docs: keep successful scope updates outcome-focused

This commit is contained in:
2026-08-30 12:59:28 +00:00
parent 4554b78e20
commit 1916761e47
+4 -2
View File
@@ -1,7 +1,7 @@
--- ---
name: corp-v1-channel-scope name: corp-v1-channel-scope
description: "Use when operating or synchronizing a Corp v1 project's Scope channel. Owns Roadmap, Epics, Features, and Ideas; correlates all seven same-project channels; proactively improves evidence-based product scope; and records human approval before work enters Architecture solution design." description: "Use when operating or synchronizing a Corp v1 project's Scope channel. Owns Roadmap, Epics, Features, and Ideas; correlates all seven same-project channels; proactively improves evidence-based product scope; and records human approval before work enters Architecture solution design."
version: 1.5.4 version: 1.5.5
author: Hermes Agent author: Hermes Agent
license: MIT license: MIT
metadata: metadata:
@@ -278,7 +278,7 @@ Scope supplies UI/UX with stable Feature identity, user problems, value, accepta
7. Load `documentation-docusaurus` and the project CI/CD skill. Run only fast, dependency-free local preflight checks such as schema/parity scripts, targeted tests already available, `git diff --check`, and secret scanning. Do not spend the working session installing dependencies or repeatedly running the full documentation build locally when PR-triggered Gitea Actions can provide the authoritative environment. 7. Load `documentation-docusaurus` and the project CI/CD skill. Run only fast, dependency-free local preflight checks such as schema/parity scripts, targeted tests already available, `git diff --check`, and secret scanning. Do not spend the working session installing dependencies or repeatedly running the full documentation build locally when PR-triggered Gitea Actions can provide the authoritative environment.
8. Push the smallest coherent reviewable branch early and open or refresh its PR. The PR workflow must install dependencies and run the complete canonical-data validation, tests, typecheck, strict production build, and built-site assertions without publishing. Wait for the run attached to the exact pushed SHA; inspect failed job steps and logs, fix only evidenced defects, push, and repeat until that exact head is green. 8. Push the smallest coherent reviewable branch early and open or refresh its PR. The PR workflow must install dependencies and run the complete canonical-data validation, tests, typecheck, strict production build, and built-site assertions without publishing. Wait for the run attached to the exact pushed SHA; inspect failed job steps and logs, fix only evidenced defects, push, and repeat until that exact head is green.
9. Review the exact CI-green head, merge through the repository workflow, then require default-head CI/publication success and deployed remote readback before reporting completion. Never treat a local build, a stale run, or CI for another SHA as acceptance evidence. 9. Review the exact CI-green head, merge through the repository workflow, then require default-head CI/publication success and deployed remote readback before reporting completion. Never treat a local build, a stale run, or CI for another SHA as acceptance evidence.
10. Post a concise Scope update with changed artifacts, implications, human gate, exact PR/head/run evidence, and deployed readback. Whenever the update reports the latest work through a merged documentation PR, include a reader-facing link to the relevant route in the deployed documentation portal; a PR, commit, or Actions URL is not a substitute for the documentation link. Prefer the most specific verified page, and include the portal landing page when several pages changed. If default-head publication or page-body verification is still pending, say so instead of presenting the route as published, then provide the documentation link in the completion follow-up after verification. Stay silent when no substantive result exists. 10. Post a concise Scope update. When verification is successful and the human did not ask for delivery evidence, report only the substantive changes and the reader-facing documentation link; omit routine test, build, CI, audit, PR, run, commit, and SHA details. Internal validation and immutable evidence remain mandatory. Include technical evidence only when requested or when a failure, blocker, or unresolved publication state makes it actionable. Handoff packets retain their explicit evidence contract. Prefer the most specific verified documentation route, and include the portal landing page when several pages changed. If default-head publication or page-body verification is still pending, say so instead of presenting the route as published, then provide the documentation link in the completion follow-up. Stay silent when no substantive result exists.
## Authority and Escalation ## Authority and Escalation
@@ -320,6 +320,7 @@ Requires human approval for:
18. Flattening the reader hierarchy by placing Features directly under an Epic or Tasks outside their owning Feature's `Tasks` group. 18. Flattening the reader hierarchy by placing Features directly under an Epic or Tasks outside their owning Feature's `Tasks` group.
19. Rewriting historic canonical identities, evidence, or append-only hashes solely to adopt `<UPPERCASE_PROJECT_CODE>-TS-<NUMBER>` display IDs. 19. Rewriting historic canonical identities, evidence, or append-only hashes solely to adopt `<UPPERCASE_PROJECT_CODE>-TS-<NUMBER>` display IDs.
20. Reporting a merged documentation PR as the latest work without giving the reader a direct link to the verified documentation portal page. 20. Reporting a merged documentation PR as the latest work without giving the reader a direct link to the verified documentation portal page.
21. Spamming a successful Scope completion with routine CI, test, PR, run, commit, or SHA details when the human asked only for the outcome and documentation link.
## Verification Checklist ## Verification Checklist
@@ -343,5 +344,6 @@ Requires human approval for:
- [ ] Architecture handoff contains value, scope, acceptance outcomes, dependencies, risks, and approval evidence. - [ ] Architecture handoff contains value, scope, acceptance outcomes, dependencies, risks, and approval evidence.
- [ ] Documentation build, links, and remote readback passed. - [ ] Documentation build, links, and remote readback passed.
- [ ] Every latest-work update that reports a merged documentation PR includes the relevant verified documentation portal link. - [ ] Every latest-work update that reports a merged documentation PR includes the relevant verified documentation portal link.
- [ ] A successful unrequested completion report contains only substantive changes and documentation links; technical delivery evidence appears only on request or for an actionable exception.
- [ ] When React Flow is used, its graph and semantic table share one canonical-YAML selector and pass accessibility, build, browser, and remote exact-head checks. - [ ] When React Flow is used, its graph and semantic table share one canonical-YAML selector and pass accessibility, build, browser, and remote exact-head checks.
- [ ] Completed work includes exact message, path, commit, URL, or run evidence. - [ ] Completed work includes exact message, path, commit, URL, or run evidence.