diff --git a/brain.md b/brain.md index 87efded..a06e4c3 100644 --- a/brain.md +++ b/brain.md @@ -1,6 +1,6 @@ # 🧠 Knowledge Wiki — Brain Summary -_Last updated: 2026-10-09 03:02 UTC_ +_Last updated: 2026-10-10 daily sync_ ## Workstreams & Status @@ -58,6 +58,9 @@ _Last updated: 2026-10-09 03:02 UTC_ ## Infrastructure +- **Eldorado presentation corrections (2026-10-09):** remove slide-2 assignment/unknown labels; explain AI Agent with familiar examples; alter slide-7 layout without changing process order; clarify the weekly-template framing. Measurement needs concrete numeric quantities grounded in the existing Measurement page, not generic “Accepted work.” Latest anchor `1558010932209262632`; implementation not established by daily sync. +- **Shorts delivery/compatibility (2026-10-09):** integrate slide 9 into the full, consistently styled deck; place a taller Cognitive Architect foundation below the columns, reduce other fonts and correct unintended black backgrounds. User reported Keynote import failure; channel workflow records v2.8.11 corrections, but native Keynote opening remains unverified. Latest anchor `1558200114269659137`. + - **Eldorado governing direction (2026-10-08):** preserve long-term Target and Roadmap as separate pages alongside 6 Months Target, 6 Months Roadmap and Beyond; the assignment-driven six-month plan must not replace the long-term vision. Distinguish workflow/organization effectiveness from skills-health metrics, connect the entire strategy story, and align the documentation-styled Reveal.js presentation with it. Homepage embed heading: **Understand In Speed**. Departments become sidebar-visible Structure children. Anchor `1557830033090027611`; detailed channel-workflow publication evidence is preserved but not independently revalidated by daily sync. - **AeroSim 3D-model channel (2026-10-08):** dedicated workspace and Gitea-backed skill requested in `1557702471294521394` (anchor `1557702572112879657`). Existing local wiki/runtime route reconciled into daily monitoring: 36 authoritative IDs and 30 mapped skill routes; remote setup details remain channel-workflow evidence. diff --git a/channels/1519069810166599764.md b/channels/1519069810166599764.md index 7d928b7..8f5f555 100644 --- a/channels/1519069810166599764.md +++ b/channels/1519069810166599764.md @@ -1,6 +1,6 @@ # Channel Wiki: #jarvis-jr-knowledge-wiki _Channel ID: 1519069810166599764_ -_Last sync: 2026-10-09 03:02 UTC_ +_Last sync: 2026-10-10 daily sync_ ## Purpose Operate and audit Hermes's persistent Discord knowledge system: channel inventory, monitored-channel coverage, per-channel context, recurring syncs, and Gitea mirroring. @@ -24,7 +24,7 @@ Operate and audit Hermes's persistent Discord knowledge system: channel inventor - Verify config refresh and Gitea push independently after monitoring changes. - The authoritative sync mapping now contains 36 text-channel IDs, including AeroSim 3D Models (`1557702471294521394`); one retained legacy ID (`#jarvis-jr-test-001`) remains absent from the live guild inventory and inaccessible. - ✅ On 2026-09-13 the recurring health-check defect was repaired: zero-match `grep -c` output can no longer become the invalid multiline value `0\n0`, and the Discord check now recognizes the gateway's actual inbound/send activity log forms. A syntax check and complete rerun passed all four checks; the same run's authenticated Discord REST scan succeeded for 31/32 monitored channels. -- ⚠️ Run #177 on 2026-10-09 scanned 35/36 monitored IDs through authenticated live Discord REST. Reconciled 20 newer Eldorado human messages and the new AeroSim setup request. Latest anchors: Eldorado `1557830033090027611`, AeroSim `1557702572112879657`; other anchors unchanged. Retained `#jarvis-jr-test-001` remains absent from live guild inventory and its anchor cannot advance. All 30 exact mapped skill routes verified against installed skills and wiki files, maximum 262 characters; all non-routing config values unchanged. Mirror preflight passed with clean main and fetched divergence `0 0`; push and authenticated artifact readback are tracked in the run report. Topic implementation/publication was not revalidated by this scan. +- ⚠️ Run #178 on 2026-10-10 scanned 35/36 authoritative monitored IDs through authenticated live Discord REST. Captured 16 Eldorado presentation/measurement messages and five Shorts layout/full-deck/Keynote messages. Latest anchors: Eldorado `1558010932209262632`, Shorts `1558200114269659137`; others unchanged. Retained `#jarvis-jr-test-001` (`1518733120831226028`) remains absent from the live guild inventory; its anchor cannot advance. All 30 mapped skill routes verified against installed skills and wiki files, maximum 262 characters; all non-routing config values unchanged. Mirror preflight passed with clean main and fetched divergence `0 0`; final push/ref/artifact results belong to the delivered run report. Presentation deployment and native Keynote compatibility were not revalidated by this scan. - ⚠️ RootAtSkic asked how people will obtain/use the numeric-ID Markdown channel files and whether moving the wiki to the “Google” `OKF` format would be useful. The intended format name and desired delivery interface are **UNKNOWN** and must be clarified before any migration; no format change was authorized. ## Channel Workspace diff --git a/channels/1547923343905259601.md b/channels/1547923343905259601.md index acafad4..51e8936 100644 --- a/channels/1547923343905259601.md +++ b/channels/1547923343905259601.md @@ -1,8 +1,8 @@ # Channel Wiki: #cogarch-v1-shorts _Channel ID: 1547923343905259601_ _Created: 2026-09-11 10:54 UTC_ -_Last sync: 2026-10-06 03:02 UTC_ -_Latest processed human message: 1556767129901072385_ +_Last sync: 2026-10-10 03:00 UTC_ +_Latest processed human message: 1558200114269659137_ ## Purpose @@ -41,6 +41,19 @@ Plan, create, review, and maintain concise short-form CogArch content. Specific ## Active Topics +### Human-direction reconciliation — daily sync 2026-10-10 +- Authenticated live Discord REST read five newer human messages through `1558200114269659137`. Slide 9 must be integrated into the full presentation and preserve its overall styling (`1558110073254055956`, `1558110195006316596`); the supplied PPTX is layout guidance only (`1558010104878727190`). +- Cognitive Architect is a separate foundation beneath the column panels, never overlapping them; increase its height and reduce other slide fonts. Remove unintended black backgrounds in the latter part of the deck (`1558200114269659137`). +- User reported a Keynote open/import failure (`1558113720150790226`). The channel workflow records compatibility rebuilds and v2.8.11 corrections below, but successful native Keynote opening remains unverified. This sync reconciles human requirements and preserves those local QA claims without independently rebuilding or validating the deck. + +- **v2.8.11 — `1558200114269659137`:** corrected black backgrounds introduced by fresh-package rebuild: source IBM master maps bg1→dk1 (white), default master mapped bg1→lt1 (black). Restored original clrMap and explicit white slide backgrounds on all 15 slides. Slide 9 column names reduced to 24pt, headings 23pt, supporting text 17/16pt; Cognitive Architect foundation increased from 1.5in to 2.8in with 34pt title, separated from columns. Full deck `release/Architecture-in-AI-World-2.8.11.pptx`, source `source/revise_v2811.py`, previews `preview/2.8.11/`. Slide text/notes preserved; schema validation passed; visual diagnostic checked. Native Keynote rendering remains unverified. + +- **Keynote import failure — `1558113720150790226`:** user reports v2.8.9 cannot open. Exact Keynote cause not reproduced; ZIP/link/slide XML checks alone were insufficient. Compatibility rebuild `/opt/data/cogarch-v1-shorts/workspace/architecture-in-an-ai-world/release/Architecture-in-AI-World-2.8.10.pptx` uses a fresh standard PPTX package, flattened inherited artwork, no old embedded-font/comment parts. All 15 slides retain exact text, notes and hyperlink destinations; diagnostic images are pixel-identical to v2.8.9. All PML slide/master/layout/notes schemas and relationship targets pass. Keynote opening remains UNVERIFIED, pending user test. Local LibreOffice extraction failed at runtime initialization, so no native-viewer claim. Builder `source/rebuild_compat_v2810.py`, report `qa/compatibility-v2810.json`. + +- **Slide 9 correction — `1558110073254055956` and following styling feedback:** changes must be integrated into the full presentation, not delivered as a detached slide. Supplied slide is a layout concept only; preserve full-deck styling. Updated full 15-slide deck: `/opt/data/cogarch-v1-shorts/workspace/architecture-in-an-ai-world/release/2026-10-09-architecture-in-an-ai-world-2.8.9.pptx`. Only `ppt/slides/slide9.xml` changed versus v2.8.7; other 14 slides, links, notes, masters/themes unchanged. Slide 9 uses IBM Plex, square F4F4F4 columns, blue approach headings and original dark-blue Cognitive Architect foundation with 0.45in separation. Individual previews in `preview/2.8.9/` are approximate diagnostics with IBM Plex fonts; not native-viewer renders. Builder `source/revise_v289.py`. + +- **Slide 9 layout — message `1558010104878727190`:** user supplied a one-slide PPTX (`2.8.7_jsa_3`) as layout direction. Cognitive Architect must be a separate full-width foundation below all five column panels, never overlapping them. Revised editable single-slide artifact: `/opt/data/cogarch-v1-shorts/workspace/slide9-foundation/2026-10-05-architecture-in-an-ai-world-2.8.8-slide-09.pptx`. Text/links/notes retained; column spacing normalized; foundation text explicitly white. ZIP/XML/bounds and 0.35in separation checked; preview is approximate, not a native PowerPoint render. Full earlier deck was not modified. + ### Current human direction — daily sync 2026-10-06 Live Discord read processed 79 newer human messages through `1556767129901072385`. This section supersedes earlier outline decisions where inconsistent. Versioned implementation/QA entries below are historical channel-workflow records, not proof that the latest requests were completed; this sync did not rebuild or validate a deck. diff --git a/channels/1555510466904727622.md b/channels/1555510466904727622.md index c80a2bf..73cdfca 100644 --- a/channels/1555510466904727622.md +++ b/channels/1555510466904727622.md @@ -126,8 +126,16 @@ After discussion, RootAtSkic authorized implementation with “go oon” (https: This replaces the old five-stage narrative with three separate native Archify visual levels: overall journey, Delivery-first adoption, and the within-phase loop. Published through PR29, merged main `8a7dbea852cd00d370f0b7d814f675417fbf1075`; exact-head CI11066 and main publication CI11067 passed. Live revision, Roadmap body and all six viewer bytes verified; desktop/mobile themes, fullscreen, scrolling, keyboard and exports checked. This is publication of the strategy—not deployment of autonomous SDLC, agreed dates or approved KPI thresholds. The unchanged dependency audit remains non-green and is outside this diagram change. +## Presentation corrections — human direction 2026-10-09 +- Remove “Assignment facts” and “Unknown until discovery” from slide 2 (`1558001675854286869`). Add a short AI Agent explanation on slide 5 with Claude, Cline, ChatGPT or similar as examples (`1558002070676578387`). +- Slide 7: change spatial layout, not the existing sequence. Understand work → Measure baseline across the top; Engineer topology below Measure baseline; Reassess to the right of topology; Collect results below Reassess; Use in real work below. Preserve the existing process order rather than interpreting spatial placement as new sequencing (`1558002613167980585`, `1558002891313250358`, explicit clarification `1558003078542921750`). Exact final geometry requires slide review. +- Slide 13 needs clearer identification as a weekly template; user questioned whether that was stated and asked for a fix (`1558006595097595965`, `1558007389830258779`). +- Measures must name concrete numeric quantities, not vague labels such as “Accepted work” (`1558010627249938463`). Use the canonical `/strategy/measurement/` page to improve the measurement slide (`1558010932209262632`). No actual metric values or company outcomes were supplied. +- These are fresh authenticated human-message requirements. Existing publication records above remain historical channel-workflow evidence; this daily sync does not prove the corrections were implemented. Explanation requests and progress pings add no separate decisions. + ## Source anchor -- Latest processed human message: `1557830033090027611` (2026-10-08 19:00 UTC; trailing progress inquiry after presentation-alignment correction). +- Latest processed human message: `1558010932209262632` (2026-10-09 06:59 UTC; measurement-page-based slide revision request). +- Daily sync 2026-10-10 read all 16 newer human messages through this anchor using authenticated live Discord REST. - Daily sync 2026-10-09 reconciled 20 human messages newer than the previous daily anchor `1557373230434754573` using authenticated live Discord REST. Requests: show lifecycle dependencies/sequence (`1557702762819493980`); distinguish organizational/workflow effectiveness from skills-maintenance metrics (`1557703741778563113`, authorization `1557704861963780158`); improve the entire Strategy as one practical architecture story (`1557733209238806539`) and evaluate it professionally (`1557758209987579978`). Compare against the supplied AI Architect Test Task PDF (`1557767519748759646`, `1557767641924501515`) and remedy gaps (`1557786954383368264`); PDF contents were not independently re-extracted by daily sync. - Further confirmed directions: department list and individual sidebar-visible Structure children (`1557803993852280952`); a documentation-styled Reveal.js presentation after PDF-driven changes (`1557805716431970304`); preserve separate long-term Target/Roadmap alongside 6 Months Target, 6 Months Roadmap and Beyond (`1557813737941901572`); embed the presentation beneath **Understand In Speed** on the homepage (`1557818798969458771`, `1557818861020123187`); realign the presentation with the full strategy (`1557828118385926256`). Existing channel-workflow implementation, review and publication evidence above is preserved, not independently revalidated by this scan. Routine progress pings do not add decisions. - Governing horizon direction: `1557813737941901572` (preserve long-term Target/Roadmap, separate six-month contribution; PR41 reviewed/published2026-10-08). Assignment `1557786954383368264` still governs the six-month scope, not replacement of the long-term vision. Earlier Measurement/Baseline authorization `1557373230434754573` remains historical. diff --git a/meta/sync-log.md b/meta/sync-log.md index ac6d687..fa9daca 100644 --- a/meta/sync-log.md +++ b/meta/sync-log.md @@ -1,5 +1,14 @@ # Sync Log +### Run #178 — 2026-10-10 daily 03:00 UTC job ⚠️ +- **Channels scanned:** 35/36 authoritative monitored IDs through authenticated live Discord REST, restricted to guild `1518726359512387766` text channels. Retained `#jarvis-jr-test-001` (`1518733120831226028`) is still absent from live guild inventory; no other-guild or voice history scanned. +- **New human activity:** 21 messages: Eldorado 16, Shorts 5. Captured presentation clarity, diagram-layout-versus-sequence, numerical measurement requirements, full-deck styling, Cognitive Architect foundation sizing and the Keynote import blocker. Existing topic-workflow implementation/QA evidence preserved, not independently revalidated. +- **Latest processed anchors:** Eldorado `1558010932209262632`; Shorts `1558200114269659137`. All others unchanged, including AeroSim `1557702572112879657`, VSSA storm `1556982849335459841`, skills `1556637831106007131`, wiki `1550913962810282146`, retained test `1532723701039108117`; remaining anchors as in complete Run #166 list. Hub-web has no human anchor and returned empty history. Wiki anchors used where explicit; prior log anchors used otherwise. +- **Config:** required --update-config passed; 30 exact mapped skill_view directives, maximum 262 characters. Installed skills (including symlinks) and wiki files verified; every parsed non-routing value unchanged. No jobs, response scope, free-response channels, permissions or monitoring membership changed. +- **Files updated:** `channels/1555510466904727622.md`, `channels/1547923343905259601.md`, `channels/1519069810166599764.md`, `MEMORY.md`, `sync-log.md`. +- **Health:** all four supplied pre-run checks passed. +- **Mirror preflight:** expected active API account, repository metadata and SSH fetch passed; clean main, divergence `0 0`. Push/ref equality and authenticated exact-SHA artifact readback follow this entry; actual outcomes reported in delivered summary. + ### Run #177 — 2026-10-09 03:02 UTC ⚠️ - **Channels scanned:** 35/36 authoritative monitored IDs via authenticated live Discord REST, limited to verified text channels of guild `1518726359512387766`. Retained `#jarvis-jr-test-001` (`1518733120831226028`) remains absent from live inventory; no other guild or voice history scanned. - **New human activity:** 21 messages (20 Eldorado; one AeroSim 3D Models). Reconciled long-term versus six-month strategy horizons, workflow/skills measurement distinction, connected architecture story, assignment comparison, Structure child pages and strategy-aligned Reveal.js homepage presentation. Seeded explicit AeroSim setup anchor. Existing channel-workflow deployment evidence was preserved, not revalidated.