Files
jarvis-at-skic f23bf1c5f4
Build and publish Eldorado documentation / build (pull_request) Successful in 48s
docs: align published presentation and verify horizon source traceability
2026-10-08 18:14:45 +00:00

20 lines
4.7 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Strategy horizons — correction evidence matrix
Authority: user message `1557813737941901572` in Eldorado storm-v1. This correction restores the agreed long-term destination; it does not authorize autonomous execution. Original PDF read in full: Format, Context, all four questions and assumptions instruction; its existing SHA-256 remains in `assignment-evidence.json`.
| Horizon / reader destination | Origin and preservation | Result / boundary | Verification |
| --- | --- | --- | --- |
| Target `/strategy/target-operating-model/` | Meaningful Target body restored from pre-PR38 `88a43757762114a506f57ed4b44484306cae1aaa`; original desktop/mobile `strategy-target` JSON unchanged | Human-directed/guided/reviewed autonomous SDLC is the long-term vision, not merely a competing optional destination. Eight lifecycle phases, central agent with eight governance spokes, eight outside human-controlled AI Agents; no fixed timing or present permission | `sdlc-cycle`, `target-midpoints`, `assignment` tests; real inline/fullscreen and complete light/dark exports |
| Roadmap `/strategy/roadmap/` | Original three-level body and six paired workflow JSON files restored from the same historical revision, then reconciled with intervention choice and new links | Skills/practices adoption → controlled autonomous capabilities; Delivery first, remaining phase order undecided, Delivery keeps improving. Evidence and separate human authority, not automatic graduation | `roadmap`, `roadmap-viewer`, browser `roadmap-timeline` |
| 6 Months Target `/strategy/six-months-target/` | PR38 assignment narrative moved out of Target, including the entire assumptions register and credible outcome conditions | PDF facts: close to80 engineers growing toward100, more than10 teams, everyone already using AI unevenly; solo CTO-reporting architect with no formal team authority. Actual stack/reporting/capacity unknown. First six months contribute toward—not replace—the destination | `assignment-evidence.json` maps all four PDF answers, format and assumptions to actual pages |
| 6 Months Roadmap `/strategy/six-months-roadmap/` | PR38 month1–6 action plan, influence/capacity and full EXP-01 packet preserved here as the single plan | One active pilot; independent checks; explicit effort limits, recovery, inconclusive extension and stop. EXP-01 remains fictional. No benefits, approvals or organization-wide rollout fabricated | Assignment markers; exact EXP-01 packet preservation; first-revision tests; browser six-month diagram controls and exports |
| Beyond 6 Months `/strategy/stage-02-autonomous-agent/` | Existing useful autonomy-stage content and diagram retained | Connect evidence-led next investments toward long-term vision; authority expands only through a separate case, scoped credentials, independent checks, stop/takeover and reopening on boundary changes | Connected-strategy tests and actual reader handoffs |
| Nested lifecycle and references | Stage01 URL retained as concise lifecycle reference beneath 6 Months Roadmap. All6 topic routes,16 metric contracts and2 shared reference pages remain reachable | No second competing monthly plan. First-revision N/A comparator, clean current-practice recovery, qualification-versus-pilot distinction retained. Contract bodies remain byte-identical;9 prototype calculations and7 unimplemented metrics remain explicitly classified |30-route manifest with original metric hashes;44-doc resolved sidebar/link/anchor checks |
| Presentation integration | Published PR40 merge `432370473d6aaee229b0279551ce7b63da52acb7` merged into isolated branch, including320px toolbar correction |19slides,35-minute content +15-minute Q&A unchanged. Focused source-link and Beyond wording changes only; references now name all five horizons. Homepage and toolbar Strategy still open long-term Target | Generated slide-source map, exact source hashes and presentation browser suite; inspect changed slides16/19 individually |
No Organization body, runtime vendor or dependency changes are introduced relative to integrated PR40 main. Independent child reviewer owns merge/publication and durable wiki reconciliation. Local candidate evidence is not publication evidence.
## Verification environment and limits
Use the prefix-correct static server for full acceptance. Docusaurus `serve` on the installed Node runtime redirects WOFF2 assets to slash-suffixed paths; the regular static server serves the same built font bytes correctly. Chromium executable is selected explicitly from the installed headless build. This is desktop/mobile viewport verification, not Safari/Firefox or physical-device certification. WebM remains unsupported/disabled in this browser; SVG/PNG/JPEG/WebP controls are verified. Existing dependency audit findings are not remediated or accepted by this content change.