refactor: implement concrete Delivery responsibility dispositions

This commit is contained in:
jarvis-at-skic committed 2026-10-23 08:11:40 +00:00
1 parent cb6b41f1a5
commit 1bff2cefab
23 files changed
+231 -717

No files matched your search

+3 -19
View File
@@ -1,21 +1,5 @@
# the adopted project Delivery Pitfalls
# Delivery exception checks
Load this reference when a gate fails, when work resumes after interruption, or before reporting a blocker, CI result, merge, or completion.
On failed gates or resumption, load [Task gates](task-delivery-gates.md) and [planning reconciliation](planning-artifact-reconciliation.md) to verify original admission, current claim and visibility; merged planning text is not implementation approval.
Before execution, load [runtime-and-ci.md](runtime-and-ci.md#execution-context-toolchain-preflight) for exact-context preflight. Before claims, load `development-gates` and `development-integrity`, then [status-and-reporting.md](status-and-reporting.md) and [planning-artifact-reconciliation.md](planning-artifact-reconciliation.md) for project formatting, semantic reconciliation and duplicate suppression.
## Common Pitfalls
1. Patching symptoms before understanding root cause.
2. Changing requirements or architecture implicitly through code.
3. Editing without loading applicable project engineering skills.
4. Skipping tests for behavioral fixes.
5. Updating documentation with aspirational rather than actual practice.
6. Inspecting another project.
7. Starting implementation because requirements exist but human implementation approval is absent.
8. Ignoring architecture task dependencies, the Task's `READY_FOR_DELIVERY` handoff, or target-version allocation.
9. Posting passive status when safe implementation, testing, diagnosis, or documentation work is available.
10. Treating a human-merged planning or Architecture documentation PR as implementation approval.
11. Treating an ideation-board entry, generated presentation, or broad approval as equivalent to an exact Task `READY_FOR_DELIVERY` transition—or requiring a second admission after that verified transition.
12. Editing in a local-only worktree or on a differently named local branch before the exact remote branch and PR head are visible and verified.
13. Stopping at a repairable gate failure, abandoning the active Task, or starting another Task instead of fixing forward and rerunning the gate until it passes.
Load `ci-runtime-skic` before command/repair work, `delivery-docs` before recording operational practice, and `status-reporting-skic` before blocker or completion wording. These owners carry their topic pitfalls once; do not repeat them here.