feat: art-direct five Skills Adoption stories #33

Merged
jarvis-at-skic merged 1 commits from feat/skills-topic-compositions into main 2026-10-06 15:37:16 -07:00
Owner

Composition, not larger cards

  • Governance: descending staircase, rework and unsafe-version withdrawal.
  • Quality: four evidence streams converge on mandatory gates and pass/rework branches.
  • Adoption: Human + AI Agent relationship, Delivery-first learning loop, accepted work plus feedback before expansion.
  • Measurement: work signals → four actual KPI calculations → interpretation and action.
  • Maintenance: revision cycle with safe-use, retirement and containment branches.

All five topics / ten native editable sources; Stage01 overview remains diagram-free. Target, Roadmap, Stage02, vendor and all page/sidebar reachability preserved. Narrow layouts retain the exact graph; desktop and phone layouts need not share geometry.

Verification

79 tests; typecheck; production build; source/build verification including all18 sidebar docs. Nine existing browser suites plus20 Skills topic/viewport contexts (1440/1024/390/320, light/dark, inline/fullscreen, short-phone scrolling). Independently opened20 actual SVG exports: exact nodes/edges/text, containment and no label occlusion. All10 native final artifacts pass showcase.

Independent complete frozen-diff AND visual review passed after a separate fix agent corrected mobile label occlusion. Reviewed tree a144d47bb9. This is agent visual review, not human aesthetic acceptance. Local before/after contact sheet and screenshot inventory preserved on task t_e19054db.

Unchanged production dependency audit remains non-green:2 critical,2 high,2 moderate; no dependency/security-green claim. Revert this PR to restore the preceding diagrams.

## Composition, not larger cards - Governance: descending staircase, rework and unsafe-version withdrawal. - Quality: four evidence streams converge on mandatory gates and pass/rework branches. - Adoption: Human + AI Agent relationship, Delivery-first learning loop, accepted work plus feedback before expansion. - Measurement: work signals → four actual KPI calculations → interpretation and action. - Maintenance: revision cycle with safe-use, retirement and containment branches. All five topics / ten native editable sources; Stage01 overview remains diagram-free. Target, Roadmap, Stage02, vendor and all page/sidebar reachability preserved. Narrow layouts retain the exact graph; desktop and phone layouts need not share geometry. ## Verification 79 tests; typecheck; production build; source/build verification including all18 sidebar docs. Nine existing browser suites plus20 Skills topic/viewport contexts (1440/1024/390/320, light/dark, inline/fullscreen, short-phone scrolling). Independently opened20 actual SVG exports: exact nodes/edges/text, containment and no label occlusion. All10 native final artifacts pass showcase. Independent complete frozen-diff AND visual review passed after a separate fix agent corrected mobile label occlusion. Reviewed tree a144d47bb93c53c76e016c50f7eece193e7d6ac1. This is agent visual review, not human aesthetic acceptance. Local before/after contact sheet and screenshot inventory preserved on task t_e19054db. Unchanged production dependency audit remains non-green:2 critical,2 high,2 moderate; no dependency/security-green claim. Revert this PR to restore the preceding diagrams.
jarvis-at-skic added 1 commit 2026-10-06 15:36:23 -07:00
feat: [verified] compose Skills Adoption diagrams around their stories
Build and publish Eldorado documentation / build (pull_request) Successful in 40s
a35cade49c
jarvis-at-skic merged commit b9c2047c61 into main 2026-10-06 15:37:16 -07:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: eldorado-v1/documentation#33