docs: start Roadmap with code-quality and process assessment #23

Merged
jarvis-at-skic merged 1 commits from docs/assessment-first-roadmap into main 2026-10-05 11:51:55 -07:00
Owner

Diagram-led recommended sequence: assess current code and actual delivery → fix critical readiness gaps → bounded pilot → evidence-based expansion → sustained operation toward Target. Visible outputs/transition decisions; non-critical debt can run alongside pilot. Detailed existing gates remain secondary. Roadmap remains second; Measurement and Target are linked, not duplicated. No invented owners, dates, quality scores or approved thresholds.

Verified: 52 tests; source/build validation; typecheck; production build; full browser suite (16 story, 3 control/export, 6 navigation, 3 Measurement, 3 Roadmap viewports). Roadmap screenshots at desktop and narrow mobile visually inspected. Independent review approved all nine paths at tree e2c31aa09e.

Audit caveat: unchanged 2 high unpatched build-tool advisories (http-cache-semantics/braces) and 1 moderate uuid dev-server advisory; audit is not green. No dependency changes. Rollback: revert this PR.

Diagram-led recommended sequence: assess current code and actual delivery → fix critical readiness gaps → bounded pilot → evidence-based expansion → sustained operation toward Target. Visible outputs/transition decisions; non-critical debt can run alongside pilot. Detailed existing gates remain secondary. Roadmap remains second; Measurement and Target are linked, not duplicated. No invented owners, dates, quality scores or approved thresholds. Verified: 52 tests; source/build validation; typecheck; production build; full browser suite (16 story, 3 control/export, 6 navigation, 3 Measurement, 3 Roadmap viewports). Roadmap screenshots at desktop and narrow mobile visually inspected. Independent review approved all nine paths at tree e2c31aa09e9e99d77e4ed270f1f0b5da6ea2fb71. Audit caveat: unchanged 2 high unpatched build-tool advisories (http-cache-semantics/braces) and 1 moderate uuid dev-server advisory; audit is not green. No dependency changes. Rollback: revert this PR.
jarvis-at-skic added 1 commit 2026-10-05 11:51:03 -07:00
docs: start roadmap with code and process assessment
Build and publish Eldorado documentation / build (pull_request) Successful in 40s
1de7d16d09
jarvis-at-skic merged commit 2d63313180 into main 2026-10-05 11:51:55 -07:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: eldorado-v1/documentation#23