wiki: sync 2026-08-11 20:34 UTC — 5 file(s) updated

This commit is contained in:
2026-08-11 20:34:53 +00:00
parent 26c221085d
commit 6c8ffdf1b0
5 changed files with 68 additions and 11 deletions
+3 -1
View File
@@ -9,7 +9,7 @@
| Service | Endpoint | Status |
|---------|----------|--------|
| TrueNAS SCALE | lego-cloud.eu | ✅ |
| Gitea | https://gitea.lego-cloud.eu (org: `home-v1`) | ⚠️ Internal upstream healthy; public ingress degraded 2026-08-02 |
| Gitea | https://gitea.lego-cloud.eu (org: `home-v1`) | ✅ 1.27.1; API, SSH Git, and HTTPS Git verified 2026-08-11 |
| Keycloak | https://keycloak.lego-cloud.eu (realm: `master`) | ⚠️ Public ingress degraded 2026-08-02 |
| Zot Registry | port 30264, OIDC via Keycloak (client: `zot`) | ✅ |
| STT (Whisper) | http://192.168.1.218:39000/v1 (model: `Systran/faster-whisper-base`) | 🔲 |
@@ -27,3 +27,5 @@
- **Gondor v1 node access (verified 2026-08-02):** reusable `gondor-v1-nodes` skill at `/opt/data/skills/cloud-architecture/gondor-v1-nodes/SKILL.md`. Hermes SSH access as `lego` is verified to Osgiliath 000 (`192.168.148.249`), Minas Tirith 010 (`192.168.153.55`), and Minas Tirith 020 (`192.168.6.208`).
- **Ingress incident (open, 2026-08-02):** Argo CD deployed `ingress-nginx` 4.11.3 as a DaemonSet with host ports 80/443 on Osgiliath, conflicting with its existing system Nginx. Kubernetes ingress intercepts legacy public hosts, returning the fake `ingress.local` certificate/default 404; `argo-workflows.apps.lego-cloud.eu` works and Gitea's internal upstream is healthy. Recommended durable repair is in GitOps (`home-v1/gondor-v1.git`, `cluster/0500-resources/0000-ingress-nginx/ingress-nginx/values.yml`): keep system Nginx as Osgiliath's public ingress, schedule Kubernetes ingress on workers, and proxy required app routes. Exact owner, due date, and final approved implementation remain **UNKNOWN**.
- **Hermes multi-day outage (2026-08-04–11):** read-only analysis separated two failures. Codex quota exhaustion is the confirmed cause of failed model responses while Discord/cron still ran. After the final preserved event at 2026-08-04 14:00:42 UTC, gateway, cron, logs, and health activity all ceased until the physical host restart at 2026-08-11 00:11:40 UTC; restart restored service without a Hermes repair. A host/container-runtime availability failure is most likely, but the exact TrueNAS Apps, kernel, ZFS/storage, hardware, watchdog, thermal, or power trigger is **UNKNOWN** because previous-boot host telemetry is unavailable inside the container. Current SQLite integrity and capacity checks are healthy.
- **Gitea Git-transport incident resolved (2026-08-11):** Gitea `1.27.0-rootless` served web/API but crashed its Git-serving process during Go runtime module verification over both SSH and Smart HTTP. Upgrade to `1.27.1` restored API and both Git transports. The queued VSSA commit `6fc42ab` was then pushed and remotely verified.
- **Gitea Pages publication contract (verified 2026-08-11):** Gitea Actions job containers receive `/mnt/lego-cloud-v1-2025-11-28/gondor-v1-gitea-pages` at `/gondor-v1-gitea-pages`; workflows publish to `/gondor-v1-gitea-pages/<organization>/<repository>/`, served at `https://pages.apps.lego-cloud.eu/<organization>/<repository>/`. The runner source path must be listed under `container.valid_volumes`. `skic-v1-playground/documentation` run 2326 and its public site were verified successful/HTTP 200.