feat: require Scope issue status matrix
This commit was merged in pull request #4.
This commit is contained in:
@@ -1,7 +1,7 @@
|
|||||||
---
|
---
|
||||||
name: corp-v1-channel-scope
|
name: corp-v1-channel-scope
|
||||||
description: "Use when operating or synchronizing a Corp v1 project's Scope channel. Owns Roadmap, Epics, Features, and Ideas; correlates all six same-project channels; proactively improves evidence-based product scope; and records human approval before work enters Architecture solution design."
|
description: "Use when operating or synchronizing a Corp v1 project's Scope channel. Owns Roadmap, Epics, Features, and Ideas; correlates all six same-project channels; proactively improves evidence-based product scope; and records human approval before work enters Architecture solution design."
|
||||||
version: 1.2.1
|
version: 1.3.0
|
||||||
author: Hermes Agent
|
author: Hermes Agent
|
||||||
license: MIT
|
license: MIT
|
||||||
metadata:
|
metadata:
|
||||||
@@ -61,6 +61,7 @@ Record approver identity, decision evidence, date, resulting status, and conditi
|
|||||||
|
|
||||||
```text
|
```text
|
||||||
Roadmap
|
Roadmap
|
||||||
|
Issue Status Matrix
|
||||||
Epics
|
Epics
|
||||||
<CODE>-EP-1
|
<CODE>-EP-1
|
||||||
<CODE>-FT-1
|
<CODE>-FT-1
|
||||||
@@ -74,6 +75,22 @@ Ideas
|
|||||||
|
|
||||||
Show verified current state and predicted plans at Epic and Feature level. Distinguish approved/current facts from forecasts and proposals. Include sequence or horizon, status, dependencies, material blockers, owner, and last evidence/update date.
|
Show verified current state and predicted plans at Epic and Feature level. Distinguish approved/current facts from forecasts and proposals. Include sequence or horizon, status, dependencies, material blockers, owner, and last evidence/update date.
|
||||||
|
|
||||||
|
### Issue Status Matrix
|
||||||
|
|
||||||
|
Maintain a dedicated **Issue Status Matrix** page directly after Roadmap in the Scope sidebar. It is the complete operational index for every governed Idea, Epic, Feature, and Task; it is not a manually curated subset and does not replace the detailed records.
|
||||||
|
|
||||||
|
Generate the matrix from the same validated canonical data and status selector used by Roadmap and Board views. Include every item, including `DONE` and `CANCELLED`, with at least:
|
||||||
|
|
||||||
|
```text
|
||||||
|
ID | type | title | direct parent/resulting scope | delivery status | EXACT/DERIVED | blocked flag/reason | owner | approval gates | required children | dependencies | release/deployment evidence | last evidenced transition | canonical record link
|
||||||
|
```
|
||||||
|
|
||||||
|
Provide type/status totals and filters, but preserve a semantic table that contains the complete unfiltered matrix for search, print, accessibility, and no-JavaScript use. Sort deterministically by hierarchy and stable ID. Link every row to its canonical record and link every relationship to the resolved target record.
|
||||||
|
|
||||||
|
Fail validation when any canonical item is absent or duplicated; a required relationship is dangling, one-sided, or double-counted; a status is invalid for the item type; `status_source` is missing or wrong; a derived status disagrees with the unified roll-up algorithm; a blocked item lacks a reason; or a transition/evidence link is not durable. The page must expose stale or contradictory states rather than silently filtering them out.
|
||||||
|
|
||||||
|
Any canonical status, relationship, gate, owner, blocker, or evidence change must update the Issue Status Matrix in the same reviewed change. Acceptance requires selector/table count parity, type/status total parity, link validation, keyboard and screen-reader access, strict production build, browser console/network health, and remote exact-head readback.
|
||||||
|
|
||||||
### Epics and Features
|
### Epics and Features
|
||||||
|
|
||||||
Use stable project-scoped IDs:
|
Use stable project-scoped IDs:
|
||||||
|
|||||||
Reference in New Issue
Block a user