wiki: sync 2026-08-28 03:03 UTC — 3 file(s) updated

This commit is contained in:
2026-08-28 03:03:11 +00:00
parent d29d0fccd9
commit 6b5d08327c
3 changed files with 185 additions and 6 deletions
+145 -2
View File
@@ -1,6 +1,6 @@
# vssa-storm
_Last sync: 2026-08-27 00:09 UTC_
_Last sync: 2026-08-27 20:20 UTC_
## CVP IS instructor lesson 3 — organization/client data (2026-08-19)
@@ -43,7 +43,150 @@ _Last sync: 2026-08-27 00:09 UTC_
- Updated the layout regression test to require both `flex-basis` and `max-width` at `20rem`. All `15` tests, full validation, production build and `git diff --check` passed; the build verified `290` client, `520` system and `111` contractor routes, `745` observations and `296` raw artifacts.
- Commit `3fc30f514db8d6ea0b2a69263dd66d4847b60cf2` is on `main`; local/remote ref equality and authenticated exact-SHA CSS readback passed. Exact-head Gitea Actions task `1263` reached `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized page-body readback and browser acceptance were unavailable because this runtime has no service-proxy client and could not launch Chrome.
## Latest scheduled rotation — 2026-08-27 00:09 UTC
## Latest scheduled rotation — 2026-08-28 02:13 UTC
- Followed the task's explicit ordered cursor after `081`–`100` and completed clients `101`–`120`; the already completed extra `001`–`020` rerun did not reset or repeat the ordered sequence.
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests at HTTP `200`. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,429` extracted characters).
- Ran `54` exact CPVA client/system searches at HTTP `200` and `54` contractor-procurement query ladders; `43` external-search responses were readable and `11` were rate-limited at HTTP `429`. CPVA broad-token pages and external-search output remained discovery only.
- Repeated both CVP IS routes with the documented identity variants. Exact-authority basic search retained `47` rows and reviewed `11` broad candidates. Organization-first discovery retained `20` identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed `197` published-notice rows and reviewed `54` broad candidates without forcing near-name identities. Candidate counts and stages remained unchanged; no source established a new system, contractor, signed engagement, delivery, production use, hosting, kickoff, release or completion.
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved; all twenty dossier and matching index dates advanced to `2026-08-28` without status promotion.
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned exact-name/path/date/six-column checks, evidence-URL/PDF checks and `git diff --check` passed. Chrome could not launch, but browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact.
- Documentation commit `1a9e2559870c90d7177b4edcc5705087c2941d5b` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1561`, run `131` (`build`), reached `success`, including the guarded Pages publication step. Public Pages returned the expected OAuth `302`; authorized Kubernetes `pages/pages` service-proxy page-body readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact, including the `2026-08-28` date and current registry counts.
- The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/`.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-28 00:12 UTC
- Followed the durable channel cursor and completed clients `161`–`180`; the already completed extra `001`–`020` rerun did not reset or repeat the ordered sequence.
- Reopened all `57` distinct current dossier evidence URLs with browser-equivalent requests at HTTP `200`. Re-downloaded, verified and text-extracted all `9` cited PDFs (`48` pages; `92,077` extracted characters).
- Ran `55` exact CPVA client/system searches and `35` client/system contractor-procurement query ladders at HTTP `200`; CPVA broad-token pages and search-provider output remained discovery only.
- Repeated both CVP IS routes. Exact-authority basic search retained `161` rows and reviewed `37` broad candidates. Organization-first discovery retained `18` identity-checked profiles, preserved both unresolved profiles for client `180`, parsed `162` published-notice rows and reviewed `42` broad candidates without forcing near-name identities. The expanded parser resurfaced known non-system vehicle, building-work, equipment, transport-ticket, digital-content and laboratory rows; none established a new information system, contractor, signed supplier engagement, delivery, production use, hosting, kickoff, release or completion.
- This was a genuine conservative no-new-claim review. Existing statuses, `35` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved; all twenty dossier and matching index dates advanced to `2026-08-28` without status promotion.
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned exact-name/path/date/six-column checks, evidence-URL/PDF checks and `git diff --check` passed. Chrome could not launch, but browser-equivalent local HTTP readback verified clients `161`, `170` and `180`, the Systems and Contractors directories, and client `170`'s raw artifact.
- Documentation commit `3f83b94a510715632c79963424bc86c7f1a324af` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1560`, run `130` (`build`), reached `success`, including Pages publication. Authorized Kubernetes `pages/pages` service-proxy page-body readback verified client `170`, the Systems and Contractors directories, and the raw client artifact, including the `2026-08-28` date and current registry counts.
- The latest `100` live Discord messages were read through `1542659725693558876` (`2026-08-27T22:18:59.837000+00:00`); all were bot-authored, with no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated worktree preserved unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/`.
- Next ordered dossier rotation: `181`–`200`.
### Previous scheduled rotation — 2026-08-27 22:15 UTC
- Repository history showed that the requested `101`–`120` range had already been delivered at `5493969b63e1aa8d284136916d48d04d475aa352` and the next ordered `121`–`140` range at `ee7f4d915f048d0797c9b53756df9b1d53aa4e05`; to avoid repeating completed work, continued the ordered cursor with clients `141`–`160`.
- Reopened all `59` distinct current dossier evidence URLs with browser-equivalent requests at HTTP `200`. Re-downloaded and text-extracted all `17` cited PDFs (`110` pages; `219,102` extracted characters).
- Ran `65` exact CPVA client/system searches and `69` client/system contractor-procurement query ladders through Bing at HTTP `200`. CPVA broad-token pages and search-provider output remained discovery only.
- Repeated both CVP IS routes. Exact-authority basic search parsed all pages and retained `342` rows, including `166` broad candidates. Organization-first discovery retained `19` identity-checked profiles, forced no near-name profile for client `155`, parsed `330` notice rows and reviewed `147` broad candidates. The candidate set reconfirmed current award/tender semantics; the newly posted client `147` special-purpose vehicle/equipment tender did not establish a new information system, supplier engagement, delivery, production use, hosting, kickoff, release or completion.
- This was a genuine conservative no-new-claim review. Existing statuses, `69` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved; all twenty dossier and matching index dates advanced to `2026-08-27` without status promotion.
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, assigned exact-name/path/date/six-column checks, evidence-URL/PDF checks and `git diff --check` passed. Chrome could not launch, but browser-equivalent local HTTP readback verified clients `141`, `150` and `160`, client `150`'s two linked canonical system pages, the Systems and Contractors directories, and the raw client artifact.
- Documentation commit `a349b049d70ca37f5e0ed46e094139bab8443b3b` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1559`, run `129` (`build`), reached `success`, including Pages publication. Public Pages reached the expected OAuth boundary; authorized Kubernetes `pages/pages` service-proxy page-body readback verified client `150`, both linked canonical system pages, the Systems and Contractors directories, and the raw client artifact, including the `2026-08-27` date, References, explicit unidentified values and current registry counts.
- The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated review worktree preserved unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/`.
- Next ordered dossier rotation: `161`–`180`.
### Previous scheduled rotation — 2026-08-27 20:20 UTC
- Followed the task's explicit ordered cursor after `081`–`100` and completed a fresh review of clients `101`–`120`; the extra `001`–`020` rerun did not reset or repeat the ordered sequence.
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP `200` bodies. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,387` extracted characters).
- Ran `54` deduplicated exact CPVA client/system searches and `54` system-contractor/procurement query ladders. Google completed `44` ladder requests and rate-limited `10`; all ten were retried through Bing at HTTP `200`, and their off-topic results established no claim. CPVA broad-token navigation matches and search-provider output remained discovery only.
- Repeated both CVP IS routes with the documented legal-form/typography variants. Organization-first discovery retained `20` identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed all `197` published-notice rows and reviewed `54` broad candidates. Exact-authority basic search retained `47` rows and `11` broad candidates. Both candidate sets remained unchanged. The `13` cited resources exposed `36` public procurement-detail bodies plus three legacy login redirects; no claim depends on an inaccessible body. The cited PDFs reconfirmed their bounded tender and award-stage semantics.
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already `2026-08-27`, so no documentation source changed and no empty commit was created.
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks and `git diff --check` passed. Chrome could not launch, but browser-equivalent local HTTP readback verified client `110`, its linked VASIS system page, the Systems and Contractors directories, and the raw client artifact.
- Documentation `main` remains exactly equal to remote commit `ee7f4d915f048d0797c9b53756df9b1d53aa4e05`; authenticated exact-SHA source readback verified client `110`. Exact-head Gitea Actions task `1427`, run `128` (`build`), remains `success`, including Pages publication. Public Pages reached the expected OAuth boundary; authorized Kubernetes `pages/pages` service-proxy readback verified client `110`, its linked VASIS system page, the Systems directory and the Contractors directory, including the `2026-08-27` date, References and explicit unidentified values.
- The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/` were not touched.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-27 18:05 UTC
- Followed the task's explicit ordered cursor after `081`–`100` and completed a fresh review of clients `101`–`120`; the extra `001`–`020` rerun did not reset or repeat the ordered sequence.
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP `200` bodies. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,429` extracted characters); the cited procurement attachment also remained available.
- Ran `54` deduplicated exact CPVA client/system searches and `54` system-contractor/procurement query ladders. Google completed `44` ladder requests and rate-limited `10`; all ten were retried through Bing at HTTP `200`, and their off-topic results established no claim. CPVA broad-token navigation matches and search-provider output remained discovery only.
- Repeated both CVP IS routes with the documented legal-form/typography variants. Organization-first discovery retained `20` identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed all `197` published-notice rows and reviewed `54` broad candidates. Exact-authority basic search retained `47` rows and `11` broad candidates. Both candidate sets are unchanged from the preceding saved pass. The `13` cited resources exposed `36` public procurement-detail bodies plus three legacy login redirects; no claim depends on an inaccessible body. The cited PDFs reconfirmed six tender and eight award-stage documents.
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already `2026-08-27`, so no documentation source changed and no empty commit was created.
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, Corepack-managed `pnpm validate`, TypeScript, production build, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified client `110`, its linked VASIS system page, the Systems and Contractors directories, and the raw client artifact.
- Documentation `main` remains exactly equal to remote commit `ee7f4d915f048d0797c9b53756df9b1d53aa4e05`; authenticated exact-SHA source readback verified client `110`. Exact-head Gitea Actions task `1427` remains `success`, including Pages publication. Public Pages returned the expected OAuth `302`; authorized Kubernetes service-proxy readback verified client `110`, its linked VASIS system page, the Systems directory and the Contractors directory, including the `2026-08-27` date, canonical/source links, References and explicit unidentified values.
- The latest `100` live Discord messages were read through `1542567110364893326` (`2026-08-27T16:10:58.622000+00:00`); all were bot-authored, with no newer instructor guidance beyond CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/` were not touched.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-27 16:09 UTC
- Followed the task's explicit ordered cursor after `081`–`100` and completed a fresh review of clients `101`–`120`; the extra `001`–`020` rerun did not reset or repeat the ordered sequence.
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests. `72` returned inspected HTTP `200` bodies in the concurrent pass; the Socialinės pagalbos žemėlapis transiently returned Cloudflare `520` and succeeded twice at HTTP `200` on the required browser-equivalent retry. The Microsoft Bookings endpoint retained its documented automation-specific `417`. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,429` extracted characters); the fifteenth procurement attachment remained a valid ZIP body.
- Ran `56` deduplicated exact CPVA client/system searches and `64` system-contractor/procurement query ladders. CPVA broad-token navigation matches and external-search output remained discovery only.
- Repeated both CVP IS routes, including the documented legal-form/typography variants. Exact organization-first searches retained `14` single identity-checked profiles, forced no near-name profile for the other six clients, parsed all `85` published-notice rows and reviewed `10` broad candidates. The bounded variant pass retained `20` identity-checked profiles, preserved both unresolved Vilniaus teatras „Lėlė“ profiles, parsed `197` notice rows and reviewed `53` broad candidates. Exact-authority basic search retained `55` rows and `7` broad candidates; the bounded all-page pass retained `63` rows and `11` candidates. These sets are unchanged from the previous saved pass. All `39` current dossier procurement-detail route requests returned HTTP `200`; the cited bodies reconfirm six tender and eight award stages.
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already `2026-08-27`, so no documentation source changed and no empty commit was created.
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, `corepack pnpm validate`, TypeScript, `corepack pnpm build`, registry/generated-route/raw-artifact checks, assigned name/path/date/six-column checks, evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, client `110`'s linked VASIS system page and raw artifact. Chrome could not be launched.
- Documentation `main` remains exactly equal to remote commit `ee7f4d915f048d0797c9b53756df9b1d53aa4e05`; authenticated exact-SHA source readback verified client `110`. Exact-head Gitea Actions task `1427` remains `success`, including Pages publication. Public Pages returned the expected OAuth `302`; authorized Kubernetes service-proxy readback verified client `110`, its linked VDI virtual-assistant system page, the Systems directory and the Contractors directory, including the `2026-08-27` date, canonical link, source-client backlink, directly evidenced `2024-03-18` production release and explicit unidentified lifecycle values.
- The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/` were not touched.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-27 14:05 UTC
- Followed the task's explicit ordered cursor after `081`–`100` and completed a fresh review of clients `101`–`120`; the extra `001`–`020` rerun did not reset or repeat the ordered sequence.
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests: `73` returned inspected HTTP `200` bodies, while the Microsoft Bookings endpoint retained its documented automation-specific `417`. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,429` extracted characters); the fifteenth procurement attachment remained a valid ZIP body.
- Ran `56` deduplicated exact CPVA client/system searches and `64` system-contractor/procurement query ladders. CPVA broad-token navigation matches and external-search output remained discovery only.
- Repeated both CVP IS routes. Exact organization-first searches retained `14` single identity-checked profiles, forced no near-name profile for the other six clients, parsed all `85` published-notice rows and reviewed `10` broad IT/communications candidates. Exact-authority basic search retained `55` rows and reviewed `7` broad candidates. Opened all three procurement-detail routes and extracted the current tender bodies for the principal broad candidates; the JRA short/800-number notice remained tender-stage communications scope and established no selected supplier or signed contract.
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already `2026-08-27`, so no documentation source changed and no empty commit was created.
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, `corepack pnpm validate`, TypeScript, `corepack pnpm build`, registry/generated-route/raw-artifact checks, assigned name/path/date/six-column checks, evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact; the Chrome harness was unavailable.
- Documentation `main` remains exactly equal to remote commit `ee7f4d915f048d0797c9b53756df9b1d53aa4e05`; authenticated exact-SHA source readback verified client `110`. Exact-head Gitea Actions task `1427` remains `success`, including Pages publication. Public Pages returned the expected OAuth `302`; authorized Kubernetes service-proxy readback verified client `110` and its linked VDI virtual-assistant system page, including the `2026-08-27` client date, canonical link, source-client backlink and explicit unidentified lifecycle values.
- The synchronized channel record contains no instructor guidance newer than CVP IS lesson 3, and this review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/` were not touched.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-27 12:05 UTC
- Followed the task's explicit ordered cursor after `081`–`100` and completed a fresh review of clients `101`–`120`; the extra `001`–`020` rerun did not reset or repeat the ordered sequence.
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests: `73` returned inspected HTTP `200` bodies, while the Microsoft Bookings endpoint retained its documented automation-specific `417`. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,429` extracted characters).
- Ran `56` deduplicated exact CPVA client/system searches and `64` system-contractor/procurement query ladders. CPVA broad-token navigation matches and search-provider output remained discovery only.
- Repeated both CVP IS routes. Exact organization-first searches retained `14` single identity-checked profiles, forced no near-name profile for the other six clients, parsed all `85` published-notice rows and reviewed `10` broad IT/communications candidates. Exact-authority basic search retained `55` rows and reviewed `7` broad candidates. The sets remained unchanged: Jaunimo reikalų agentūra contact-centre/telephony notices and false-positive programme or civil-works rows did not establish an additional system, supplier, signed contract, delivery, hosting, production use, kickoff, release or completion.
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already `2026-08-27`, so no documentation source changed and no empty commit was created.
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, `corepack pnpm validate`, TypeScript, `corepack pnpm build`, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact.
- Documentation `main` remains exactly equal to remote commit `ee7f4d915f048d0797c9b53756df9b1d53aa4e05`; authenticated exact-SHA source readback verified client `110`. Exact-head Gitea Actions task `1427` remains `success`, including Pages publication. Public Pages returned the expected OAuth `302`; authorized Kubernetes Pages service-proxy readback verified client `110` and its linked VDI virtual-assistant system page, including the `2026-08-27` client date, explicit unidentified kickoff and evidenced `2024-03-18` production release.
- The latest `100` live Discord messages were read through `1542476637419999274` (`2026-08-27T10:11:28.191000+00:00`) and contain no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/` were not touched.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-27 10:08 UTC
- Followed the task's explicit ordered cursor after `081`–`100` and completed a fresh review of clients `101`–`120`; the extra `001`–`020` rerun did not reset or repeat the ordered sequence.
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests: `73` returned inspected HTTP `200` bodies, while the Microsoft Bookings endpoint retained its documented automation-specific `417`. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,429` extracted characters).
- Ran `56` deduplicated exact CPVA client/system searches and `64` system-contractor/procurement query ladders. CPVA broad-token navigation matches and search-provider output remained discovery only.
- Repeated both CVP IS routes. Exact organization-first searches retained `14` single identity-checked profiles, forced no near-name profile for the other six clients, parsed all `85` published-notice rows and reviewed `10` broad IT/communications candidates. Exact-authority basic search retained `55` rows and reviewed `7` broad candidates. The sets remained unchanged: Jaunimo reikalų agentūra contact-centre/telephony notices and false-positive programme or civil-works rows did not establish an additional system, supplier, signed contract, delivery, hosting, production use, kickoff, release or completion.
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already `2026-08-27`, so no documentation source changed and no empty commit was created.
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Validator statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, `corepack pnpm validate`, TypeScript, `corepack pnpm build`, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact. The browser harness could not launch Chrome.
- Documentation `main` remains exactly equal to remote commit `ee7f4d915f048d0797c9b53756df9b1d53aa4e05`; authenticated exact-SHA source readback verified client `110`. Exact-head Gitea Actions task `1427` remains `success`, including Pages publication. Authorized Kubernetes Pages service-proxy readback verified client `110` and its linked VDI virtual-assistant system page, including the `2026-08-27` client date, explicit unidentified system kickoff and directly evidenced `2024-03-18` production release.
- The latest `100` live Discord messages were read through `1542448315751342083` (`2026-08-27T08:18:55.779000+00:00`) and contain no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/` were not touched.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-27 08:17 UTC
- Followed the task's explicit ordered cursor after `081`–`100` and completed another fresh review of clients `101`–`120`; the extra `001`–`020` rerun did not reset or repeat the ordered sequence.
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests: `73` returned inspected HTTP `200` bodies, while the Microsoft Bookings endpoint retained its documented automation-specific `417`. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,387` extracted characters).
- Ran `56` deduplicated exact CPVA client/system searches and `64` system-contractor/procurement query ladders. CPVA broad-token matches and Bing result pages remained discovery only.
- Repeated both CVP IS routes. Exact organization-first searches retained `14` single identity-checked profiles and forced no near-name profile for the other six clients. Exact-authority basic search retained `45` byte-exact rows; seven broad IT/communications candidates were all the already reviewed Jaunimo reikalų agentūra contact-centre/telephony or false-positive programme rows. No procurement table row was treated as body-level evidence.
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already `2026-08-27`, so no documentation source changed and no empty commit was created.
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, `corepack pnpm validate`, TypeScript, `corepack pnpm build`, registry/generated-route/raw-artifact checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact.
- Documentation `main` remains exactly equal to remote commit `ee7f4d915f048d0797c9b53756df9b1d53aa4e05`; authenticated exact-SHA source readback verified client `110`. Exact-head Gitea Actions task `1427` remains `success`, including Pages publication. Public Pages DNS was unavailable from this runtime, while authorized Kubernetes Pages service-proxy readback verified client `110` and its linked VDI virtual-assistant system page, including the `2026-08-27` client date, explicit unknown system kickoff and directly evidenced `2024-03-18` production release.
- The latest `100` live Discord messages were read through `1542415999553241099` (`2026-08-27T06:10:30.997000+00:00`) and contain no instructor guidance newer than CVP IS lesson 3. This review established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/` were not touched.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-27 06:09 UTC
- Followed the task's explicit ordered cursor after `081`–`100` and completed a fresh review of clients `101`–`120`; the extra `001`–`020` rerun did not reset or repeat the ordered sequence.
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests: `73` returned inspected HTTP `200` bodies, while the Microsoft Bookings endpoint retained its documented automation-specific `417`. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,429` extracted characters).
- Ran `56` exact CPVA client/system searches and `64` system-contractor/procurement query ladders. Broad-token CPVA navigation and noisy external-search output remained discovery only.
- Repeated both CVP IS routes. Exact organization-first searches retained `14` single identity-checked profiles, forced no near-name profile for the other six clients, parsed `85` current published-notice rows and reviewed `10` broad IT/digital candidates. Basic search retained `55` exact-authority rows and reviewed `7` broad candidates. Candidate sets were unchanged from the preceding completed review.
- This was a genuine conservative no-new-claim review. Existing statuses, `64` system/service observations, labels, contractor relationships, confidence, aliases, gaps and explicit lifecycle/hosting unknowns were preserved. All dossier and matching index dates were already `2026-08-27`, so no documentation source changed and no empty commit was created.
- Registry state remains `290` clients, `530` canonical systems, `755` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `217` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`.
- All `16` tests, `corepack pnpm validate`, TypeScript, `corepack pnpm build`, registry/generated-route/raw-artifact checks, evidence-URL/PDF checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, the VDI virtual-assistant system page, the UAB „Novian PRO“ contractor page and client `110`'s raw artifact. Chrome could not be launched.
- Documentation `main` remains exactly equal to remote commit `ee7f4d915f048d0797c9b53756df9b1d53aa4e05`; authenticated exact-SHA source readback verified client `110`. Exact-head Gitea Actions task `1427` remains `success`, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized Kubernetes Pages service-proxy readback verified client `110` and its linked VDI virtual-assistant system page, including the `2026-08-27` client check date, explicit unknown infrastructure/kickoff fields and the directly evidenced `2024-03-18` production release.
- The latest `100` live Discord messages were read through `1542357428635697186` (`2026-08-27T02:17:46.602000+00:00`) and contain no instructor guidance newer than CVP IS lesson 3. This run established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. The isolated review worktree stayed clean and unrelated dirty primary-worktree clients `181`–`200`, `data/system-analysis.json`, `.hermes/`, `.pptx_improve_run/` and `pptx_improvement_run_20260814/` were not touched.
- Next ordered dossier rotation: `121`–`140`.
### Previous scheduled rotation — 2026-08-27 00:09 UTC
- Followed the task's explicit ordered cursor after `081`–`100` and completed clients `101`–`120`; the extra `001`–`020` rerun did not reset or repeat the ordered sequence.
- Reopened all `74` distinct current dossier evidence URLs with browser-equivalent requests and inspected `73` HTTP `200` bodies. The Microsoft Bookings endpoint returned its documented automation-specific `417`; the opened institution page remains the relationship evidence. Re-downloaded, verified and text-extracted all `14` cited PDFs (`56` pages; `92,373` extracted characters).