4.7 KiB
Strategy horizons — correction evidence matrix
Authority: user message 1557813737941901572 in Eldorado storm-v1. This correction restores the agreed long-term destination; it does not authorize autonomous execution. Original PDF read in full: Format, Context, all four questions and assumptions instruction; its existing SHA-256 remains in assignment-evidence.json.
| Horizon / reader destination | Origin and preservation | Result / boundary | Verification |
|---|---|---|---|
Target /strategy/target-operating-model/ |
Meaningful Target body restored from pre-PR38 88a43757762114a506f57ed4b44484306cae1aaa; original desktop/mobile strategy-target JSON unchanged |
Human-directed/guided/reviewed autonomous SDLC is the long-term vision, not merely a competing optional destination. Eight lifecycle phases, central agent with eight governance spokes, eight outside human-controlled AI Agents; no fixed timing or present permission | sdlc-cycle, target-midpoints, assignment tests; real inline/fullscreen and complete light/dark exports |
Roadmap /strategy/roadmap/ |
Original three-level body and six paired workflow JSON files restored from the same historical revision, then reconciled with intervention choice and new links | Skills/practices adoption → controlled autonomous capabilities; Delivery first, remaining phase order undecided, Delivery keeps improving. Evidence and separate human authority, not automatic graduation | roadmap, roadmap-viewer, browser roadmap-timeline |
6 Months Target /strategy/six-months-target/ |
PR38 assignment narrative moved out of Target, including the entire assumptions register and credible outcome conditions | PDF facts: close to80 engineers growing toward100, more than10 teams, everyone already using AI unevenly; solo CTO-reporting architect with no formal team authority. Actual stack/reporting/capacity unknown. First six months contribute toward—not replace—the destination | assignment-evidence.json maps all four PDF answers, format and assumptions to actual pages |
6 Months Roadmap /strategy/six-months-roadmap/ |
PR38 month1–6 action plan, influence/capacity and full EXP-01 packet preserved here as the single plan | One active pilot; independent checks; explicit effort limits, recovery, inconclusive extension and stop. EXP-01 remains fictional. No benefits, approvals or organization-wide rollout fabricated | Assignment markers; exact EXP-01 packet preservation; first-revision tests; browser six-month diagram controls and exports |
Beyond 6 Months /strategy/stage-02-autonomous-agent/ |
Existing useful autonomy-stage content and diagram retained | Connect evidence-led next investments toward long-term vision; authority expands only through a separate case, scoped credentials, independent checks, stop/takeover and reopening on boundary changes | Connected-strategy tests and actual reader handoffs |
| Nested lifecycle and references | Stage01 URL retained as concise lifecycle reference beneath 6 Months Roadmap. All6 topic routes,16 metric contracts and2 shared reference pages remain reachable | No second competing monthly plan. First-revision N/A comparator, clean current-practice recovery, qualification-versus-pilot distinction retained. Contract bodies remain byte-identical;9 prototype calculations and7 unimplemented metrics remain explicitly classified | 30-route manifest with original metric hashes;44-doc resolved sidebar/link/anchor checks |
| Presentation integration | Published PR40 merge 432370473d6aaee229b0279551ce7b63da52acb7 merged into isolated branch, including320px toolbar correction |
19slides,35-minute content +15-minute Q&A unchanged. Focused source-link and Beyond wording changes only; references now name all five horizons. Homepage and toolbar Strategy still open long-term Target | Generated slide-source map, exact source hashes and presentation browser suite; inspect changed slides16/19 individually |
No Organization body, runtime vendor or dependency changes are introduced relative to integrated PR40 main. Independent child reviewer owns merge/publication and durable wiki reconciliation. Local candidate evidence is not publication evidence.
Verification environment and limits
Use the prefix-correct static server for full acceptance. Docusaurus serve on the installed Node runtime redirects WOFF2 assets to slash-suffixed paths; the regular static server serves the same built font bytes correctly. Chromium executable is selected explicitly from the installed headless build. This is desktop/mobile viewport verification, not Safari/Firefox or physical-device certification. WebM remains unsupported/disabled in this browser; SVG/PNG/JPEG/WebP controls are verified. Existing dependency audit findings are not remediated or accepted by this content change.