@@ -126,8 +126,16 @@ After discussion, RootAtSkic authorized implementation with “go oon” (https:
|
||||
|
||||
This replaces the old five-stage narrative with three separate native Archify visual levels: overall journey, Delivery-first adoption, and the within-phase loop. Published through PR29, merged main `8a7dbea852cd00d370f0b7d814f675417fbf1075`; exact-head CI11066 and main publication CI11067 passed. Live revision, Roadmap body and all six viewer bytes verified; desktop/mobile themes, fullscreen, scrolling, keyboard and exports checked. This is publication of the strategy—not deployment of autonomous SDLC, agreed dates or approved KPI thresholds. The unchanged dependency audit remains non-green and is outside this diagram change.
|
||||
|
||||
## Presentation corrections — human direction 2026-10-09
|
||||
- Remove “Assignment facts” and “Unknown until discovery” from slide 2 (`1558001675854286869`). Add a short AI Agent explanation on slide 5 with Claude, Cline, ChatGPT or similar as examples (`1558002070676578387`).
|
||||
- Slide 7: change spatial layout, not the existing sequence. Understand work → Measure baseline across the top; Engineer topology below Measure baseline; Reassess to the right of topology; Collect results below Reassess; Use in real work below. Preserve the existing process order rather than interpreting spatial placement as new sequencing (`1558002613167980585`, `1558002891313250358`, explicit clarification `1558003078542921750`). Exact final geometry requires slide review.
|
||||
- Slide 13 needs clearer identification as a weekly template; user questioned whether that was stated and asked for a fix (`1558006595097595965`, `1558007389830258779`).
|
||||
- Measures must name concrete numeric quantities, not vague labels such as “Accepted work” (`1558010627249938463`). Use the canonical `/strategy/measurement/` page to improve the measurement slide (`1558010932209262632`). No actual metric values or company outcomes were supplied.
|
||||
- These are fresh authenticated human-message requirements. Existing publication records above remain historical channel-workflow evidence; this daily sync does not prove the corrections were implemented. Explanation requests and progress pings add no separate decisions.
|
||||
|
||||
## Source anchor
|
||||
- Latest processed human message: `1557830033090027611` (2026-10-08 19:00 UTC; trailing progress inquiry after presentation-alignment correction).
|
||||
- Latest processed human message: `1558010932209262632` (2026-10-09 06:59 UTC; measurement-page-based slide revision request).
|
||||
- Daily sync 2026-10-10 read all 16 newer human messages through this anchor using authenticated live Discord REST.
|
||||
- Daily sync 2026-10-09 reconciled 20 human messages newer than the previous daily anchor `1557373230434754573` using authenticated live Discord REST. Requests: show lifecycle dependencies/sequence (`1557702762819493980`); distinguish organizational/workflow effectiveness from skills-maintenance metrics (`1557703741778563113`, authorization `1557704861963780158`); improve the entire Strategy as one practical architecture story (`1557733209238806539`) and evaluate it professionally (`1557758209987579978`). Compare against the supplied AI Architect Test Task PDF (`1557767519748759646`, `1557767641924501515`) and remedy gaps (`1557786954383368264`); PDF contents were not independently re-extracted by daily sync.
|
||||
- Further confirmed directions: department list and individual sidebar-visible Structure children (`1557803993852280952`); a documentation-styled Reveal.js presentation after PDF-driven changes (`1557805716431970304`); preserve separate long-term Target/Roadmap alongside 6 Months Target, 6 Months Roadmap and Beyond (`1557813737941901572`); embed the presentation beneath **Understand In Speed** on the homepage (`1557818798969458771`, `1557818861020123187`); realign the presentation with the full strategy (`1557828118385926256`). Existing channel-workflow implementation, review and publication evidence above is preserved, not independently revalidated by this scan. Routine progress pings do not add decisions.
|
||||
- Governing horizon direction: `1557813737941901572` (preserve long-term Target/Roadmap, separate six-month contribution; PR41 reviewed/published2026-10-08). Assignment `1557786954383368264` still governs the six-month scope, not replacement of the long-term vision. Earlier Measurement/Baseline authorization `1557373230434754573` remains historical.
|
||||
|
||||