wiki: sync 2026-10-09 03:03 UTC — 5 file(s) updated

This commit is contained in:
jarvis-at-skic committed 2026-10-09 03:03:41 +00:00
1 parent fb171809c1
commit 732ea845e6
5 files changed
+125 -6

No files matched your search

+85 -2
View File
@@ -22,7 +22,87 @@ Source request: https://discord.com/channels/1518726359512387766/155551046690472
Keep future channel material here. No existing files were migrated.
## Measurement registry and workflow Baseline — published 2026-10-07
## Full-Strategy presentation alignment — current publication 2026-10-08
The canonical **Less Prompting, More Shipping** presentation and homepage **Understand In Speed** now show the same23-slide deck. This supersedes the19-slide presentation descriptions in historical entries below. Visible story: why change → substantive human-controlled autonomous SDLC Target (cycle/governance and outside contributors) → Delivery-first human+AI connected skills, wider SDLC, separately controlled autonomy Roadmap →6MonthsTarget → practical months1–6/influence/capacity/measurement → evidence-led Beyond →Q&A. EXP-01 is one2minute fictional illustration, not the strategy spine; sample arithmetic remains optional speaker-note/reference depth.21main slides total35minutes, followed by15minute Q&A and a zero-minute reference appendix. All four assignment questions and explicit unknowns/constraints remain; no company results, guaranteed gains or six-month autonomy promise. Direction: https://discord.com/channels/1518726359512387766/1555510466904727622/1557830033090027611.
Independent review/publication task `t_8aabf7d2` approved PR43 head `c88f4dbc2515f4f87fd2cc00c6a0bb9598b12235`, tree `ff09ecc2ed2768d514256a5b96e9f25e75ea295c`, against fresh main `eea14bf00fd6a92b8a530edbb555c46557ecf268`. Exact-head CI11110/run7123 succeeded. Merge `46bb8b2b48b0cb3d09a684b1a329328c3cb88040` preserves that reviewed tree; exact-main publication CI11111/run7124 passed. Public HTTPS revision and all12 deck files match the independently built candidate; all39 Strategy/Organization article bodies match. Strategy/Organization/diagram/runtime/dependency sources were unchanged.
Independent102tests, typecheck, build,44-document links/sidebar/search checks,30Strategy routes at4widths and14Organization contexts passed. Both candidate and public site passed69standalone and92embedded slide views; all23text/notes records agree, full keyboard traversal and Target deep-link refresh pass. Keyboard/touch/focus/URL/scroll isolation/fullscreen/overview/notes/print/reduced-motion/narrow-phone behavior exercised.92individual candidate desktop/mobile/embedded images were visually reviewed with no blocking defects; deployed earlyTarget/Roadmap pixels inspected again. Actual diagnostic PDF has23pages. Evidence: `/opt/data/kanban/boards/eldorado-storm/workspaces/t_8aabf7d2/` (`merge.json`, `publication.json`, `deployed-readback.json`, `parity.json`, repository `.cache/`). Chromium emulation only, not physical-device/Safari/Firefox or full assistive-technology certification; timings are planned, not rehearsed; preexisting dependency findings unchanged and not remediated/accepted.
Presentation: https://pages.apps.lego-cloud.eu/eldorado-v1/documentation/presentations/less-prompting-more-shipping/ . Homepage: https://pages.apps.lego-cloud.eu/eldorado-v1/documentation/ .
## Strategy horizon correction — published 2026-10-08, governing direction
User correction1557813737941901572 requires five distinct top-level pages in order: **Target; Roadmap; 6 Months Target; 6 Months Roadmap; Beyond 6 Months**. The original long-term human-controlled autonomous SDLC Target/Roadmap remain substantive standalone pages and diagrams. The assignment's first six months contribute toward that destination; they neither replace it nor promise/authorize autonomy. This supersedes the short-horizon hierarchy and optional-destination framing in historical PR38 entries below. Direction: https://discord.com/channels/1518726359512387766/1555510466904727622/1557813737941901572.
Canonical routes: `/strategy/target-operating-model/`; `/strategy/roadmap/`; `/strategy/six-months-target/`; `/strategy/six-months-roadmap/`; `/strategy/stage-02-autonomous-agent/` (Beyond 6 Months). The old Stage01 URL is a reachable Skills lifecycle reference beneath 6 Months Roadmap, not a competing plan. All six topic references and16metric contracts remain reachable. Roadmap restores skills/practices adoption, Delivery first and later phase order undecided, then separately justified autonomous capabilities. The19-slide presentation retains35+15minutes and now distinguishes both horizons in its wording, links and source hashes.
Independent review task `t_a0cf62b0` approved PR41 head `36967880825ec288cbbe233093f3a77e8ec32bef`, tree `477859cf2b6addcc1a385b313e9dfd6dea8c5ec2`, against refreshed base `432370473d6aaee229b0279551ce7b63da52acb7`. Required CI11104/run7118/attempt1/job13893 passed. Merge `7472b835e8f12377f6056fa57a6aaa46c5569c67` preserves the reviewed tree; publication CI11106/run7120/attempt1/job13895 passed including Pages copy. Public HTTPS readback verified exact revision, all30Strategy article bodies and45diagram/presentation files byte-identical to the independently built candidate, plus homepage deck link.
Reviewer read the original PDF and historical Target/Roadmap, verified all8original diagram JSONs unchanged, ran98tests/typecheck/build/44-doc links/sidebar/search checks and15candidate browser/export suites. Actual desktop/mobile pages, full exports and changed deck slides were visually inspected. All15browser/export suites also passed again against the public HTTPS deployment, including30Strategy routes,57slide views,34reader handoffs and14Organization contexts. Evidence: `/opt/data/kanban/boards/eldorado-storm/workspaces/t_a0cf62b0/repo/.cache/review41/`. Existing dependency audit remains2critical/2high/2moderate with unchanged dependency manifests; no remediation/risk acceptance. Chromium viewport checks are not cross-browser or physical-device certification; WebM remains unsupported/disabled.
The separate homepage embed PR42 subsequently merged at `eea14bf00fd6a92b8a530edbb555c46557ecf268`; its reviewer `t_494145d5` owns embed-specific acceptance. Strategy reviewer verified that all Strategy sources, diagrams, sidebar, slide bodies and source-map generator are unchanged from PR41; latest publication CI11108/run7122/attempt1/job13897 passed. At that deployed revision all30Strategy article bodies and43unchanged diagram/deck files still match the PR41 candidate; the two changed presentation runtime/theme files match fetched PR42 sources. No open PR remained at this readback.
## Homepage inline presentation — published 2026-10-08
Homepage https://pages.apps.lego-cloud.eu/eldorado-v1/documentation/ now has the exact heading **Understand In Speed**, matching the existing section-heading style, directly above a playable inline version of the canonical19-slide presentation. Existing hero/cards are preserved; the old verbose link-only teaser is replaced. Standalone title/route, notes, print and deep links remain available. Narrow phones use portrait composition; slide navigation owns keyboard focus only inside the frame and does not change the parent URL. Fullscreen enter/exit restores focus; an Open presentation escape remains.
Independent task `t_494145d5` integrated published Strategy PR41 into PR42, resolving only the shared presentation-test assertion and preserving both the embed and horizon/source-map assertions. Reviewed head `4e94ad24fd288f881fb5a479c05f26ef7188c9a1`, tree `916185c7f394c1cf5282f606275d44d5520f0ebb`, exact-head CI11107 succeeded. Merge `eea14bf00fd6a92b8a530edbb555c46557ecf268` has the identical reviewed tree; publication CI11108 succeeded. Public HTTPS revision and all12 deck assets match the reviewed build byte-for-byte.
Independent100 tests, typecheck, production build and44-document links/sidebar/search checks passed. Both candidate and public deployment passed76 inline slide views at1440/390/320/844 widths and57 standalone views, plus19-slide text/notes equality and homepage refresh. Real pixels, touch, keyboard/parentURL/scroll isolation, fullscreen controls and focus restoration, Tab exit, light/dark, reduced-motion changes, notes popup, print and deep links were inspected/exercised. Reveal.js reference was inspected live and its control navigation exercised. Evidence: `/opt/data/kanban/boards/eldorado-storm/workspaces/t_494145d5/merge.json`, `publication.json`, and `documentation/.cache/`. Chromium only; native OS Escape, physical devices, Safari/Firefox and full assistive-technology certification remain unverified. Dependency manifests unchanged; preexisting audit findings not remediated or accepted. User direction: https://discord.com/channels/1518726359512387766/1555510466904727622/1557818798969458771.
## Less Prompting, More Shipping — published 2026-10-08
Presentation: https://pages.apps.lego-cloud.eu/eldorado-v1/documentation/presentations/less-prompting-more-shipping/ . Homepage: https://pages.apps.lego-cloud.eu/eldorado-v1/documentation/ . A dedicated additive homepage section opens the genuine locally bundled Reveal.js5.2.1 deck, styled with the portal's Lato/gold/charcoal design. There are19 slides:17 spoken slides totaling35 minutes,15-minute Q&A, and a zero-minute linked reference appendix. Speaker notes carry timings and sources; EXP-01 data are explicitly fictional, not company benefits. All four original PDF questions are covered.
Independent reviewer task `t_f6feed26` approved PR40 after finding and fixing320px toolbar Print clipping. Reviewed head `6b38b128d49df400476d8bfc5c7481cca3fb68a3`, tree `6da9988bc8e3d956fcc4098ec637d22049bfd9ee`; exact-head CI11101 succeeded. Refreshed base remained `a283d6a34a6a81d76f018848966147125d1835d7`. Merge `432370473d6aaee229b0279551ce7b63da52acb7` preserves the reviewed tree; publication CI11102 succeeded. Public HTTPS revision readback matches; all12 presentation files match the candidate byte-for-byte. All35 Strategy/Structure article bodies remain equal to the reviewed candidate, with their source files untouched.
Reviewer independently ran98tests, typecheck, build/link/sidebar checks,57 slide views and full19-slide keyboard traversal; overview/fullscreen/touch/hash refresh/notes/print, reduced-motion changes, focus outline, phone rotation,320px toolbar and homepage return/open paths passed. All19 final desktop slides individually inspected, plus dense mobile and corrected narrow-toolbar pixels. Strategy navigation (28routes at4widths) and Organization (14contexts) passed both locally and live; the complete presentation suite also passed against the public HTTPS site. Evidence: `/opt/data/kanban/boards/eldorado-storm/workspaces/t_f6feed26/evidence/` and repository `.cache/presentation/`. Chromium only—not Safari/Firefox, physical-device or full assistive-technology certification. Existing audit remains2 critical/2 high/2 moderate; no security-risk acceptance or remediation claimed. Notes are public content.
## Organization department navigation — published 2026-10-08
Structure remains the leadership/organization-diagram overview and now has a concise six-link department list. Its linked expandable sidebar category directly contains, in order: Product; Technology; Operations; Marketing; Finance & Accounting; HR & Administration. Child routes are `/organization/structure/{product,technology,operations,marketing,finance-accounting,hr-administration}/`. Collaboration and SDLC remain peers. All previous department bodies are preserved exactly; Product has two teams, Technology five, and each other department one squad with its existing workstreams. Old department anchors remain on the overview list; each child has breadcrumbs, previous/next navigation and a return-to-overview link. Authorization: https://discord.com/channels/1518726359512387766/1555510466904727622/1557803993852280952.
Independent review/publication task `t_147e3895` approved PR39 head `9bacb7043a40ef51d98be5c032e00688c463e490`, tree `5577cd32d6447c8ca4268e4bf7582ae68a58cb4f`, against refreshed main `fcaa84f3bf9058f4ede0a097d16d0e3571590a6b` (including Strategy PR38). Required CI task11098/run7112/attempt1/job13887 succeeded before merge. Merge `a283d6a34a6a81d76f018848966147125d1835d7` preserves the reviewed tree; publication task11099/run7113/attempt1/job13888 passed including the Pages copy step. Strategy and diagram sources were untouched.
Independent checks: 96 tests, typecheck, production build, all42-document link/sidebar checks and six department search routes passed. All six source bodies were directly compared with pre-change main, not only implementer hashes. Fourteen desktop/mobile contexts passed against both the candidate and public HTTPS deployment, covering all seven pages, category nesting/expansion, real sidebar/list/return navigation, breadcrumbs, pagination and overflow. Public readback verified exact revision, all seven article bodies equal to the candidate and byte-identical organization viewer. Lazy-loaded diagram rendering and desktop/mobile pixels were inspected. Dependency manifests are unchanged; preexisting audit findings remain outside this content-only task, and no security remediation is claimed.
Published Structure: https://pages.apps.lego-cloud.eu/eldorado-v1/documentation/organization/structure/.
## Six-month AI Architect assignment — historical PR38 publication, horizon framing superseded
PR38 made the original AI Architect Test Task PDF the main Strategy narrative: one solo architect reporting to the CTO, without formal team authority, across more than ten teams and roughly 80 engineers growing toward 100, all already using AI unevenly. Those assignment facts and the evidence-led plan remain valid. Its framing of the former autonomous Target as only a supporting option, displacing the long-term destination, was rejected by user correction1557813737941901572 and is superseded by the five-page publication above. The six-month plan is now a separate contribution toward the original human-controlled autonomous SDLC Target. Earlier source direction: https://discord.com/channels/1518726359512387766/1555510466904727622/1557786954383368264. Original source: `/opt/data/channels/eldorado-storm-v1/research/AI_Architect_Test_Task.pdf`.
Months 1–6, influence/capacity, balanced measures, realistic month-six evidence and evidence-led later choices are explicit. The presentation outline reserves 35 minutes for content and 15 for Q&A. The first-revision qualification/recovery path and EXP-01's bounded evidence/decision package address the previous professional audit gaps. EXP-01's numbers, thresholds and results are fictional illustrations, not company facts, approved commitments or measured benefit; actual tools, people, capacity and baselines remain to be validated.
Independent task `t_1fdc2d95` approved PR38 head `1a2d16bc9193a2b32436ad2d45756ab37329f0f4`, tree `e0d1b45fd061c0f3a40bd92eb43b282f9a289b19`, against base `88a43757762114a506f57ed4b44484306cae1aaa`. Required exact-head CI task11096/run7110/attempt1/job13885 passed before merge. Merge `fcaa84f3bf9058f4ede0a097d16d0e3571590a6b` preserves the reviewed tree; publication task11097/run7111/attempt1/job13886 passed, including the Pages copy step.
Independent evidence: 94 tests, typecheck, production build and built links/search/sidebar checks passed; all13 candidate browser/export suites passed. All28 Strategy routes and unchanged16 canonical metric contracts were reviewed; 9 calculations remain prototypes and7 metrics unimplemented. Desktop/mobile pixels and complete exports were inspected. Public HTTPS readback verified the exact deployed revision, all28 article bodies matching the candidate and all27 viewer files byte-identical. Five live browser suites passed again: navigation,36 story contexts,28 reader handoffs, Target controls/exports and48 Roadmap contexts. No open PR remained at final readback.
Published entry: https://pages.apps.lego-cloud.eu/eldorado-v1/documentation/strategy/target-operating-model/. Reviewer report and immutable evidence: repository `.cache/review38/review.md`, `merge.json`, `publication.json`, `browser-final.json`, `live-browser.json`, `live-readback.json`. Unchanged dependency audit remains **2 critical, 2 high, 2 moderate**; no security-risk acceptance or remediation is claimed. WebM remains disabled/unsupported in tested Chromium; raster decoding is not exhaustive cross-browser fidelity proof.
## Connected Strategy story — historical publication 2026-10-08
The whole Strategy now follows one illustrative Delivery workflow: understand and baseline current work, engineer connected skills, independently qualify the candidate, authorize a bounded pilot, compare real outcomes, then retain, improve, stop or propose a new scope. Stage01 has a dependency/feedback diagram; its six topics are supporting lifecycle activities, not six artificial approval gates. Governance and Measurement span the work; Quality establishes artifact fitness, safety and revision regression; Maintenance returns changed revisions to qualification. Stage02 remains future, separately authorized autonomy with independent stop/takeover—not an automatic reward for adoption. Target's human-controlled central-agent topology and all canonical routes remain intact. This broader authorized scope supersedes the earlier restriction against changing Roadmap/Stage02. Direction: https://discord.com/channels/1518726359512387766/1555510466904727622/1557733209238806539.
Independent review/publication task `t_2af79253` approved PR37 head `f7a68d7e37bb5cb0c0e020f523857b586471df54`, tree `310ec303776e7486ddecbaddb8bae155d6fea9e1`, against base `c934ddb5e05553d2530a763990dd50b8805e1409`, with no blocking findings. Exact-head CI11094 passed before merge. Main merge `88a43757762114a506f57ed4b44484306cae1aaa` has the identical reviewed tree; publication CI11095/run7109/job13884 attempt1 passed, including the Pages publication step.
Reviewer independently ran 89 tests, typecheck, production build and built link/search/sidebar verification. All13 browser/export suites passed both against the isolated candidate and the deployed service: all28 Strategy routes at4 widths,28 actual reader handoffs,32 topic/stage contexts,32 standalone SVGs,48 Roadmap contexts, metric references, keyboard/fullscreen/theme/preset and supported export controls. All28 desktop/mobile page captures and dedicated in-viewport/complete-export diagram pixels were inspected. Offscreen lazy iframe/full-page captures are not diagram proof; stable in-viewport captures and exports supplied that evidence. All16 metric contract bodies are unchanged; no new company results, baseline values, assigned individuals, approved thresholds or causal benefits are claimed.
Deployed readback verified exact `revision.txt`, all28 article bodies matching the candidate and25 viewer files byte-identical. Public HTTPS also returned the real Stage01 title, new story marker and exact revision, not a sign-in page. Published entry: https://pages.apps.lego-cloud.eu/eldorado-v1/documentation/strategy/stage-01-skills-adoption/. Evidence in repository `.cache/review37/`: `merge.json`, `publication.json`, `public-readback.json`, `review37-browser.json`, `live37-browser.json`, logs and stable pixel captures; complete source coverage is `research/ai-adoption/strategy-coverage.json`. Preexisting dependency audit remains **2 critical, 2 high, 2 moderate**, not green; dependencies were not changed. WebM remains unsupported/disabled in the tested Chromium; supported SVG/PNG/JPEG/WebP exports passed.
## Two-track Measurement clarity — historical publication 2026-10-08
Measurement now visibly separates **Workflow effectiveness** (11 contracts: baseline current work, then compare relevant outcomes after introducing skills) from **Skills effectiveness & health** (5 contracts: qualification, supported use and upkeep when skills exist). Both tracks inform improvement, retention or retirement. Optional selection remains; all 16 canonical contract blocks are byte-identical to the prior publication, with 9 prototype calculations and 7 unimplemented metrics. Absent applicable skill populations are N/A, not false zeros; missing evidence is unknown. Validated task success remains a live matured-workflow metric; predeclared skill/version slices reuse that contract without summing overlaps. Sandbox evaluations remain separate. Observational changes do not establish causal ROI. Baseline, Adoption, Maintenance and the minimal Stage01 summary agree. Authorization: https://discord.com/channels/1518726359512387766/1555510466904727622/1557704861963780158.
Independent task `t_d4830990` reviewed PR36 head `e22d3a5c13e3f82c75c406a3385af92046904026`, tree `8d02db6b69ceb14d4c543bd268084e85fde815f1`, base `386133c8b61d08dc372069e5da0ac0bf4358da0c`; no blocking findings. Exact-head CI11092/run7106 attempt1/job13881 passed before merge. Merged main `c934ddb5e05553d2530a763990dd50b8805e1409` preserves the reviewed tree; publication CI11093/run7107 attempt1/job13882 passed, including the publication step. Final repository inventory had no open PRs.
Reviewer independently ran 85 tests, typecheck, build and built-route/search verification; Measurement at 1440/390/320px, 24 story contexts, 32 metric-page contexts, 108 sidebar contexts and all 28 Strategy routes at four widths passed. Complete desktop/mobile exports and stable fullscreen pixels were inspected. After publication, authorized Osgiliath service readback verified the exact deployed revision, six changed page bodies, all 16 metric contract page bodies and all 12 Stage01 viewer files byte-identical to the reviewed build. Live Measurement controls/exports, all 24 story contexts and all 28 routes at four widths passed again. Evidence: repository `.cache/review36/merge.json`, `publication.json`, `live-metric-contracts.json`, verification logs and `.cache/measurement-live36/`, `.cache/skills-live36/`, `.cache/strategy-navigation-live36/`.
Published page: https://pages.apps.lego-cloud.eu/eldorado-v1/documentation/strategy/measurement/. Browser verification used the authorized operator-side service tunnel, not an anonymous sign-in response; public end-user authentication was not revalidated. SVG/light/dark SVG, PNG, JPEG and WebP exports passed; WebM was unsupported/disabled in the test browser. Existing production dependency audit independently remains **2 critical, 2 high, 2 moderate**; dependency manifests/lockfile are unchanged and security audit is not green. No actual telemetry, company baseline, new thresholds or causal benefit is claimed. Target, Roadmap, Stage02 and unrelated diagrams were not redesigned.
## Measurement registry and workflow Baseline — historical publication 2026-10-07
Current Stage 01 topic order is **Measurement → Baseline → Governance → Quality → Adoption → Maintenance**. This supersedes the topic order and Measurement collection-plan interpretation in earlier historical entries below, not the Target/Roadmap/Stage 02 structure. Approval: https://discord.com/channels/1518726359512387766/1555510466904727622/1557373230434754573.
@@ -47,7 +127,10 @@ After discussion, RootAtSkic authorized implementation with “go oon” (https:
This replaces the old five-stage narrative with three separate native Archify visual levels: overall journey, Delivery-first adoption, and the within-phase loop. Published through PR29, merged main `8a7dbea852cd00d370f0b7d814f675417fbf1075`; exact-head CI11066 and main publication CI11067 passed. Live revision, Roadmap body and all six viewer bytes verified; desktop/mobile themes, fullscreen, scrolling, keyboard and exports checked. This is publication of the strategy—not deployment of autonomous SDLC, agreed dates or approved KPI thresholds. The unchanged dependency audit remains non-green and is outside this diagram change.
## Source anchor
- Latest processed human message: `1557373230434754573` (2026-10-07 12:45 UTC; authorized the discussed Measurement/Baseline updates).
- Latest processed human message: `1557830033090027611` (2026-10-08 19:00 UTC; trailing progress inquiry after presentation-alignment correction).
- Daily sync 2026-10-09 reconciled 20 human messages newer than the previous daily anchor `1557373230434754573` using authenticated live Discord REST. Requests: show lifecycle dependencies/sequence (`1557702762819493980`); distinguish organizational/workflow effectiveness from skills-maintenance metrics (`1557703741778563113`, authorization `1557704861963780158`); improve the entire Strategy as one practical architecture story (`1557733209238806539`) and evaluate it professionally (`1557758209987579978`). Compare against the supplied AI Architect Test Task PDF (`1557767519748759646`, `1557767641924501515`) and remedy gaps (`1557786954383368264`); PDF contents were not independently re-extracted by daily sync.
- Further confirmed directions: department list and individual sidebar-visible Structure children (`1557803993852280952`); a documentation-styled Reveal.js presentation after PDF-driven changes (`1557805716431970304`); preserve separate long-term Target/Roadmap alongside 6 Months Target, 6 Months Roadmap and Beyond (`1557813737941901572`); embed the presentation beneath **Understand In Speed** on the homepage (`1557818798969458771`, `1557818861020123187`); realign the presentation with the full strategy (`1557828118385926256`). Existing channel-workflow implementation, review and publication evidence above is preserved, not independently revalidated by this scan. Routine progress pings do not add decisions.
- Governing horizon direction: `1557813737941901572` (preserve long-term Target/Roadmap, separate six-month contribution; PR41 reviewed/published2026-10-08). Assignment `1557786954383368264` still governs the six-month scope, not replacement of the long-term vision. Earlier Measurement/Baseline authorization `1557373230434754573` remains historical.
- Daily sync 2026-10-08 read four newer human messages through authenticated live Discord REST. Discussion initially explicitly excluded implementation (`1557330803644567578`); Measurement-first was proposed (`1557358862053675132`), then clarified as a registry of candidate KPIs/metrics, not a requirement to use or baseline all metrics, with a separate Baseline phase proposed next (`1557370994006560821`). Final message authorized updates. This reconciles the current channel-workflow entry above; its implementation/CI/publication claims were not independently revalidated by this scan.
- Daily sync 2026-10-07 read 14 newer human messages via authenticated live Discord REST. Reconciled the already-recorded Delivery-first two-stage roadmap, approved Stage 01/02 navigation, wider topic-specific diagram compositions, sidebar completeness and Measurement nesting/URL changes. Later SDLC-phase ordering remains undecided. Implementation/CI/publication records above are inherited channel-workflow evidence, not independently revalidated by this scan.
- Daily sync 2026-10-06 read 31 newer human messages through authenticated live Discord REST. Decisions below are human requirements; this scan does not establish implementation or publication.