diff --git a/channels/1532415849762127902.md b/channels/1532415849762127902.md index 291fed8..8bce89e 100644 --- a/channels/1532415849762127902.md +++ b/channels/1532415849762127902.md @@ -1,6 +1,6 @@ # vssa-storm -_Last sync: 2026-08-23 12:13 UTC_ +_Last sync: 2026-08-25 02:17 UTC_ ## CVP IS instructor lesson 3 — organization/client data (2026-08-19) @@ -43,7 +43,109 @@ _Last sync: 2026-08-23 12:13 UTC_ - Updated the layout regression test to require both `flex-basis` and `max-width` at `20rem`. All `15` tests, full validation, production build and `git diff --check` passed; the build verified `290` client, `520` system and `111` contractor routes, `745` observations and `296` raw artifacts. - Commit `3fc30f514db8d6ea0b2a69263dd66d4847b60cf2` is on `main`; local/remote ref equality and authenticated exact-SHA CSS readback passed. Exact-head Gitea Actions task `1263` reached `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized page-body readback and browser acceptance were unavailable because this runtime has no service-proxy client and could not launch Chrome. -## Latest scheduled rotation — 2026-08-23 12:13 UTC +## Latest scheduled rotation — 2026-08-25 02:17 UTC + +- Followed the durable ordered cursor and completed clients `121`–`140`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the sequence. +- Reopened all `89` distinct current dossier URLs with browser-equivalent requests and inspected HTTP `200` bodies. Ran `89` exact CPVA client/system searches and `89` client/system contractor-procurement query ladders; broad CPVA and search-endpoint results remained discovery only. +- Repeated both CVP IS routes. Basic search retained `98` exact-authority rows and reviewed seven broad IT/digital candidates. Organization-first discovery retained `20` identity-checked current, successor or typography-variant profiles across all twenty clients, parsed `579` published-notice rows and reviewed `51` broad candidates without forcing near-name identities. +- Re-downloaded and text-extracted all `16` cited CVP IS PDFs (`65` pages; `108,908` extracted characters), reconfirming fifteen tender notices and one award notice. All `48` public procurement detail-route bodies returned HTTP `200`; no dossier claim depends on an inaccessible body. +- This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to `2026-08-25` without status promotion. +- Registry state remains `290` clients, `527` canonical systems, `752` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `216` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`. +- All `16` tests, `corepack pnpm validate`, `corepack pnpm build`, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date/name/path and evidence-URL checks, and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `121`, `130` and `140`, the Systems and Contractors directories, and client `130`'s raw artifact. +- Documentation commit `b1c633be0466e6445fad34da5e3c17e702768535` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1364`, run `117` (`build`), reached `success`, including Pages publication. +- The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. +- Next ordered dossier rotation: `141`–`160`. + +### Previous scheduled rotation — 2026-08-25 00:11 UTC + +- Followed the user-designated durable ordered cursor and completed clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the sequence. +- Reopened all `74` distinct current dossier URLs with browser-equivalent requests and inspected HTTP `200` bodies. Ran `54` exact CPVA client/system searches and `54` client/system contractor-procurement query ladders; an independent Bing fallback completed `52` additional ladder formulations, and all broad/noisy results remained discovery only. +- Repeated both CVP IS routes. Basic search retained `47` exact-authority rows and reviewed `11` broad candidates. Organization-first discovery retained `20` identity-checked current/typography/successor profiles across `19` clients, preserved both Vilniaus teatras „Lėlė“ profiles, forced no near-name record for client `117`, parsed all `197` published-notice rows and reviewed `54` broad candidates. +- Re-downloaded and text-extracted all `14` cited CVP IS PDFs, reconfirming six tender notices and eight award notices. The `13` cited resources exposed `36` public detail-route bodies and three login redirects; no claim depends on an inaccessible body. +- This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to `2026-08-25` without status promotion. +- Registry state remains `290` clients, `527` canonical systems, `752` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `216` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`. +- All `16` tests, `corepack pnpm validate`, `corepack pnpm build`, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date/name/path and evidence-URL checks, and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `101`, `110` and `120`, the Systems and Contractors directories, and client `110`'s raw artifact. +- Documentation commit `597d58dab64c6f75692e26636d81340209d3bbce` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1363`, run `116` (`build`), reached `success`, including Pages publication. Public Pages returned the expected Keycloak/OAuth `302`; authorized deployed page-body readback remains unavailable because this runtime has no `/gondor-v1-gitea-pages` mount, `microk8s`, `kubectl` or `k3s` service-proxy client. +- The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. +- Next ordered dossier rotation: `121`–`140`. + +### Previous scheduled rotation — 2026-08-24 22:14 UTC + +- Followed the latest durable wiki cursor and completed clients `181`–`200`; the already completed extra `001`–`020` rerun did not reset the ordered sequence. +- Reopened all `66` distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP `200` bodies. Ran `52` exact CPVA client/system searches and `52` client/system contractor-procurement query ladders; broad CPVA and search-engine results remained discovery only. +- Repeated both CVP IS routes. Basic search retained `545` exact-authority rows and reviewed `106` broad IT/digital candidates. Organization-first discovery retained `15` identity-checked current/successor profiles, parsed all `924` published-notice rows and reviewed `188` broad candidates without forcing near-name identities. +- One defensible evidence update is published for client `190`. Opened official award-notice bodies now bound UAB „Asseco Lietuva“ to maintenance and development of named constituent national education registries (Mokinių, Pedagogų and Licencijų) under separate 2025–2026 contracts without extending that role to all nine registries. A separate opened award establishes Starkodas as the Švietimo portalo informacinė sistema programming-services supplier under contract No. `33539`, signed `2025-09-22` for EUR `170,368`; procurement is recorded without inferring operation, hosting, original development, go-live or release. The other nineteen clients produced conservative no-new-claim outcomes. All twenty dossier and matching index dates advanced to `2026-08-24` without status promotion. +- Registry state is `290` clients, `527` canonical systems, `752` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `216` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`. +- All `16` tests, `corepack pnpm validate`, `corepack pnpm build`, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date and evidence-URL checks, and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `181`, `190` and `200`, the Systems and Contractors directories, and client `190`'s raw artifact; Chrome could not be launched in this runtime. +- Documentation commit `2563f54a9c8961d1f1d533d4a861aaeb4b3118c2` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1362`, run `115` (`build`), reached `success`, including Pages publication. Public Pages resolved to the expected Keycloak/OAuth `302`; authorized deployed page-body readback remains unavailable because this runtime has no `/gondor-v1-gitea-pages` mount, `microk8s`, `kubectl` or `k3s` service-proxy client. +- The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. +- Next ordered dossier rotation: `201`–`220`. + +### Previous scheduled rotation — 2026-08-24 20:09 UTC + +- Followed the latest durable wiki cursor and completed clients `161`–`180`; the already completed extra `001`–`020` rerun did not reset the ordered sequence. +- Reopened all `64` current dossier evidence occurrences (`57` distinct URLs) with browser-equivalent requests and inspected the returned bodies. The retired SMIS deep page redirected to an unreachable external host, so client `175` now cites the opened HTTP `200` parent resource catalogue that explicitly lists SMIS. Ran `55` exact CPVA client/system searches and `70` system-contractor/procurement query ladders; broad token matches and search-engine output remained discovery only. +- Repeated both CVP IS routes. Basic search retained `93` exact-authority rows and reviewed `21` broad IT/digital candidates. Organization-first discovery retained `18` identity-checked current/typography profiles for `17` clients, preserved both unresolved duplicate profiles for client `180`, parsed all `188` published-notice rows and reviewed `33` broad candidates without forcing near-name identities. No candidate established a new defensible claim. +- Re-downloaded and text-extracted all `8` cited CVP IS PDFs (`43` pages; `78,783` extracted characters), reconfirming four award notices and four tender notices, including the bounded winner, contract, tender-only and subcontracting semantics already recorded for clients `161`, `162` and `179`. +- This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, system labels, contractor relationships, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to `2026-08-24` without status promotion. +- Registry state remains `290` clients, `526` canonical systems, `751` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `214` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`. +- All `16` tests, `corepack pnpm validate`, `corepack pnpm build`, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date and all-evidence-URL checks, and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `161`, `175` and `180`, the Systems and Contractors directories, and client `175`'s raw artifact; Chrome could not be launched in this runtime. +- Documentation commit `d4c84abce661cdf7a4fc5cf879754e613c607c62` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1361`, run `114` (`build`), reached `success`, including Pages publication. Public Pages resolved to the expected Keycloak/OAuth login boundary; authorized deployed page-body readback remains unavailable because this runtime has no `/gondor-v1-gitea-pages` mount, `microk8s`, `kubectl` or `k3s` service-proxy client. +- The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. +- Next ordered dossier rotation: `181`–`200`. + +### Previous scheduled rotation — 2026-08-24 18:12 UTC + +- Followed the latest durable wiki cursor and completed clients `141`–`160`; the already completed extra `001`–`020` rerun did not reset the ordered sequence. +- Reopened all `77` current dossier evidence occurrences (`59` distinct URLs) with browser-equivalent requests and inspected HTTP `200` bodies. Ran `65` exact CPVA client/system searches and `65` client/system contractor-procurement query ladders; broad CPVA token matches and search-engine output remained discovery only. +- Repeated CVP IS organization-first discovery using the live entry form, lowercase fields and session-preserving POST. It retained `15` byte-exact identity profiles, forced no near-name records for the other five clients, parsed all `185` published-notice rows and reviewed `71` broad IT/digital candidates. No notice newer than the already reviewed dossier evidence established a defensible claim. +- This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to `2026-08-24` without status promotion. +- Registry state remains `290` clients, `526` canonical systems, `751` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `214` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`. +- All `16` tests, `corepack pnpm validate`, `corepack pnpm build`, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `141`, `150` and `160`, the Systems and Contractors directories, and client `141`'s raw artifact; Chrome could not be launched in this runtime. +- Documentation commit `fae340b2b1ee395273c085cd8b0310afd50ea899` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1360`, run `113` (`build`), reached `success`, including Pages publication. Public Pages resolved to the expected Keycloak/OAuth login boundary; authorized deployed page-body readback remains unavailable because this runtime has no `/gondor-v1-gitea-pages` mount, `microk8s`, `kubectl` or `k3s` service-proxy client. +- The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. +- Next ordered dossier rotation: `161`–`180`. + +### Previous scheduled rotation — 2026-08-24 16:12 UTC + +- Followed the durable wiki cursor and completed clients `121`–`140`; the already completed extra `001`–`020` rerun did not reset the sequence. +- Reopened all `70` distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP `200` content. Ran `41` exact CPVA client/system searches and `41` contractor/procurement query ladders; broad CPVA token matches and search-engine output remained discovery only. +- Repeated both CVP IS discovery routes. Basic search retained `224` exact-authority rows and `34` broad candidates. Organization-first discovery reviewed `20` identity-checked current/successor/typography profiles, including the established variants for clients `130`, `134` and `136`, and parsed all `508` published-notice rows with `72` broad candidates without forcing near-name identities. The three additional broad matches were non-IT false positives caused by generic words in food-ration and expert-evaluation titles and were excluded. +- Re-downloaded and text-extracted all `16` cited CVP IS PDFs (`65` pages; `108,908` extracted characters), confirming `15` tender notices and one award notice. All `48` order, notice-list and procurement-document detail routes returned inspected HTTP `200` bodies without login redirection. +- This was a genuine conservative no-new-claim review. No defensible additional system, contractor, signed supplier engagement, delivery, production use, hosting, original kickoff, production release or completion claim was found. Existing statuses, rows, confidence, aliases, gaps and explicit unknowns were preserved; all twenty dossier and matching index dates advanced to `2026-08-24` without status promotion. +- Registry state remains `290` clients, `526` canonical systems, `751` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `214` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`. +- All `16` tests, `corepack pnpm validate`, `corepack pnpm build`, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified clients `121`, `130` and `140`, the Systems and Contractors directories, and client `130`'s raw artifact; Chrome could not be launched in this runtime. +- Documentation commit `6ce3258fd12b822efcc86e5c3bd3dc8dce7ecd05` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1359`, run `112` (`build`), reached `success`, including Pages publication. Public Pages returned the expected OAuth `302`; authorized deployed page-body readback remains unavailable because this runtime has no `/gondor-v1-gitea-pages` mount, `microk8s`, `kubectl` or `k3s` service-proxy client. +- The synchronized channel record contained no instructor guidance newer than CVP IS lesson 3, and this run established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. +- Next ordered dossier rotation: `141`–`160`. + +### Previous scheduled rotation — 2026-08-24 14:05 UTC + +- Followed the user-designated durable ordered cursor and completed clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the sequence. +- Reopened all `72` distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP `200` content. Ran `52` exact CPVA client/system searches and `52` contractor/procurement query ladders; broad CPVA token matches and search-engine output remained discovery only. +- Repeated both CVP IS discovery routes. Basic search retained `51` exact-authority rows and five broad candidates. Organization-first discovery reviewed `17` strict identity-matched current/variant profiles across `16` clients, preserved both Vilniaus teatras „Lėlė“ profiles, excluded the near-name collision for client `117`, and parsed all `124` published-notice rows with `23` broad candidates. Clients without a strict portal profile match were not forced to near-name records. +- Re-downloaded and text-extracted all `13` cited CVP IS PDFs (`52` pages; `86,409` extracted characters), confirming five tender notices and eight award notices. The `12` cited resources exposed `33` public detail-route bodies and three login redirects; no claim was based on an inaccessible body. +- Two defensible evidence updates are now published. Client `112` records only the intended procurement established by the `2026-07-20` Klaipėda regional career-centre interactive-premises tender; no supplier, signed contract, delivery, production use, hosting or release was inferred. Client `110` now records VDI virtual assistant „Vaidas“: the opened official tender and procurement package directly establish operation since `2024-03-18` on the Tilde chatbot platform, planned 24-month maintenance/modification procurement, and UAB Tilde informacinės technologijos' bounded Lithuanian implementation/maintenance/support-provider role; the 2026 tender does not establish an award or signed contract, and its future cloud requirement was not misreported as current production hosting. +- Registry state is `290` clients, `526` canonical systems, `751` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `214` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`. +- All `16` tests, `corepack pnpm validate`, `corepack pnpm build`, TypeScript, registry/generated-route/raw-artifact checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified client `110`, the Vaidas canonical system page, the Systems directory and client `110`'s raw artifact. +- Documentation commit `1278695d78cab2f8026ba7d8b178a414f93d41de` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1352`, run `111` (`build`), reached `success`, including Pages publication. Public Pages reached the expected Keycloak/OAuth boundary; authorized deployed page-body readback remains unavailable because this runtime has no `/gondor-v1-gitea-pages` mount, `microk8s`, `kubectl` or `k3s` service-proxy client. +- No instructor guidance newer than CVP IS lesson 3 was present, and this run established no reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. +- Next ordered dossier rotation: `121`–`140`. + +### Previous scheduled rotation — 2026-08-24 10:16 UTC + +- Followed the user-designated durable ordered cursor and completed clients `101`–`120`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the sequence. +- Reopened all `72` distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP `200` content. Ran `52` exact CPVA client/system searches and `52` contractor/procurement query ladders; broad CPVA token matches and search-engine output remained discovery only. +- Repeated both CVP IS discovery routes. Basic search retained `51` exact-authority rows and five broad candidates. Organization-first discovery reviewed `17` strict identity-matched current/variant profiles across `16` clients, preserved both Vilniaus teatras „Lėlė“ profiles, excluded the near-name collision for client `117`, and parsed all `124` published-notice rows with `23` broad candidates. Clients without a strict portal profile match were not forced to near-name records. +- Re-downloaded and text-extracted all `13` currently cited CVP IS PDFs (`52` pages; `86,409` extracted characters), confirming five tender notices and eight award notices. The `12` cited resources exposed `33` public detail-route bodies and three login redirects; no claim was based on an inaccessible body. +- One defensible evidence update was published for client `112`: an opened four-page official CVP IS open-tender notice published `2026-07-20` establishes planned procurement of Klaipėda regional career-centre interactive premises, including an interactive opportunities room, consultation and individual-work areas, and video monitors. It remains classified strictly as intended procurement; no selected supplier, signed contract, delivery, production use, hosting or release was inferred. The other nineteen clients produced conservative no-new-claim outcomes. All twenty dossier and matching index dates advanced to `2026-08-24` without status promotion. +- Registry state is now `290` clients, `525` canonical systems, `750` observations and `111` contractor cards; Client→contractor and System→contractor links remain complete at `213` each. Statuses remain `79 researched`, `196 partial`, `15 no-public-evidence` and `0 pending`. +- All `16` tests, `corepack pnpm validate`, `corepack pnpm build`, TypeScript, registry/generated-route/raw-artifact checks, assigned six-column/date checks and `git diff --check` passed. Browser-equivalent local HTTP readback verified client `112`, the new canonical system page, the Systems directory and client `112`'s raw artifact. Chrome could not be launched in this runtime. +- Documentation commit `810c2f5dfbb7230827d2a9d4bb4c2f53f897749a` is on `main`; local/remote ref equality and authenticated exact-SHA source readback passed. Exact-head Gitea Actions task `1344`, run `110` (`build`), reached `success`, including Pages publication. Public Pages returned the expected OAuth `302`; authorized deployed page-body readback was unavailable because this runtime has no `/gondor-v1-gitea-pages` mount, `microk8s`, or `kubectl` service-proxy client. +- The latest live Discord messages contain no instructor guidance newer than CVP IS lesson 3. This run established no new reusable portal mechanic or pitfall, so the authoritative `vssa-clients` skill required no update. Unrelated `.pptx_improve_run/` and `pptx_improvement_run_20260814/` remained unmodified. +- Next ordered dossier rotation: `121`–`140`. + +### Previous scheduled rotation — 2026-08-23 12:13 UTC - Followed the durable ordered cursor and completed clients `121`–`140`; the extra `001`–`020` rerun at `d62f4fde19e19209af94d49fdb5cda3c4dc1bade` did not reset or repeat the sequence. - Reopened all `70` distinct current dossier evidence URLs with browser-equivalent requests and inspected HTTP `200` content. Ran `40` exact CPVA client/system searches and `40` contractor/procurement query ladders; broad CPVA token matches and search-engine output remained discovery only. diff --git a/meta/sync-log.md b/meta/sync-log.md index c2567f6..35a8789 100644 --- a/meta/sync-log.md +++ b/meta/sync-log.md @@ -1,5 +1,40 @@ # Sync Log +### Run #133 — 2026-08-25 03:02 UTC ✅ +- **Channels scanned:** 26/26 authoritative monitored channels (all accessible; the last 50 messages, or complete shorter history, were fetched from each; no channel-fetch failures). +- **New human activity since Run #132 (2026-08-23 11:45 UTC):** None — all 26 monitored channels were quiet. +- **Durable knowledge captured:** None; no per-channel, topic/action-plan, `MEMORY.md`, or inventory edit was warranted. The standing constraint remains unchanged: there is no ŽŪM AWS environment. +- **Processed anchors (latest known human message per channel):** + - `#atea-storm` → `1532359647435165829` (2026-07-30 12:10 UTC) + - `#general` → `1540036980283408424` (2026-08-20 16:37 UTC; Wave sticker only) + - `#zeta-functions` → `1531221244530397214` (2026-07-27 08:46 UTC) + - `#network-v1` → `1529573612510511214` (2026-07-22 19:39 UTC) + - `#vssa-storm-1st-contract` → `1532462731142103040` (2026-07-30 18:59 UTC) + - `#dpvp-phase-2-opportunity` → `1532001823597264957` (2026-07-29 12:28 UTC) + - `#vssa-storm` → `1539935625673965638` (2026-08-20 09:54 UTC; latest-presentation retrieval request) + - `#vssa-dpvp-storm` → `1531567826039734333` (2026-07-28 07:43 UTC) + - `#vssa-dpvp-cvpa-audit` → `1533830589722132510` (2026-08-03 13:35 UTC) + - `#cogarch-model-v1-storm` → `1528684615898759258` (2026-07-20 08:46 UTC) + - `#cogarch-storm` → `1532481752365273090` (2026-07-30 20:15 UTC) + - `#cogarch-storm-skills` → `1529471826697392228` (2026-07-22 12:54 UTC) + - `#cogarch-storm-drawio-custom-shapes` → `1531292165874126998` (2026-07-27 13:28 UTC) + - `#cogarch-storm-cogarch-hub-web` → no human-message anchor (empty history) + - `#playground-eduard-melman` → `1536841496366415932` (2026-08-11 20:59 UTC) + - `#lego-as-enterprise-architect-within-vssa` → `1523377235153780836` (2026-07-05 17:17 UTC) + - `#jarvis-jr-test-001` → `1532723701039108117` (2026-07-31 12:16 UTC) + - `#jarvis-jr-enablement-voice` → `1519063294973841571` (2026-06-23 19:35 UTC) + - `#jarvis-jr-general` → `1521626344599851211` (2026-06-30 21:19 UTC) + - `#jarvis-jr-knowledge-wiki` → `1538593425660584066` (2026-08-16 17:00 UTC) + - `#jarvis-jr-truenas` → `1540337931590434816` (2026-08-21 12:33 UTC; repeated availability check; latest substantive message remains `1539151473189978142`) + - `#lego-planner-v1` → `1539600781953466438` (2026-08-19 11:43 UTC) + - `#vssa-account-strategy` → `1524753167483408526` (2026-07-09 12:24 UTC) + - `#jarvis-jr-v1-hermes-setup` → `1536529995176878242` (2026-08-11 00:21 UTC) + - `#jarvis-jr-v1-hermes` → `1531933519285063771` (2026-07-29 07:56 UTC) + - `#skic-v1-playground` → `1536839098277437601` (2026-08-11 20:49 UTC) +- **Files updated:** `sync-log.md` only for this scan; no per-channel, topic/action-plan, `MEMORY.md`, or inventory edit was warranted. +- **Inventory:** unchanged at 44 text channels, 2 voice channels and 14 categories. The authoritative 26-channel list remains synchronized with `MONITORED_CHANNELS`; all 26 monitored wiki files are present, and `discord/README.md` remains aligned with the 18 additional unmonitored live text channels. +- **Context refresh and Gitea push:** executed after this log update; real results reported in the delivered run summary. + ### Run #132 — 2026-08-23 11:45 UTC ✅ - **Channels scanned:** 26/26 authoritative monitored channels (all accessible; the last 50 messages, or complete shorter history, were fetched from each; no channel-fetch failures). - **New human activity since Run #131 (2026-08-21 03:06 UTC):** 1 message in `#jarvis-jr-truenas` at 2026-08-21 12:33 UTC (a repeated “Alive?” availability check); no new human activity in the other 25 channels.