next dossier rotation: 051–060.

Previous scheduled rotation — 2026-08-14

  • Reviewed rotation 031–040 through official client/system pages, exact CPVA searches, and all pages of identity-checked CVP IS organization notice lists. Confirmed exact CVP IS organization/profile IDs and profile-derived (authorityId, orgGroupId) pairs: 031 4823 (4823,5354); 032 9665 (9665,17861); 033 1678 (1678,1681); 035 4133 (4133,4459); 036 6537 (6537,9237); 037 8915 (8915,15595); 038 6884 (6884,9865); 039 499664 (499664,810894); 040 5791 (5791,7267). No exact organization result was established for 034, so no near-name record was forced. No new CVP IS instructor guidance was present after message 1537121770707091537.
  • Converted dossier 039 to the canonical six-column format. Five direct award PDFs added bounded high-confidence Customs Department supplier roles: UAB „Baltnetos komunikacijos“ for VIKIS maintenance/support under a EUR 108,917.92 contract signed 2026-07-30; UAB „Hnit-Baltic“ for ArcGIS licence support/updates/migration under the 2024-08-28 contract whose 2026 notice records EUR 122,064.43 excluding VAT; UAB „Hnit-Baltic“ for MGIS maintenance/support under a EUR 90,118.38 offer-value contract signed 2025-04-01; Netcode for MOVAS maintenance/support under a EUR 162,621.82 contract signed 2025-04-01; and UAB „InnoForce“ for tax-accounting/control-IS maintenance/support under a EUR 95,550 contract signed 2025-01-28. These awards are not presented as original development, hosting, acceptance, or production release.
  • The remaining clients produced tender-stage, generic IT or unrelated leads only. Exact CPVA searches yielded no additional defensible claim. All ten dossier/index dates advanced to 2026-08-14 after the full rotation, with statuses unchanged.
  • Generated state: 290 clients, 441 systems, 647 observations, 80 contractors; statuses 79 researched, 195 partial, 16 no-public-evidence. Four new canonical system-analysis records were bootstrapped with production hosting, original kickoff, and latest production release explicitly unknown. The reviewed ArcGIS software licences / ESRI programinė įranga alias merged two clearly identical Esri ArcGIS observations into one canonical system instead of creating a duplicate.
  • corepack pnpm validate, corepack pnpm build, and git diff --check passed; build verified 290 client, 441 system and 80 contractor routes, 647 system-observation links and 296 raw artifacts. Every Markdown URL in the changed 039 dossier returned browser-equivalent HTTP 200, including five direct CVP IS award PDFs; the generated client route contained the new deterministic system links and contractor markers.
  • Commit a8861147288068b2bd0a231ab0e4effb702f27c6 was pushed to main; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task 682 completed with success, including Pages publication. The representative public Pages dossier returned the expected Keycloak OAuth 302; no direct Pages-backend route was available from this runtime. An unrelated untracked .pptx_improve_run/ worktree directory was preserved and excluded from the commit. Next dossier rotation: 041–050.

Previous scheduled rotation — 2026-08-14

  • Reviewed rotation 021–030 through official client/system pages, exact CPVA searches, and identity-checked CVP IS organization notice lists. Confirmed profile IDs for 021–028 and 030: 4630, 1689, 12872, 11636, 1778, 5297, 3731, 2363, and 1336; no exact organization result was established for 029, so no near-name record was forced. No new CVP IS instructor guidance was present after message 1537121770707091537.
  • Converted legacy dossiers 022, 025, 026, 028, and 030 to the canonical concise six-column format. Direct award PDFs added four bounded high-confidence supplier roles: APVA awarded UAB Dizaino kryptis APVIS development/support under a EUR 500,000 offer-value contract; NŽT awarded NRD Digital process-management-IS support under a EUR 129,600 contract signed 2026-02-27, and UAB „Asseco Lietuva“ land-asset-administration-IS support/development under a EUR 211,680 contract signed 2026-02-27 plus document-management-IS support under a EUR 76,800 contract signed 2025-01-31. The awards are not presented as original development, hosting, acceptance, or production release.
  • The remaining clients produced tender-stage, generic IT, or unrelated leads only. Exact CPVA searches yielded no additional defensible claim. All ten dossier/index check dates advanced to 2026-08-14 after the full source-class rotation, with statuses unchanged.
  • Generated state: 290 clients, 437 systems, 642 observations, 77 contractors; statuses 79 researched, 195 partial, 16 no-public-evidence. Three new canonical system-analysis records were bootstrapped with production hosting, original kickoff, and latest production release explicitly unknown; the former duplicate nSoft vendor-as-system row was removed when the Zoo ticketing observation was normalized.
  • corepack pnpm validate, corepack pnpm build, and git diff --check passed; build verified 290 client, 437 system and 77 contractor routes plus 296 raw artifacts. Every Markdown URL in the changed dossiers returned browser-equivalent HTTP 200, including four direct CVP IS award PDFs.
  • Commit e2f160b76aef06d063559fb3fc1e287523f843f5 was pushed to main; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task 673 completed with success, including Pages publication. The representative public Pages dossier returned the expected Keycloak OAuth 302; no direct Pages-backend route was available from this runtime. Next dossier rotation: 031–040.

Previous scheduled rotation — 2026-08-13

  • Reviewed rotation 011–020 through official client pages and sitemaps, exact CPVA searches, and all pages of the identity-checked CVP IS organization notice lists. Exact CVP IS organization/profile IDs and profile-derived (authorityId, orgGroupId) pairs were confirmed as: 011 2964 (2964,3027); 012 2352 (2352,2387); 013 1489 (1489,1492); 014 4357 (4357,4722); 015 5459 (5459,6540); 016 9187 (9187,16821); 017 9608 (9608,17654); 018 4872 (4872,5425); 019 1287 (1287,1288); 020 5035 (5035,5718).
  • Converted dossiers 017 and 018 from the legacy four-column format to the canonical concise six-column format. Direct award PDFs added bounded high-confidence roles: Valstybinė miškų tarnyba awarded UAB „Erisata“ ALIS LKMP development/programming under a EUR 170,000 offer-value contract signed 2025-07-15; VTPSI awarded Proit TPDR application maintenance/development under a EUR 498,000 contract signed 2025-04-29, and UAB „Hnit-Baltic“ land-use-supervision e-service/GIS work under a EUR 229,900 offer-value contract signed 2025-07-15 plus ESRI subscriptions under a EUR 113,000.87 offer value. The ALIS award's separately displayed participant-group-leader label „Via GIS“ was not concatenated into the winner identity. Awards are not presented as original development, hosting, acceptance, or production release.
  • The other 011–020 records produced tender-stage, generic IT, or unrelated leads only; no unsupported supplier mapping was made. Exact CPVA searches produced no additional defensible system/contractor claim. No new CVP IS instructor guidance was available beyond message 1537121770707091537.
  • Generated state: 290 clients, 435 systems, 640 observations, 74 contractors; statuses 79 researched, 195 partial, 16 no-public-evidence. Three new canonical analysis entries were bootstrapped with hosting, kickoff and latest production release explicitly unknown.
  • corepack pnpm validate, corepack pnpm build, and git diff --check passed; build verified 290 client, 435 system and 74 contractor routes plus 296 raw artifacts. Every Markdown URL in the changed dossiers returned browser-equivalent HTTP 200, including four direct CVP IS PDFs.
  • Commits 9cb2f44601775a366f44a09251af772bfbdded4c and e4c9f9ab6c6052445cd90c803555f9c90cd69c65 were pushed to main; the latter normalized the ALIS winner identity after distinguishing the award's participant-group-leader metadata. Authenticated source readback and ref equality passed. Exact-SHA Gitea Actions tasks 662 and 663 both completed with success, including Pages publication. Representative public Pages routes returned the expected Keycloak OAuth 302; no direct Pages-backend route was available from this runtime. Next dossier rotation: 021–030.

Previous scheduled rotation — 2026-08-13

  • Reopened and normalized dossiers 001–010 into the canonical concise six-column format; exact names/statuses were preserved and dossier/index check dates advanced to 2026-08-13.
  • Reopened purpose acts, official system pages, VSSA centralized-service evidence, exact CPVA searches, and CVP IS organization-first searches. Exact CVP IS organization IDs for 001–009: 2076, 2017, 3210, 3345, 2862, 5224, 2737, 2900, 1599; profile-derived (authorityId, orgGroupId) pairs: (2076,2088), (2017,2026), (3210,3287), (3345,3427), (2862,2917), (5224,6045), (2737,2788), (2900,2956), (1599,1602). No byte-exact row was found for 010; no near-name record was forced.
  • Current PPVIS licence/support, VBAMS licence-update, Moodle implementation, and generic SADM development/analysis/test records were classified conservatively. Tender-stage records were not treated as supplier/delivery proof; generic awards were not mapped to SPIS without explicit scope.
  • No defensible new commercial contractor, production-hosting classification, original delivery kickoff, or production-release date was established. Existing bounded public-provider roles were retained.
  • Generated state: 290 clients, 432 systems, 637 observations, 72 contractors; statuses 79 researched, 195 partial, 16 no-public-evidence.
  • corepack pnpm validate and corepack pnpm build passed; build verified 290 client, 432 system and 72 contractor routes plus 296 raw artifacts. Every Markdown URL in changed dossiers returned browser-equivalent HTTP 200.
  • Commit 4fc00aa78776cc8ee7971f21b72cd13c365e84a5 was pushed to main; authenticated source readback and ref equality passed. Exact-SHA Gitea Actions task 649 completed with success, including Pages publication. The public Pages endpoint returned the expected Keycloak OAuth 302; this host exposes no direct Pages-backend verification route.
  • Next dossier rotation: 011–020.

Purpose

VSSA client investigation and evidence gathering.

Current assets

  • Gitea organization: vssa-v1
  • Repository: https://gitea.lego-cloud.eu/vssa-v1/documentation
  • Repository worktree: /opt/data/vssa-documentation
  • Published Docusaurus site: https://pages.apps.lego-cloud.eu/vssa-v1/documentation/
  • Client navigation has first-level Overview and an expanded Registry group containing 290 ordered client dossiers. System navigation follows the same hierarchy with 494 ordered system dossiers. Contractors are a separate top-level collection with the same Overview → Registry hierarchy and 104 generated contractor/provider dossiers. Systems Dossiers are generated from canonical client system-table rows; the latest validated registry contains 494 unique systems from 719 observations, with conservative alias rules in data/system-aliases.json and machine-readable outputs at /data/systems-registry.json and /data/contractors-registry.json.
  • Each generated Systems Dossier now includes canonical system-level analysis for production cloud/on-premises/hybrid hosting, original delivery kickoff, and latest production release. The source is data/system-analysis.json; known values require direct system-level URLs and supporting quotes, while missing evidence remains explicit rather than inferred.
  • Overview, Clients, Systems, Contractors, Methodology, and Data now use separate Docusaurus docs-plugin instances and dedicated sidebars. Generated system relationships use reusable React evidence cards, and every generated client/system dossier has a de-duplicated References index. SYS-* and CTR-* IDs are deterministic internal registry IDs, not public-source identifiers.
  • Every generated client system table has a System dossier column. Each of the 719 client observations displays its canonical SYS-* ID and links directly to one of the 494 internal system dossiers; generation fails if any observation is unlinked. Per Lego's confirmed 2026-08-14 requirement, each exact client-system row also shows every evidenced contractor in the Contractor / company column and links each named contractor to its CTR-* Contractor Card; multiple contractors are supported, while unknown contractors remain explicit and unlinked. Commit bc0b40f17b3bfecb41bc54574ece969bb02e08fa implemented and pushed the relationship-linking change. Its local validation/build passed and local/remote refs matched; final CI/Pages verification for that exact commit was not claimed because an approval timed out.
  • Gitea Actions workflow: .gitea/workflows/pages.yml; successful main builds publish through the mounted LEGO Cloud Pages root.
  • Source registry: source/message.txt, containing 290 numbered clients.
  • Required output: one concise Markdown dossier per client with exact name, one-sentence purpose, systems/clouds, plain-language system meaning, precise client relationship, identified contractor/company and role, direct evidence, confidence, and short gaps.
  • Investigation skill: vssa-clients; authoritative source is Gitea repository vssa-v1-skills-code-agent/vssa-clients on main, maintained in /opt/data/vssa-clients-skill and installed through the runtime symlink /opt/data/skills/research/vssa-clients. Recurring runs must deepen contractor research and publish validated reusable skill improvements to Gitea before reporting them.
  • Documentation skill: documentation-docusaurus; authoritative source is Gitea repository vssa-v1-skills-code-agent/documentation-docusaurus on main, maintained in /opt/data/documentation-docusaurus-skill and installed through /opt/data/skills/productivity/documentation-docusaurus. It absorbs the former gitea-docusaurus-projects capabilities, including Docusaurus structure, evidence portals, Gitea repository setup, Actions, LEGO Cloud Pages, and end-to-end acceptance verification.

Confirmed skill-governance decisions — 2026-08-14

  • Lego renamed the channel's investigation skill from client-investigator to vssa-clients and required it to be managed in Gitea. Organization vssa-v1-skills-code-agent and public repository vssa-clients were created; commit fd33a2144ac78223bbe8281776b043d61121b74d was pushed, exact-SHA Actions task 814 succeeded, and the runtime now loads the Gitea worktree through a symlink. The former active skill was archived outside the runtime tree.
  • Lego directed that gitea-docusaurus-projects be merged into a VSSA-owned documentation-docusaurus skill repository. The merged repository is vssa-v1-skills-code-agent/documentation-docusaurus; commit b08614dc908cd110de2dc82fece14f8d276a3250 was pushed, exact-SHA Actions task 818 succeeded, authenticated source readback passed, and the runtime symlink now points to its maintainer worktree. The absorbed skill was archived and removed from the active runtime.
  • The requested comparison source corp-v1-skills-code-agent/documentation-docusaurus was unavailable (404 through the authenticated API and Cannot find repository through SSH), so it remains untouched. Read-only comparison used the accessible home-v1-skills-code-agent/documentation-docusaurus baseline and corp-v1-aerosim-skills-code-agent/documentation-docusaurus--aerosim; provenance and independent-adoption safeguards were retained.

Operational ledger — documentation improvement follow-up (2026-08-14)

  • Status: DELIVERED. The approved documentation-improvement work was resumed from the 11-file partial worktree, reviewed, validated, committed, pushed, and deployed. The two unrelated untracked PPTX-improvement directories were preserved and excluded.
  • Outcome: Contractors are now an equal homepage discovery path with a source-derived count; static search covers client, system, contractor, methodology, and provenance content through a filename-hashed index; system dossiers link every named observation contractor to its generated CTR-* card; machine-readable contractor provenance and identifier semantics are documented; and build validation now enforces homepage contractor discovery, contractor-registry schema, complete system→contractor-card links, and representative search-index coverage.
  • Verification: corepack pnpm validate, corepack pnpm build, and git diff --check passed. The build verified 290 client routes, 453 system routes, 86 contractor routes, 659 observations, 298 client→contractor links, 298 system→contractor links, one filename-hashed search index, and 296 raw artifacts. Local browser acceptance verified contractor search/results and no JavaScript errors.
  • Delivery: Commit 905e57522e8c054590d6065d10a13ebf73960370 is on main; local/remote ref equality and authenticated source readback passed. Exact-SHA Gitea Actions task 826 (run 45) succeeded, including Pages publication. Public Pages returned the expected OAuth 302; authorized pages/pages service-proxy readback verified the new homepage contractor/search markers and the INVESTIS system→ATEA contractor-card link.
  • Current next action: Continue the scheduled evidence rotation at clients 151–160; no documentation-delivery blocker remains. Latest synchronized channel high-watermark: 1538007301989331127.

Automation

  • Cron job 88833e00b4a2 (VSSA documentation continuous research) runs every 20 minutes at */20 * * * * and reports to this channel.
  • Per Lego's 2026-08-17 reset directive, the ordered rotation restarts with clients 001–020, then continues in 20-client batches (021–040, 041–060, and so on), wrapping after 281–290. Each successful run records its completed and next batch here as the durable cursor.
  • Each run audits all 290 records, deeply researches its assigned 20-client batch, continuously improves client/system/contractor evidence and documentation, reviews conservative system identity rules, validates the complete Docusaurus build, pushes evidence-backed changes, verifies exact-head Actions, and checks the deployed Pages backend.
  • Research must prefer primary sources and must not infer providers/systems without corroborating evidence.
  • Every run explicitly searches CPVA's official search portal for exact client/system names and relevant projects, treating result pages as discovery only until an opened CPVA source proves the claim. It also maintains per-record References indexes and preserves dedicated sidebars and evidence cards.
  • Discord user 476287310627864587 is the designated CVP IS instructor for https://viesiejipirkimai.lt/epps/viewCFTSAction.do. Every run reads that user’s new channel guidance, validates reusable portal mechanics, updates the Gitea-backed vssa-clients skill, and searches procurement stages from RFI/market consultation through tender, award, contract, amendment, and completion. Records are mapped to exact clients and canonical systems only when supported; stage semantics prevent an RFI/RFP/bid from being presented as an award, supplier engagement, implementation, production use, hosting, or completion.
  • CVP IS also has a validated organization-first discovery route: search the exact client at https://viesiejipirkimai.lt/epps/viewOrganisations.do, identity-check and open prepareViewCAOrganisation.do?id=<organizationId>, then follow PERŽIŪRĖTI VISUS PASKELBTUS SKELBIMUS to viewPublishedNotices.do?authorityId=<authorityId>&orgGroupId=<orgGroupId>. Both IDs must be extracted from the actual profile link. Notice-type links can be direct PDF downloads; preserve their identifiers/metadata, extract the body, and classify procurement stage before mapping evidence. This route is additional and not assumed complete.
  • The job workdir and remote now target /opt/data/vssa-documentation and vssa-v1/documentation; it must not edit generated Docusaurus output.
  • The recurring job explicitly treats a dated official announcement that says a named system started operating/launched/went live as direct production-release evidence at the announcement's stated precision, while distinguishing this from generic webpage metadata. It maintains contractor dossiers as exact client-system-role-evidence relationships and does not conflate development, hosting, support, licensing, or other roles.
  • Latest rotation (2026-08-13): clients 281–290 were reviewed through official client sources, exact CPVA searches, contractor queries, and CVP IS organization-first profiles/notices. Exact organization profiles were confirmed for clients 282–287 and 289–290 (organization/profile IDs 2025, 1466, 14214, 9078, 10493, 1739, 1670, and 11068); client 281 returned two different records and client 288 returned none, so neither was force-mapped. Direct award PDFs added high-confidence bounded supplier roles: Generalinė prokuratūra awarded Starkodas PAIS maintenance/improvement (EUR 118,228; contract 2026-06-05); NTA awarded Proit LITEKO–MAIS integration and LITEKO development (EUR 229,900; contract 2025-04-15), Aisoft LITEKO2 licence support (EUR 205,700; contract 2026-05-15), and UAB „Asseco Lietuva“ accounting/financial-system maintenance, improvement and user consulting (EUR 298,870 offer value; contract 2026-05-14). No award is presented as proof of original development, hosting, acceptance or go-live. Other notice rows were tender-stage or unrelated, and CPVA exact searches yielded no additional defensible claim. No new CVP IS instructor guidance was present after message 1537121770707091537. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; the registry now contains 432 systems, 637 observations, and 70 normalized contractors/providers. Commit 9897769d3a47e39c15be9b194706f43013fcd4b9 was pushed and authenticated source readback passed; Actions run 2402, task 639, succeeded including Pages publication. Public Pages returned the expected Keycloak/OAuth 302; direct backend verification was unavailable from this runtime. Next rotation wraps to clients 1–10.
  • Previous rotation (2026-08-13): clients 271–280 were reviewed through authoritative identity recovery, official sources, CPVA exact-name searches, contractor queries, and CVP IS organization-first profiles/notices. Exact CVP IS identities were confirmed for clients 272–280 (organization/profile IDs 2868, 1067, 1203, 1965, 12934, 4839, 7603, 5900, and 1763); client 271 had no exact result and was not mapped to a near name. Direct award PDFs added two high-confidence VRKIS supplier roles for client 279: UAB „iTree Lietuva“ won VRKIS maintenance, development and support under a EUR 1,736,000 contract signed 2026-01-02; UAB „IO projects“ won VRKIS modernization technical supervision under a EUR 79,000 contract signed 2025-07-21. A VRK voluntary ex-ante notice also established dependency on an intelligent chatbot whose support includes rental and operation of the production cloud infrastructure in which it runs; the notice does not name the supplier or cloud provider. Other notices were tender-stage, unrelated, or did not support a distinct client-system claim; CPVA searches yielded no additional defensible claim. No new CVP IS instructor guidance was present after message 1537121770707091537. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; registry counts are now 430 systems, 635 observations, and 68 normalized contractor/provider entities. Next rotation: clients 281–290. Commits 256011fc76c857ec1aa74b1df982ea8699f3eda6 and fcd7781dedd5d06d408443d46fb7f066ed4f6830 were pushed; the second conservatively scoped the generic chatbot identity to VRK before attaching its production-cloud evidence. Authenticated source readback passed; final Actions run 2388, task 625, succeeded including Pages publication. Public Pages returned the expected Keycloak 302; direct backend verification was unavailable from this runtime.
  • Previous rotation (2026-08-13 14:00 UTC): clients 261–270 were reviewed through exact identity checks, official client/system sources, CPVA exact searches, contractor searches, and CVP IS organization-first profiles/notices. Exact CVP IS identities were found for clients 261–263, 266, and 268–270 (organization IDs 1007, 8353, 1107, 7928, 5391, 1258, and 5708); exact byte-level matches were absent for clients 264, 265, and 267 and were not forced to near-name records. A direct Žemės ūkio agentūra award PDF (resourceId=3904100, documentId=6586911, noticeId=6586102, procedure e698e26b-25bd-4bae-b4f0-e7c365b7fcf1) added two high-confidence system observations: its import/export licences, quotas and export-compensation administration IS, and its market-regulation-measures administration IS. UAB „Novian PRO“ won their maintenance/support, updates, new-function/change development and consulting contract for EUR 78,840, signed 2025-10-17. The award does not prove original development, hosting, acceptance or production release. Other notice lists yielded tender-stage or unrelated leads only; exact CPVA searches produced no additional defensible claim. No new CVP IS instructor guidance was present after message 1537121770707091537. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; registry counts are now 428 systems, 633 observations, and 68 normalized contractor/provider entities. Commit 2143cc9b81aee5371f1924500d0bb3fa98adb15e was pushed and authenticated source readback passed; Actions run 2378, task 615, succeeded including Pages publication. Public Pages returned the expected Keycloak 302; direct backend verification was unavailable from this runtime.
  • Previous rotation (2026-08-13 12:00 UTC): clients 251–260 were reviewed through exact identity checks, official client-system pages, CPVA exact searches, contractor/vendor searches, and CVP IS organization-first profiles/notices. All ten clients identity-matched in CVP IS (organization IDs 10152, 3359, 3851, 4239, 1022, 8182, 1480, 3838, 1349, and 1707); current organization lists produced only tender-stage or unrelated leads and no new award/contractor claim. One official Police completion page materially deepened DI.POLIS: implementation began in September 2023, the production version moved from Vytautas Magnus University's experimental environment into the Informatikos ir ryšių departamentas production environment, was integrated into ePolicija, accepted for operation, and opened to external users. The canonical system analysis now records kickoff at month precision and preserves the production-environment statement while leaving cloud/on-premises/hybrid and latest release explicitly unknown. The existing IRD contractor identity was reused, yielding 68 normalized contractor/provider entities without fragmentation. Exact CPVA searches produced no additional defensible claim. No new CVP IS instructor guidance was present after message 1537121770707091537. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; registry counts remain 426 systems and 631 observations. Commit ed851725b68866d749d8d5924f7ed66f5cb9ec8c was pushed and authenticated source readback passed; Actions run 2371, task 608, succeeded including Pages publication. Public Pages returned the expected Keycloak 302; direct backend verification was unavailable from this runtime.
  • Previous rotation (2026-08-13 10:08 UTC): clients 241–250 were reviewed. The CVP IS organization-first route identity-matched nine clients; no exact organization result was found for client 241. Two direct award PDFs added high-confidence contractor evidence: AB „Via Lietuva“ awarded Starkodas maintenance/modification of its public EV-charging-operator/access-point registration system for EUR 98,920 under a contract signed 2026-07-13; Lietuvos probacijos tarnyba awarded Buddi Limited rental of electronic-monitoring devices and software for EUR 2,196,000 under a contract signed 2026-01-06. A „Plačiajuostis internetas“ network-equipment award was reviewed but not mapped as a distinct software/system observation. Exact CPVA searches produced no additional defensible claim. No new CVP IS instructor guidance was present in the latest accessible channel export. Commit 7273c63676ad36d79178e40abc44327e9c49e171 was pushed and authenticated source readback passed; Actions run 2369, task 606, succeeded including Pages publication. Public Pages returned the expected Keycloak 302; the Pages dataset mount was unavailable from this runtime. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; the registry now contains 426 systems, 631 observations, and 67 normalized contractor/provider entities. Next rotation: clients 251–260.
  • Previous rotation (2026-08-13 08:08 UTC): clients 231–240 were reviewed. Direct CVP IS award PDFs added four high-confidence system/contractor observations: Inovacijų agentūra awarded UAB „DevOcean LT“ IAVV IS creation/support for EUR 576,250 under a contract signed 2025-03-21; CPVA awarded ECM studija DVS IS support/development for EUR 392,040 under a 36-month contract signed 2026-02-27; and CPVA awarded UAB „NRD Systems“ VSFSVVP IS development/support for EUR 198,347 under a contract signed 2024-12-16, with UAB „Etronika“ explicitly named as a 10% / EUR 18,997 subcontractor. Awards are not presented as acceptance, production release, hosting, or completion evidence. Exact CPVA searches for all ten clients produced no additional defensible claim. No new CVP IS instructor guidance was present in the latest accessible channel export. Commit cf311bbbd2ae07a49ff88d2f54782ac6f2725665 was pushed and authenticated source readback passed; Actions run 2367, task 604, succeeded including Pages publication. Public Pages returned the expected Keycloak 302; direct backend verification was unavailable from this runtime. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; the registry contained 425 systems, 630 observations, and 65 normalized contractor/provider entities.
  • Previous rotation (2026-08-13 04:08 UTC): clients 221–230 were reviewed. The CVP IS organization-first route identity-matched all ten exact legal names. Direct award PDFs added two high-confidence findings: (1) Valstybinė duomenų apsaugos inspekcija awarded UAB „Lexita“ both 2025 project lots—new information-system creation for EUR 265,000 and statistics-tool creation for EUR 53,000—under contracts signed 2025-07-31; (2) Viešųjų pirkimų tarnyba awarded MB „Nordic plum“ the CVP IS subsystem maintenance/development contract for EUR 287,200, signed 2025-11-30. The records explicitly retain acceptance, production release, and hosting as unknown. Exact CPVA searches and the other identity-checked organization notice lists produced no defensible new claim. No new CVP IS instructor guidance was present in the latest accessible channel export. Commit 1980408a29173679122dd9b34e2c9ce1ad75749e was pushed and authenticated source readback passed; Actions run 2366, job 3342, succeeded including Pages publication. Public Pages returned the expected Keycloak 302; backend verification was unavailable because this runtime has no resolvable Kubernetes control-plane host. Coverage remains 79 researched, 195 partial, 16 no-public-evidence, and 0 pending; the registry contained 422 systems, 627 observations, and 61 normalized contractor/provider entities.
  • Previous rotation (2026-08-13 02:14 UTC): clients 211–220 were reviewed. The CVP IS organization-first route identity-matched clients 211–214 and 216–220; no exact organization result was found for 215. The direct award PDFs established that UAB „Asseco Lietuva“ received three bounded E-kinas contracts from the Lithuanian Central State Archives: modernization/deployment signed 2025-02-10 for EUR 93,800, plus maintenance/development signed 2025-05-13 and 2026-03-31 for EUR 165,000 each. A separate award established UAB „Asseco Lietuva“ as the Lithuanian Chief Archivist’s Office EAIS modernization contractor under a EUR 660,000 contract signed 2025-02-24 for the E-kultūros platform project. Client 213 and 219 dossiers now cite the exact CVP IS award PDFs and explicitly retain production hosting, acceptance, and go-live dates as unknown. Other exact client/system CPVA searches, official sources, and procurement lists produced no defensible additional system, contractor, production-hosting, delivery-kickoff, or production-release claim. No new CVP IS instructor guidance was available through the runtime's latest accessible channel export. Commits 0220ccfc71f97950e61457eb636eee8ac3d8a6a1 and f5574bc01fb7aba20b9c6f77cf3a8e524f177460 were pushed; Actions runs 2364 and 2365 succeeded, including Pages publication.

Availability continuity

  • On 2026-08-14, gitea-docusaurus-projects was merged into the VSSA-managed documentation-docusaurus skill and retired from the active runtime. Public Gitea repository vssa-v1-skills-code-agent/documentation-docusaurus is authoritative; all 22 merged references, the Actions template, provenance, validator and runtime symlink are maintained from /opt/data/documentation-docusaurus-skill. The exact requested comparison repository corp-v1-skills-code-agent/documentation-docusaurus was absent through both authenticated API and SSH and was not touched. The accessible central home-v1-skills-code-agent/documentation-docusaurus baseline and independent AeroSim adoption were inspected read-only; the VSSA skill preserved the baseline guidance and adopted the explicit independent-adoption/provenance model. Cron job 88833e00b4a2 now loads documentation-docusaurus instead of the absorbed skill.

  • On 2026-08-14, the VSSA research skill was renamed from client-investigator to vssa-clients. Public Gitea organization vssa-v1-skills-code-agent and repository vssa-clients were created; repository main is now authoritative, /opt/data/vssa-clients-skill is the maintainer worktree, and /opt/data/skills/research/vssa-clients is the runtime symlink. Cron job 88833e00b4a2 now loads vssa-clients and requires every reusable skill improvement to be validated, committed, pushed, remotely read back, and runtime-loaded before reporting.

  • On 2026-08-13, rotation 231–240 added direct CVP IS award evidence for IAVV IS (UAB „DevOcean LT“, EUR 576,250), CPVA DVS IS (ECM studija, EUR 392,040), and VSFSVVP IS (UAB „NRD Systems“, EUR 198,347; UAB „Etronika“ as the explicitly named 10% subcontractor). Validation and the production build passed with 290 clients, 425 systems, 630 observations, and 65 contractor/provider dossiers. Commit cf311bb was pushed and read back; Actions run 2367, task 604, succeeded including LEGO Cloud Pages publication, and public Pages retained the expected Keycloak 302.

  • On 2026-08-13, rotation 221–230 added direct CVP IS award evidence that UAB „Lexita“ received VDAI's new information-system and statistics-tool creation contracts (EUR 265,000 and EUR 53,000; signed 2025-07-31), and MB „Nordic plum“ received VPT's CVP IS subsystem maintenance/development contract (EUR 287,200; signed 2025-11-30). Validation and the production build passed with 290 clients, 422 systems, 627 observations, and 61 contractor/provider dossiers. Commit 1980408 was pushed and read back; Actions run 2366, job 3342, succeeded including LEGO Cloud Pages publication, and public Pages retained the expected Keycloak 302.

  • On 2026-08-13, rotation 211–220 added direct CVP IS award evidence for three E-kinas contracts awarded to UAB „Asseco Lietuva“ (EUR 93,800 modernization/deployment and two EUR 165,000 maintenance/development contracts) and a EUR 660,000 EAIS modernization contract awarded to the same company. Validation and the production build passed with 290 clients, 421 systems, 626 observations, and 59 contractor/provider dossiers. Commits 0220ccf and f5574bc were pushed and read back; Actions runs 2364 and 2365 succeeded including LEGO Cloud Pages publication, and public Pages retained the expected Keycloak 302.

  • On 2026-08-13, rotation 201–210 added direct CVP IS award evidence that UAB „iTree Lietuva“ won the NMA ŽŪPAIS Informacinio portalo 36-month maintenance/development contract for EUR 104,060, signed 2026-05-28. The award PDF is resourceId=6504564, documentId=8110181, noticeId=8110157, procedure 32350071-7198-4af1-a61e-f26a6efd8eba. Validation and the full build passed with 290 clients, 421 systems, 626 observations, and 58 contractor/provider dossiers. Commit 5cc1b2c was pushed and read back; Actions run 2363, job 3339, succeeded including LEGO Cloud Pages publication, and public Pages retained the expected Keycloak 302.

  • On 2026-08-12, scheduled rotation 191–200 completed with conservative no-new-claim outcomes. corepack pnpm validate, the full production build (290 client, 421 system and 57 contractor routes; 626 observations; 296 raw artifacts), and git diff --check passed. Commit 7c1f68f was pushed, authenticated read back, and published by successful Actions run 2357; public Pages retained the intended Keycloak 302. The host did not expose the runner Pages dataset mount, so no direct backend-file readback was available from this runtime.

  • On 2026-08-12, commit d0c828a added the first-class Contractors collection: top navigation, dedicated Docusaurus plugin/sidebar, Overview → Registry, 58 generated contractor/provider dossiers, stable internal CTR-* IDs, a machine-readable registry, exact client/system/evidence relationships, and generated contractor sections on system dossiers. INVESTIS now displays ATEA with its bounded evidenced role. The same change recorded 2023-10-02 as INVESTIS's production release because CPVA's dated official announcement explicitly says the system started operating; the 2023-10-03 Inovacijų agentūra announcement is retained as corroboration. Delivery kickoff remains unknown because neither announcement establishes when delivery began. Focused tests, registry validation, the full production build, local browser checks, authenticated Gitea source readback, and Actions run 2351 succeeded; public Pages correctly returns the expected Keycloak 302 for the new routes. Recurring job 88833e00b4a2 and client-investigator now preserve this release-date rule and contractor-registry semantics.

  • On 2026-08-12, three live organization-first CVP IS trials produced exact, PDF-backed system procurements. (1) Vyriausybės kanceliarija: organization 2076, orgGroupId=2088, 40 notices; a 2025 PPVIS maintenance/improvement tender (resourceId=3325946) explicitly names PPVIS, EUR 110,000 excluding VAT, 36 months, and has a later contract-award notice, which must be opened separately before supplier attribution. (2) Inovacijų agentūra: organization 1679, orgGroupId=1681; the IAVV IS creation/support award (resourceId=16691) names UAB DevOcean LT, EUR 576,250, winner selection 2025-02-27, and contract date 2025-03-21. This maps to a newly evidenced IAVV IS, not INVESTIS; separate AIS, IAVVIS technical-supervision, project/portfolio-platform, and B2Lithuania notices also appeared. (3) CPVA: organization 1253, orgGroupId=1254, 224 notices; a 2026 tender (resourceId=9090393) explicitly covers development, maintenance, and warranty services for VSFSVVP IS, an electronic data-exchange system for Internal Security Fund / Border Management and Visa Policy financial support. It proves intended procurement only, not award or supplier. Direct notice endpoints returned valid PDF attachments and extracted text.

  • On 2026-08-12, instructor guidance established the CVP IS organization-first route. Live validation confirmed that the organization search exposes exact organization rows; example profile id=1297 links to published notices with distinct authorityId=1297 and orgGroupId=1298; the notice list exposes type, title, upload/publication dates, language, and status; and a notice-type link returned HTTP 200 application/pdf with an attachment filename and stable resource/document/notice identifiers. Browser navigation can abort on this legitimate download. The validated mechanics and PDF/stage safeguards were added to client-investigator and recurring job 88833e00b4a2.

  • On 2026-08-12, an exhaustive CPVA sweep queried all 421 then-current canonical system names through the live validated https://cpva.lt/paieska?_sf_s=<phrase> mechanism with zero request failures. CPVA uses broad token matching, so raw search-card hits are noisy and require opened-body verification. The first defensible case was INVESTIS: CPVA's 2023-10-02 production-launch notice explicitly describes INVESTIS/DMS, its production start and functions, and ATEA as the service provider collaborating on system creation. Client 236 (Inovacijų agentūra) and client 240 (CPVA) were updated with the bounded historical supplier role in commit 18751f6; local validation/build, authenticated readback, Actions run 2350, and Pages publication succeeded. The client-investigator CPVA procedure was corrected from ineffective POST assumptions to the confirmed _sf_s URL and now warns that broad token matches are discovery only.

  • On 2026-08-12, Lego designated Discord user 476287310627864587 to teach Hermes use of the CVP IS procurement portal (https://viesiejipirkimai.lt/epps/viewCFTSAction.do) for finding and mapping RFIs, RFPs, specifications, awards, contracts/amendments, and completion records to VSSA clients and systems. This is a CONFIRMED process directive; exact portal procedures remain UNKNOWN until taught and validated. Recurring job 88833e00b4a2 was configured to ingest the instructor's channel guidance and preserve procurement-stage semantics.

  • On 2026-08-12, commit 15020a8 added one defensible Mano dienynas observation for client 167, increasing the registry to 622 observations while retaining 420 canonical systems. Validation, deployed-content checks, authenticated remote readback, and Gitea Actions run 2344 succeeded. CPVA exact-name searches for clients 161–170 returned no applicable findings.

  • On 2026-08-12, commit 4756f0d added a generated System dossier column to every client “Cloud services and systems”/structured systems table. All 621 observations link by displayed SYS-* ID to valid canonical system routes covering 420 systems. Local validation/build passed, authenticated source readback succeeded, and Gitea Actions run 2343 completed successfully including Pages publication. Public access continues to return the intended Keycloak 302 redirect.

  • On 2026-08-12, commit d3b833b reorganized both Clients and Systems sidebars into exactly two first-level entries: Overview and an expanded Registry group containing the ordered individual dossiers (290 clients and 420 systems). Local validation/build and rendered sidebar checks passed, authenticated Gitea readback confirmed both sidebar files, and Actions run 2342 completed successfully including the Pages publish step. Public access continues to return the intended Keycloak 302 redirect.

  • On 2026-08-12, commit 95d2a9c split Overview, Clients, Systems, Methodology, and Data into dedicated Docusaurus sidebars; documented that SYS-* values are deterministic internal IDs generated from canonical identity keys rather than public identifiers; replaced system relationship tables with reusable React evidence cards; added de-duplicated References indexes to all 290 client and 420 system dossiers; and updated recurring job 88833e00b4a2 to search CPVA's official https://cpva.lt/paieska endpoint for client/system mentions while retaining only verified evidence. Validation/build and representative rendered-route checks passed, Gitea Actions run 2341 succeeded, and public Pages retained its expected Keycloak 302 protection.

  • On 2026-08-12, commit a6ca8ab added infrastructure/lifecycle analysis fields to all 420 then-current unique system records, updated the machine-readable registry to schema version 2, added identity-safe validation/bootstrap handling, and updated the recurring research job to investigate these fields continuously. Initial values remain unknown until direct evidence is found; no hosting or dates were fabricated from existing client observations. Validation/build passed, Gitea Actions run 2340 succeeded, and the Pages backend returned HTTP 200 with the three fields, schema-v2 registry, and raw canonical analysis file. Public access remains Keycloak-protected (302).

  • On 2026-08-12, commit 1542674 reorganized the portal around researched user tasks after reviewing GOV.UK content-design/writing guidance, W3C WAI design guidance, and USWDS card/table guidance. Global navigation is now Overview, Clients, Systems, Methodology, and Data; the homepage prioritizes client browsing, system exploration, and evidence search; scope metrics distinguish clients, systems, and observations; generated overview/directory/system-registry guidance explains ordering, statuses, counts, and safe interpretation; provenance documents the machine-readable registry. The rationale is recorded in docs/content-organization-research.md. Validation/build passed, desktop visual and browser checks found no clipping/JS errors, Gitea Actions run 2335 succeeded, and the Pages backend returned HTTP 200 for all representative routes and search. Public access remains Keycloak-protected (302).

  • The first scheduled continuous-research invocation at 22:00 UTC failed because the model provider reported overload. The next invocation completed at 00:12 UTC, validated all 290 clients plus 419 system routes/620 observations, pushed commit b34670484501f0ddd27154c19b7605bf00f3efdd, and verified successful Gitea Actions run 2333. Public Pages correctly redirected unauthenticated traffic to Keycloak (302), while direct backend checks returned HTTP 200 for representative client/system routes and the registry.

  • On 2026-08-11, the visible navbar/site label was changed from VSSA Documentation to VSSA - Clients & Systems in commit d062598. Gitea Actions run 2332 succeeded and the Pages backend returned HTTP 200 with the new label.

  • On 2026-08-11, commit e0efc31 flattened the Client Dossiers sidebar and added Systems Dossiers: 621 canonical evidence observations consolidated into 421 conservative unique-system records, 421 generated system routes, client/system provenance links, reviewed alias rules, machine-readable JSON, search indexing, and build validation. Gitea Actions run 2331 succeeded. The Pages backend returned HTTP 200 for the homepage, client 001, systems registry, representative centralized-government-IT dossier, registry JSON, and search index. Public Pages became Keycloak-protected concurrently and now correctly returns HTTP 302 to /oauth2/start for unauthenticated requests; this is infrastructure authentication, not a deployment failure.

  • On 2026-08-11, the dedicated VSSA-styled Docusaurus landing page and native local search were published in commit d43effe. The design uses the official VSSA navy/blue visual language, locally bundled Public Sans, the official mark, square geometry, a separate /overview/ documentation route, and live registry-derived metrics. Gitea Actions run 2330 completed successfully. The public homepage, overview, directory, local 3 MB search index, and logo returned HTTP 200; a browser query for kanceliarija returned multiple dossier results and opened client 001 successfully. Search is generated and executed inside the static site with no external search service.

  • On 2026-08-11, vssa-v1/vssa-clients was renamed to vssa-v1/documentation with history preserved. The main worktree and 20 linked-worktree pointers were repaired and verified. Docusaurus 3.10.2 now renders all 290 dossiers from generated MDX-safe copies, preserves canonical source artifacts, and publishes byte-identical raw artifacts with SHA-256 hashes. Gitea Actions run 2329 completed successfully for commit 0a2144f, and the public LEGO Cloud Pages homepage, directory, representative dossier routes, and raw manifest returned HTTP 200.

  • On 2026-08-11, Gitea 1.27.0 initially left web/API healthy while all Git transport operations crashed in the Go runtime during moduledataverify1. Gitea was subsequently updated to 1.27.1; SSH and Smart HTTP recovered. The queued VSSA commit 6fc42ab was pushed and remotely verified, leaving local main synchronized with origin/main.

  • CONFIRMED recovery decision/status (2026-08-11 19:05–19:06 UTC): after Lego asked Hermes to recheck, live verification showed Gitea 1.27.1, REST API, SSH Git, and HTTPS Git all healthy. The queued VSSA client-dossier commit 6fc42ab was pushed, remote INDEX.md was read back, and local main matched origin/main. No VSSA delivery blocker remained from this incident.

  • On 2026-08-04 at 20:05–20:42 UTC, Lego (root_at_skic) repeatedly asked whether Hermes was alive. These messages are evidence of the broader Hermes availability incident, not a change to the VSSA investigation scope. The incident was subsequently investigated in #jarvis-jr-v1-hermes-setup.

Terminology

  • In repository and Gitea workflow guidance, mutation means an operation that changes data or state (for example editing, committing, pushing, changing settings, or deleting). “Discovery before mutation” means inspect and confirm the target repository and its current state before making changes.

Source anchor

  • Latest processed human message: 1539720023382298655 (2026-08-19 19:37 UTC). RootAtSkic requested an executive-level presentation using the VSSA PowerPoint template; the completed, validated final presentation and artifact details are recorded above.
  • Previous processed human message: 1539580734690557972 (2026-08-19 10:24 UTC). RootAtSkic corrected VSSA's entity classification; the confirmed repository, skill and generated-route correction is recorded above.
  • Previous processed human message: 1539556697855623238 (2026-08-19 08:48 UTC). The designated CVP IS instructor supplied lesson 3, the organization/client-data search and profile-derived published-notices route recorded above.
  • Previous processed human messages: 1539539693383852083 and 1539544570164158526 (2026-08-19 07:41–08:00 UTC). The designated instructor supplied CVP IS lessons 1 and 2, recorded and validated above.
  • Previous processed human message: 1539320694246998056 (2026-08-18 17:10 UTC). RootAtSkic required the desktop “On this page” panel to be at least twice as wide; the confirmed 160px → 320px delivery is recorded above.
  • Previous processed human messages: 1537814241019564032, 1537819093254668479, and 1537819134069571685 (2026-08-14 13:24–13:44 UTC). Lego directed the documentation improvement using the updated documentation-docusaurus skill and then confirmed that approval was given.
  • Previous processed human message: 1537799637707128902 (2026-08-14 12:26 UTC). Lego directed the merge of gitea-docusaurus-projects into a dedicated VSSA-managed documentation-docusaurus repository and authorized read-only learning from, but no modification of, the requested corp repository; the verified outcome and unavailable exact comparison source are recorded above.
  • Previous processed human messages: 1537796686020349992–1537798034602065940 (2026-08-14 12:15–12:20 UTC). Lego asked which documentation skills were used and whether both were Gitea-managed, leading to the confirmed merge/repository directive.
  • Previous processed human messages: 1537794036780498954 and 1537794525836218368 (2026-08-14 12:04–12:06 UTC). Lego asked which skill governs this channel, renamed it to vssa-clients, and required a dedicated repository under vssa-v1-skills-code-agent.
  • Previous processed human messages: 1537785454265634817 and 1537793619442925701 (2026-08-14 11:30–12:02 UTC). Lego required contractor links on each exact client-system row and asked for a concrete Client Card example; the implemented relationship model and Nacionalinė teismų administracija example are recorded above.
  • Previous processed human message: 1537121770707091537 (2026-08-12 15:33 UTC). Lego clarified that dated official announcements explicitly saying a system started operating can evidence its production release and asked why INVESTIS lacked kickoff/release values; the confirmed release-date rule and deployed INVESTIS result are recorded above, while kickoff remains unknown.
  • Previous processed human message: 1537121281529356391 (2026-08-12 15:31 UTC). Lego required system dossiers to expose evidenced contractors and proposed a first-class Contractors registry; commit d0c828a implemented and published that structure.
  • Previous processed human message: 1537120485870018662 (2026-08-12 15:28 UTC). Lego requested exact system links to inspect documentation updates; Hermes clarified that the three CVP IS trials had been captured as research leads but had not yet been incorporated into documentation pages.
  • Previous processed human messages: 1537116481408466974–1537117840715546624 (2026-08-12 15:12–15:17 UTC). Lego taught and requested live trials of the additional CVP IS organization-first search route; the validated mechanics and three trial results are recorded above.
  • Previous processed human message: 1537072799775203358 (2026-08-12 12:18 UTC). Lego designated user 476287310627864587 as the CVP IS instructor and directed the recurring job to learn the procurement portal workflow and map supported procurement records to VSSA clients and systems.
  • Previous processed human message: 1537067600998047804 (2026-08-12 11:57 UTC). Lego requested internal system-dossier links in every client cloud-services/systems table; commit 4756f0d implemented and verified the links as recorded above.
  • Previous processed human message: 1537058117223972915 (2026-08-12 11:20 UTC). Lego requested Overview/Registry hierarchy for both Clients and Systems sidebars; commit d3b833b implemented it.
  • Previous processed human messages: 1537047891309494343–1537049333352894514 (2026-08-12 10:39–10:45 UTC). Lego required recurring infrastructure/lifecycle research, dedicated top-level sidebars, clarification of generated SYS-* IDs, reusable relationship cards, CPVA searching, and per-record reference indexes; commits a6ca8ab and 95d2a9c implemented these requirements.
  • Latest processed human message: 1536934392302141461 (2026-08-12). Lego requested an immediate research-led overall page improvement cycle focused on best practices for content organization; the deployed result is recorded above.
  • Latest processed human message: 1536859431533281312 (2026-08-11). Lego requested the site label VSSA - Clients & Systems; it was published and verified as recorded above.
  • Latest processed human message: 1536847412382015629 (2026-08-11). Lego requested a flat Client Dossiers sidebar, a unique Systems Dossiers registry, and continuous documentation/research automation; all three were implemented and published as recorded above.
  • Latest processed human message: 1536845732613591160 (2026-08-11). Lego reported that the new landing page and search were not visible; inspection confirmed the changes had only existed locally. Hermes committed and pushed them, verified successful Actions run 2330, and confirmed the public deployment and search behavior.
  • Latest processed human message: 1536835494909055107 (2026-08-11). Lego directed Hermes to rename the repository to documentation, convert it to Docusaurus, add Gitea Actions, and publish through LEGO Cloud Pages; the completed state is recorded above.
  • Previous processed human message: 1536812738679021618 (2026-08-11 19:05 UTC). Lego asked Hermes to check Gitea after remediation; the subsequent verified result is recorded above.
  • Previous incident message: 1536807021674762261 (2026-08-11 18:42 UTC), asking what was wrong with Gitea and how to resolve it.
  • Previous availability message: 1534300468530905170 (2026-08-04 20:42 UTC). Lego asked whether Hermes was alive; no VSSA project scope or status changed.
  • Previous terminology message: 1533032343021813930 (2026-08-01 08:43 UTC), requesting clarification of “mutation”.
  • Previous durable directive: 1532810727847624884 (2026-07-31 18:02 UTC), confirming the concise one-file-per-client format, plain-language system meaning, contractor/company research, deep public investigation, and iterative improvement of client-investigator.