docs: reconcile AeroSim Wave 2 progress #23

Merged
jarvis-at-skic merged 1 commits from docs/aerosim-wave2-progress into main 2026-09-03 14:33:35 -07:00
Owner

Summary

  • advance the dated AeroSim Board checkpoint to canonical and repository-verified 8/114 (7.0%)
  • retain released progress at 0/114 and preserve the canonical authority boundary
  • mark Wave 2 complete and Wave 3 active
  • strengthen portal verification with 32 document-mutation fixtures

Validation

  • independent automated review: PASS on exact packet
  • node scripts/verify-portal.mjs --self-test: 32/32
  • pnpm verify:portal: PASS
  • pnpm typecheck: PASS
  • pnpm build: PASS
  • git diff --check: PASS

Dependency audit

No dependency files changed. Existing baseline remains 7 high and 4 moderate transitive findings.

## Summary - advance the dated AeroSim Board checkpoint to canonical and repository-verified 8/114 (7.0%) - retain released progress at 0/114 and preserve the canonical authority boundary - mark Wave 2 complete and Wave 3 active - strengthen portal verification with 32 document-mutation fixtures ## Validation - independent automated review: PASS on exact packet - `node scripts/verify-portal.mjs --self-test`: 32/32 - `pnpm verify:portal`: PASS - `pnpm typecheck`: PASS - `pnpm build`: PASS - `git diff --check`: PASS ## Dependency audit No dependency files changed. Existing baseline remains 7 high and 4 moderate transitive findings.
jarvis-at-skic added 1 commit 2026-09-03 14:32:33 -07:00
[verified] docs: reconcile AeroSim Wave 2 progress
Build and publish Corp v1 Board portal / build (pull_request) Successful in 39s
42b876e82e
jarvis-at-skic merged commit 666b6a8d25 into main 2026-09-03 14:33:35 -07:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: corp-v1/portal#23