docs: redesign Roadmap as a native five-stage workflow #24

Merged
jarvis-at-skic merged 1 commits from docs/roadmap-workflow into main 2026-10-05 12:36:43 -07:00
Owner

Native Archify Workflow v2: Understand today → Prepare foundations → Pilot → Expand → Sustain. One horizontal path on wide desktop, same five stages vertically stacked on narrow/tablet screens. Action, output and exit condition only in each card; detailed assessments/gates and recommended framing preserved below. No Skills Measurement changes. Pinned vendor unchanged; scoped multiline adapter and final composition checks, explicitly identified portal hash receipts.

Verified 54 tests, typecheck, production build, source/build verification. Full browser suite passes (one pre-existing strategy-story keyboard timing retry). Roadmap verified at 1440/390/320 with screenshots and theme sync, presets, SVG export, fullscreen close/Escape/focus, plus 768/1024/1280 geometry regression. Independent review passed all13 files at tree857a90b5133081c5ac351b81ea4cbb574bbeee56 after addressing intermediate-width readability.

Unchanged audit caveat: high http-cache-semantics and braces advisories with no patched versions; moderate uuid dev-server advisory. No dependency changes. Rollback: revert PR.

Native Archify Workflow v2: Understand today → Prepare foundations → Pilot → Expand → Sustain. One horizontal path on wide desktop, same five stages vertically stacked on narrow/tablet screens. Action, output and exit condition only in each card; detailed assessments/gates and recommended framing preserved below. No Skills Measurement changes. Pinned vendor unchanged; scoped multiline adapter and final composition checks, explicitly identified portal hash receipts. Verified 54 tests, typecheck, production build, source/build verification. Full browser suite passes (one pre-existing strategy-story keyboard timing retry). Roadmap verified at 1440/390/320 with screenshots and theme sync, presets, SVG export, fullscreen close/Escape/focus, plus 768/1024/1280 geometry regression. Independent review passed all13 files at tree857a90b5133081c5ac351b81ea4cbb574bbeee56 after addressing intermediate-width readability. Unchanged audit caveat: high http-cache-semantics and braces advisories with no patched versions; moderate uuid dev-server advisory. No dependency changes. Rollback: revert PR.
jarvis-at-skic added 1 commit 2026-10-05 12:35:53 -07:00
docs: redesign Roadmap as a native five-stage workflow
Build and publish Eldorado documentation / build (pull_request) Successful in 39s
e149131307
jarvis-at-skic merged commit 2f68e60cec into main 2026-10-05 12:36:43 -07:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: eldorado-v1/documentation#24